CN204163084U - Subway Tunnel power line downcast deep foundation ditch combined enclosure structure - Google Patents

Subway Tunnel power line downcast deep foundation ditch combined enclosure structure Download PDF

Info

Publication number
CN204163084U
CN204163084U CN201420521197.9U CN201420521197U CN204163084U CN 204163084 U CN204163084 U CN 204163084U CN 201420521197 U CN201420521197 U CN 201420521197U CN 204163084 U CN204163084 U CN 204163084U
Authority
CN
China
Prior art keywords
power line
wall
downcast
foundation ditch
subway tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420521197.9U
Other languages
Chinese (zh)
Inventor
王宗勇
武明静
王剑
雷军
赵香萍
李晓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 12th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
China Railway 12th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 12th Bureau Group Co Ltd, Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical China Railway 12th Bureau Group Co Ltd
Priority to CN201420521197.9U priority Critical patent/CN204163084U/en
Application granted granted Critical
Publication of CN204163084U publication Critical patent/CN204163084U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model belongs to Subway Tunnel ventilating shaft space enclosing structure, specifically a kind of Subway Tunnel power line downcast deep foundation ditch combined enclosure structure.Solve the problem that existing Subway Tunnel high-tension electricity downcast construction risk is large, cost is high, working procedure is complicated, a kind of Subway Tunnel power line downcast deep foundation ditch combined enclosure structure, comprise the circle drilled pile bottom the foundation ditch below power line, drilled pile top is connected with Guan Liang, in hat beam, side stay has concrete support, a circle catchwater is provided with outside hat beam, be provided with a circle outside catchwater and put slope section spray anchor wall, put slope section spray anchor wall by anchor rod anchored, put and to be provided with outside slope section spray anchor wall that a circle is anti-floods wall, anti-flooding outside wall is provided with infrared rays height-limiting alarm.The utility model makes full use of puts the advantages such as construction safety height is large behind slope, not only accelerating construction progress, reduces construction cost, and guarantees construction safety, simplifies working procedure.

Description

Subway Tunnel power line downcast deep foundation ditch combined enclosure structure
Technical field
The utility model belongs to Subway Tunnel ventilating shaft space enclosing structure, specifically a kind of Subway Tunnel power line downcast deep foundation ditch combined enclosure structure.
Background technology
China's city underground siding-to-siding block length, more than 1600 meters, just must establish ventilating shaft, and the ventilating shaft degree of depth is comparatively dark, and long interval general Dou Shilishi center is comparatively far away, and ground high-tension electricity is more.Current domestic interval ventilating shaft is boring fender post substantially, but when there being high-tension electricity above interval ventilating shaft, if directly adopt boring fender post, need to set up protection canopy, not only have a big risk, cost is high, and needs to reequip equipment, and work efficiency is low.The at present also not i.e. safe but also space enclosing structure of easy construction.
Summary of the invention
The utility model, in order to solve the problem that existing Subway Tunnel high-tension electricity downcast construction risk is large, cost is high, working procedure is complicated, provides a kind of Subway Tunnel power line downcast deep foundation ditch combined enclosure structure.
The utility model takes following technical scheme: a kind of Subway Tunnel power line downcast deep foundation ditch combined enclosure structure, comprise the circle drilled pile bottom the foundation ditch below power line, drilled pile top is connected with Guan Liang, in hat beam, side stay has concrete support, be provided with a circle catchwater outside hat beam, be provided with a circle outside catchwater and put slope section spray anchor wall, put slope section spray anchor wall by anchor rod anchored, put and to be provided with outside slope section spray anchor wall that a circle is anti-floods wall, anti-flooding outside wall is provided with infrared rays height-limiting alarm.
The described gradient of putting slope section spray anchor wall is 1:1.
Described puts slope section spray anchor wall toe elevation higher than groundwater level 1 meter.
The utility model construction sequence is as follows: first carry out putting slope excavation with Miniature digging machine, and carry out shotcrete, until put slope to excavate in groundwater table 1 meter; Then infrared rays height-limiting alarm is utilized to carry out drilled pile construction; Finally carry out Guan Liang and concrete support, form combined enclosure structure.
Compared with prior art, the utility model has following beneficial effect:
1) first carry out putting slope with Miniature digging machine to excavate in groundwater table 1 meter and carry out bolt-spary supports, be not only drilled pile and construction space is provided, construction safety, and cancel protection canopy, reduce construction cost.
2) utilize infrared rays height-limiting alarm, after putting slope, drilled pile construction is carried out on ground, not only do not need to reequip equipment, accelerating construction progress greatly, and reduce the merogenesis of stake, greatly simplify working procedure.
The utility model makes full use of puts the advantages such as construction safety height is large behind slope, not only accelerating construction progress, reduces construction cost, and guarantees construction safety, simplifies working procedure.Have that technique is simple, advanced technology, the advantage such as practical.
Accompanying drawing explanation
Fig. 1 is floor map of the present utility model;
Fig. 2 is vertical section of the present utility model schematic diagram;
In figure: 1-power line, 2-is anti-floods wall, 3-anchor pole, and 4-puts slope section shotcrete wall, 5-catchwater, 6 drilled piles, 7-concrete support, 8-infrared rays height-limiting alarm, 9-Guan Liang.
Detailed description of the invention
As shown in Figure 1, 2, a kind of Subway Tunnel power line downcast deep foundation ditch combined enclosure structure, comprise the circle drilled pile 6 bottom the foundation ditch below power line 1, drilled pile 6 top is connected with hat beam 9, and in hat beam 9, side stay has concrete support 7, is provided with a circle catchwater 5 outside hat beam 9, be provided with a circle outside catchwater 5 and put slope section spray anchor wall 4, put slope section spray anchor wall 4 by anchor pole 3 anchoring, put and to be provided with outside slope section spray anchor wall 4 that a circle is anti-floods wall 2, anti-flooding outside wall 2 is provided with infrared rays height-limiting alarm 8.
Described, the gradient of putting slope section spray anchor wall 4 is 1:1.
Described, put slope section spray anchor wall 4 toe elevation higher than groundwater level 1 meter.
During concrete enforcement, comprise the following steps:
Step one, soil nail wall space enclosing structure is constructed.
A, ground are built by laying bricks or stones and prevents flooding wall; B, ground erection infrared rays height-limiting alarm; C, put slope by the 1:1 gradient and excavate more than phreatic line 1 meter; Anchor is sprayed in time after D, construction anchor pole.
Step 2, bored pile structure construction.
A, under toe, build catchwater; B, the stake of employing reverse circular technique construction drill; Excavation is continued after C, construction Guan Liang and concrete support.

Claims (3)

1. a Subway Tunnel power line downcast deep foundation ditch combined enclosure structure, it is characterized in that: comprise circle drilled pile (6) bottom the foundation ditch below power line (1), drilled pile (6) top is connected with Guan Liang (9), Guan Liang (9) interior side stay has concrete support (7), Guan Liang (9) outside is provided with a circle catchwater (5), catchwater (5) outside is provided with a circle and puts slope section spray anchor wall (4), put slope section spray anchor wall (4) by anchor pole (3) anchoring, put slope section spray anchor wall (4) outside and be provided with that a circle is anti-floods wall (2), anti-wall (2) outside of flooding is provided with infrared rays height-limiting alarm (8).
2. Subway Tunnel power line downcast deep foundation ditch combined enclosure structure according to claim 1, is characterized in that: the gradient of putting slope section spray anchor wall (4) is 1:1.
3. Subway Tunnel power line downcast deep foundation ditch combined enclosure structure according to claim 1, is characterized in that: put slope section spray anchor wall (4) toe elevation higher than groundwater level 1 meter.
CN201420521197.9U 2014-09-12 2014-09-12 Subway Tunnel power line downcast deep foundation ditch combined enclosure structure Expired - Fee Related CN204163084U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420521197.9U CN204163084U (en) 2014-09-12 2014-09-12 Subway Tunnel power line downcast deep foundation ditch combined enclosure structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420521197.9U CN204163084U (en) 2014-09-12 2014-09-12 Subway Tunnel power line downcast deep foundation ditch combined enclosure structure

Publications (1)

Publication Number Publication Date
CN204163084U true CN204163084U (en) 2015-02-18

Family

ID=52536789

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420521197.9U Expired - Fee Related CN204163084U (en) 2014-09-12 2014-09-12 Subway Tunnel power line downcast deep foundation ditch combined enclosure structure

Country Status (1)

Country Link
CN (1) CN204163084U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108625376A (en) * 2018-05-08 2018-10-09 中铁十八局集团有限公司 The construction method of fender post under a kind of high-voltage line
CN114541408A (en) * 2022-03-03 2022-05-27 中铁四局集团有限公司 Air-contained shaft structure at front upper part of end well of underground station and underpass construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108625376A (en) * 2018-05-08 2018-10-09 中铁十八局集团有限公司 The construction method of fender post under a kind of high-voltage line
CN114541408A (en) * 2022-03-03 2022-05-27 中铁四局集团有限公司 Air-contained shaft structure at front upper part of end well of underground station and underpass construction method thereof
CN114541408B (en) * 2022-03-03 2023-06-02 中铁四局集团有限公司 Front upper part wind-containing well structure of underground station end well and underpass construction method thereof

Similar Documents

Publication Publication Date Title
CN103758134B (en) A kind of construction method combining Double-row Piles Support system
CN105298507B (en) A kind of underground pipe gallery construction method of top open cut bottom tunneler construction
CN204552747U (en) A kind of coal mine shaft lining shaft wall structure
CN204098043U (en) After staying soil, excavation is in conjunction with inner support Retaining Structure with Double-row Piles
CN103306682B (en) Long-span and high-side-wall underground space building and excavation support method thereof
CN103114595A (en) Support method and device of support pile preformed core-soil double-buttress inclined inner-strut foundation ditch
CN204139197U (en) Bottom enlarging prestress anchoring pile wind energy conversion system basis
CN103939115B (en) A kind of method of half shallow mining method hangar tunnel and structure
CN109056810A (en) The transverse direction that open cut or lid dig underground main structure below existing building digs construction and its construction method
CN103243721B (en) Highrise Building With Raft Foundation and Core Walls Structure excavation construction method under Unfavorable geology condition
CN106120822B (en) A kind of method for protecting support and device that prevent mud stone from coming down
CN104141500A (en) Hardened sand gravel stratum cavern construction method
CN204163084U (en) Subway Tunnel power line downcast deep foundation ditch combined enclosure structure
CN203716156U (en) Pit-in-pit city gate hole type excavation construction structure in deep foundation pit
CN204825923U (en) Relay formula underground structure
CN204311456U (en) Foundation ditch strengthening structure
CN204040041U (en) A kind of front close rear thin Double-row Piles Support system being provided with vertical anchor pole
CN203498860U (en) Anchor rod foundation structure with concrete blocks for photovoltaic module brackets
CN203498841U (en) Inclined pile vertical anchor rod supporting structure used for foundation pit supporting
CN208815566U (en) The transverse direction that open cut or lid dig underground main structure below existing building digs construction
CN103306248A (en) High dam spillway foundation drainage system and excavation method
CN203625911U (en) Soil discharging construction structure with pit-in-pit door opening arranged in deep foundation pit
CN203429645U (en) Slope support structure assembly
CN105178355A (en) Stratum pre-reinforcement treatment method for underground space construction
CN203514325U (en) Foundation pit stair support system with gravity type cement cob wall in combination with single rank of piles

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150218