CN204150669U - The splicing of U pipe, pay-off - Google Patents

The splicing of U pipe, pay-off Download PDF

Info

Publication number
CN204150669U
CN204150669U CN201420610482.8U CN201420610482U CN204150669U CN 204150669 U CN204150669 U CN 204150669U CN 201420610482 U CN201420610482 U CN 201420610482U CN 204150669 U CN204150669 U CN 204150669U
Authority
CN
China
Prior art keywords
materials
tube
feed belt
pay
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420610482.8U
Other languages
Chinese (zh)
Inventor
刘忠
易粟
董波
田壘
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongshan CLG Automation Equipment Co Ltd
Original Assignee
Zhongshan CLG Automation Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongshan CLG Automation Equipment Co Ltd filed Critical Zhongshan CLG Automation Equipment Co Ltd
Priority to CN201420610482.8U priority Critical patent/CN204150669U/en
Application granted granted Critical
Publication of CN204150669U publication Critical patent/CN204150669U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Structure Of Belt Conveyors (AREA)

Abstract

The U pipe splicing that the utility model relates to, pay-off, comprise materials in the tube carriage mechanism, materials in the tube conveyer mechanism, it is characterized in that: materials in the tube carriage mechanism comprises the materials in the tube bracket of upper and lower translation and drives the first actuating device, the vertical guide rail structure of the upper and lower translation of materials in the tube bracket; Materials in the tube conveyer mechanism comprises the materials in the tube feed belt of horizontal transmission and drives pivotal second actuating device of materials in the tube feed belt, live roller structure; Described materials in the tube bracket is positioned at materials in the tube feed belt both sides or homonymy, and upwards translation is higher than materials in the tube feed belt driving surface for materials in the tube bracket, and the downward translation of materials in the tube bracket is lower than materials in the tube feed belt driving surface.It is simple that the utility model object is to provide a kind of structure, U pipe splicing easy to use, pay-off.

Description

The splicing of U pipe, pay-off
Technical field
The utility model relates to a kind of pay-off, particularly a kind of U-shaped bend pipe is transferred to the splicing of U pipe, the pay-off of assigned address from splicing pipe bending machine.
Background technology
The general rotation material receiving mechanism that adopts of existing U pipe comes splicing, feeding.Rotate material receiving mechanism and comprise a swivel mount, swivel mount is provided with splicing platform, when bend pipe is sent from pipe bending machine, rotate material receiving mechanism and catch a pile U pipe, rotate the downward swing of material receiving mechanism subsequently, under Gravitative Loads, many U pipes slide along the table top rotating material receiving mechanism downward-sloping together, cause the very large sound, mutually collide simultaneously between single U pipe, easily scrape flower prod, affect product design.For this reason, the applicant through long-time research, innovation and creation this application technology.
Utility model content
In order to solve above-mentioned technical matters, the utility model provides a kind of structure simple, U pipe splicing easy to use, pay-off.
The utility model solves the technical scheme that its technical matters adopts:
The splicing of U pipe, pay-off, comprise materials in the tube carriage mechanism, materials in the tube conveyer mechanism, it is characterized in that: materials in the tube carriage mechanism comprises the materials in the tube bracket of upper and lower translation and drives the first actuating device, the vertical guide rail structure of the upper and lower translation of materials in the tube bracket; Materials in the tube conveyer mechanism comprises the materials in the tube feed belt of horizontal transmission and drives pivotal second actuating device of materials in the tube feed belt, live roller structure; Described materials in the tube bracket is positioned at materials in the tube feed belt both sides or homonymy, and upwards translation is higher than materials in the tube feed belt driving surface for materials in the tube bracket, and the downward translation of materials in the tube bracket is lower than materials in the tube feed belt driving surface.
U pipe described above splicing, pay-off, it is characterized in that: materials in the tube conveyer mechanism is arranged on a bracing frame, bracing frame is arranged on a line slideway, bracing frame is provided with and can clamps or the quick clip of loose line slideway, quick clip is provided with handle, be rotationally connected by two connecting panels between handle and the support body of quick clip, handle lower end is provided with the chuck that can be pressed on line slideway.
U pipe described above splicing, pay-off, is characterized in that: the first actuating device is lift cylinder.
U pipe described above splicing, pay-off, it is characterized in that: vertical guide rail structure is the two upright guide rails and orienting sleeve that vertically arrange, orienting sleeve is arranged on bracing frame, and materials in the tube bracket is arranged on guide rail upper end, and guide rail movable set is upper and lower in orienting sleeve to slide axially.
U pipe described above splicing, pay-off, is characterized in that: the second actuating device is DC speed-reducing.
U pipe described above splicing, pay-off, is characterized in that: materials in the tube feed belt is the single feed belt joining end to end into closed loop.
U pipe described above splicing, pay-off, is characterized in that: materials in the tube feed belt is two feed belt, and two feed belts are arranged side by side.
The beneficial effects of the utility model are: materials in the tube carriage mechanism comprises the materials in the tube bracket of upper and lower translation, materials in the tube conveyer mechanism comprises the materials in the tube feed belt of horizontal transmission, materials in the tube bracket is positioned at materials in the tube feed belt both sides or homonymy, materials in the tube bracket upwards translation higher than materials in the tube feed belt driving surface, and the downward translation of materials in the tube bracket is lower than materials in the tube feed belt driving surface, by materials in the tube bracket, U pipe is also transmitted vertically downward from splicing pipe bending machine like this, until U pipe hanger leans against on materials in the tube feed belt, materials in the tube bracket continues to move down to manage with U and departs from completely subsequently, now U pipe fitly lies on the transmission table top of materials in the tube feed belt one by one, then DC speed-reducing is started, U pipe is sent to the position of setting by materials in the tube feed belt one by one, U is there will not be to manage the sound of collision mutually and scratch phenomenon in whole transport process, structure is simple, easy to use.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is described in further detail.
Fig. 1 is the utility model structural representation.
Detailed description of the invention
As shown in Figure 1, the splicing of U pipe, pay-off, comprise materials in the tube carriage mechanism, materials in the tube conveyer mechanism, and materials in the tube carriage mechanism comprises the materials in the tube bracket 11 of upper and lower translation and drives the first actuating device 12, the vertical guide rail structure 13 of the upper and lower translation of materials in the tube bracket; Materials in the tube conveyer mechanism comprises the materials in the tube feed belt 21 of horizontal transmission and drives pivotal second actuating device 22 of materials in the tube feed belt, live roller structure 23; Materials in the tube bracket 11 is positioned at materials in the tube feed belt 21 both sides, and upwards translation is higher than materials in the tube feed belt 21 driving surface for materials in the tube bracket 11, and materials in the tube bracket 11 translation is downwards lower than materials in the tube feed belt 21 driving surface.
Wherein, materials in the tube conveyer mechanism is arranged on a bracing frame 3, bracing frame 3 is arranged on a line slideway 4, bracing frame 3 is provided with and can clamps or the quick clip 31 of loose line slideway, quick clip is provided with handle, be rotationally connected by two connecting panels between handle and the support body of quick clip, handle lower end is provided with the chuck that can be pressed on line slideway.
Concrete enforcement structure is as follows: the first actuating device 12 is lift cylinder.Vertical guide rail structure 13 is the two upright guide rails and orienting sleeve that vertically arrange, and orienting sleeve is arranged on bracing frame, and materials in the tube bracket 11 is arranged on guide rail upper end, and guide rail movable set is upper and lower in orienting sleeve to slide axially.Second actuating device 22 is DC speed-reducing.
Further improvement: materials in the tube feed belt 21 is the single feed belt joining end to end into closed loop.Or materials in the tube feed belt 21 is two feed belts, and two feed belts are arranged side by side.
Further improvement: materials in the tube bracket 11 has been arranged side by side one group of chute 110, the multiple U pipes got off from pipe bending machine can directly correspondence slip in each chute 110.

Claims (7)

  1. The splicing of 1.U pipe, pay-off, comprise materials in the tube carriage mechanism, materials in the tube conveyer mechanism, it is characterized in that: materials in the tube carriage mechanism comprises the materials in the tube bracket of upper and lower translation and drives the first actuating device, the vertical guide rail structure of the upper and lower translation of materials in the tube bracket; Materials in the tube conveyer mechanism comprises the materials in the tube feed belt of horizontal transmission and drives pivotal second actuating device of materials in the tube feed belt, live roller structure; Described materials in the tube bracket is positioned at materials in the tube feed belt both sides or homonymy, and upwards translation is higher than materials in the tube feed belt driving surface for materials in the tube bracket, and the downward translation of materials in the tube bracket is lower than materials in the tube feed belt driving surface.
  2. 2. the splicing of U pipe, pay-off according to claim 1, it is characterized in that: described materials in the tube conveyer mechanism is arranged on a bracing frame, bracing frame is arranged on a line slideway, bracing frame is provided with and can clamps or the quick clip of loose line slideway, quick clip is provided with handle, be rotationally connected by two connecting panels between handle and the support body of quick clip, handle lower end is provided with the chuck that can be pressed on line slideway.
  3. 3. the splicing of U pipe, pay-off according to claim 2, is characterized in that: described first actuating device is lift cylinder.
  4. 4. the splicing of U pipe, pay-off according to claim 2, it is characterized in that: described vertical guide rail structure is the two upright guide rails and orienting sleeve that vertically arrange, orienting sleeve is arranged on bracing frame, materials in the tube bracket is arranged on guide rail upper end, and guide rail movable set is upper and lower in orienting sleeve to slide axially.
  5. 5. the splicing of U pipe, pay-off according to claim 2, is characterized in that: described second actuating device is DC speed-reducing.
  6. 6. the splicing of U pipe, pay-off according to claim 2, is characterized in that: described materials in the tube feed belt is the single feed belt joining end to end into closed loop.
  7. 7. the splicing of U pipe, pay-off according to claim 1, is characterized in that: described materials in the tube feed belt is two feed belts, and two feed belts are arranged side by side.
CN201420610482.8U 2014-10-18 2014-10-18 The splicing of U pipe, pay-off Active CN204150669U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420610482.8U CN204150669U (en) 2014-10-18 2014-10-18 The splicing of U pipe, pay-off

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420610482.8U CN204150669U (en) 2014-10-18 2014-10-18 The splicing of U pipe, pay-off

Publications (1)

Publication Number Publication Date
CN204150669U true CN204150669U (en) 2015-02-11

Family

ID=52508807

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420610482.8U Active CN204150669U (en) 2014-10-18 2014-10-18 The splicing of U pipe, pay-off

Country Status (1)

Country Link
CN (1) CN204150669U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107814207A (en) * 2017-04-03 2018-03-20 内蒙古硕博自动化科技有限公司 A kind of petal special shape processes automatic material connection Palletizer
CN108620504A (en) * 2018-07-19 2018-10-09 珠海格力智能装备有限公司 Material receiving mechanism and angle pipe equipment with it
CN113942825A (en) * 2021-09-09 2022-01-18 山东华滋自动化技术股份有限公司 Plunger paste finished product transferring and conveying device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107814207A (en) * 2017-04-03 2018-03-20 内蒙古硕博自动化科技有限公司 A kind of petal special shape processes automatic material connection Palletizer
CN108620504A (en) * 2018-07-19 2018-10-09 珠海格力智能装备有限公司 Material receiving mechanism and angle pipe equipment with it
CN113942825A (en) * 2021-09-09 2022-01-18 山东华滋自动化技术股份有限公司 Plunger paste finished product transferring and conveying device

Similar Documents

Publication Publication Date Title
CN203697155U (en) Automatic plate cutting device
CN205324937U (en) All -round cutting production line
CN203612601U (en) Elevator door board conveying location device
CN204150669U (en) The splicing of U pipe, pay-off
CN207566443U (en) A kind of automatical feeding system
CN101623780A (en) Full-automatic fixed-length cutting device of metallic hose
CN203996998U (en) A kind of automatic placement foaming machine structure of ceramic tile packaging machine
CN204416776U (en) A kind of yarn group automatic removing barrel device
CN201470976U (en) Full-automatic fixed-length cutting device of metal hoses
CN112027632A (en) Pipe fitting continuous conveying device
CN203127772U (en) Transferring device for carton stacking
CN202461813U (en) Automatic warehouse system
CN204416447U (en) A kind of automatic feed mechanism
CN103625667A (en) Aluminum pipe bagging device
CN206050919U (en) A kind of positioning clamping structure in sponge production line
CN103447876B (en) A kind of pipeline lifting device
CN202861251U (en) Automatic material-receiving device for long U-shaped copper pipe bending machine
CN204624654U (en) A kind of manufacturing line automatic charging device
CN205170028U (en) Automatic wire feeder send line controlling means
CN205675851U (en) A kind of material volume automatic roll-changing device
CN104555532A (en) Ratchet-type transfer device for supplying paper
CN204310075U (en) Bucket wrap up in film device
CN207671202U (en) A kind of Furniture panel feed device
CN205615735U (en) Automatic receiving device of baling line
CN107457277A (en) Tube Drawing device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: U pipe material receiving and feeding device

Effective date of registration: 20170622

Granted publication date: 20150211

Pledgee: China Everbright Bank Co., Ltd. Zhongshan branch

Pledgor: Zhongshan Keligao Automation Equipment Co., Ltd.

Registration number: 2017440020014

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20180801

Granted publication date: 20150211

Pledgee: China Everbright Bank Co., Ltd. Zhongshan branch

Pledgor: Zhongshan Keligao Automation Equipment Co., Ltd.

Registration number: 2017440020014

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: U pipe material receiving and feeding device

Effective date of registration: 20180806

Granted publication date: 20150211

Pledgee: China Everbright Bank Zhongshan branch

Pledgor: Zhongshan Keligao Automation Equipment Co., Ltd.

Registration number: 2018440020047

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20190917

Granted publication date: 20150211

Pledgee: China Everbright Bank Zhongshan branch

Pledgor: Zhongshan Keligao Automation Equipment Co., Ltd.

Registration number: 2018440020047

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: U tube receiving and feeding device

Effective date of registration: 20200928

Granted publication date: 20150211

Pledgee: China Everbright Bank Zhongshan branch

Pledgor: ZHONGSHAN CLG AUTOMATION EQUIPMENT Co.,Ltd.

Registration number: Y2020980006521

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20211015

Granted publication date: 20150211

Pledgee: China Everbright Bank Zhongshan branch

Pledgor: ZHONGSHAN CLG AUTOMATION EQUIPMENT Co.,Ltd.

Registration number: Y2020980006521