CN104481071A - Assembled composite floor assembly and production method thereof - Google Patents

Assembled composite floor assembly and production method thereof Download PDF

Info

Publication number
CN104481071A
CN104481071A CN201410751548.XA CN201410751548A CN104481071A CN 104481071 A CN104481071 A CN 104481071A CN 201410751548 A CN201410751548 A CN 201410751548A CN 104481071 A CN104481071 A CN 104481071A
Authority
CN
China
Prior art keywords
floor
steel
girder
girder steel
composite floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410751548.XA
Other languages
Chinese (zh)
Other versions
CN104481071B (en
Inventor
张跃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410751548.XA priority Critical patent/CN104481071B/en
Publication of CN104481071A publication Critical patent/CN104481071A/en
Application granted granted Critical
Publication of CN104481071B publication Critical patent/CN104481071B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

The invention relates to an assembled composite floor assembly and a production method thereof. The assembled composite floor assembly comprises at least one assembled frame and at least one floor. The assembled frame which is arranged on the lower portion of the composite floor assembly is used for supporting and mounting floor and assembled by a plurality of bearing beams. The floor which is arranged on the upper portion of the composite floor assembly is less than 2.3 m in width and less than 12 m in length. A hoisting seat is arranged on the floor and used for hoisting. The composite floor assembly has the advantages that edges are less prone to crush, strength is high, shock resistance is good, assembly speed is fast, adaptation to factory standardizing mass production is achieved, and optional assembly is realized.

Description

A kind of fabricated composite floor assembly and manufacture craft thereof
Technical field
The present invention relates to building field, be specifically related to a kind of fabricated composite floor assembly and manufacture craft thereof.
Background technology
In building construction process, the making of floor, handling, assembling, load-bearing property are directly connected to speed and the quality of building operations.In existing assembled architecture, floor is generally en-block construction, adopts assembling design, assembles at the construction field (site).The shortcomings such as existing assembling floor exists not high, the inconvenient Container Transport of assembly connection intensity, edge easily breaks, shock resistance is not high.
Summary of the invention
The object of the invention is to overcome the deficiencies in the prior art, providing that a kind of edge not easily breaks, assembly connection intensity is high, shock resistance good, assembling speed is fast, be convenient to the fabricated composite floor assembly of one that other component connects and manufacture craft thereof.
The present invention is achieved by the following technical programs:
A kind of fabricated composite floor assembly, comprising: at least one assembling frame, and described assembling chord position is in the bottom of composite floor assembly, and for supporting and installation floor, described assembling frame is assembled by more than one piece spandrel girder; At least one floor, described floor is positioned at the top of composite floor assembly, and floor width is less than 2.3m, and length is less than 12m, and described floor is provided with the handling seat of lifting.
Further, the spandrel girder top of described assembling frame is provided with a boss, described boss surface is provided with the connecting hole be connected with floor, and described assembling frame is linked together by the floor of the connecting hole on boss and top, and described boss side-lower is provided with the platform installed or overlap.
Further, described spandrel girder inside is provided with the stiffening rib of proper alignment, and described stiffening rib is provided with the installing hole for installing pipeline.
Further, steel mesh reinforcement is inlaid with in described floor, floor surrounding is prefabricated with girder steel, the top of described girder steel is inserted into floor inside, and be connected with the steel mesh reinforcement inlayed in floor, described girder steel top has part to be exposed at outside floor outward, forms a shoulder with floor, the side of described girder steel and bottom are positioned at outside floor, and the prefabricated girder steel of surrounding is connected to each other integral.
Further, described girder steel is channel-section steel shape, and girder steel side is vertical with floor, and side is provided with the knock down hole that pipeline is installed or connected, and described steel beam bottom is provided with the connecting hole corresponding with assembling frame.
A manufacture craft for fabricated composite floor assembly, comprises the following steps:
The first step, according to the size determination steel plate materials of spandrel girder, on steel plate, row's connecting hole is gone out with punch press, with bender, steel plate bending is made into the spandrel girder of band boss and platform again, and make the connecting hole gone out be positioned at lug boss position, then the stiffening rib of welded bands installing hole in spandrel girder, stiffening rib answers straight uniform to arrange, the spandrel girder of the band stiffening rib made is welded into the assembling frame of rectangle.
Second step, is made into girder steel with steel plate or channel-section steel, is made into steel mesh reinforcement with thin wire or fine steel rib, is connected by girder steel or the mode of riveting or welding is connected to each other rectangle or other shape with bolt, then is adopted by steel mesh reinforcement the mode of spot welding to be welded in above girder steel.
3rd step, tips upside down on the upset of the girder steel of above-mentioned band steel mesh reinforcement in casting moulds, and makes the girder steel be connected to each other wrap up casting moulds from surrounding, inverted handling seat is put in casting moulds, in casting moulds, inject the concrete be stirred again, vibrations compression solidification, form the floor of surrounding parcel girder steel.
4th step, the floor made above-mentioned upset, makes band handling seat upward, is lifted into by floor on assembling frame that the first step made and assembles, form composite floor assembly.
Technique effect of the present invention is as follows:
(1) easy to assembly, assembling speed is fast, assembling intensity is high, shock resistance good.The present invention is by the mode Rapid Combination of girder steel bolt or welding, be assembled into one by assembling frame again after combination, assembling frame is assembled by the spandrel girder of more than one piece band boss and platform, and concrete floor periphery girder steel wraps up, girder steel top is connected with the reinforcing bar inlayed in concrete, girder steel bottom connects with spandrel girder, this periphery parcel girder steel, the assembled spandrel girder in bottom the Trinity structure be connected with inner reinforcing bar, resistance to compression shear strength is high, and shock resistance is also much better than existing floor slab structure.
(2) lifting and Container Transport is convenient to.Floor of the present invention is provided with handling seat, and floor length and width are less than the interior empty size of container, conveniently exports to Container Transport with hoisting machine handling.
(3) compared with existing floor, installation connectivity of the present invention is better, convenience is higher, solves the problem that existing floor and other component are difficult to be connected.Girder steel top of the present invention has part to be exposed at outside concrete floor outward, forms a shoulder with concrete floor, is convenient to other component overlap joint location or is welded to connect; The boss side-lower of spandrel girder of the present invention is provided with platform, is used for fixing or overlaps other building unit, and the stiffening rib of spandrel girder is provided with installing hole, installs or connect for pipeline.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention.
Fig. 2 is decomposing schematic representation of the present invention.
Fig. 3 is the A-A sectional view in Fig. 1.
In accompanying drawing: 1-floor, 2-girder steel, 3-assembling frame, 4-knock down hole, 5-stiffening rib, 6-installing hole, 7-boss, 8-platform, 9-spandrel girder, 10-shoulder, 11-handling seat.
Detailed description of the invention
As shown in Figure 1 and Figure 2, a kind of fabricated composite floor assembly, comprises an assembling frame 3 and two pieces of floors 1.Described assembling frame 3 is positioned at the bottom of composite floor assembly, for supporting and installation floor 1; Described floor 1 is positioned at the top of composite floor assembly, and the width of every part floor 1 is less than 2.3m, and length is less than 12m, and be less than the interior empty size of container, convenience Container Transport exports.Floor 1 is provided with the handling seat 11 of lifting, by the entrucking of crane machine or very convenient, safety of constructing.
Assembling frame 3 is assembled by more than one piece spandrel girder 9, and spandrel girder 9 adopts the steel plate of band connecting hole to make, and with bender, steel plate bending is made into the structure of band boss 7 and platform 8.Boss 7 is positioned at the top of spandrel girder 9, and described boss 7 surface is provided with the connecting hole be connected with floor 1, and boss 7 side-lower is provided with platform 8, is used for fixing or overlaps other building unit.Be welded with the stiffening rib 5 of proper alignment in spandrel girder 9, described stiffening rib 5 is provided with the installing hole 6 for installing pipeline.Assembling frame 3 can be linked together rapidly with the floor 1 of top by the connecting hole on the boss 7 of spandrel girder 9.
As shown in Figure 3, steel mesh reinforcement is inlaid with in floor 1, floor 1 surrounding is prefabricated with girder steel 2, the top of described girder steel 2 is inserted into floor 1 inside, and be connected with the steel mesh reinforcement inlayed in floor 1, described girder steel 2 top has part to be exposed at outside floor 1 outward, forms a shoulder 10 with floor 1, is convenient to other component overlap joint location or is welded to connect.The side of girder steel 2 and bottom are positioned at outside floor 1, and the prefabricated girder steel 2 of surrounding is connected to each other integral.Not only play stressed subjective role from the girder steel 2 of surrounding parcel floor 1, floor 1 intensity is significantly improved, and the edge of floor 1 can be protected not broken in construction hoisting process.
As shown in Figure 1, Figure 2, Figure 3 shows, girder steel 2 adopts section steel manufacture, and the girder steel 2 of the present embodiment preferably adopts channel-section steel or is bent into the steel plate of channel-section steel shape, and girder steel 2 side is vertical with floor 1, and side is provided with the knock down hole 4 that pipeline is installed or connected.When connecting or pipeline installation needs, the knock down hole 4 of girder steel 2 side can be knocked open.Being provided with the connecting hole corresponding with assembling frame 3 bottom girder steel 2, floor 1 can being assembled rapidly with assembling frame 3 by the connecting hole of girder steel 2, form composite floor assembly.The periphery parcel girder steel 2 of composite floor assembly, the assembled spandrel girder in bottom 9 Trinity structure be connected with inner reinforcing bar, resistance to compression shear strength is high, and shock resistance is also much better than existing floor 1 structure.
The manufacture craft of above-mentioned a kind of fabricated composite floor assembly, comprises the following steps:
The first step, according to the size determination steel plate materials of spandrel girder 9, on steel plate, row's connecting hole is gone out with punch press, with bender, steel plate bending is made into the spandrel girder 9 of band boss 7 and platform 8 again, and make the connecting hole gone out be positioned at boss 7 position, then the stiffening rib 5 of welded bands installing hole 6 in spandrel girder 9, stiffening rib 5 answers straight uniform to arrange, the spandrel girder 9 of the band stiffening rib 5 made is welded into the assembling frame 3 of rectangle.
Second step, girder steel 2 is made into steel plate or channel-section steel, be made into steel mesh reinforcement with thin wire or fine steel rib, girder steel 2 connected with bolt or the mode of riveting or welding is connected to each other rectangle or other shape, then adopted by steel mesh reinforcement the mode of spot welding to be welded in above girder steel 2.
3rd step, the upset of the girder steel 2 of above-mentioned band steel mesh reinforcement is tipped upside down in casting moulds, and make the girder steel 2 be connected to each other from surrounding parcel casting moulds, inverted handling seat 11 is put in casting moulds, the concrete be stirred is injected again in casting moulds, shake, pressurize, solidify, form the floor 1 of surrounding parcel girder steel 2.
4th step, overturns the above-mentioned floor 1 made, makes band handling seat 11 upward, one or several floors 1 is lifted into as required on assembling frame 3 that the first step made, assembles, form composite floor assembly by the mode of bolt or welding.
Above embodiment is explanation of the invention, and non-limiting, is more than PART.It should be noted that, concerning the technician of the industry, the simple transformation of carrying out according to general principle of the present invention and structure and improvement, according to the combination that above embodiment is carried out, include within protection scope of the present invention.

Claims (6)

1. a fabricated composite floor assembly, is characterized in that: described composite floor assembly comprises: at least one assembling frame, and described assembling chord position is in the bottom of composite floor assembly, and for supporting and installation floor, described assembling frame is assembled by more than one piece spandrel girder; At least one floor, described floor is positioned at the top of composite floor assembly, and floor width is less than 2.3m, and length is less than 12m, and described floor is provided with the handling seat of lifting.
2. the fabricated composite floor assembly of one according to claim 1, it is characterized in that: the spandrel girder top of described assembling frame is provided with a boss, described boss surface is provided with the connecting hole be connected with floor, described assembling frame is linked together by the floor of the connecting hole on boss and top, and described boss side-lower is provided with the platform installed or overlap.
3. the fabricated composite floor assembly of one according to claim 2, is characterized in that: described spandrel girder inside is provided with the stiffening rib of proper alignment, and described stiffening rib is provided with the installing hole for installing pipeline.
4. the fabricated composite floor assembly of the one according to any one of claim 1-3, it is characterized in that: in described floor, be inlaid with steel mesh reinforcement, floor surrounding is prefabricated with girder steel, the top of described girder steel is inserted into floor inside, and be connected with the steel mesh reinforcement inlayed in floor, described girder steel top has part to be exposed at outside floor outward, forms a shoulder with floor, the side of described girder steel and bottom are positioned at outside floor, and the prefabricated girder steel of surrounding is connected to each other integral.
5. the fabricated composite floor assembly of one according to claim 4, it is characterized in that: described girder steel is channel-section steel shape, girder steel side is vertical with floor, and side is provided with the knock down hole that pipeline is installed or connected, and described steel beam bottom is provided with the connecting hole corresponding with assembling frame.
6. the manufacture craft of a kind of fabricated composite floor assembly according to claim 1, is characterized in that: comprise the following steps:
The first step, according to the size determination steel plate materials of spandrel girder, on steel plate, row's connecting hole is gone out with punch press, with bender, steel plate bending is made into the spandrel girder of band boss and platform again, and make the connecting hole gone out be positioned at lug boss position, then the stiffening rib of welded bands installing hole in spandrel girder, stiffening rib answers straight uniform to arrange, the spandrel girder of the band stiffening rib made is welded into the assembling frame of rectangle;
Second step, is made into girder steel with steel plate or channel-section steel, is made into steel mesh reinforcement with thin wire or fine steel rib, is connected by girder steel or the mode of riveting or welding is connected to each other rectangle or other shape with bolt, then is adopted by steel mesh reinforcement the mode of spot welding to be welded in above girder steel;
3rd step, tips upside down on the upset of the girder steel of above-mentioned band steel mesh reinforcement in casting moulds, and makes the girder steel be connected to each other wrap up casting moulds from surrounding, inverted handling seat is put in casting moulds, in casting moulds, inject the concrete be stirred again, vibrations compression solidification, form the floor of surrounding parcel girder steel;
4th step, the floor made above-mentioned upset, makes band handling seat upward, is lifted into by floor on assembling frame that the first step made and assembles, form composite floor assembly.
CN201410751548.XA 2014-12-10 2014-12-10 A kind of fabricated composite floor assembly and its manufacture craft Expired - Fee Related CN104481071B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410751548.XA CN104481071B (en) 2014-12-10 2014-12-10 A kind of fabricated composite floor assembly and its manufacture craft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410751548.XA CN104481071B (en) 2014-12-10 2014-12-10 A kind of fabricated composite floor assembly and its manufacture craft

Publications (2)

Publication Number Publication Date
CN104481071A true CN104481071A (en) 2015-04-01
CN104481071B CN104481071B (en) 2019-04-12

Family

ID=52755666

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410751548.XA Expired - Fee Related CN104481071B (en) 2014-12-10 2014-12-10 A kind of fabricated composite floor assembly and its manufacture craft

Country Status (1)

Country Link
CN (1) CN104481071B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104895231A (en) * 2015-04-30 2015-09-09 宁波大学 Assembled composite floor slab and manufacturing method thereof
CN105040954A (en) * 2015-07-13 2015-11-11 张跃 Concrete floor covered with metal sheets
CN108623117A (en) * 2018-05-30 2018-10-09 芜湖优聚塑模有限公司 A kind of assembled resistance to compression septic tank and its assembly method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09256524A (en) * 1996-03-22 1997-09-30 Natl House Ind Co Ltd Floor panel
CN1616781A (en) * 2003-11-11 2005-05-18 潘旭鹏 Light truss type steel bar reinforced concrete combined floorslab and its technical method
JP2005307447A (en) * 2004-04-16 2005-11-04 Sumitomo Metal Ind Ltd Heat insulating material for steel sleeper, and underfloor heat insulating structure
CN101131019A (en) * 2006-08-11 2008-02-27 樊立 Compound floor slab and its production and installation method
CN103061448A (en) * 2012-12-26 2013-04-24 江苏沪宁钢机股份有限公司 Box-shaped secondary member and assembling process thereof
CN203145273U (en) * 2013-03-21 2013-08-21 中国京冶工程技术有限公司 Dismountable steel-concrete composite floor
CN103498523A (en) * 2013-09-25 2014-01-08 张跃 Floor system
CN203701414U (en) * 2014-02-17 2014-07-09 安徽工业大学 Reinforced concrete slab surrounded by shear reinforcement channel-steel framework
CN204356955U (en) * 2014-12-10 2015-05-27 张跃 A kind of fabricated composite floor assembly

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09256524A (en) * 1996-03-22 1997-09-30 Natl House Ind Co Ltd Floor panel
CN1616781A (en) * 2003-11-11 2005-05-18 潘旭鹏 Light truss type steel bar reinforced concrete combined floorslab and its technical method
JP2005307447A (en) * 2004-04-16 2005-11-04 Sumitomo Metal Ind Ltd Heat insulating material for steel sleeper, and underfloor heat insulating structure
CN101131019A (en) * 2006-08-11 2008-02-27 樊立 Compound floor slab and its production and installation method
CN103061448A (en) * 2012-12-26 2013-04-24 江苏沪宁钢机股份有限公司 Box-shaped secondary member and assembling process thereof
CN203145273U (en) * 2013-03-21 2013-08-21 中国京冶工程技术有限公司 Dismountable steel-concrete composite floor
CN103498523A (en) * 2013-09-25 2014-01-08 张跃 Floor system
CN203701414U (en) * 2014-02-17 2014-07-09 安徽工业大学 Reinforced concrete slab surrounded by shear reinforcement channel-steel framework
CN204356955U (en) * 2014-12-10 2015-05-27 张跃 A kind of fabricated composite floor assembly

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104895231A (en) * 2015-04-30 2015-09-09 宁波大学 Assembled composite floor slab and manufacturing method thereof
CN104895231B (en) * 2015-04-30 2017-04-12 宁波大学 Assembled composite floor slab and manufacturing method thereof
CN105040954A (en) * 2015-07-13 2015-11-11 张跃 Concrete floor covered with metal sheets
CN108623117A (en) * 2018-05-30 2018-10-09 芜湖优聚塑模有限公司 A kind of assembled resistance to compression septic tank and its assembly method

Also Published As

Publication number Publication date
CN104481071B (en) 2019-04-12

Similar Documents

Publication Publication Date Title
US20110308183A1 (en) Concrete platform production process, concrete platform, and connecting member
CN101851983A (en) Template-free U-shaped steel concrete combination beam
KR101049880B1 (en) Composite beam having concrete member precasted or casted in place and, construction methods using the same
KR101548114B1 (en) Steel concrete composite beam having increased composite effect of connecting part at the cross-section change part
KR101064731B1 (en) Steel-concrete composite girder and constructing method thereof
CN104481071A (en) Assembled composite floor assembly and production method thereof
CN110747736B (en) Rigid skeleton integrated device integrated with lifting appliance and steel reinforcement cage lifting construction method
KR20100121866A (en) Pc slave for building having reinforcement structure as a set
CN104895197A (en) Sectional steel concrete column-steel bar concrete beam joint connection method
CN205153536U (en) Structure is assembled to self -balancing integral template of reinforced concrete roof beam
KR102027813B1 (en) Built-Up Beam
JP5607892B2 (en) Reinforcement method for reinforced concrete column beam joints
CN103696582A (en) Method and structure for improving rigidity of reinforced concrete beam
CN204356955U (en) A kind of fabricated composite floor assembly
CN204826639U (en) Rag bolt preformed hole mould
CN209799386U (en) Assembled shaped steel stores pylon that supplementary prefabricated large-scale framework of steel of job site used
CN104314354B (en) High tension electric tower pedestal
KR101367706B1 (en) Steel Connection Structure For Self-Positioning of Composite Precast Concrete Member And Construction Method Thereof
KR20150075843A (en) Cargo transport box
CN202788024U (en) High-rigidity concrete beam structure
CN106884664B (en) Tunnel inverted arch template and tunnel inverted arch filling rapid construction method
CN206410774U (en) For field erected concrete truck scale plummer
CN201722844U (en) U-shaped steel reinforced concrete combination beam without mold plate
CN211473348U (en) Scaffold wall connecting piece
CN211666085U (en) Prestressed superposed beam

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190412

Termination date: 20211210