CN204826639U - Foundation bolt preformed hole mould - Google Patents

Foundation bolt preformed hole mould Download PDF

Info

Publication number
CN204826639U
CN204826639U CN201520317987.XU CN201520317987U CN204826639U CN 204826639 U CN204826639 U CN 204826639U CN 201520317987 U CN201520317987 U CN 201520317987U CN 204826639 U CN204826639 U CN 204826639U
Authority
CN
China
Prior art keywords
mould
core rod
mold core
size
anchor bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520317987.XU
Other languages
Chinese (zh)
Inventor
杨贵柏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 19th Metallurgical Group Co ltd
Original Assignee
China 19th Metallurgical Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 19th Metallurgical Group Co ltd filed Critical China 19th Metallurgical Group Co ltd
Priority to CN201520317987.XU priority Critical patent/CN204826639U/en
Application granted granted Critical
Publication of CN204826639U publication Critical patent/CN204826639U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a rag bolt preformed hole mould belongs to construction technical field, solves current steel mould problem with high costs, unable assurance structural performance. Anchor bolt preformed hole mould includes the mold core and wraps up in the foam layer around the mold core, the size of mouthful is less than the size of mouthful under the mould on the mould to the size of mouthful is greater than or equal to the size of mouthful under the mold core on the mould. And before concrete pouring, positioning and fixing the foundation bolt preformed hole mould, and then pouring. After the concrete reaches the strength, the mold core is pulled out upwards through external force, and the foam layer is broken. The mold core of the utility model can be used repeatedly, thereby saving the cost and improving the economic benefit; the mold core is made of wood, so that the manufacturing cost is low and the pore-forming quality is good; and cleaning the foam layer, and then performing secondary pouring, wherein the secondary poured concrete and the original foundation concrete are effectively connected into a whole to meet the structural performance requirement.

Description

Anchor bolt box mould
Technical field
The utility model belongs to the realm of building construction, is specifically related to a kind of anchor bolt box mould.
Background technology
Existing anchor bolt box mould directly makes of Plate Welding, such as be welded into the shape that size suitable for reading is less than bottom size, and the trapezoidal anchor bolt box mould that cross section is rectangular, there are following two point defects in such steel die: the first, steel die cost of manufacture is high, and be embedded in concrete to take out and re-use; The second, steel die inner wall smooth, back-grouting is shaken rear easy former concrete and is split, and structure exists quality problems and potential safety hazard.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of anchor bolt box mould, solves the problem that existing steel die cost is high, cannot ensure structural performance.
The utility model solves the technical scheme that its technical problem adopts: anchor bolt box mould, comprise core rod and the froth bed being wrapped in core rod surrounding, described mould size suitable for reading is less than mould bottom size, and mould size suitable for reading is more than or equal to core rod bottom size.
Further, arbitrary cross section of described core rod is rectangle or circle.
Further, described core rod is made up of timber, and described froth bed is bundled on core rod by iron wire.
Further, the described core rod plank that is not less than 20mm by thickness is assembled.
Further, the upper end of described core rod arranges hoisting structure.
Further, described hoisting structure is the circle groove being arranged at core rod upper end.
Further, in the groove of described core rod upper end, anti-skidding rib is also set.
Before concrete placings, anchor bolt box mould located and fixes, then building.Reach after intensity until concrete, upwards extracted by core rod by external force, simultaneously froth bed drawing crack is broken, due to and mould size suitable for reading is more than or equal to core rod bottom size, core rod can be extracted in anchor bolt box.
The beneficial effects of the utility model are: core rod can be reused, and have saved cost, have improve economic benefit; Core rod selects timber, and cost of manufacture is low, and hole quality is good; Carry out second pouring again after cleaning out froth bed, second pouring concrete and former foundation concrete link into an integrated entity effectively, meet structural performance requirements.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is plan structure schematic diagram of the present utility model.
Component, position and numbering in figure: core rod 1, froth bed 2, groove 3, the rope made of hemp buckle 4, suspension hook 5, base surface 6.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail.
As depicted in figs. 1 and 2, the utility model anchor bolt box mould, comprise core rod 1 and the froth bed 2 being wrapped in core rod 1 surrounding, described mould size n suitable for reading is less than mould bottom size m, and mould size n suitable for reading is more than or equal to core rod bottom size d.Arbitrary cross section of core rod 1 is rectangle or circle, is illustrated in figure 2 rectangular-shaped, the length that now mould is suitable for reading and/or the wide length that is greater than mould end opening respectively and/or wide, and mould length and width suitable for reading is more than or equal to core rod end opening length and width.
Core rod 1 can select timber, and in order to ensure the intensity of core rod 1, the plank that core rod 1 is not less than 20mm by thickness is assembled, then to be bundled on core rod 1 by iron wire with cystosepiment and to form froth bed 2.The thickness of froth bed 2 is determined according to above-mentioned upper and lower opening dimensional requirement.
For the ease of extracting of core rod 1, core rod 1 upper end arranges hoisting structure, and described hoisting structure is the circle groove 3 being arranged at core rod 1 upper end, also arranges anti-skidding rib, as shown in Figure 1 in groove 3.In addition, the hoisting structure of core rod 1 can also be other forms such as lifting hole(eyelet).
Use the utility model, before building concrete, mould of first being boxed out by the utility model stone bolt is located, and with reinforcing bar and angle steel reinforced, guarantees that foot bolt is boxed out mould accurate positioning.Mould size suitable for reading is the height in face 6 based on take the altitude really, then carries out building to base surface.Until after concrete reaches intensity, buckle 4 by core rod 1 in bundle jail, groove 3 place with the rope made of hemp, by drive a vehicle or manual chain hoist frame suspension hook 5 pierces into the rope made of hemp and buckles 4 and upwards extract, break after froth bed 2 crimp when extracting core rod 1.Finally, the foam particle in preformed hole is cleaned out, so that second pouring.

Claims (7)

1. anchor bolt box mould, it is characterized in that: comprise core rod (1) and be wrapped in the froth bed (2) of core rod (1) surrounding, described mould size suitable for reading is less than mould bottom size, and mould size suitable for reading is more than or equal to core rod bottom size.
2. anchor bolt box mould as claimed in claim 1, is characterized in that: arbitrary cross section of described core rod (1) is rectangle or circle.
3. anchor bolt box mould as claimed in claim 1, it is characterized in that: described core rod (1) is made up of timber, described froth bed (2) is bundled on core rod (1) by iron wire.
4. anchor bolt box mould as claimed in claim 1, is characterized in that: the plank that described core rod (1) is not less than 20mm by thickness is assembled.
5. anchor bolt box mould as claimed in claim 1, is characterized in that: the upper end of described core rod (1) arranges hoisting structure.
6. anchor bolt box mould as claimed in claim 5, is characterized in that: described hoisting structure is for being arranged at circle groove (3) of core rod (1) upper end.
7. anchor bolt box mould as claimed in claim 6, is characterized in that: also arrange anti-skidding rib in the groove (3) of described core rod (1) upper end.
CN201520317987.XU 2015-05-18 2015-05-18 Foundation bolt preformed hole mould Active CN204826639U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520317987.XU CN204826639U (en) 2015-05-18 2015-05-18 Foundation bolt preformed hole mould

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520317987.XU CN204826639U (en) 2015-05-18 2015-05-18 Foundation bolt preformed hole mould

Publications (1)

Publication Number Publication Date
CN204826639U true CN204826639U (en) 2015-12-02

Family

ID=54684254

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520317987.XU Active CN204826639U (en) 2015-05-18 2015-05-18 Foundation bolt preformed hole mould

Country Status (1)

Country Link
CN (1) CN204826639U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105971003A (en) * 2016-06-06 2016-09-28 安徽汇力建筑工程有限公司 Reusable reserved hole gasbag mould
CN107234712A (en) * 2017-04-07 2017-10-10 华侨大学 An assembled inverted trapezoidal connection hole preparation device
CN110241845A (en) * 2019-07-12 2019-09-17 中国化学工程第十一建设有限公司 An easy-to-remove equipment foundation reserved hole core and its construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105971003A (en) * 2016-06-06 2016-09-28 安徽汇力建筑工程有限公司 Reusable reserved hole gasbag mould
CN105971003B (en) * 2016-06-06 2018-06-22 安徽汇力建筑工程有限公司 A repeated use of preformed hole air bag mould
CN107234712A (en) * 2017-04-07 2017-10-10 华侨大学 An assembled inverted trapezoidal connection hole preparation device
CN110241845A (en) * 2019-07-12 2019-09-17 中国化学工程第十一建设有限公司 An easy-to-remove equipment foundation reserved hole core and its construction method

Similar Documents

Publication Publication Date Title
CN108457421B (en) Manufacturing die and manufacturing method of assembled reinforced concrete U-shaped frame beam
CN203247600U (en) Equipment foundation bolt preformed hole die
CN103726586B (en) H-shaped steel and steel plate framework assembly shear wall with interfaces with grooves and manufacturing method
CN102900024B (en) Using method for overturning die plate for large-scale concrete structure and
CN204826639U (en) Foundation bolt preformed hole mould
CN204940860U (en) One prevents Form floating part
CN101705692B (en) Construction Method of Forming Deep Reserved Anchor Bolt Holes for Large Equipment Foundation
CN203034353U (en) Connection structure of bridge support padstone and abutment
CN202064636U (en) Closed stair formwork erecting device
CN208950170U (en) A kind of frame column reinforcing bar preventing offsetting device
CN201511439U (en) System for integrally binding and hoisting box girder steel reinforcement framework
CN104453235B (en) Current conversion station fire wall construction technology
CN202449171U (en) Construction device based on sectioned pull-in method
CN104878756B (en) Sand-filling hollow structure based cast-in-place special-shaped pile construction method
CN203285056U (en) Stair formwork supporting base
CN204869175U (en) Y shape precast reinforced concrete stake mould
CN202745370U (en) Concrete reserved hole without formwork removal
KR101367706B1 (en) Steel Connection Structure For Self-Positioning of Composite Precast Concrete Member And Construction Method Thereof
CN201275601Y (en) Polygon sand jack for casting
CN211473342U (en) Overhanging scaffold upright rod with anti-skid device
CN203755682U (en) Secondary pouring form board constructing structure for small opening of concrete structure floor slab
CN207092546U (en) A kind of subsiding crack both sides shear wall formwork for placing frame being easily installed
CN211250565U (en) Pouring die for beam
CN204510590U (en) A kind of reinforcement upper cover plate steel wire net rack inner support casing
CN208668745U (en) A kind of hollow floor large scale core mold structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant