CN204356955U - A kind of fabricated composite floor assembly - Google Patents
A kind of fabricated composite floor assembly Download PDFInfo
- Publication number
- CN204356955U CN204356955U CN201420773980.4U CN201420773980U CN204356955U CN 204356955 U CN204356955 U CN 204356955U CN 201420773980 U CN201420773980 U CN 201420773980U CN 204356955 U CN204356955 U CN 204356955U
- Authority
- CN
- China
- Prior art keywords
- floor
- steel
- girder steel
- girder
- assembly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Pallets (AREA)
Abstract
The utility model relates to a kind of fabricated composite floor assembly, comprising: at least one assembling frame, and described assembling chord position is in the bottom of composite floor assembly, and for supporting and installation floor, described assembling frame is assembled by more than one piece spandrel girder; At least one floor, described floor is positioned at the top of composite floor assembly, and floor width is less than 2.3m, and length is less than 12m, and described floor is provided with the handling seat of lifting.The utility model has the advantage that edge not easily breaks, intensity is high, shock resistance is good, assembling speed is fast, be applicable to factory normalization large-scale production, can be combined.
Description
Technical field
The utility model relates to building field, is specifically related to a kind of fabricated composite floor assembly.
Background technology
In building construction process, the making of floor, handling, assembling, load-bearing property are directly connected to speed and the quality of building operations.In existing assembled architecture, floor is generally en-block construction, adopts assembling design, assembles at the construction field (site).The shortcomings such as existing assembling floor exists not high, the inconvenient Container Transport of assembly connection intensity, edge easily breaks, shock resistance is not high.
Utility model content
The purpose of this utility model is to overcome the deficiencies in the prior art, provides that a kind of edge not easily breaks, assembly connection intensity is high, shock resistance good, assembling speed is fast, is convenient to the fabricated composite floor assembly of one that other component connects.
The utility model is achieved by the following technical programs:
A kind of fabricated composite floor assembly, comprising: at least one assembling frame, and described assembling chord position is in the bottom of composite floor assembly, and for supporting and installation floor, described assembling frame is assembled by more than one piece spandrel girder; At least one floor, described floor is positioned at the top of composite floor assembly, and floor width is less than 2.3m, and length is less than 12m, and described floor is provided with the handling seat of lifting.
Further, the spandrel girder top of described assembling frame is provided with a boss, described boss surface is provided with the connecting hole be connected with floor, and described assembling frame is linked together by the floor of the connecting hole on boss and top, and described boss side-lower is provided with the platform installed or overlap.
Further, described spandrel girder inside is provided with the stiffening rib of proper alignment, and described stiffening rib is provided with the installing hole for installing pipeline.
Further, steel mesh reinforcement is inlaid with in described floor, floor surrounding is prefabricated with girder steel, the top of described girder steel is inserted into floor inside, and be connected with the steel mesh reinforcement inlayed in floor, described girder steel top has part to be exposed at outside floor outward, forms a shoulder with floor, the side of described girder steel and bottom are positioned at outside floor, and the prefabricated girder steel of surrounding is connected to each other integral.
Further, described girder steel is channel-section steel shape, and girder steel side is vertical with floor, and side is provided with the knock down hole that pipeline is installed or connected, and described steel beam bottom is provided with the connecting hole corresponding with assembling frame.
Technique effect of the present utility model is as follows:
(1) easy to assembly, assembling speed is fast, assembling intensity is high, shock resistance good.The utility model is by the mode Rapid Combination of girder steel bolt or welding, be assembled into one by assembling frame again after combination, assembling frame is assembled by the spandrel girder of more than one piece band boss and platform, and concrete floor periphery girder steel wraps up, girder steel top is connected with the reinforcing bar inlayed in concrete, girder steel bottom connects with spandrel girder, this periphery parcel girder steel, the assembled spandrel girder in bottom the Trinity structure be connected with inner reinforcing bar, resistance to compression shear strength is high, and shock resistance is also much better than existing floor slab structure.
(2) lifting and Container Transport is convenient to.The utility model floor is provided with handling seat, and floor length and width are less than the interior empty size of container, conveniently exports to Container Transport with hoisting machine handling.
(3) compared with existing floor, installation connectivity of the present utility model is better, convenience is higher, solves the problem that existing floor and other component are difficult to be connected.Girder steel top of the present utility model has part to be exposed at outside concrete floor outward, forms a shoulder with concrete floor, is convenient to other component overlap joint location or is welded to connect; The boss side-lower of spandrel girder of the present utility model is provided with platform, is used for fixing or overlaps other building unit, and the stiffening rib of spandrel girder is provided with installing hole, installs or connect for pipeline.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is decomposing schematic representation of the present utility model.
Fig. 3 is the A-A sectional view in Fig. 1.
In accompanying drawing: 1-floor, 2-girder steel, 3-assembling frame, 4-knock down hole, 5-stiffening rib, 6-installing hole, 7-boss, 8-platform, 9-spandrel girder, 10-shoulder, 11-handling seat.
Detailed description of the invention
As shown in Figure 1 and Figure 2, a kind of fabricated composite floor assembly, comprises an assembling frame 3 and two pieces of floors 1.Described assembling frame 3 is positioned at the bottom of composite floor assembly, for supporting and installation floor 1; Described floor 1 is positioned at the top of composite floor assembly, and the width of every part floor 1 is less than 2.3m, and length is less than 12m, and be less than the interior empty size of container, convenience Container Transport exports.Floor 1 is provided with the handling seat 11 of lifting, by the entrucking of crane machine or very convenient, safety of constructing.
Assembling frame 3 is assembled by more than one piece spandrel girder 9, and spandrel girder 9 adopts the steel plate of band connecting hole to make, and with bender, steel plate bending is made into the structure of band boss 7 and platform 8.Boss 7 is positioned at the top of spandrel girder 9, and described boss 7 surface is provided with the connecting hole be connected with floor 1, and boss 7 side-lower is provided with platform 8, is used for fixing or overlaps other building unit.Be welded with the stiffening rib 5 of proper alignment in spandrel girder 9, described stiffening rib 5 is provided with the installing hole 6 for installing pipeline.Assembling frame 3 can be linked together rapidly with the floor 1 of top by the connecting hole on the boss 7 of spandrel girder 9.
As shown in Figure 3, steel mesh reinforcement is inlaid with in floor 1, floor 1 surrounding is prefabricated with girder steel 2, the top of described girder steel 2 is inserted into floor 1 inside, and be connected with the steel mesh reinforcement inlayed in floor 1, described girder steel 2 top has part to be exposed at outside floor 1 outward, forms a shoulder 10 with floor 1, is convenient to other component overlap joint location or is welded to connect.The side of girder steel 2 and bottom are positioned at outside floor 1, and the prefabricated girder steel 2 of surrounding is connected to each other integral.Not only play stressed subjective role from the girder steel 2 of surrounding parcel floor 1, floor 1 intensity is significantly improved, and the edge of floor 1 can be protected not broken in construction hoisting process.
As shown in Figure 1, Figure 2, Figure 3 shows, girder steel 2 adopts section steel manufacture, and the girder steel 2 of the present embodiment preferably adopts channel-section steel or is bent into the steel plate of channel-section steel shape, and girder steel 2 side is vertical with floor 1, and side is provided with the knock down hole 4 that pipeline is installed or connected.When connecting or pipeline installation needs, the knock down hole 4 of girder steel 2 side can be knocked open.Being provided with the connecting hole corresponding with assembling frame 3 bottom girder steel 2, floor 1 can being assembled rapidly with assembling frame 3 by the connecting hole of girder steel 2, form composite floor assembly.The periphery parcel girder steel 2 of composite floor assembly, the assembled spandrel girder in bottom 9 Trinity structure be connected with inner reinforcing bar, resistance to compression shear strength is high, and shock resistance is also much better than existing floor 1 structure.
Above embodiment is to explanation of the present utility model, and non-limiting, is more than PART.It should be noted that, concerning the technician of the industry, the simple transformation of carrying out according to general principle of the present utility model and structure and improvement, according to the combination that above embodiment is carried out, include within protection domain of the present utility model.
Claims (5)
1. a fabricated composite floor assembly, is characterized in that: described composite floor assembly comprises: at least one assembling frame, and described assembling chord position is in the bottom of composite floor assembly, and for supporting and installation floor, described assembling frame is assembled by more than one piece spandrel girder; At least one floor, described floor is positioned at the top of composite floor assembly, and floor width is less than 2.3m, and length is less than 12m, and described floor is provided with the handling seat of lifting.
2. the fabricated composite floor assembly of one according to claim 1, it is characterized in that: the spandrel girder top of described assembling frame is provided with a boss, described boss surface is provided with the connecting hole be connected with floor, described assembling frame is linked together by the floor of the connecting hole on boss and top, and described boss side-lower is provided with the platform installed or overlap.
3. the fabricated composite floor assembly of one according to claim 2, is characterized in that: described spandrel girder inside is provided with the stiffening rib of proper alignment, and described stiffening rib is provided with the installing hole for installing pipeline.
4. the fabricated composite floor assembly of the one according to any one of claim 1-3, it is characterized in that: in described floor, be inlaid with steel mesh reinforcement, floor surrounding is prefabricated with girder steel, the top of described girder steel is inserted into floor inside, and be connected with the steel mesh reinforcement inlayed in floor, described girder steel top has part to be exposed at outside floor outward, forms a shoulder with floor, the side of described girder steel and bottom are positioned at outside floor, and the prefabricated girder steel of surrounding is connected to each other integral.
5. the fabricated composite floor assembly of one according to claim 4, it is characterized in that: described girder steel is channel-section steel shape, girder steel side is vertical with floor, and side is provided with the knock down hole that pipeline is installed or connected, and described steel beam bottom is provided with the connecting hole corresponding with assembling frame.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420773980.4U CN204356955U (en) | 2014-12-10 | 2014-12-10 | A kind of fabricated composite floor assembly |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420773980.4U CN204356955U (en) | 2014-12-10 | 2014-12-10 | A kind of fabricated composite floor assembly |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204356955U true CN204356955U (en) | 2015-05-27 |
Family
ID=53258433
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420773980.4U Expired - Fee Related CN204356955U (en) | 2014-12-10 | 2014-12-10 | A kind of fabricated composite floor assembly |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204356955U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104481071A (en) * | 2014-12-10 | 2015-04-01 | 张跃 | Assembled composite floor assembly and production method thereof |
-
2014
- 2014-12-10 CN CN201420773980.4U patent/CN204356955U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104481071A (en) * | 2014-12-10 | 2015-04-01 | 张跃 | Assembled composite floor assembly and production method thereof |
CN104481071B (en) * | 2014-12-10 | 2019-04-12 | 张跃 | A kind of fabricated composite floor assembly and its manufacture craft |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103452039B (en) | Cast-in-situs type Inverted T beam and bridge pier and Bridge Pier Construction technique thereof | |
CN105332452A (en) | Dragline curtain wall support system with steel truss at top and construction method thereof | |
CN204877484U (en) | A steel reinforcement cage structure for reducing shield structure discrepancy station degree of difficulty | |
CN205153536U (en) | Structure is assembled to self -balancing integral template of reinforced concrete roof beam | |
CN104343214A (en) | Bracket prefabricated reinforcement framework of pseudo-classic building, fabrication method of reinforcement framework, and construction method of reinforced concrete bracket of pseudo-classic building | |
CN103206075B (en) | Suspension platform for construction of steel reinforced concrete cantilever structure | |
CN204385883U (en) | A kind of Fabricated balcony | |
CN205907855U (en) | Steel pipe board combination steel sheet shear force wall | |
CN204356955U (en) | A kind of fabricated composite floor assembly | |
CN104499664A (en) | Lightweight concrete step and manufacturing method thereof | |
CN104481071A (en) | Assembled composite floor assembly and production method thereof | |
CN103806537B (en) | The method of attachment of sleeper formula precast unit | |
CN102635227A (en) | Aluminum alloy lifting scaffold | |
CN203066352U (en) | Self-supporting type special-shaped steel-encased-concrete composite beam | |
CN208249704U (en) | A kind of townhouse carrying pole type hoisting frame being mounted laterally based on concrete isolated beam | |
CN105804416A (en) | Connecting structure for prefabricated assembling type building tower crane | |
CN103061444B (en) | Self-supporting deformed steel-encased concrete composite beam | |
CN204174848U (en) | A kind of precast reinforced skeleton of sets of brackets on top of the columns of building in the style of the ancients | |
CN205382595U (en) | Integral shear force wall of steel pipe concrete edge constraint coincide | |
CN204590502U (en) | A kind of prefabricated concrete floor | |
CN104499565A (en) | Assembled balcony | |
CN204356958U (en) | A kind of fixing floor spiced benefit roof beam structure | |
CN211817362U (en) | Solid net wall fixed knot of engineering building assembly constructs | |
CN209685126U (en) | A kind of steel vestibule integrally promotes lifting lug device | |
CN203222981U (en) | Suspended platform for steel reinforced concrete cantilever structure construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150527 Termination date: 20211210 |