CN204326029U CN201420761809.1U CN201420761809U CN204326029U CN 204326029 U CN204326029 U CN 204326029U CN 201420761809 U CN201420761809 U CN 201420761809U CN 204326029 U CN204326029 U CN 204326029U
Authority
CN
China
Prior art keywords
gate
tape machine
floating thing
induction system
sealing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420761809.1U
Other languages
Chinese (zh)
Inventor
陈迁
易晶萍
孔繁忠
李斌
胡宏敏
祝胜
杨丹汉
闫军
张�雄
陈蓉强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changjiang Institute of Survey Planning Design and Research Co Ltd
Original Assignee
Changjiang Institute of Survey Planning Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changjiang Institute of Survey Planning Design and Research Co Ltd filed Critical Changjiang Institute of Survey Planning Design and Research Co Ltd
Priority to CN201420761809.1U priority Critical patent/CN204326029U/en
Application granted granted Critical
Publication of CN204326029U publication Critical patent/CN204326029U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Before the utility model discloses a kind of powerplant intakes trashrack, floating thing induction system is the floating thing treatment system be arranged on hydroelectric station dam, comprises interception gripping portion and transport portion.Interception gripping portion comprises: some gate piers of hydroelectric station dam upstream side; Gate slot group is provided with between some gate piers; Gate slot group updrift side is provided with inlet opening; Gate pier is also provided with the wharf portal crane track of double rail type; Wharf portal crane track is provided with gate-type trash rake; Gate-type trash rake is connected with the grab bucket of gate-type trash rake by mechanical arm; Transport portion comprises: the main sealing-tape machine of hydroelectric station dam upstream side plank road formula; Main sealing-tape machine is supported by the section steel beam of lower end, both sides; Section steel beam is arranged on the cantilever bracket of below; Cantilever bracket is fixed on dam body by rear anchoring chemical anchor bolts; The plank road formula design of main sealing-tape machine, does not go the confined space taking original dam body, is especially applicable to built power station and builds, and continuity delivery significantly improves floating thing conveying capacity.

Description

Floating thing induction system before powerplant intakes trashrack
Technical field
The utility model relates to equipment for hydroelectric station, and more particularly it is floating thing induction system before powerplant intakes trashrack.
Background technology
It is more that Upper Yangtze River floating thing carrys out amount, after the Gezhouba Water Control Project be positioned on the Changjiang river is constructed and put into operation, before annual major flood season flood into reservoir all enters hinge dam with a large amount of floating thing.Warehouse-in floating thing is mainly plant (as cornstalk, straw stalk, branch, tree root, stub and grass roots etc.), the household garbages (as packaging waste, foam, plastic foam, bamboo wood board, life plasthetics, disposable lunch box, beverage bottle) such as the crop stalk piled up two sides, when there is the natural calamity such as torrential rain or mountain torrents in basin, often the large-scale floating things such as the room material of the timber on mountain, trees, destruction, furniture, wood (bamboo) row, the deck of boat and animal remains are poured in river, sometimes also have barge, light tender etc. out of control.Wherein a part of floating thing sluices discharged to downstream through two river sluice gates, and a part of floating thing flows to into import waters, power station with power station electrical generation water.Because two power stations, river are located in main flow concave bank, affect by flow-shape, floating thing blocking powerplant intakes trashrack phenomenon very serious (before mainly concentrating on 1F, 2F machine trashrack), form pressure reduction before and after trashrack, cause unit head loss, time serious, even threaten unit operation safety.
The existing mode of removing contamination in Ge Zhou Ba adopts automobile, ship transportation after mainly adopting the mode of gate-type trash rake and door machine lifting grab bucket (band hydraulic pressure) to salvage.Such means of transportation is discontinuous, discontinuity, needs to be equipped with a large amount of people's force-summing devices, and input is many, and efficiency is low.
Utility model content
The purpose of this utility model be to overcome above-mentioned background technology weak point and provide a kind ofly significantly improve floating thing induction system before the powerplant intakes trashrack of power station floating thing treatment effeciency.
It realizes by following technical scheme:
Before powerplant intakes trashrack, floating thing induction system is the floating thing treatment system be arranged on hydroelectric station dam, comprises interception gripping portion and transport portion.
Described interception gripping portion comprises: some gate piers of hydroelectric station dam upstream side; Gate slot group is provided with between described some gate piers; Described gate slot group updrift side is provided with inlet opening;
Described gate pier is also provided with the wharf portal crane track of double rail type; Described wharf portal crane track is provided with gate-type trash rake; Described gate-type trash rake is connected with the grab bucket of gate-type trash rake by gate-type trash rake mechanical arm;
Described transport portion comprises: the main sealing-tape machine of hydroelectric station dam upstream side plank road formula; Described main sealing-tape machine is supported by the section steel beam of lower end, both sides; Described section steel beam is arranged on the cantilever bracket of below; Described cantilever bracket is fixed on dam body by rear anchoring chemical anchor bolts; Described main sealing-tape machine downstream is also provided with wave wall.
Further, described main sealing-tape machine upstream side is also provided with access path.
Further, described main sealing-tape machine and described access path periphery are provided with totally-enclosed going along with sb. to guard him; Wherein said totally-enclosed upper surface of going along with sb. to guard him goes along with sb. to guard him part for profiled sheet cover; Described profiled sheet cover is provided with some floating thing receiving openings.
Again further, described floating thing receiving opening lower end is provided with hopper.
Also further, described main sealing-tape machine is three-roller type sealing-tape machine, forms haul concave surface.
Again further, described main sealing-tape machine end arranged beneath has longitudinally secondary sealing-tape machine; Laterally secondary sealing-tape machine is also furnished with below described longitudinal direction secondary sealing-tape machine end.
Usefulness of the present utility model is: to remove contamination the problem that efficiency is low, can not meet in time clear drift for the floating thing before current trash rack for water inlet; devise complete mechanical conveying system; by this system by before water inlet floating thing safety, fast shift; solve floating thing blocking trashrack problem, guarantee unit safety.The sealing-tape machine induction system adopted, can be shifted by floating thing continuously, evenly, constantly, efficiency is high, attendant is few.Because sealing-tape machine drives power to be electric power, do not need fuel, clean environment firendly, be adapted at built and promote the use of in each power station built both at home and abroad.
Accompanying drawing explanation
Fig. 1 is the schematic cross-section of floating thing induction system before the utility model powerplant intakes trashrack.
Fig. 2 is the enlarged drawing of A in Fig. 1.
Fig. 3 is the schematic top plan view of floating thing induction system before the utility model powerplant intakes trashrack.
In figure: rear anchoring chemical anchor bolts 1; Cantilever bracket 2; Section steel beam 3; Main sealing-tape machine 4; Longitudinally secondary sealing-tape machine 41; Laterally secondary sealing-tape machine 42; Hopper 5; Totally-enclosedly go along with sb. to guard him 6; Profiled sheet cover 61; Wave wall 7; Access path 8; Gate-type trash rake 9; Gate-type trash rake mechanical arm 91; Gate-type trash rake grab bucket 92; Inlet opening 10; Gate pier 11; Wharf portal crane track 12; Gate slot group 13, floating thing 14.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is described in further detail, but this embodiment should not be construed restriction of the present utility model, only for example, simultaneously by illustrating that advantage of the present utility model will become clearly and easy understand.
Before powerplant intakes trashrack, floating thing induction system is the floating thing treatment system be arranged on hydroelectric station dam, comprises interception gripping portion and transport portion;
Interception gripping portion comprises: some gate piers 11 of hydroelectric station dam upstream side; Gate slot group 13 is provided with between some gate piers 11; Gate slot group 13 updrift side is provided with inlet opening 10; Gate slot group 13 is generally trash rake gate slot, trashrack gate slot and draining bottom outlet maintenance gate slot from upstream to downstream direction.Multiple gate slot can control to open by functional requirement, and interception may enter the floating thing 14. of water wheels impact generating
Gate pier 11 is also provided with the wharf portal crane track 12 of double rail type; Wharf portal crane track 12 is provided with gate-type trash rake 9; Gate-type trash rake 9 is connected with gate-type trash rake grab bucket 92 by gate-type trash rake mechanical arm 91;
Transport portion comprises: the main sealing-tape machine 4 of hydroelectric station dam upstream side plank road formula; Main sealing-tape machine 4 is supported by the section steel beam 3 of lower end, both sides; Section steel beam 3 is arranged on the cantilever bracket 2 of below; Main sealing-tape machine 4 downstream is also provided with wave wall 7.The plank road formula design of main sealing-tape machine 4, does not go the confined space taking original dam body, is especially applicable to built power station and builds.
Conventional sealing-tape machine induction system is all arrange on the ground, relies on bottom bracing structure to build operation platform, and therefore it is built, runs the enough places of needs and space.The utility model is upstream face design arrangement floating thing sealing-tape machine induction system near water outside the dam body of power station, does not take any space of dam end face, avoids and causes interference to the normal operation of dam existing equipment (such as door machine, trashrack etc.).
Conventional sealing-tape machine delivery system device is made up of belt of adhesive tape machine, cylinder and motor, carrying roller, middle frame, supporting leg, and elevation is generally at more than 1m, and height space requires higher.The utility model eliminates middle frame and the supporting leg of sealing-tape machine delivery system device, adopts section steel beam 3 and cantilever bracket 2 to support, effectively reduces structure height.
Preferably, the utility model major bearing structures cantilever bracket 2 is connected with adopting rear anchoring chemical anchor bolts 1 between dam concrete, carries out anchoring by Chemical Felter and concrete adhesion stress.Its anchorage length can be deep into steel concrete internal core district, and anchoring is firm, all applicable on newly-built or built dam.Can promote the use of the equal tool of key water control project that there is floating thing blocking water inlet problem.
Preferably, main sealing-tape machine 4 upstream side is also provided with access path 8.
Preferably, main sealing-tape machine 4 and access path 8 periphery are provided with and totally-enclosedly go along with sb. to guard him 6; Wherein totally-enclosed upper surface of going along with sb. to guard him 6 goes along with sb. to guard him part for profiled sheet cover 61; Profiled sheet cover 61 is provided with some floating thing receiving openings 62.Such design, to the protection be provided in main sealing-tape machine 4 under various meteorological condition, makes the rubbish in floating thing 14 can not pollute the environment of dam body.
Preferably, floating thing receiving opening 62 lower end is provided with hopper 5, makes floating thing 14 enter main sealing-tape machine 4 system more smooth-going.
Preferably, main sealing-tape machine 4 is three-roller type sealing-tape machine, and form haul concave surface, the sealing-tape machine of comparing plane structure improves carrying capacity.
Preferably, main sealing-tape machine 4 end arranged beneath has longitudinally secondary sealing-tape machine 41; Longitudinally also be furnished with laterally secondary sealing-tape machine 42 below secondary sealing-tape machine 41 end.Floating thing 14 smoothly can fall into the sealing-tape machine of lower end from the sealing-tape machine of upper end, and many sealing-tape machines cooperatively interact like this, wriggles and connects, and to adjust the building structure of the complexity adapted on dam structure, floating thing is transported to two sides to be further processed.
For Ge Zhou Ba: Gezhouba second Channel powerplant installs 7 generating sets altogether, before dam, face length degree is about 320m near water, and a unit has 3 water inlets, 7 generating set totally 21 inlet openings, crest access is wide about 6.5 meters, when clearing up 21 hole floating thing of water inlet, a large amount of automobile stop, at crest access, causes traffic congestion, add the discontinuity of Automobile Transportation, transport capacity is reduced greatly, and the floating thing sewage crossing current salvaged, causes dam crest environment pollution.Floating thing quantity of slag when flood season is large, and the non-flood period quantity of slag is little, and the haulage devices such as automobile are by requirement configuration in flood season, and the utilization rate therefore in 1 year is relatively low, and maintenance costs is large, causes waste.Use sealing-tape machine supply line transport floating thing, equipment investment is little, late maintaining expense is low, there is continuative transport ability, advantage that freight volume is large, simultaneously, sealing-tape machine supply line, according to dam crest existence conditions, is arranged in face near a river, dam crest upstream, does not disturb Transformation Plan of Gantry Crane operation, mechanical transport, affects, the floating thing sewage salvaged flows into the Changjiang river, does not affect dam crest environment.
Sealing-tape machine supply line overall length 300 meters, transport capacity is 150 ~ 300t/h, and it is 10000 yuan that supply line builds peace engineering (containing equipment) every meter of cost, production shift: 20 hours/day; 25 days/month.
Automobile Transportation scheme, according to dam crest road and facility condition, can select the Automobile Transportation floating thing of 10 ~ 15t.Consider by annual cleaning 150,000 m3 floating thing, see the following form 1 by price level sealing-tape machine supply line annual operating and maintenance cost in 2009.
Table 1 sealing-tape machine, Automobile Transportation annual operating and maintenance cost summary sheet
It should be noted that: to those of ordinary skill in the art, can also make some changes or distortion to the utility model under the prerequisite not changing the utility model principle, this belongs to protection domain of the present utility model equally.

Claims (6)

1. floating thing induction system before powerplant intakes trashrack, comprises interception gripping portion, and described interception gripping portion comprises: some gate piers (11) of hydroelectric station dam upstream side; Gate slot group (13) is provided with between described some gate piers (11); Described gate slot group (13) updrift side is provided with inlet opening (10); Described gate pier (11) is also provided with the wharf portal crane track (12) of double rail type; Described wharf portal crane track (12) is provided with gate-type trash rake (9); Described gate-type trash rake (9) is connected with gate-type trash rake grab bucket (92) by gate-type trash rake mechanical arm (91), it is characterized in that: described floating thing induction system also comprises transport portion;
Described transport portion comprises: the main sealing-tape machine (4) of hydroelectric station dam upstream side plank road formula; Described main sealing-tape machine (4) is supported by the section steel beam (3) of lower end, both sides; Described section steel beam (3) is arranged on the cantilever bracket (2) of below; Described cantilever bracket (2) is fixed on dam body by rear anchoring chemical anchor bolts (1); Described main sealing-tape machine (4) downstream is also provided with wave wall (7).
2. floating thing induction system before powerplant intakes trashrack according to claim 1, is characterized in that:
Described main sealing-tape machine (4) upstream side is also provided with access path (8).
3. floating thing induction system before powerplant intakes trashrack according to claim 2, is characterized in that:
Described main sealing-tape machine (4) and described access path (8) periphery are provided with totally-enclosed going along with sb. to guard him (6); Wherein said totally-enclosed upper surface of going along with sb. to guard him (6) goes along with sb. to guard him part for profiled sheet cover (61); Described profiled sheet cover (61) is provided with some floating thing receiving openings (62).
4. floating thing induction system before powerplant intakes trashrack according to claim 3, is characterized in that:
Described floating thing receiving opening (62) lower end is provided with hopper (5).
5. floating thing induction system before powerplant intakes trashrack according to claim 1, is characterized in that:
Described main sealing-tape machine (4) is three-roller type sealing-tape machine, forms haul concave surface.
6. floating thing induction system before powerplant intakes trashrack according to claim 1, is characterized in that:
Described main sealing-tape machine (4) end arranged beneath has longitudinally secondary sealing-tape machine (41); Laterally secondary sealing-tape machine (42) is also furnished with below the secondary sealing-tape machine of described longitudinal direction (41) end.
CN201420761809.1U 2014-12-05 2014-12-05 Floating thing induction system before powerplant intakes trashrack Active CN204326029U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420761809.1U CN204326029U (en) 2014-12-05 2014-12-05 Floating thing induction system before powerplant intakes trashrack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420761809.1U CN204326029U (en) 2014-12-05 2014-12-05 Floating thing induction system before powerplant intakes trashrack

Publications (1)

Publication Number Publication Date
CN204326029U true CN204326029U (en) 2015-05-13

Family

ID=53162405

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420761809.1U Active CN204326029U (en) 2014-12-05 2014-12-05 Floating thing induction system before powerplant intakes trashrack

Country Status (1)

Country Link
CN (1) CN204326029U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104452687A (en) * 2014-12-05 2015-03-25 长江勘测规划设计研究有限责任公司 Floating object conveying system in front of trash rack for power plant water inlet

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104452687A (en) * 2014-12-05 2015-03-25 长江勘测规划设计研究有限责任公司 Floating object conveying system in front of trash rack for power plant water inlet

Similar Documents

Publication Publication Date Title
CN203559454U (en) Stratified water taking device for dam water inlet
CN204185336U (en) For the stereo ecological gallery system of river water body in-situ immobilization
CN113585188A (en) River dam with function of collecting floating garbage on water surface
CN101469540B (en) Trash block system for nuclear plant water intaking channel
CN202482816U (en) Floating breakwater
CN211080161U (en) Antifouling fishing device for hydropower station
CN204326029U (en) Floating thing induction system before powerplant intakes trashrack
CN201155104Y (en) Device for intercepting sewage in water channel for nuclear plant
CN205296100U (en) Husky equipment is arranged in reservoir segmentation
CN102400452B (en) Dirt preventing facility and construction method thereof
CN206706699U (en) Ramp type sand surfing structure
CN201843159U (en) Movable grab sewage disposal apparatus
CN207294336U (en) Floating type interim purified in situ device for Drain contamination for river channel mouth
CN104452687A (en) Floating object conveying system in front of trash rack for power plant water inlet
CN205668777U (en) A kind of fish-collecting box vertical-lift and horizontal movement system
CN203755273U (en) Trash rack of hydropower station
CN209277121U (en) Pump lock double-layer drainage structure
CN110241781B (en) Comprehensive treatment method for urban inland river ecology and embankment landscape
CN210031661U (en) Fish collecting device suitable for built hydropower station
CN203755236U (en) Break-bulk cargo berth wharf
CN203872109U (en) Piling photovoltaic power generation and floating photovoltaic power generation combined solar power station built in lake
CN209523169U (en) A kind of protection slope device
CN216360709U (en) Novel trash rack for river channel entering lake
CN108661021B (en) System for controlling interception and collection of source garbage at coastal entrance of river
CN202390815U (en) Antifouling facility

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant