CN204252124U - Steel pipe concrete profiled congruent pile - Google Patents

Steel pipe concrete profiled congruent pile Download PDF

Info

Publication number
CN204252124U
CN204252124U CN201420747884.2U CN201420747884U CN204252124U CN 204252124 U CN204252124 U CN 204252124U CN 201420747884 U CN201420747884 U CN 201420747884U CN 204252124 U CN204252124 U CN 204252124U
Authority
CN
China
Prior art keywords
steel pipe
pile
seed harvest
tube wall
extravasating hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420747884.2U
Other languages
Chinese (zh)
Inventor
吕连勋
李廷春
杜贻腾
段会玲
张永文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN201420747884.2U priority Critical patent/CN204252124U/en
Application granted granted Critical
Publication of CN204252124U publication Critical patent/CN204252124U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of steel pipe concrete profiled congruent pile, it comprises colored steel pipe, core Seed harvest and outer Seed harvest three part of pipe, wherein, flower steel pipe is provided with the extravasating hole of quincunx arrangement, and the tube wall between adjacent two row extravasating hole is provided with elongated stiffening rib, and the connected mode of stiffening rib and steel pipe is overall die casting or is welded to connect, the upper end of flower steel pipe tube wall is provided with screw thread, to connect high-pressure slip-casting equipment, flower steel pipe lower end is provided with back taper pile top, and pile top is also provided with extravasating hole; Core Seed harvest is the grout material of steel duct condensation after slip casting completes, and managing outer Seed harvest is the mixture Seed harvest that cement paste outside steel pipe and soil around pile are formed.The utility model carries out the consolidation process of ground by the method for floral tube slip casting, and slurries, after stake week, stratum was combined, improve resistance to capsizing and the bearing capacity of single pile of stake, and the supporting capacity of all grounds of stake simultaneously gets a promotion.

Description

Steel pipe concrete profiled congruent pile
Technical field
The utility model relates to pile foundation technical field, particularly relates to a kind of steel pipe concrete profiled congruent pile, is mainly used in process that is broken in the engineering constructions such as building structure, port works, road and bridge, soft foundation.
Background technology
Along with national economy increases fast, the infrastructure construction of China enters the stage of high speed development.The rise gradually of large scale industry, civilian construction, proposes very high requirement to the supporting capacity of ground.In fact, many engineerings have no alternative but build in the weakness, broken formation of complex geologic conditions, and this kind of ground bulk strength is low and Stiffness Distribution uneven, easily produce larger differential settlement.Improve the geological conditions of weak broken ground, improve the supporting capacity of ground, the inhomogeneous deformation of adjust structure, become the main task of soft foundation and broken basement process.
Pile foundation becomes the conventional means in basement process by means of good consolidation effect, it can improve foundation capability, improve the anti-seismic performance of structure, has been widely used in the basement process of all kinds of object of construction production.Existing treatment of soft foundation comprises castinplace pile, cement mixing pile, high-pressure rotary jet grouting pile and all kinds ofly sinks to stake etc.But, for the consolidation process of pole soft foundation or broken ground, at present still there is the rigidity of stake and intensity is lower, stake native between interaction more weak, process groundwork strength deficiency, there is the problems such as serious inhomogeneous deformation in structure, brings grave danger to the safe handling of engineering structures.Therefore, for the process of unfavorable geology ground, except the construction quality of work progress king-pile will be ensured, also need to research and develop that a kind of supporting capacity is high, the reliable Novel pile of consolidation effect.
Summary of the invention
Technical problem to be solved in the utility model is to provide a kind of steel pipe concrete profiled congruent pile, is solved the process problem of soft foundation, can improve bearing capacity and the resistance to capsizing of stake, improve foundation capability by the method for floral tube slip casting.
The purpose of this utility model is achieved through the following technical solutions:
A kind of steel pipe concrete profiled congruent pile, comprise colored steel pipe, core Seed harvest and the outer Seed harvest of pipe, it is characterized in that, described colored steel pipe is provided with the extravasating hole of quincunx arrangement, tube wall between adjacent two row extravasating hole is provided with elongated stiffening rib, and the upper end of flower steel pipe tube wall is provided with screw thread, to connect high-pressure slip-casting equipment, flower steel pipe lower end is provided with back taper pile top, and pile top is also provided with extravasating hole; Described core Seed harvest is after slip casting operation completes, the grout material of steel duct condensation; The outer Seed harvest of described pipe is after slip casting operation completes, the slurries Seed harvest outside flower steel pipe tube wall.
In above-mentioned steel pipe concrete profiled congruent pile, the internal diameter of described colored steel pipe is 200 ~ 300mm, and pipe thickness is not less than 5mm; The through tube wall of described extravasating hole, bore dia is 5mm ~ 10mm, in order to prevent cement paste in slip casting process from gushing out from stake week earth's surface, going up overflowing slurry pitch-row most and being not less than 500mm from tube wall upper end; Described stiffening rib and the connected mode of steel pipe are overall die casting or are welded to connect.
The piling method of the steel pipe concrete profiled congruent pile of the utility model, specifically comprises following process:
(1) pore-forming operation: inserted to play casing sleeve pipe behind location, stake position, then utilize rig to carry out pore-forming operation, in drilling process, casing sleeve pipe follows up gradually to projected depth, and borehole perpendicularity is no more than 1%;
(2) immersed tube operation: use vibration sinking tube mode to squeeze into design elevation in casing sleeve pipe by flower steel pipe, in immersed tube process, steel pipe verticality is no more than 1%;
(3) slip casting operation: pull out casing sleeve pipe, connect high-pressure slip-casting equipment and carry out slip casting in steel pipe, cement grout is seeped into surrounding formation by extravasating hole after being full of steel pipe, the hole of pile soil horizon is filled by slurries, forms rigid composite foundation after grout hardens.
The advantage of the steel pipe concrete profiled congruent pile of the utility model is:
(1) utilize the method soft soil foundation of flower steel pipe high-pressure slip-casting, slurries combine with stake week stratum, and improve the supporting capacity of stake week ground, consolidation effect is reliable;
(2) manage outer Seed harvest to be combined as a whole with flower steel pipe, core Seed harvest, increase the surface area of stake, improve resistance to capsizing and the bearing capacity of single pile of stake;
(3) use of stiffening rib had both improve the strength and stiffness of steel pipe itself, in turn increased the contact area of steel pipe and cement paste, enhanced the degree of engagement between Seed harvest and steel pipe;
(4) consolidation process of weakness, broken ground is applicable to, applied widely, construction technology is simple, Pile arrangement is flexible.
Accompanying drawing explanation
Fig. 1 is the utility model steel pipe concrete profiled congruent pile shaping structures figure;
Fig. 2 is the schematic cross-sectional view of the steel pipe concrete profiled congruent pile of the utility model;
Fig. 3 is colored steel pipe organigram of the present utility model.
Marginal data: 1-flower steel pipe; 2-core Seed harvest; 3-manages outer Seed harvest; 11-extravasating hole; 12-back taper pile top; 13-stiffening rib; 14-screw thread.
Detailed description of the invention
The utility model provides a kind of steel pipe concrete profiled congruent pile, for making the purpose of this utility model, technical scheme and effect clearly, clearly, is described in further detail its detailed description of the invention below in conjunction with accompanying drawing.
As shown in Figure 1 and Figure 2, steel pipe concrete profiled congruent pile of the present utility model, comprises colored steel pipe 1, core Seed harvest 2 and outer Seed harvest 3 three part of pipe, wherein, flower steel pipe 1 plays the effect of skeleton after pile, and its internal diameter is 200 ~ 300mm, and pipe thickness is not less than 5mm; Core Seed harvest 2 is grout materials of steel duct condensation after slip casting completes, and managing outer Seed harvest 3 is the mixture Seed harvest spending the cement paste outside steel pipe 1 and soil around pile to be formed.
As shown in Figure 3, flower steel pipe 1 is provided with the extravasating hole 11 of quincunx arrangement, the tube wall of the through colored steel pipe 1 of extravasating hole 11, and bore dia is 5mm ~ 10mm, in order to prevent cement paste in slip casting process from gushing out from stake week earth's surface, going up row's extravasating hole 11 most and being not less than 500mm apart from tube wall upper end; Tube wall between adjacent two row extravasating hole 11 is provided with elongated stiffening rib 13, and stiffening rib 13 is overall die casting with the connected mode of steel pipe or is welded to connect; The upper end of flower steel pipe 1 tube wall is provided with screw thread 14, to connect outside high-pressure slip-casting equipment; Flower steel pipe 1 lower end is provided with back taper pile top 12, and pile top is also provided with extravasating hole 11.
The piling method of the steel pipe concrete profiled congruent pile of the utility model is: rig pore-forming behind location, stake position also transfers casing sleeve pipe to projected depth, then uses vibration sinking tube mode to squeeze in casing sleeve pipe flower steel pipe 1 to design elevation; After pulling out casing sleeve pipe, connect high-pressure slip-casting equipment by the screw thread 14 of flower steel pipe 1 and carry out slip casting in steel pipe, be seeped into surrounding formation by extravasating hole 11 after cement grout is full of steel pipe, the hole of pile soil horizon filled by slurries, after grout hardens, forms rigid composite foundation.

Claims (2)

1. a steel pipe concrete profiled congruent pile, comprise colored steel pipe, core Seed harvest and the outer Seed harvest of pipe, it is characterized in that, described colored steel pipe is provided with the extravasating hole of quincunx arrangement, tube wall between adjacent two row extravasating hole is provided with elongated stiffening rib, the upper end of flower steel pipe tube wall is provided with screw thread, and flower steel pipe lower end is provided with back taper pile top, and pile top is also provided with extravasating hole; Described core Seed harvest is the grout material of steel duct condensation after slip casting completes; The outer Seed harvest of described pipe is the Seed harvest that cement paste outside steel pipe and soil around pile are formed.
2. steel pipe concrete profiled congruent pile as claimed in claim 1, is characterized in that, the through tube wall of extravasating hole of described colored steel pipe, and bore dia is 5mm ~ 10mm, goes up overflowing slurry pitch-row most and is not less than 500mm from tube wall upper end.
CN201420747884.2U 2014-12-04 2014-12-04 Steel pipe concrete profiled congruent pile Expired - Fee Related CN204252124U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420747884.2U CN204252124U (en) 2014-12-04 2014-12-04 Steel pipe concrete profiled congruent pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420747884.2U CN204252124U (en) 2014-12-04 2014-12-04 Steel pipe concrete profiled congruent pile

Publications (1)

Publication Number Publication Date
CN204252124U true CN204252124U (en) 2015-04-08

Family

ID=52956449

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420747884.2U Expired - Fee Related CN204252124U (en) 2014-12-04 2014-12-04 Steel pipe concrete profiled congruent pile

Country Status (1)

Country Link
CN (1) CN204252124U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113322982A (en) * 2021-04-28 2021-08-31 西安工业大学 Method for managing landslide of accumulation layer

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113322982A (en) * 2021-04-28 2021-08-31 西安工业大学 Method for managing landslide of accumulation layer

Similar Documents

Publication Publication Date Title
CN109899089A (en) Goaf grouting method based on pinniform horizontal branch directional drilling technique
CN102296630A (en) Construction method of long-screw high-pressure mix jetting cement diaphragm wall
CN102943466A (en) Construction method for miniature steel pipe concrete pile to penetrate through roadbed layer for reinforcing soft foundation construction
CN107386274A (en) Wear the compound isolation pile and its reinforced construction method of bridge pier in tunnel side
CN204199335U (en) A kind of pressure release well reducing PHC tube pile construction soil compaction effect
CN105256795A (en) End support type thread core composite pile and construction device and method for end support type thread core composite pile
WO2021004007A1 (en) Foundation reinforcement method for conventional building
CN104153783B (en) A kind of rich in subsoil water and loose sand sand cobble diversion tunnel construction technology
CN104863183B (en) Damping pilework and construction method is isolated in large cross-section tunnel proximity architecture construction
CN201762702U (en) Drilling bitten pile
CN102817361B (en) Double bushing top cover for broken rock curtain grouting and construction method of double bushing top cover
CN107060821A (en) A kind of many lithology method for protecting support of face
CN204252124U (en) Steel pipe concrete profiled congruent pile
CN103410529B (en) A kind of support of tunnel arch springing ruggedized construction for weak surrounding rock and construction method
CN205934916U (en) Steel casing pipe pore -forming anti -floating anchor rod
CN204609897U (en) A kind of pipe curtain freezing process supporting and protection structure
CN201183950Y (en) Self-propelling type anchor rod of seamless steel pipe
CN101565955B (en) Micro-stress shelter pile foundation strengthening method for present pile foundation
CN207109805U (en) Wear the compound isolation pile of bridge pier in a kind of tunnel side
CN202881962U (en) Foundation pit dewatering structure
CN105370306A (en) Mountain body tunnel excavation construction method adopting vertical pre-reinforcement treatment
CN207080242U (en) Shield tunnel termination bamboo reinforcement grouted anchor bar cup type lateral stiffening feature
CN105350544A (en) Waterproof curtain used for stone-contained area and construction method thereof
CN109162758A (en) A kind of Striping noise goaf grouting administering method
CN205062809U (en) End support type screw thread core composite pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150408

Termination date: 20161204