CN204366893U - Change electric energy meter intelligent checking table to plug into the device of probe - Google Patents
Change electric energy meter intelligent checking table to plug into the device of probe Download PDFInfo
- Publication number
- CN204366893U CN204366893U CN201420763568.4U CN201420763568U CN204366893U CN 204366893 U CN204366893 U CN 204366893U CN 201420763568 U CN201420763568 U CN 201420763568U CN 204366893 U CN204366893 U CN 204366893U
- Authority
- CN
- China
- Prior art keywords
- probe
- sleeve
- slewing equipment
- connecting rod
- electric energy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000000523 sample Substances 0.000 title claims abstract description 49
- 238000009434 installation Methods 0.000 abstract description 2
- 241000282376 Panthera tigris Species 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 210000000080 chela (arthropods) Anatomy 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010301 surface-oxidation reaction Methods 0.000 description 1
Landscapes
- Measuring Leads Or Probes (AREA)
Abstract
The utility model discloses a kind of electric energy meter intelligent checking table of changing to plug into the device of probe, comprising: the sleeve that can be sleeved on the root sleeve pipe of probe, the through hole cross section in the middle of sleeve is polygon; Radial fixing locking device is carried out to the probe in sleeve; Be used for the slewing equipment of manually turnbarrel, slewing equipment is fixed on sleeve one end by connecting rod, and the length of connecting rod makes the slewing equipment when sleeve is fixed on the root sleeve pipe of probe at least be positioned at outside probe.Adopt sleeve locking probe root sleeve, and slewing equipment is fixed on outside probe by connecting rod, the interference by both sides probe when slewing equipment rotates, can continuous rotation, thus dismantle and installation probe of plugging into fast very convenient, operating efficiency can significantly improve.
Description
Technical field
The utility model relates to a kind ofly to plug into the device of probe for changing electric energy meter intelligent checking table.
Background technology
Electric energy meter intelligent checking table is a kind of device for verifying intelligent electric energy meter, such as, is exactly so a kind of device disclosed in Chinese patent ZL201020227679.9.Gauge stand is provided with the probe of plugging into that a row is arranged in parallel, and close together between two probes, general interval is less than 0.5cm.Usually bend at probe, spring deficiency, detecting probe surface oxidation etc. affect probe when contacting with electric energy meter, replacing is needed to plug into probe, because probe adopts elastic extension structure, namely front end probe portion is contained in root sleeve pipe by spring housing, sleeve pipe is threaded connection and is fixed on gauge stand, and must pass through rotation root sleeve pipe could unload probe from gauge stand.Because between probe, interval is less, tiger's jaw pincers can only be adopted to clamp sleeve pipe low-angle and little by little clamp, replacing is extremely required great effort time-consuming.
Summary of the invention
Change the problem of inconvenience to solve above-mentioned electric energy meter intelligent checking table probe of plugging into, the utility model provides a kind of electric energy meter intelligent checking table of changing and to plug into the device of probe, can change probe of plugging into quickly and easily, increase work efficiency.
The utility model have employed following technical scheme, comprising: the sleeve that can be sleeved on the root sleeve pipe of probe, and the through hole cross section in the middle of sleeve is polygon; Radial fixing locking device is carried out to the probe in sleeve; Be used for the slewing equipment of manually turnbarrel, slewing equipment is fixed on sleeve one end by connecting rod, and the length of connecting rod makes the slewing equipment when sleeve is fixed on the root sleeve pipe of probe at least be positioned at outside probe.
Further, locking device is clamping screw, sleeve lateral wall has screw that coordinate with clamping screw, that lead to sleeve intermediate throughholes.
Preferably, slewing equipment is rotation hand wheel, has the connecting rod that comprise several parallel is arranged between sleeve ends and rotation hand wheel.
The beneficial effects of the utility model are: adopt sleeve locking probe root sleeve, and slewing equipment is fixed on outside probe by connecting rod, interference not by both sides probe when slewing equipment rotates, can continuous rotation, thus dismantle and installation probe of plugging into fast very convenient, operating efficiency can significantly improve.In addition, adopt the root sleeve of bolt-locking probe, easy to operate.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation.
Fig. 2 is the left view of Fig. 1.
In figure, the implication of label symbol is as follows:
1-sleeve, 11-through hole
2-clamping screw
3-connecting rod
4-rotation hand wheel
5-probe 51-sleeve pipe
Detailed description of the invention
Below in conjunction with accompanying drawing, the technical scheme in the utility model embodiment is clearly and completely described.Obviously, described embodiment is only the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all belong to the scope of the utility model protection.
As shown in Figure 1, 2, sleeve 1 cross section is triangular in shape, and through hole 11 cross section in the middle of sleeve 1 is triangular in shape, and the root sleeve pipe 51 of probe 5 can be sleeved in through hole 11.
Carrying out radial fixing locking device to the probe in sleeve 1 is clamping screw 2, sleeve 1 sidewall has screw that coordinate with clamping screw 2, that lead to sleeve 1 intermediate throughholes 11.The sleeve pipe 51 of probe can be locked on through hole 11 inwall of sleeve by rotational lock bolt 2.
Slewing equipment adopts rotation hand wheel 4, and have the connecting rod 3 that comprise several parallel is arranged between sleeve 1 end and rotation hand wheel 4, connecting rod 3 preferably has three and is evenly distributed on the end of sleeve 1.The length of connecting rod 3 makes the slewing equipment when sleeve 1 is fixed on the root sleeve pipe 51 of probe at least be positioned at outside probe 5.
During dismounting, first by sleeve 1 by being inserted in outside probe 5 and being advanced to the position of its root sleeve pipe 51, then rotational lock bolt 2, is locked sleeve pipe 51 on the inwall of sleeve intermediate throughholes 11, then rotates handwheel 4 by hand, can pull down probe 5.
It is to be noted: other polygon also can be arranged in the through hole cross section of above-mentioned sleeve, and slewing equipment also can adopt other can extend the form of the radius of gyration, is such as vertically connected in the revoliving arm of interlinking lever end.
Claims (3)
1. change electric energy meter intelligent checking table to plug into the device of probe, it is characterized in that comprising: the sleeve (1) that can be sleeved on the root sleeve pipe (51) of probe (5), through hole (11) cross section in the middle of sleeve (1) is polygon; Radial fixing locking device is carried out to the probe in sleeve (1); Be used for the slewing equipment of manually turnbarrel (1), slewing equipment is fixed on sleeve (1) one end by connecting rod (3), and the length of connecting rod (3) makes the slewing equipment when sleeve (1) is fixed on root sleeve pipe (51) of probe at least be positioned at probe (5) outside.
2. replacing electric energy meter intelligent checking table according to claim 1 is plugged into the device of probe, it is characterized in that: locking device is clamping screw (2), sleeve (1) sidewall has screw that coordinate with clamping screw (2), that lead to sleeve intermediate throughholes (11).
3. replacing electric energy meter intelligent checking table according to claim 1 and 2 is plugged into the device of probe, it is characterized in that: slewing equipment is rotation hand wheel (4), the connecting rod (3) having comprise several parallel to arrange between sleeve (1) end and rotation hand wheel (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420763568.4U CN204366893U (en) | 2014-12-05 | 2014-12-05 | Change electric energy meter intelligent checking table to plug into the device of probe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420763568.4U CN204366893U (en) | 2014-12-05 | 2014-12-05 | Change electric energy meter intelligent checking table to plug into the device of probe |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204366893U true CN204366893U (en) | 2015-06-03 |
Family
ID=53323141
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420763568.4U Expired - Fee Related CN204366893U (en) | 2014-12-05 | 2014-12-05 | Change electric energy meter intelligent checking table to plug into the device of probe |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204366893U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105071178A (en) * | 2015-08-12 | 2015-11-18 | 国家电网公司 | Electric meter position wiring terminal changing device of electric meter intelligent verification table |
CN106291006A (en) * | 2016-07-27 | 2017-01-04 | 京东方科技集团股份有限公司 | A kind of probe more changing device and replacing options thereof and test equipment |
CN107971964A (en) * | 2017-11-20 | 2018-05-01 | 德淮半导体有限公司 | It is a kind of to be used to the instrument of probe be installed and operate the method for the instrument |
CN108872708A (en) * | 2018-06-13 | 2018-11-23 | 阜南县特立电子有限公司 | A kind of phone vibrator wiring board impedance analyzer improving structure |
-
2014
- 2014-12-05 CN CN201420763568.4U patent/CN204366893U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105071178A (en) * | 2015-08-12 | 2015-11-18 | 国家电网公司 | Electric meter position wiring terminal changing device of electric meter intelligent verification table |
CN105071178B (en) * | 2015-08-12 | 2017-05-31 | 国家电网公司 | Change the device of electric energy meter intelligent checking table epitope binding post |
CN106291006A (en) * | 2016-07-27 | 2017-01-04 | 京东方科技集团股份有限公司 | A kind of probe more changing device and replacing options thereof and test equipment |
CN106291006B (en) * | 2016-07-27 | 2019-01-22 | 京东方科技集团股份有限公司 | A kind of probe more changing device and its replacing options and test equipment |
CN107971964A (en) * | 2017-11-20 | 2018-05-01 | 德淮半导体有限公司 | It is a kind of to be used to the instrument of probe be installed and operate the method for the instrument |
CN108872708A (en) * | 2018-06-13 | 2018-11-23 | 阜南县特立电子有限公司 | A kind of phone vibrator wiring board impedance analyzer improving structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204366893U (en) | Change electric energy meter intelligent checking table to plug into the device of probe | |
CN201689109U (en) | Multifunctional universal power detecting pincers | |
CN204441617U (en) | A kind of regulation and control self-locking ground detection device | |
CN203983842U (en) | Repair apparatus hangs eminence grounding wire device | |
CN204011790U (en) | Repair apparatus hangs the binding clip of eminence grounding wire device | |
CN202668492U (en) | Installing and dismounting tool of impeller locking device for pump | |
CN202025861U (en) | C-shaped wire clamp | |
CN203895727U (en) | Multipurpose fast and portable ground wire | |
CN204947300U (en) | Change the device of electric energy meter intelligent checking table epi-position binding post | |
CN203445264U (en) | Low voltage grounding wire device for compact electrical structure | |
CN203285795U (en) | Clamp of Christmas tree | |
CN204344588U (en) | A kind of fastening rope type medical clamp tool | |
CN204068049U (en) | A kind of charged for replacement 220kV linear string bunch of insulator cross-arm jig | |
CN204116533U (en) | A kind of local discharge on-line monitoring device with extension type buckle | |
CN105071178A (en) | Electric meter position wiring terminal changing device of electric meter intelligent verification table | |
CN203471629U (en) | Clamp | |
CN202534972U (en) | Over-current clamping device | |
CN204658312U (en) | A kind of automobile interior exterior decorations part buckle is done over again dismounting aid | |
CN201993385U (en) | Connecting device for electric energy meter detection and electric energy meter detection system | |
CN203150508U (en) | Special operation rod of drop-type fuse | |
CN204958014U (en) | Earth connection is around putting frame | |
CN202930574U (en) | Grounding rod of overhead transmission line | |
CN203895802U (en) | Special maintenance sleeve plate used for moving contact of isolation switch | |
CN203665409U (en) | Novel screwdriver bit | |
CN215201533U (en) | Electrician uses novel clamp |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150603 Termination date: 20211205 |
|
CF01 | Termination of patent right due to non-payment of annual fee |