CN204826639U - Foundation bolt preformed hole mould - Google Patents
Foundation bolt preformed hole mould Download PDFInfo
- Publication number
- CN204826639U CN204826639U CN201520317987.XU CN201520317987U CN204826639U CN 204826639 U CN204826639 U CN 204826639U CN 201520317987 U CN201520317987 U CN 201520317987U CN 204826639 U CN204826639 U CN 204826639U
- Authority
- CN
- China
- Prior art keywords
- mould
- core rod
- mold core
- size
- anchor bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 6
- 229910052742 iron Inorganic materials 0.000 claims description 3
- 229910000831 Steel Inorganic materials 0.000 abstract description 6
- 239000010959 steel Substances 0.000 abstract description 6
- 239000006260 foam Substances 0.000 abstract description 4
- 238000004519 manufacturing process Methods 0.000 abstract description 3
- 238000004140 cleaning Methods 0.000 abstract description 2
- 238000010276 construction Methods 0.000 abstract 1
- 239000002023 wood Substances 0.000 abstract 1
- 244000025254 Cannabis sativa Species 0.000 description 3
- 235000012766 Cannabis sativa ssp. sativa var. sativa Nutrition 0.000 description 3
- 235000012765 Cannabis sativa ssp. sativa var. spontanea Nutrition 0.000 description 3
- 235000009120 camo Nutrition 0.000 description 3
- 235000005607 chanvre indien Nutrition 0.000 description 3
- 239000011487 hemp Substances 0.000 description 3
- 239000000725 suspension Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000002245 particle Substances 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a rag bolt preformed hole mould belongs to construction technical field, solves current steel mould problem with high costs, unable assurance structural performance. Anchor bolt preformed hole mould includes the mold core and wraps up in the foam layer around the mold core, the size of mouthful is less than the size of mouthful under the mould on the mould to the size of mouthful is greater than or equal to the size of mouthful under the mold core on the mould. And before concrete pouring, positioning and fixing the foundation bolt preformed hole mould, and then pouring. After the concrete reaches the strength, the mold core is pulled out upwards through external force, and the foam layer is broken. The mold core of the utility model can be used repeatedly, thereby saving the cost and improving the economic benefit; the mold core is made of wood, so that the manufacturing cost is low and the pore-forming quality is good; and cleaning the foam layer, and then performing secondary pouring, wherein the secondary poured concrete and the original foundation concrete are effectively connected into a whole to meet the structural performance requirement.
Description
Technical field
The utility model belongs to the realm of building construction, is specifically related to a kind of anchor bolt box mould.
Background technology
Existing anchor bolt box mould directly makes of Plate Welding, such as be welded into the shape that size suitable for reading is less than bottom size, and the trapezoidal anchor bolt box mould that cross section is rectangular, there are following two point defects in such steel die: the first, steel die cost of manufacture is high, and be embedded in concrete to take out and re-use; The second, steel die inner wall smooth, back-grouting is shaken rear easy former concrete and is split, and structure exists quality problems and potential safety hazard.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of anchor bolt box mould, solves the problem that existing steel die cost is high, cannot ensure structural performance.
The utility model solves the technical scheme that its technical problem adopts: anchor bolt box mould, comprise core rod and the froth bed being wrapped in core rod surrounding, described mould size suitable for reading is less than mould bottom size, and mould size suitable for reading is more than or equal to core rod bottom size.
Further, arbitrary cross section of described core rod is rectangle or circle.
Further, described core rod is made up of timber, and described froth bed is bundled on core rod by iron wire.
Further, the described core rod plank that is not less than 20mm by thickness is assembled.
Further, the upper end of described core rod arranges hoisting structure.
Further, described hoisting structure is the circle groove being arranged at core rod upper end.
Further, in the groove of described core rod upper end, anti-skidding rib is also set.
Before concrete placings, anchor bolt box mould located and fixes, then building.Reach after intensity until concrete, upwards extracted by core rod by external force, simultaneously froth bed drawing crack is broken, due to and mould size suitable for reading is more than or equal to core rod bottom size, core rod can be extracted in anchor bolt box.
The beneficial effects of the utility model are: core rod can be reused, and have saved cost, have improve economic benefit; Core rod selects timber, and cost of manufacture is low, and hole quality is good; Carry out second pouring again after cleaning out froth bed, second pouring concrete and former foundation concrete link into an integrated entity effectively, meet structural performance requirements.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is plan structure schematic diagram of the present utility model.
Component, position and numbering in figure: core rod 1, froth bed 2, groove 3, the rope made of hemp buckle 4, suspension hook 5, base surface 6.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail.
As depicted in figs. 1 and 2, the utility model anchor bolt box mould, comprise core rod 1 and the froth bed 2 being wrapped in core rod 1 surrounding, described mould size n suitable for reading is less than mould bottom size m, and mould size n suitable for reading is more than or equal to core rod bottom size d.Arbitrary cross section of core rod 1 is rectangle or circle, is illustrated in figure 2 rectangular-shaped, the length that now mould is suitable for reading and/or the wide length that is greater than mould end opening respectively and/or wide, and mould length and width suitable for reading is more than or equal to core rod end opening length and width.
Core rod 1 can select timber, and in order to ensure the intensity of core rod 1, the plank that core rod 1 is not less than 20mm by thickness is assembled, then to be bundled on core rod 1 by iron wire with cystosepiment and to form froth bed 2.The thickness of froth bed 2 is determined according to above-mentioned upper and lower opening dimensional requirement.
For the ease of extracting of core rod 1, core rod 1 upper end arranges hoisting structure, and described hoisting structure is the circle groove 3 being arranged at core rod 1 upper end, also arranges anti-skidding rib, as shown in Figure 1 in groove 3.In addition, the hoisting structure of core rod 1 can also be other forms such as lifting hole(eyelet).
Use the utility model, before building concrete, mould of first being boxed out by the utility model stone bolt is located, and with reinforcing bar and angle steel reinforced, guarantees that foot bolt is boxed out mould accurate positioning.Mould size suitable for reading is the height in face 6 based on take the altitude really, then carries out building to base surface.Until after concrete reaches intensity, buckle 4 by core rod 1 in bundle jail, groove 3 place with the rope made of hemp, by drive a vehicle or manual chain hoist frame suspension hook 5 pierces into the rope made of hemp and buckles 4 and upwards extract, break after froth bed 2 crimp when extracting core rod 1.Finally, the foam particle in preformed hole is cleaned out, so that second pouring.
Claims (7)
1. anchor bolt box mould, it is characterized in that: comprise core rod (1) and be wrapped in the froth bed (2) of core rod (1) surrounding, described mould size suitable for reading is less than mould bottom size, and mould size suitable for reading is more than or equal to core rod bottom size.
2. anchor bolt box mould as claimed in claim 1, is characterized in that: arbitrary cross section of described core rod (1) is rectangle or circle.
3. anchor bolt box mould as claimed in claim 1, it is characterized in that: described core rod (1) is made up of timber, described froth bed (2) is bundled on core rod (1) by iron wire.
4. anchor bolt box mould as claimed in claim 1, is characterized in that: the plank that described core rod (1) is not less than 20mm by thickness is assembled.
5. anchor bolt box mould as claimed in claim 1, is characterized in that: the upper end of described core rod (1) arranges hoisting structure.
6. anchor bolt box mould as claimed in claim 5, is characterized in that: described hoisting structure is for being arranged at circle groove (3) of core rod (1) upper end.
7. anchor bolt box mould as claimed in claim 6, is characterized in that: also arrange anti-skidding rib in the groove (3) of described core rod (1) upper end.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520317987.XU CN204826639U (en) | 2015-05-18 | 2015-05-18 | Foundation bolt preformed hole mould |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520317987.XU CN204826639U (en) | 2015-05-18 | 2015-05-18 | Foundation bolt preformed hole mould |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204826639U true CN204826639U (en) | 2015-12-02 |
Family
ID=54684254
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520317987.XU Active CN204826639U (en) | 2015-05-18 | 2015-05-18 | Foundation bolt preformed hole mould |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204826639U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105971003A (en) * | 2016-06-06 | 2016-09-28 | 安徽汇力建筑工程有限公司 | Reusable reserved hole gasbag mould |
CN107234712A (en) * | 2017-04-07 | 2017-10-10 | 华侨大学 | An assembled inverted trapezoidal connection hole preparation device |
CN110241845A (en) * | 2019-07-12 | 2019-09-17 | 中国化学工程第十一建设有限公司 | An easy-to-remove equipment foundation reserved hole core and its construction method |
-
2015
- 2015-05-18 CN CN201520317987.XU patent/CN204826639U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105971003A (en) * | 2016-06-06 | 2016-09-28 | 安徽汇力建筑工程有限公司 | Reusable reserved hole gasbag mould |
CN105971003B (en) * | 2016-06-06 | 2018-06-22 | 安徽汇力建筑工程有限公司 | A repeated use of preformed hole air bag mould |
CN107234712A (en) * | 2017-04-07 | 2017-10-10 | 华侨大学 | An assembled inverted trapezoidal connection hole preparation device |
CN110241845A (en) * | 2019-07-12 | 2019-09-17 | 中国化学工程第十一建设有限公司 | An easy-to-remove equipment foundation reserved hole core and its construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108457421B (en) | Manufacturing die and manufacturing method of assembled reinforced concrete U-shaped frame beam | |
CN203247600U (en) | Equipment foundation bolt preformed hole die | |
CN103726586B (en) | H-shaped steel and steel plate framework assembly shear wall with interfaces with grooves and manufacturing method | |
CN102900024B (en) | Using method for overturning die plate for large-scale concrete structure and | |
CN204826639U (en) | Foundation bolt preformed hole mould | |
CN204940860U (en) | One prevents Form floating part | |
CN101705692B (en) | Construction Method of Forming Deep Reserved Anchor Bolt Holes for Large Equipment Foundation | |
CN203034353U (en) | Connection structure of bridge support padstone and abutment | |
CN202064636U (en) | Closed stair formwork erecting device | |
CN208950170U (en) | A kind of frame column reinforcing bar preventing offsetting device | |
CN201511439U (en) | System for integrally binding and hoisting box girder steel reinforcement framework | |
CN104453235B (en) | Current conversion station fire wall construction technology | |
CN202449171U (en) | Construction device based on sectioned pull-in method | |
CN104878756B (en) | Sand-filling hollow structure based cast-in-place special-shaped pile construction method | |
CN203285056U (en) | Stair formwork supporting base | |
CN204869175U (en) | Y shape precast reinforced concrete stake mould | |
CN202745370U (en) | Concrete reserved hole without formwork removal | |
KR101367706B1 (en) | Steel Connection Structure For Self-Positioning of Composite Precast Concrete Member And Construction Method Thereof | |
CN201275601Y (en) | Polygon sand jack for casting | |
CN211473342U (en) | Overhanging scaffold upright rod with anti-skid device | |
CN203755682U (en) | Secondary pouring form board constructing structure for small opening of concrete structure floor slab | |
CN207092546U (en) | A kind of subsiding crack both sides shear wall formwork for placing frame being easily installed | |
CN211250565U (en) | Pouring die for beam | |
CN204510590U (en) | A kind of reinforcement upper cover plate steel wire net rack inner support casing | |
CN208668745U (en) | A kind of hollow floor large scale core mold structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |