CN204343169U - For the steel diagonal brace of pier prestressed cap beam with extra length Construction Supporting System in water - Google Patents

For the steel diagonal brace of pier prestressed cap beam with extra length Construction Supporting System in water Download PDF

Info

Publication number
CN204343169U
CN204343169U CN201420719329.9U CN201420719329U CN204343169U CN 204343169 U CN204343169 U CN 204343169U CN 201420719329 U CN201420719329 U CN 201420719329U CN 204343169 U CN204343169 U CN 204343169U
Authority
CN
China
Prior art keywords
strut
pier
steel
diagonal brace
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420719329.9U
Other languages
Chinese (zh)
Inventor
徐楚
余流
郭颖
王晓东
刘明智
张�诚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Engineering Co Ltd of China Construction Sixth Engineering Division Co Ltd
Original Assignee
Third Construction Engineering Co Ltd of China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Engineering Co Ltd of China Construction Sixth Engineering Division Co Ltd filed Critical Third Construction Engineering Co Ltd of China Construction Sixth Engineering Division Co Ltd
Priority to CN201420719329.9U priority Critical patent/CN204343169U/en
Application granted granted Critical
Publication of CN204343169U publication Critical patent/CN204343169U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of steel diagonal brace for pier prestressed cap beam with extra length Construction Supporting System in water, this steel diagonal brace is provided with two and is parallel to each other and isometric relative strut, two described struts by steel structure connection together, pin hinge and bearing thereof is connected with in the bottom of each described strut, pin hinged-support is connected with the cushion cap of pier in water by pre-embedded steel slab, bottom and the described pin hinged-support of described strut pass through pin hinge connection, the afterbody cut with scissors at described pin is provided with annular groove, axial limiting baffle plate is fitted with in described annular groove, described axial limiting baffle plate is fixed on described pin hinged-support, described in every root, the top of strut is provided with horizontal support cover plate.The utility model rigidity is large, supporting capacity is strong, can the reduction of erection time, reduce labour cost and material cost, and reusable edible, can be greater than 8m more than 40m, setting height(from bottom) by prove-in length, between pier shaft, clear distance is greater than pier stud overlength Coping Construction support system in the water of 18m.

Description

For the steel diagonal brace of pier prestressed cap beam with extra length Construction Supporting System in water
Technical field
The utility model relates to a kind of Coping Construction support system, particularly a kind of steel diagonal brace for pier prestressed cap beam with extra length Construction Supporting System in water.
Background technology
At present, domestic heavy civil, Design of Highway Bridge mostly are two-way six-lane or eight tracks, unidirectional three lanes or Four-Lane Road, and the length of pier stud bent cap is most at below 40m, minority length is at more than 40m, and Coping Construction generally adopts Support Method and no rack technique two kinds of modes.The requirement for bearing capacity of Support Method to ground is high, and costly, the duration is limited for basement process, constructs careless slightly, can cause support integral sinking, has a strong impact on the construction quality of bent cap, and inapplicable for bridge pier in water; No rack technique construction common are: pre-buried method, cross method and Hold Hoop method, although be applicable to bent cap in high pier capping beam and water, but three kinds of methods cut both ways, the advantage of often kind of method all can not be taken into account and ensure that bent cap support system is to many-sided overall control overflow such as construction speed, quality and costs.
Industry park, Zhong Huan through street, Suzhou City section engineering Wusongjiang River bridge, for single span double width Simple Supported Steel Truss Bridge, gross weight is about 4410t, across footpath 119m, the wide 22.8m of single width, belong to domestic single width width, Suzhou City and Jiangsu Province across footpath, bent cap: long 54.2m, wide 3.6m, high 2.5m, also be domestic bridge length of the same type, single bent cap gross weight can reach 1300t, under bent cap, between pier stud and pier stud, clear distance is 20.2m, and be positioned at over-water construction, there is the silt soil strata dark more than 20m in the south of the River, Wusong bank, traditional construction with brackets and no rack technique construction are not all suitable for this engineering.Meanwhile, this engineering is very high to the supporting capacity of support, stability requirement.
Summary of the invention
The utility model provides a kind of steel diagonal brace for pier prestressed cap beam with extra length Construction Supporting System in water for solving in known technology the technical problem that exists, this steel diagonal brace can be worked in coordination with steel pipe post and be supported pier prestressed cap beam with extra length Construction Supporting System in water, and make this support system have stronger supporting capacity and higher stability, can be greater than 8m more than 40m, setting height(from bottom) by prove-in length, between pier shaft, clear distance is greater than pier capping beam construction in the overlength water of 18m.
The technical scheme that the utility model is taked for the technical problem existed in solution known technology is: a kind of steel diagonal brace for pier prestressed cap beam with extra length Construction Supporting System in water, this steel diagonal brace is provided with two and is parallel to each other and isometric relative strut, two described struts by steel structure connection together, pin hinge and bearing thereof is connected with in the bottom of each described strut, pin hinged-support is connected with the cushion cap of pier stud in water by pre-embedded steel slab, bottom and the described pin hinged-support of described strut pass through pin hinge connection, the afterbody cut with scissors at described pin is provided with annular groove, axial limiting baffle plate is fitted with in described annular groove, described axial limiting baffle plate is fixed on described pin hinged-support, described in every root, the top of strut is provided with horizontal support cover plate.
Described strut adopts Two bors d's oeuveres i-beam structure.
At the position of Two bors d's oeuveres i iron strut and described pin hinge connection, the web both sides of described Two bors d's oeuveres i iron strut are equipped with reinforcement steel plate.
Two described struts by M shape steel structure connection together.
The advantage that the utility model has and good effect are: in water pier stud bearing platform construction during pre-embedded steel slab, after in water, pier stud has been constructed, steel diagonal brace is connected on pre-embedded steel slab, pull out the Larsen stake for pier stud construction in cushion cap and water, steel diagonal brace is forwarded to setting inclination angle, next step construction can be carried out, the installation period of bent cap support system can be shortened, save cost.Reason is: utilize pin hinge structure, make steel diagonal brace carry out angle adjustment.Because the Larsen stake of pier stud working cofferdam and the steel diagonal brace of support intersect, the Larsen stake of crossover sites during mounting bracket, first must be extracted.If adopt the erection mode that steel diagonal brace directly welds with cushion cap pre-embedded steel slab, difficulty of construction is large, cushion cap Lijiang River bank far, again has underwater obstacle, therefore change into and increase an articulated structure at the footing place of steel diagonal brace and be connected with cushion cap pre-embedded steel slab, use the impact that this articulated structure can not intersect by field environmental condition and Larsen stake, after steel diagonal brace is connected with cushion cap pre-embedded steel slab, first upright and steel pipe post is connected and fixed, and installs after Larsen stake is pulled out according to oblique angle again.If do not arranged pin hinge turntable, then need entirety to set Larsen pile cofferdam, all pier stud cushion caps are formed closed entirety.Swivel point is set, the stake of part bearing platform construction Larsen can be pulled out in advance, decrease cost and duration that entirety sets Larsen stake simultaneously, shorten the support installing time, save the lease expenses of Larsen stake.The utility model utilizes existing cushion cap as the basis of structure, decreases the process procedure of basement process, and structure steel beam column used can also recycle, and can save great amount of cost.The support system of the utility model construction is adopted to compare with no rack technique with traditional Support Method, construction with brackets can be avoided to process ground or to set steel pipe pile, the shortcoming of bearing capacity and stability deficiency, and the utility model adopts shaped steel supporting, rigidity is large, supporting capacity is strong, relative no rack technique construction bent cap, avoid pre-buried method, cross method, every defect of Hold Hoop method, on permanent structure pier shaft quality and outward appearance without impact, can prove-in length more than 40m, setting height(from bottom) is greater than 8m, between pier shaft, clear distance is greater than pier capping beam construction in the overlength water of 18m, and the Coping Construction of non-cylindrical pier stud can be applicable to.
In sum, the utility model rigidity is large, and supporting capacity is strong, can the reduction of erection time, reduce labour cost and material cost, and reusable edible, can be greater than 8m more than 40m, setting height(from bottom) by prove-in length, between pier shaft, clear distance is greater than pier overlength Coping Construction support system in the water of 18m.
Accompanying drawing explanation
Fig. 1 is elevation of the present utility model;
Fig. 2 is the right view of Fig. 1;
Fig. 3 is the A-A sectional view of Fig. 1.
In figure: 1, strut; 2, pin hinge; 3, hinged-support is sold; 4, pre-embedded steel slab; 5, steel work; 6, horizontal support cover plate; 7, cushion cap; 8, postive stop baffle; 9, reinforcement steel plate.
Detailed description of the invention
For summary of the invention of the present utility model, Characteristic can be understood further, hereby exemplify following examples, and coordinate accompanying drawing to be described in detail as follows:
Refer to Fig. 1 ~ Fig. 3, a kind of steel diagonal brace for pier prestressed cap beam with extra length Construction Supporting System in water, this steel diagonal brace is provided with two and is parallel to each other and isometric relative strut 1, two described struts 1 are linked together by steel work 5, pin hinge 2 and bearing thereof is connected with in the bottom of each described strut 1, pin hinged-support 3 is connected with the cushion cap 7 of pier stud in described water by pre-embedded steel slab 4, the bottom of described strut 1 is connected by pin hinge 2 with described pin hinged-support 3, annular groove is provided with at the afterbody of described pin hinge 2, axial limiting baffle plate 8 is fitted with in described annular groove, described axial limiting baffle plate 8 is fixed on described pin hinged-support 3, described in every root, the top of strut 1 is provided with horizontal support cover plate 6.
In the present embodiment, described strut 1 adopts Two bors d's oeuveres i-beam structure.Cut with scissors 2 positions be connected at Two bors d's oeuveres i iron strut and described pin, be equipped with reinforcement steel plate 9 in the web both sides of described Two bors d's oeuveres i iron strut.Two described struts 1 by M shape steel structure connection together.Easy construction, structure is reliable.
Although be described preferred embodiment of the present utility model by reference to the accompanying drawings above; but the utility model is not limited to above-mentioned detailed description of the invention; above-mentioned detailed description of the invention is only schematic; be not restrictive; those of ordinary skill in the art is under enlightenment of the present utility model; do not departing under the ambit that the utility model aim and claim protect, can also make a lot of form, these all belong within protection domain of the present utility model.

Claims (4)

1. the steel diagonal brace for pier prestressed cap beam with extra length Construction Supporting System in water, it is characterized in that, this steel diagonal brace is provided with two and is parallel to each other and isometric relative strut, two described struts by steel structure connection together, pin hinge and bearing thereof is connected with in the bottom of each described strut, pin hinged-support is connected with the cushion cap of pier in water by pre-embedded steel slab, bottom and the described pin hinged-support of described strut pass through pin hinge connection, the afterbody cut with scissors at described pin is provided with annular groove, axial limiting baffle plate is fitted with in described annular groove, described axial limiting baffle plate is fixed on described pin hinged-support, described in every root, the top of strut is provided with horizontal support cover plate.
2. the steel diagonal brace for pier prestressed cap beam with extra length Construction Supporting System in water according to claim 1, is characterized in that, described strut adopts Two bors d's oeuveres i-beam structure.
3. the steel diagonal brace for pier prestressed cap beam with extra length Construction Supporting System in water according to claim 2, is characterized in that, at the position of Two bors d's oeuveres i iron strut and described pin hinge connection, the web both sides of described Two bors d's oeuveres i iron strut are equipped with reinforcement steel plate.
4. the steel diagonal brace for pier prestressed cap beam with extra length Construction Supporting System in water according to claim 1, is characterized in that, two described struts by M shape steel structure connection together.
CN201420719329.9U 2014-11-25 2014-11-25 For the steel diagonal brace of pier prestressed cap beam with extra length Construction Supporting System in water Expired - Fee Related CN204343169U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420719329.9U CN204343169U (en) 2014-11-25 2014-11-25 For the steel diagonal brace of pier prestressed cap beam with extra length Construction Supporting System in water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420719329.9U CN204343169U (en) 2014-11-25 2014-11-25 For the steel diagonal brace of pier prestressed cap beam with extra length Construction Supporting System in water

Publications (1)

Publication Number Publication Date
CN204343169U true CN204343169U (en) 2015-05-20

Family

ID=53226447

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420719329.9U Expired - Fee Related CN204343169U (en) 2014-11-25 2014-11-25 For the steel diagonal brace of pier prestressed cap beam with extra length Construction Supporting System in water

Country Status (1)

Country Link
CN (1) CN204343169U (en)

Similar Documents

Publication Publication Date Title
CN102352604B (en) Truss sheet unit of steel truss girder, steel truss girder structure and mounting method thereof
CN108755377B (en) Construction method of deepwater non-covering layer steel trestle
CN104452597B (en) Pier prestressed cap beam with extra length Construction Supporting System in water
CN110344335B (en) Method for constructing steel trestle, initial platform and cofferdam in bridge construction process
CN204753354U (en) Cover worker's board landing stage
CN205295963U (en) Long span steel case back pushes away construction with bearing structure that transversely rectifies
CN110016938B (en) Positioning and verticality adjusting device for rectangular lattice column of reverse construction method foundation pit
CN103866693A (en) Installing method of reinforced concrete bowstring rod arch bridge arch ribs and hanging auxiliary bridge
CN202298440U (en) Steel trestle structure used on cliff terrains
CN213772963U (en) Floor type cantilever truss for cast-in-situ cover beam in water of large cantilever of municipal bridge
CN214459689U (en) Cast-in-place box girder support of weak soil foundation
CN102777050B (en) Assembly type jig frame for longspan pipe truss roof girder
CN110016871A (en) A kind of construction method suitable for over-height pier large span curve bridge
CN104195956A (en) Scaffolding type water area continuous beam cast-in-situ supporting frame and erection method thereof
CN204401462U (en) For the support of pier prestressed cap beam with extra length Construction Supporting System in water
CN204343169U (en) For the steel diagonal brace of pier prestressed cap beam with extra length Construction Supporting System in water
CN204370314U (en) A kind of lower hanging steel bridge erects suspension rod
CN104452598B (en) The construction method of pier prestressed cap beam with extra length Construction Supporting System in water
CN107761549B (en) Triangular support bracket is used in a kind of construction of battered leg pier stud
CN215630021U (en) Highway bridge construction foundation ditch protector
CN206359894U (en) Naked rock geology combined type cast-in-place box beam bracket system in a kind of water
CN104404884B (en) For the support of pier prestressed cap beam with extra length Construction Supporting System in water
CN205296206U (en) Tower cane foundation
CN205501833U (en) A weighing apparatus pylon support system evens up to one side that is used for Y type mound battered leg to be under construction
CN204151662U (en) A kind of one across the temporary trestle bridge crossing over river valley

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150520

Termination date: 20151125