CN204199649U - Mobile operating frame - Google Patents

Mobile operating frame Download PDF

Info

Publication number
CN204199649U
CN204199649U CN201420531800.1U CN201420531800U CN204199649U CN 204199649 U CN204199649 U CN 204199649U CN 201420531800 U CN201420531800 U CN 201420531800U CN 204199649 U CN204199649 U CN 204199649U
Authority
CN
China
Prior art keywords
framework
space
gag lever
mobile operating
steel structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420531800.1U
Other languages
Chinese (zh)
Inventor
杭宏飞
赵亚军
李峰
戚海军
刘创
黄江
廖顺杨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201420531800.1U priority Critical patent/CN204199649U/en
Application granted granted Critical
Publication of CN204199649U publication Critical patent/CN204199649U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a kind of mobile operating frame, enclose around steel structure column for setting up, this mobile operating frame comprises base, framework, gag lever post and roller, framework to be arranged on base and to have the multilayer operating surface being positioned at differing heights, the sidepiece of framework has opening and caves inward to form a up/down perforation and untightly enclose space, steel structure column is located at and is enclosed in space, many gag lever posts are removably installed in opening part respectively and enclose space to close, and multiple roller is arranged under base.The utility model achieves 100% covering operation side, and improves the efficient of construction and safety further.

Description

Mobile operating frame
Technical field
The utility model relates to a kind of mobile operating frame, is specifically related to a kind of mobile operating frame be set up in order to auxiliary detection construction around steel work.
Background technology
Current Domestic structural steelwork gets more and more.Generally, after steel work completes, need to carry out coherent detection to steel work, as flaw detection, the ultrasound examination of steel pipe inner concrete, the construction of steel pipe outer coversheet etc.At this moment, just need to use handling frame, and handling frame generally adopts steel tube well cabinet frame, traveling stage or double ladder.But these existing conventional handling frames have following shortcoming: 1. steel pipe shape type is many, diameter is comparatively large, the scope of operation is wider; 2. adopt well cabinet frame set up costly and can not have enough to meet the need; 3. traveling stage coverage rate is complete and handling safety hidden danger is larger; 4. complete, the underaction of the same coverage rate of double ladder and handling safety hidden danger is larger.
Utility model content
For overcoming the defect existing for prior art, now providing a kind of simple and efficient mobile operating frame, achieving 100% covering operation side, and improve the efficient of construction and safety further.
For achieving the above object, a kind of mobile operating frame is provided, enclose around steel structure column for setting up, this mobile operating frame comprises base, framework, gag lever post and roller, framework to be arranged on base and to have the multilayer operating surface being positioned at differing heights, the sidepiece of framework has opening and caves inward to form a up/down perforation and untightly enclose space, steel structure column is located at and is enclosed in space, many gag lever posts are removably installed in opening part respectively and enclose space to close, and multiple roller is arranged under base.
The beneficial effect of the utility model mobile operating frame is,
1) by enclosing the removable gag lever post of interference fit to enclose steel structure column flexibly in framework;
2) face is done in the operation by being positioned at framework differing heights, so that constructor carries out coherent detection to steel structure column efficiently and safely on differing heights.
Preferably, the outer shape enclosing space and steel structure column formed is suitable.
Preferably, gag lever post is horizontally disposed with one by one along the short transverse of framework, and the two ends of each gag lever post respectively bolt are connected on the framework of opening part both sides.
Preferably, steel structure column is steel rectangle column or tubular pillar, and framework is located in the periphery of steel structure column by enclosing face, space three, and enclosing space is solid rectangle space.
Preferably, framework comprises: the multiple horizontal extension bar being built in the multiple perpendicular strut on base and being connected with perpendicular strut, and the multiple horizontal extension bar head and the tail being positioned at same level height are connected to form operating surface.
Accompanying drawing explanation
Fig. 1 is the perspective view after closing in the utility model mobile operating frame first embodiment;
Fig. 2 is the view before closing in Fig. 1;
Fig. 3 is the view before enclosing in Fig. 2;
Fig. 4 is the first structural representation of gag lever post in Fig. 1;
Fig. 5 is the first gag lever post shown in Fig. 4 and horizontal extension bar syndeton schematic diagram;
Fig. 6 is the first gag lever post shown in Fig. 4 and base connector schematic diagram;
Fig. 7 is the second structural representation of gag lever post in Fig. 1;
Fig. 8 is the second gag lever post shown in Fig. 7 and perpendicular strut connecting structure schematic diagram.
Detailed description of the invention
For the benefit of to the understanding of structure of the present utility model, be described below in conjunction with drawings and Examples.
Embodiment one:
With reference to Fig. 1, it is the perspective view after closing in the utility model mobile operating frame first embodiment.As shown in Figure 1, the utility model provides a kind of mobile operating frame, enclose in steel structure column 3 around for setting up, this mobile operating frame comprises base 12, framework 1, gag lever post 4 and roller 5, framework 1 to be arranged on base 12 and to have the multilayer operating surface 10 being positioned at differing heights, the sidepiece of framework 1 has opening and caves inward to form a up/down perforation and untightly enclose space 2, steel structure column 3 is located at and is enclosed in space 2, many gag lever posts 4 are detachably installed on opening part respectively and enclose space 2 to close, and multiple roller 5 is arranged under base 12.Wherein, above-mentioned gag lever post 4 is horizontally disposed with one by one along rectangular frame 1 short transverse, and each gag lever post 4 respectively bolt is connected on the framework 1 of opening part both sides, in this way, closes and encloses space 2.
With reference to Fig. 2, it is the view before closing in Fig. 1.As shown in Figure 2, particularly, in the present embodiment, above-mentioned steel structure column 3 is steel rectangle column or tubular pillar, above-mentioned framework 1 then three faces is located in the periphery of steel structure column 3, form with this " recessed " font comprehensive architecture extended to steel structure column 3 short transverse, and to be formed by framework 1 lateral recess and the outer shape of steel structure column is suitable encloses space 2 simultaneously, namely rectangle enclose space 2.
With reference to Fig. 3, it is the view before enclosing in Fig. 2.As shown in Figure 3, above-mentioned framework 1 comprises: the multiple horizontal extension bar 16 being built in the multiple perpendicular strut 14 on base 12 and being connected with perpendicular strut, and multiple horizontal extension bar 16 head and the tail being positioned at same level height are connected to form above-mentioned operating surface 10.Comparatively preferably, channel-section steel can be adopted as perpendicular strut 14, angle steel can be adopted as horizontal extension bar 16, channel-section steel can be adopted to be connected to form base 12.
After having said structure feature, shown in composition graphs 1 to Fig. 3, the present embodiment can be implemented by following process:
First, corresponding to the steel structure column 3 of rectangle, by multiple perpendicular strut 14 and the affixed formation of horizontal extension bar 16 " recessed " font space framework 1, wherein, be formed with rectangle in this comprehensive architecture and untightly enclose space 2.
Then, adopt the universal wheel of strap brake as the roller 5 bottom framework, also coordinate this to enclose space 2 by these rollers 5 simultaneously, promote to be somebody's turn to do " recessed " font space framework 1, above-mentioned enclose in space 2 so that steel structure column 3 is located at, wherein, space 2 is enclosed suitable with three contoured surfaces of rectangle steel structural column 3.
Finally, the two ends of multiple gag lever post 4 are installed on the framework 1 of opening part both sides respectively, enclose space 2 to close, and form complete rectangle mobile operating frame.Particularly, mounting limit bar 4 generally has two kinds of mounting methods:
One, reference Fig. 4 are the first structural representation of gag lever post in Fig. 1.As shown in Figure 4, the both sides of gag lever post 4 have the linkage section 40 extended to framework 1.With reference to the first gag lever post shown in Fig. 5, Fig. 4 and horizontal extension bar syndeton schematic diagram.As shown in Figure 5, offer corresponding bolt hole on this linkage section 40 and on the horizontal extension bar 16 of framework 1 opening part both sides, gag lever post 4 level is installed on horizontal extension bar 16 by the mode be bolted.With reference to Fig. 6, be the first gag lever post shown in Fig. 4 and base connector schematic diagram.As shown in Figure 6, if required for engineering also has, also can offer corresponding bolt hole on this linkage section 40 and on the base 12 of framework 1 opening part both sides, gag lever post 4 level is installed on base 12 by the mode be bolted.
Two, with reference to Fig. 7, it is the second structural representation of gag lever post in Fig. 1.As shown in Figure 7, the both sides of gag lever post 4 still have linkage section 40, and, under both sides linkage section 40, be connected with convex fastener 42.With reference to Fig. 8, be the second gag lever post shown in Fig. 7 and perpendicular strut connecting structure schematic diagram.As shown in Figure 8, concavity cutting ferrule 18 installed by the perpendicular strut 14 of framework 1 opening part both sides, then by convex fastener 42, gag lever post 4 is arranged in concavity cutting ferrule 18.
Again shown in composition graphs 1, in practice of construction, framework 1 opening part is respectively equipped with the gag lever post 4 in inside and outside two-layer vertical plane.Relatively be positioned at outer field gag lever post 4 and can adopt the first above-mentioned mounting method, the mode be namely bolted, outer field gag lever post 4 is installed on one by one respectively on horizontal extension bar 16 and base 12; And the gag lever post 4 being relatively positioned at internal layer can adopt above-mentioned the second mounting method, namely by blocking the connected mode of establishing, the gag lever post 4 of internal layer is installed on perpendicular strut 14 one by one.
Obviously, no matter use above-mentioned which kind of plant mounting method can constructability personnel dismounting.Like this, the steel structure column 3 of rectangle is just enclosed in this mobile operating frame completely.Constructor just can carry out a series of coherent detection by this mobile operating frame to steel structure column 3.
Certainly, for tackling difform steel structure column 3, the three-dimensional shape enclosing space 2 be recessed to form can be changed, develop out multiple embodiment with this, because the structure that can develop is too much, therefore, no longer be illustrated.Below only example is given one example again, implements two:
If steel structure column 3 is triangular prism, namely there are three edge-on contoured surfaces.Constructor then need form triangle and untightly enclose space 2 ' in framework 1 '.With this, what just the steel structure column 3 ' of triangular prism shape can be located in this encloses in space 2 ', recycles multiple gag lever post 4 ' and closes and enclose space 2 ', and form complete triangular solid mobile operating frame.
Below embodiment has been described in detail the utility model by reference to the accompanying drawings, and those skilled in the art can make many variations example to the utility model according to the above description.Thus, some details in embodiment should not formed restriction of the present utility model, the utility model by the scope that defines using appended claims as protection domain.

Claims (5)

1. a mobile operating frame, enclosing around steel structure column for setting up, it is characterized in that,
Described mobile operating frame comprises base, framework, gag lever post and roller, described framework to be arranged on described base and to have the multilayer operating surface being positioned at differing heights, the sidepiece of described framework has opening and caves inward to form a up/down perforation and untightly enclose space, described steel structure column encloses in space described in being located at, many described gag lever posts are removably installed in described opening part respectively and enclose space described in closing, and multiple described roller is arranged under described base.
2. mobile operating frame according to claim 1, is characterized in that,
The outer shape enclosing space and described steel structure column described in being formed is suitable.
3. mobile operating frame according to claim 2, is characterized in that,
Described gag lever post is horizontally disposed with one by one along the short transverse of described framework, and the two ends of each described gag lever post respectively bolt are connected on the described framework of described opening part both sides.
4. mobile operating frame according to claim 3, is characterized in that,
Described steel structure column is steel rectangle column or tubular pillar, encloses the periphery that face, space three is located in described steel structure column described in described framework passes through, described in enclose space be solid rectangle space.
5. the mobile operating frame according to claim 3 or 4, is characterized in that,
Described framework comprises the multiple perpendicular strut be built on described base and the multiple horizontal extension bar be connected with described perpendicular strut, and the multiple described horizontal extension bar head and the tail being positioned at same level height are connected to form described operating surface.
CN201420531800.1U 2014-09-16 2014-09-16 Mobile operating frame Active CN204199649U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420531800.1U CN204199649U (en) 2014-09-16 2014-09-16 Mobile operating frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420531800.1U CN204199649U (en) 2014-09-16 2014-09-16 Mobile operating frame

Publications (1)

Publication Number Publication Date
CN204199649U true CN204199649U (en) 2015-03-11

Family

ID=52657621

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420531800.1U Active CN204199649U (en) 2014-09-16 2014-09-16 Mobile operating frame

Country Status (1)

Country Link
CN (1) CN204199649U (en)

Similar Documents

Publication Publication Date Title
CN204076498U (en) A kind of Precast T-Beam beam rib steel-bar binding location moulding bed
CN103114681B (en) High-altitude long-span reinforced concrete beam treat pouring structure
CN206545307U (en) It is a kind of to be constructed by the bolted concrete folding plate piece of steel plate
CN207700068U (en) A kind of modularization Bridge Pier Construction job platform
CN204199649U (en) Mobile operating frame
CN204152231U (en) Socket type safety guard rail
CN108252218A (en) A kind of large span cable-carried arch bridge steel lagging jack external wrapping concrete bed die slide device
CN206298994U (en) A kind of waveform energy-dissipating and shock-absorbing steel plate, rubber concrete compound shear wall
CN206187284U (en) Pitching pile formula safety railing
CN204644878U (en) A kind of transom pier steel truss girder lifting construction device
CN204843228U (en) Production hoist is with electric welding protective screen
CN204386154U (en) Wall internal corner concrete casting shaping equipment
CN206591818U (en) Pier stud vertical stratification integrative protection template
CN206591443U (en) Pier stud vertical stratification integrative protection template
CN202689529U (en) Deformation-joint steel flying die template
CN206091308U (en) Be used for reinforced (rfd) supporting platform device of big steel form of outer wall
CN206205905U (en) A kind of chassis suitable for City Subway Station abnormity big cross section lining cutting one-piece casting
CN205225331U (en) A link device can be dismantled to rotation type for tunnel convergence detects
CN204703542U (en) The assembled passage of a kind of Construction of Steel Structure regularization
CN204781425U (en) Light antiknock wall system based on hard shield board of type B steel
CN208431002U (en) The exchange apparatus for work of tunnel excavation trolley and anchor pole Operation Van
CN203403660U (en) Indoor scaffold
CN106984066A (en) A kind of chromatographic column safeguards pylon
CN203403681U (en) Temporary supporting frame of string beam
CN203361165U (en) Supporting beam connection structure for building foundation pit support