CN204298849U - A kind of construction work unit bulk head water retaining - Google Patents

A kind of construction work unit bulk head water retaining Download PDF

Info

Publication number
CN204298849U
CN204298849U CN201420804280.7U CN201420804280U CN204298849U CN 204298849 U CN204298849 U CN 204298849U CN 201420804280 U CN201420804280 U CN 201420804280U CN 204298849 U CN204298849 U CN 204298849U
Authority
CN
China
Prior art keywords
sheet pile
profile steel
steel sheet
steel
baffle plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420804280.7U
Other languages
Chinese (zh)
Inventor
袁超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420804280.7U priority Critical patent/CN204298849U/en
Application granted granted Critical
Publication of CN204298849U publication Critical patent/CN204298849U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of construction work unit bulk head water retaining, comprising: a steel sheet pile, there is multiple adjacent recess and protuberance; Multiple H profile steel, is located at described steel sheet pile side respectively, and each protuberance of one end of each described H profile steel and steel sheet pile mutually against; Multiple baffle plate, is located at the other end of each described H profile steel, and is positioned between each two described H profile steel, makes easy two protuberances of appointing of described steel sheet pile coordinate two H profile steel and baffle plate to define a space region; And multiple filler, be arranged at respectively among each space region.The utility model can when ground excavation construction, steel sheet pile is utilized to use as dash, and utilize the cooperation of H profile steel, baffle plate and filler to use as gear soil simultaneously, and reach have preferably dash with the native intensity of gear, be easy to construct and construct rear callable effect.

Description

A kind of construction work unit bulk head water retaining
Technical field
The utility model relates to construction engineering technical field, refers to a kind of construction work unit bulk head water retaining especially.
Background technology
General when ground excavation construction, first must carry out implantation H profile steel to around base, form retaining wall body, squeeze into brace steel post more afterwards, to carry out the engineering of underground shoveling, and when being excavated to a desired depth, then must set up Horizontal steelwork bracing structure again to support retaining wall around, and in the work progress successively excavated, repeatedly carry out the erection of Horizontal steelwork bracing.
But, H profile steel stake itself there is no water retaining function, therefore due to when ground excavation construction, water plug must be set outside base to carry out drawing water engineering, to reach block-water effect, but due to off-base engineering of drawing water, ground is easily caused to sink or the inclination of interim room, workmanship is wayward, and affects construction speed.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of construction work unit bulk head water retaining, to solve the problems of the technologies described above.
For solving the problems of the technologies described above, embodiment of the present utility model provides a kind of construction work unit bulk head water retaining, comprising: a steel sheet pile, has multiple adjacent recess and protuberance; Multiple H profile steel, is located at described steel sheet pile side respectively, and each protuberance of one end of each described H profile steel and steel sheet pile mutually against; Multiple baffle plate, is located at the other end of each described H profile steel, and is positioned between each two described H profile steel, makes easy two protuberances of appointing of described steel sheet pile coordinate two H profile steel and baffle plate to define a space region; And multiple filler, be arranged at respectively among each space region.
Each described recess and protuberance are sequential like.
The straight plate that each described H profile steel comprises one first transverse slat respectively, one second transverse slat and connects first and second transverse slat, the lateral surface of each described first transverse slat and each protuberance of steel sheet pile mutually against, each described baffle plate is located at the second transverse slat medial surface of each two H profile steel respectively.
The beneficial effect of technique scheme of the present utility model is as follows:
The utility model can when ground excavation construction, steel sheet pile is utilized to use as dash, and utilize the cooperation of H profile steel, baffle plate and filler to use as gear soil simultaneously, and reach have preferably dash with the native intensity of gear, be easy to construct and construct rear callable effect.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model embodiment.
Fig. 2 is the generalized section of the utility model embodiment.
Fig. 3 is the using state figure of the utility model embodiment.
Detailed description of the invention
For making the technical problems to be solved in the utility model, technical scheme and advantage clearly, be described in detail below in conjunction with the accompanying drawings and the specific embodiments.
As shown in Figure 1 to Figure 3, the utility model provides a kind of construction work unit bulk head water retaining, and it comprises a steel sheet pile 1, multiple H profile steel 2, multiple baffle plate 3 and multiple filler 4.
Described steel sheet pile 1 comprises multiple to adjoin each other and in the recess 11 of sequential like and protuberance 12.
Each H profile steel 2 is located at steel sheet pile 1 side respectively, and each protuberance 12 of one end of each H profile steel 2 and steel sheet pile 1 mutually against, each H profile steel 2 comprises the straight plate 23 that one first transverse slat 21,1 second transverse slat 22 and connects first and second transverse slat 21,22 respectively, the lateral surface system of described first transverse slat 21 and each protuberance 13 of steel sheet pile 1 mutual against.
Each baffle plate 3 is located at the other end of each H profile steel 2, and be positioned between each two H profile steel 2, make each baffle plate 3 be located at the second transverse slat 22 medial surface of each two H profile steel 2 respectively, and make easy two protuberances 13 of appointing of steel sheet pile 1 coordinate two H profile steel 2 and baffle plate 3 to define a space region 31.
Each filler 4 is arranged among each space region 31 respectively.
When the utility model uses, steel sheet pile 1 can be squeezed in advance on the ground for construction, squeeze into H profile steel 2 more afterwards, and the lateral surface making the first transverse slat 21 of each H profile steel 2 respectively steel sheet pile 1 each protuberance 13 against, and baffle plate 3 is squeezed between each two H profile steel 2, each baffle plate 3 is made to be located at the second transverse slat 22 medial surface of each two H profile steel 2 respectively, now, the soil on ground does not then form filler 4 among each space region 31, if when still having the space do not filled up in each space region 31, then can inject filler 4 more in addition in each space region 31, so, assembling of the present utility model can be completed, required ground excavation construction is carried out in described steel sheet pile 1 side, or other construction works, use as dash (seepage in underground) executing steel sheet pile 1 described in utilization of hour, and utilize H profile steel 2 simultaneously, the cooperation of baffle plate 3 and filler 4 uses as gear soil, the effect that there is preferably dash and the native intensity of gear and be easy to construct is reached when ground excavation construction, and after construction completes, then steel sheet pile 1, each H profile steel 2 and each baffle plate 3 are directly extracted out by ground remove, and make the utility model after construction can in addition recycling.
The utility model can when ground excavation construction, steel sheet pile is utilized to use as dash, and utilize the cooperation of H profile steel, baffle plate and filler to use as gear soil simultaneously, and reach have preferably dash with the native intensity of gear, be easy to construct and construct rear callable effect.
The above is preferred embodiment of the present utility model; should be understood that; for those skilled in the art; under the prerequisite not departing from principle described in the utility model; can also make some improvements and modifications, these improvements and modifications also should be considered as protection domain of the present utility model.

Claims (3)

1. a construction work unit bulk head water retaining, is characterized in that, comprising: a steel sheet pile, has multiple adjacent recess and protuberance; Multiple H profile steel, is located at described steel sheet pile side respectively, and each protuberance of one end of each described H profile steel and steel sheet pile mutually against; Multiple baffle plate, is located at the other end of each described H profile steel, and is positioned between each two described H profile steel, makes easy two protuberances of appointing of described steel sheet pile coordinate two H profile steel and baffle plate to define a space region; And multiple filler, be arranged at respectively among each space region.
2. construction work unit bulk head water retaining according to claim 1, is characterized in that, each described recess and protuberance are sequential like.
3. construction work unit bulk head water retaining according to claim 1, it is characterized in that, the straight plate that each described H profile steel comprises one first transverse slat respectively, one second transverse slat and connects first and second transverse slat, the lateral surface of each described first transverse slat and each protuberance of steel sheet pile mutually against, each described baffle plate is located at the second transverse slat medial surface of each two H profile steel respectively.
CN201420804280.7U 2014-12-17 2014-12-17 A kind of construction work unit bulk head water retaining Expired - Fee Related CN204298849U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420804280.7U CN204298849U (en) 2014-12-17 2014-12-17 A kind of construction work unit bulk head water retaining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420804280.7U CN204298849U (en) 2014-12-17 2014-12-17 A kind of construction work unit bulk head water retaining

Publications (1)

Publication Number Publication Date
CN204298849U true CN204298849U (en) 2015-04-29

Family

ID=53104398

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420804280.7U Expired - Fee Related CN204298849U (en) 2014-12-17 2014-12-17 A kind of construction work unit bulk head water retaining

Country Status (1)

Country Link
CN (1) CN204298849U (en)

Similar Documents

Publication Publication Date Title
CN103758134B (en) A kind of construction method combining Double-row Piles Support system
CN204023501U (en) A kind of reinforcement Anti-seeping technology structure for earth and rockfill dam
CN104047621B (en) Based on the maximum section of passenger flow adit construction method of top small interval basement excavation condition
CN103882869A (en) Inclined supporting pile structure for foundation pit support and construction method thereof
CN106021753A (en) Calculation method for anti-overturning stability of double-row piles supporting structure
CN102995643A (en) Underground-space steel truss foundation pit supporting structure and construction method thereof
CN204608794U (en) A kind of transhipment mound platform for deep-foundation pit excavation
CN203383220U (en) Foundation pit supporting structure capable of reducing horizontal deformation of double-row piles
CN203668976U (en) Waterproof structure for joints of underground diaphragm walls
CN203768914U (en) Foundation pit bracing diagonal support pile structure
CN204298849U (en) A kind of construction work unit bulk head water retaining
CN204343338U (en) A kind of construction of diaphragm wall reinforcing cage syndeton
CN204212168U (en) A kind of dam water-retaining structure utilizing solution cavity to combine to build a dam
CN204212180U (en) A kind of reinforcing cage for basement plugging dewatering well
CN204112338U (en) There is the H profile steel structure of steel sheet pile
CN202370539U (en) Front tunnel face excavated soil pre-reinforcing structure of tunnel
CN104674780A (en) Karst stratum stabilization structure
CN104895008B (en) The construction method of environmentally friendly ecology wallboard type with ribbing barricade shore protection
CN204401622U (en) The working grout pipe of foundation grouting in a kind of construction work of improvement
CN204225033U (en) A kind of walling block for construction dyke
CN204212158U (en) A kind of Grouting Pipe with well
CN203514325U (en) Foundation pit stair support system with gravity type cement cob wall in combination with single rank of piles
CN205242415U (en) Hydraulic engineering salvagees protection module of usefulness
CN203034462U (en) A steel truss support structure for a ground pit of underground space
CN207131405U (en) Deep cheuch cut-and-cover tunnel structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Zhong Tie ChengJian Group Co., Ltd

Assignor: Yuan Chao

Contract record no.: 2015430000107

Denomination of utility model: Soil and water stop structure for constructional engineering

Granted publication date: 20150429

License type: Exclusive License

Record date: 20150717

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150429

Termination date: 20151217

EXPY Termination of patent right or utility model