CN201993385U - Connecting device for electric energy meter detection and electric energy meter detection system - Google Patents

Connecting device for electric energy meter detection and electric energy meter detection system Download PDF

Info

Publication number
CN201993385U
CN201993385U CN 201020662936 CN201020662936U CN201993385U CN 201993385 U CN201993385 U CN 201993385U CN 201020662936 CN201020662936 CN 201020662936 CN 201020662936 U CN201020662936 U CN 201020662936U CN 201993385 U CN201993385 U CN 201993385U
Authority
CN
China
Prior art keywords
electric energy
energy meter
keeper
connecting rod
guide rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201020662936
Other languages
Chinese (zh)
Inventor
贺民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Electric Power Bureau
Original Assignee
Ningbo Electric Power Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Electric Power Bureau filed Critical Ningbo Electric Power Bureau
Priority to CN 201020662936 priority Critical patent/CN201993385U/en
Application granted granted Critical
Publication of CN201993385U publication Critical patent/CN201993385U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

The embodiment of the utility model discloses a connecting device for electric energy meter detection. The device includes a base plate, a fixing part arranged on one end of the base plate, a clamping part connected with the other end of the base plate and used to fix an electric energy meter, a left connecting rod and a right connecting rod hinged on the two sides of the fixing part respectively, a left guide rail connected with the left connecting rod, a right guide rail connected with the right connecting rod, a first locating piece, a second locating piece, a third locating piece, a forth locating piece, a fifth locating piece, a sixth locating piece, a probe pedestal, probes arranged in the probe pedestal and pluggable into a voltage terminal interface and an auxiliary terminal interface. The connecting device for electric energy meter detection disclosed by the utility model can insert the probes into corresponding interfaces of the electric energy meter by rotating the left guide rail or the right guide rail, thus establishing an electrical connection between the electric energy meter and a testing device, and can detect the voltage of the electric energy meter and the function of an auxiliary terminal by the testing device. The whole operation is simple and convenient, so the detecting efficiency of the electric energy meter is improved. The utility model also discloses an electric energy meter detection system.

Description

A kind of electric energy meter detects docking apparatus and electric energy meter detection system
Technical field
The utility model relates to the power technology field, in particular, relates to a kind of electric energy meter and detects docking apparatus and have the electric energy meter detection system of this device.
Background technology
Along with China's rapid economy development, all trades and professions are increasing to the demand of electric power, are used to measure the instrument of various electrical quantities, and promptly electric energy meter (load or negative control terminal equipment) is also used widely.In the long-term use of electric energy meter (load or negative control terminal equipment),, equally also need electric energy meter (load or negative control terminal equipment) is detected for the use that guarantees electric energy meter (load or negative control terminal equipment) is normal.
At present in the process that electric energy meter (load or negative control terminal equipment) is detected, adopt every road signal (voltage and current) port to connect by the manual screw of a conducting medium earlier, utilize the crocodile clip that is communicated with the wire end of testing tool to clamp conducting medium again, set up being electrically connected between electric energy meter (load or negative control terminal equipment) and the testing tool with this, realize detecting.When needs detect another electric energy meter (load or negative control terminal equipment), repeat the aforesaid operations process.
When adopting prior art to carry out the detection of electric energy meter (load or negative control terminal equipment), electric energy meter of every detection (load or negative control terminal equipment) all needs to carry out once above-mentioned testing process, and this testing process complicated operation, detection efficiency when practical operation is very low.Especially the electric energy meter that detects at needs more for a long time, above-mentioned shortcoming is obvious all the more.
The utility model content
In view of this, the electric energy meter detection system that the purpose of this utility model is to provide a kind of electric energy meter to detect docking apparatus and have this device, can detect the voltage and the auxiliary terminal function of electric energy meter fast, solve the low problem of complicated operation, detection efficiency that prior art exists.
For achieving the above object, the utility model provides following technical scheme:
A kind of electric energy meter detects docking apparatus, and described electric energy meter comprises voltage terminal interface and auxiliary terminal interface, comprising:
Place the base plate of electric energy meter;
Be arranged at the fixed part of described base plate one end;
Be connected in the described base plate other end, can fix the clamping part of described electric energy meter;
Be articulated in the left connecting rod and the right connecting rod of described fixed part both sides respectively;
The left rail that is connected with described left connecting rod;
The right guide rail that is connected with described right connecting rod;
Be arranged at first keeper, second keeper and the 3rd keeper on the described left rail;
Be arranged at the 4th keeper, the 5th keeper and the 6th keeper on the described right guide rail;
Be connected between described first keeper and the 4th keeper, the probe base between second keeper and the 5th keeper, between the 3rd keeper and the 6th keeper;
Be arranged at described probe base, can insert the probe of described voltage terminal interface and auxiliary terminal interface;
The structural symmetry of described left connecting rod and described right connecting rod, the structural symmetry of described left rail and described right guide rail.
Preferably, detect in the docking apparatus at above-mentioned electric energy meter, described probe base is provided with a plurality of jacks, and described probe can be arranged at arbitrary jack, and by securing member with described probe base and described probe stationary.
Preferably, detect in the docking apparatus at above-mentioned electric energy meter, described first keeper, second keeper and the 3rd keeper are provided with the groove adaptive with described left rail, can be fixed in described left rail by securing member; Described the 4th keeper, the 5th keeper and the 6th keeper are provided with and the adaptive groove of described right guide rail, can be fixed in described right guide rail by securing member.
Preferably, detect in the docking apparatus at above-mentioned electric energy meter, described base plate is provided with a plurality of mounting holes, and described clamping part can be fixed in described a plurality of mounting hole any one by securing member.
Preferably, detect in the docking apparatus, further comprise the auxiliary guide rail that connects described left rail and right guide rail at above-mentioned electric energy meter.
Preferably, detect in the docking apparatus, further comprise the operating grip that is connected with described left connecting rod or described right connecting rod at above-mentioned electric energy meter.
A kind of electric energy meter detection system comprises that aforesaid electric energy meter detects docking apparatus, and detects the testing tool that the probe afterbody in the docking apparatus is connected by lead with described electric energy meter.
This shows, utilizing the disclosed electric energy meter of the utility model to detect docking apparatus detects electric energy meter, only electric energy meter need be put on the base plate of electric energy meter detection docking apparatus, by fixed part and clamping part electric energy meter is fixed, because the tail end of probe is connected to testing tool by lead, after rotation left connecting rod or right connecting rod insert probe the voltage terminal interface and auxiliary terminal interface of electric energy meter, can set up the voltage terminal of electric energy meter and being electrically connected of auxiliary terminal and testing tool, utilize testing tool can the voltage and the auxiliary terminal function of electric energy meter be detected, whole operation is easy, has improved the detection efficiency of electric energy meter.
Description of drawings
In order to be illustrated more clearly in the utility model embodiment, to do simple introduction to the accompanying drawing of required use among the embodiment below, apparently, accompanying drawing in describing below only is embodiment more of the present utility model, for those of ordinary skills, under the prerequisite of not paying creative work, can also obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the front view that the disclosed a kind of electric energy meter of the utility model detects docking apparatus;
Fig. 2 is the side view that electric energy meter shown in Figure 1 detects docking apparatus;
Fig. 3 is the front view that the disclosed another kind of electric energy meter of the utility model detects docking apparatus.
Embodiment
Below in conjunction with the accompanying drawing among the utility model embodiment, the technical scheme among the utility model embodiment is clearly and completely described, obviously, described embodiment only is the utility model part embodiment, rather than whole embodiment.Based on the embodiment in the utility model, those of ordinary skills are not making under the creative work prerequisite, and the every other embodiment that is obtained belongs to the utility model protection domain.
The utility model discloses a kind of electric energy meter and detect docking apparatus, can detect the voltage and the auxiliary terminal function of electric energy meter fast, solve the low problem of complicated operation, detection efficiency that prior art exists.
Referring to Fig. 1 and Fig. 2, Fig. 1 is the front view that the disclosed a kind of electric energy meter of the utility model detects docking apparatus, and Fig. 2 is the side view that electric energy meter shown in Figure 1 detects docking apparatus.
This device comprises: base plate 1, fixed part 2, clamping part 3, left connecting rod 4, right connecting rod 5, left rail 6, right guide rail 7, first keeper 8, second keeper 9, the 3rd keeper 10, the 4th keeper 11, the 5th keeper 12, the 6th keeper 13, probe base 14 and probe 15.
Base plate 1 is used to place electric energy meter.
Fixed part 2 is arranged at an end of base plate 1, and in force, fixed part 2 can be catch or block.
Clamping part 3 is arranged at the other end of base plate 1, be placed on electric energy meter 16 on the base plate 1 after, can stationary electric table 16 by the acting in conjunction of clamping part 3 and fixed part 2.
Left side connecting rod 4 and right connecting rod 5 are articulated in the both sides of fixed part 2 respectively, and the structural symmetry of left connecting rod 4 and right connecting rod 5.
Left rail 6 is connected with left connecting rod 4, and right guide rail 7 is connected with right connecting rod 5, and the structural symmetry of left rail 6 and right guide rail 7.
First keeper 8, second keeper 9 and the 3rd keeper 10 are arranged on the left rail 6, and the 4th keeper 11, the 5th keeper 12 and the 6th keeper 13 are arranged on the right guide rail 7.
Between first keeper 8 and the 4th keeper 11, between second keeper 9 and the 5th keeper 12, be connected with probe base 14 respectively between the 3rd keeper 10 and the 6th keeper 13.
Probe 15 is arranged on the probe base 14, and in left connecting rod 4 and right connecting rod 5 rotary courses, probe 15 can insert the voltage terminal interface and the auxiliary terminal interface of electric energy meter 16.
The course of work to the disclosed electric energy meter detection of the utility model docking apparatus describes below.
In the time of will detecting the voltage of electric energy meter 16 and auxiliary terminal function, electric energy meter 16 is positioned on the base plate 1, and the lower end that guarantees electric energy meter 16 contacts with fixed part 2, the duty of clamping part 3 or adjustment clamping part 3 is installed, acting in conjunction stationary electric table 16 by fixed part 2 and clamping part 3, afterwards by left connecting rod 4 of rotation and right connecting rod 5, probe 15 is inserted in the voltage terminal interface and auxiliary terminal interface of electric energy meter 16, the afterbody of probe 15 is connected to the testing tool (not shown) by the lead (not shown), and can detect this moment to the voltage and the auxiliary terminal function of electric energy meter.
After the voltage of electric energy meter 16 and auxiliary terminal Function detection are finished, electric energy meter 16 to be detected the docking apparatus from electric energy meter and take apart, at first direction is rotated left connecting rod 4 and right connecting rod 5, probe 15 is deviate from from the voltage terminal interface of electric energy meter 16 and auxiliary terminal interface, dismantle the duty of clamping part 3 or adjustment clamping part 3 afterwards, discharge the state that electric energy meter 16 is fixed, electric energy meter 16 is taken out.
It is to be noted, the position that is provided with according to voltage end sub-interface and auxiliary terminal interface on the existing electric energy meter 16, be connected in probe on the probe base 14 between first keeper 8 and the 4th keeper 11 and be used to insert the auxiliary terminal interface of electric energy meter 16, be connected in the probe on the probe base 14 between second keeper 9 and the 5th keeper 12 and be connected in the 3rd keeper 10 and the 6th keeper 13 between probe base 14 on probe be used to insert the voltage terminal interface of electric energy meter 16.
In force, the implementation of clamping part 3 has multiple.For example: clamping part 3 adopts catch or block structure, after electric energy meter 16 is placed on the base plate 1, by using securing member clamping part 3 is fixed on the base plate 1, realization is fixing to electric energy meter 16, after electric energy meter 16 detects,, discharge electric energy meter by dismounting clamping part 3; Perhaps clamping part 3 can adopt pressure table handle, pressure table handle is parallel to base plate 1 at off position, after electric energy meter 16 is placed on the base plate 1, press the table handle by rotation, itself and base plate 1 are in vertical position, clamp electric energy meter 16, and then realize fixing to electric energy meter 16, after electric energy meter 16 detects, press the table handle by reverse rotation, it is returned to and base plate 1 parastate, discharges electric energy meter.
In force, the specification that electric energy meter detects the electric energy meter 16 of docking apparatus detection may there are differences, distance between the voltage terminal interface of the electric energy meter 16 of different size and the auxiliary terminal interface may be different, distance between each voltage terminal interface may be different, distance between each auxiliary terminal interface may be different, and the size of electric energy meter (mainly being height) also may be different.
In order to guarantee that the disclosed electric energy meter of the utility model detects docking apparatus and can detect the voltage of the electric energy meter 16 of different size and the function of auxiliary terminal, the position that electric energy meter is detected probe 15, each keeper and clamping part 3 in the docking apparatus all is set to adjustable, below specific implementation is described respectively.
A plurality of jack (not shown)s are set on probe base 14, and probe 15 can be arranged at arbitrary jack, and by the securing member (not shown) probe base 14 and probe 15 is fixed as one.
In the process that detects electric energy meter 16, can determine the insertion position of probe 15 according to the distance between the distance between each voltage terminal interface, each auxiliary terminal interface in the electric energy meter 16, and in the jack with probe 15 these positions of insertion, by securing member probe 15 and probe base 14 are connected as one afterwards.
The position of probe 15 on probe base 14 be set to adjustable after, the disclosed electric energy meter of the utility model detects docking apparatus can be different to the distance between each voltage terminal interface, the different electric energy meter of distance between the auxiliary terminal interface detect.
Be provided with the groove (not shown) adaptive with described left rail 6 on first keeper 8, second keeper 9 and the 3rd keeper 10, first keeper 8, second keeper 9 and the 3rd keeper 10 all can be fixed on the left rail 6 by securing member; The 4th keeper 11, the 5th keeper 12 and the 6th keeper 13 are provided with the groove (not shown) adaptive with right guide rail 7, and the 4th keeper 11, the 5th keeper 12 and the 6th keeper 13 all can be fixed on the right guide rail 7 by securing member.
In the process that detects electric energy meter 16, can adjust first keeper 8, second keeper 9, the 3rd keeper 10, the 4th keeper 11, the 5th keeper 12 and the position of the 6th keeper 13 on its guide rail of living in respectively according to the voltage terminal interface and the distance between the auxiliary terminal interface of electric energy meter 16, after determining the position, each keeper is fixed on the corresponding guide rail by securing member.
The position of each keeper on its residing guide rail be set to adjustable after, the disclosed electric energy meter of the utility model detects docking apparatus and can detect the voltage terminal interface electric energy meter different with distance between the auxiliary terminal interface.
Base plate 1 is provided with a plurality of mounting hole (not shown)s, and clamping part 3 can be fixed in a plurality of mounting holes any one by securing member.
In the process that detects electric energy meter 16, can determine that the disclosed electric energy meter of the utility model detects the distance between the fixed part 2 and clamping part 3 in the docking apparatus according to the size of electric energy meter 16 (mainly being height), and determine in view of the above the installation site of clamping part 3 clamping part 3 to be installed in the mounting hole of this position by securing member.Clamping part 3 both can adopt catch, block mechanism, also can adopt pressure table handle.
The position of clamping part 3 on base plate 1 be set to adjustable after, the disclosed electric energy meter of the utility model detects docking apparatus and can detect the different electric energy meter of size.
Referring to Fig. 3, Fig. 3 is the front view that the disclosed another kind of electric energy meter of the utility model detects docking apparatus.
Compare with electric energy meter detection docking apparatus shown in Figure 1, electric energy meter shown in Figure 3 detects docking apparatus and further is provided with operating grip 17 and auxiliary guide rail 18.
Operating grip 17 is connected with left connecting rod 4 or right connecting rod 5, when needs rotate left connecting rod 4 or right connecting rod 5, can get final product by rotating operating handle 17, makes more convenient to operate.
Auxiliary guide rail 18 is connected between left rail 6 and the right guide rail 7, makes that the connection between left rail 6 and the right guide rail 7 no longer only relies on probe base 14 to realize.The control crank 17 that is installed in left rail 6 and the right guide rail 7 any is in rotary course, and the rotation of left rail 6 and right guide rail 7 is more unified.
By above-mentioned description of the present utility model as can be known, utilize the disclosed electric energy meter of the utility model to detect in the process that docking apparatus detects electric energy meter, only electric energy meter need be put on the base plate of electric energy meter detection docking apparatus, by fixed part and clamping part electric energy meter is fixed, because the tail end of probe is connected to testing tool by lead, after rotation left connecting rod or right connecting rod insert probe the voltage terminal interface and auxiliary terminal interface of electric energy meter, the voltage terminal of electric energy meter and being electrically connected of auxiliary terminal and testing tool have promptly been set up, utilize testing tool can the voltage and the auxiliary terminal function of electric energy meter be detected, whole operation is easy, has improved the detection efficiency of electric energy meter.
The invention also discloses a kind of electric energy meter detection system, can detect the voltage and the auxiliary terminal function of electric energy meter fast, solve the low problem of complicated operation, detection efficiency that prior art exists.
This electric energy meter detection system comprises that mainly the disclosed electric energy meter of above-mentioned the utility model detects docking apparatus, and detects the testing tool that the probe afterbody in the docking apparatus is connected by lead with described electric energy meter.
Wherein, this electric energy meter detection docking apparatus comprises: base plate, fixed part, clamping part, left connecting rod, right connecting rod, left rail, right guide rail, first keeper, second keeper, the 3rd keeper, the 4th keeper, the 5th keeper, the 6th keeper, probe base and probe.The annexation of each parts is consistent with the disclosed electric energy meter detection of fit system and above-mentioned the utility model docking apparatus, repeats no more here.
By above-mentioned description of the present utility model as can be known, utilize in the process that the disclosed electric energy meter detection system of the utility model detects electric energy meter, only electric energy meter need be put on the base plate of electric energy meter detection docking apparatus, by fixed part and clamping part electric energy meter is fixed, because the tail end of probe is connected to testing tool by lead, after rotation left connecting rod or right connecting rod insert probe the voltage terminal interface and auxiliary terminal interface of electric energy meter, the voltage terminal of electric energy meter and being electrically connected of auxiliary terminal and testing tool have promptly been set up, utilize testing tool can the voltage and the auxiliary terminal function of electric energy meter be detected, whole operation is easy, has improved the detection efficiency of electric energy meter.
Each embodiment adopts the mode of going forward one by one to describe in this instructions, and what each embodiment stressed all is and the difference of other embodiment that identical similar part is mutually referring to getting final product between each embodiment.
To the above-mentioned explanation of the disclosed embodiments, make this area professional and technical personnel can realize or use the utility model.Multiple modification to these embodiment will be conspicuous concerning those skilled in the art, and defined herein General Principle can realize under the situation that does not break away from spirit or scope of the present utility model in other embodiments.Therefore, the utility model will can not be restricted to these embodiment shown in this article, but will meet and principle disclosed herein and features of novelty the wideest corresponding to scope.

Claims (7)

1. an electric energy meter detects docking apparatus, and described electric energy meter comprises voltage terminal interface and auxiliary terminal interface, it is characterized in that, comprising:
Place the base plate of electric energy meter;
Be arranged at the fixed part of described base plate one end;
Be connected in the described base plate other end, can fix the clamping part of described electric energy meter;
Be articulated in the left connecting rod and the right connecting rod of described fixed part both sides respectively;
The left rail that is connected with described left connecting rod;
The right guide rail that is connected with described right connecting rod;
Be arranged at first keeper, second keeper and the 3rd keeper on the described left rail;
Be arranged at the 4th keeper, the 5th keeper and the 6th keeper on the described right guide rail;
Be connected between described first keeper and the 4th keeper, the probe base between second keeper and the 5th keeper, between the 3rd keeper and the 6th keeper;
Be arranged at described probe base, can insert the probe of described voltage terminal interface and auxiliary terminal interface;
The structural symmetry of described left connecting rod and described right connecting rod, the structural symmetry of described left rail and described right guide rail.
2. electric energy meter according to claim 1 detects docking apparatus, it is characterized in that described probe base is provided with a plurality of jacks, and described probe can be arranged at arbitrary jack, and by securing member with described probe base and described probe stationary.
3. electric energy meter according to claim 2 detects docking apparatus, it is characterized in that,
Described first keeper, second keeper and the 3rd keeper are provided with the groove adaptive with described left rail, can be fixed in described left rail by securing member;
Described the 4th keeper, the 5th keeper and the 6th keeper are provided with and the adaptive groove of described right guide rail, can be fixed in described right guide rail by securing member.
4. electric energy meter according to claim 1 detects docking apparatus, it is characterized in that described base plate is provided with a plurality of mounting holes, and described clamping part can be fixed in described a plurality of mounting hole any one by securing member.
5. electric energy meter according to claim 1 detects docking apparatus, it is characterized in that, further comprises the auxiliary guide rail that connects described left rail and right guide rail.
6. electric energy meter according to claim 1 detects docking apparatus, it is characterized in that, further comprises the operating grip that is connected with described left connecting rod or described right connecting rod.
7. an electric energy meter detection system is characterized in that, comprises that the described electric energy meter of claim 1 detects docking apparatus, and detects the testing tool that the probe afterbody in the docking apparatus is connected by lead with described electric energy meter.
CN 201020662936 2010-12-15 2010-12-15 Connecting device for electric energy meter detection and electric energy meter detection system Expired - Lifetime CN201993385U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201020662936 CN201993385U (en) 2010-12-15 2010-12-15 Connecting device for electric energy meter detection and electric energy meter detection system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201020662936 CN201993385U (en) 2010-12-15 2010-12-15 Connecting device for electric energy meter detection and electric energy meter detection system

Publications (1)

Publication Number Publication Date
CN201993385U true CN201993385U (en) 2011-09-28

Family

ID=44669871

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201020662936 Expired - Lifetime CN201993385U (en) 2010-12-15 2010-12-15 Connecting device for electric energy meter detection and electric energy meter detection system

Country Status (1)

Country Link
CN (1) CN201993385U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102121978A (en) * 2010-12-15 2011-07-13 宁波电业局 Electrical energy meter detecting connection-inserting device and electrical energy meter detecting system
CN108254714A (en) * 2018-04-10 2018-07-06 南京电力自动化设备三厂有限公司 Integral three-phase dial framework and three-phase electric energy meter metering calibration equipment and verification mode of connection

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102121978A (en) * 2010-12-15 2011-07-13 宁波电业局 Electrical energy meter detecting connection-inserting device and electrical energy meter detecting system
CN102121978B (en) * 2010-12-15 2013-01-02 宁波电业局 Electrical energy meter detecting connection-inserting device and electrical energy meter detecting system
CN108254714A (en) * 2018-04-10 2018-07-06 南京电力自动化设备三厂有限公司 Integral three-phase dial framework and three-phase electric energy meter metering calibration equipment and verification mode of connection

Similar Documents

Publication Publication Date Title
CN102121978B (en) Electrical energy meter detecting connection-inserting device and electrical energy meter detecting system
CN102121979A (en) Insertion device for detecting electric energy meter and detection system of electric energy meter
CN107843820B (en) Insulator discharge alarm device
CN201788200U (en) Special test clamp for direct-current resistance test
CN201993385U (en) Connecting device for electric energy meter detection and electric energy meter detection system
CN201984087U (en) Electric energy meter detection plug device and electric energy meter detection system
CN110596446A (en) Transformer substation tripping pressure plate voltage measuring instrument
CN201222538Y (en) High-performance ammeter access line device
CN201903586U (en) Automatic test device for voltage and internal resistance of battery
CN108037328A (en) Frock for circuit board detecting
CN202512139U (en) Connection apparatus for testing clamp piece
CN202210106U (en) Clamp for testing capacitance capacity and loss
CN204831927U (en) Thermocouple tensile test device
CN203069674U (en) Automatic detection tool for loop resistance
CN203630348U (en) Electric energy meter detection tooling plate
CN203572846U (en) Detection line for connection of 2M coaxial signal cable
CN203396819U (en) Digital universal meter convenient for test
CN201909840U (en) Electric energy meter access line device and electric energy meter test system with same
CN221176843U (en) Quick wiring tool for wiring terminal
CN203630303U (en) Clamping type solid-state relay detector
CN216117725U (en) Handcart-type circuit breaker return circuit resistance testing arrangement
CN203606484U (en) Rapid connecting line device for examination of three-phase intelligent meter
CN207424021U (en) A kind of filament test fixture
CN210465125U (en) Bus duct bending resistance rapid test device
CN219676257U (en) Detection device of combined transformer

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20110928

Effective date of abandoning: 20130227

RGAV Abandon patent right to avoid regrant