CN204139308U - Promotion formula is built - Google Patents
Promotion formula is built Download PDFInfo
- Publication number
- CN204139308U CN204139308U CN201420514824.6U CN201420514824U CN204139308U CN 204139308 U CN204139308 U CN 204139308U CN 201420514824 U CN201420514824 U CN 201420514824U CN 204139308 U CN204139308 U CN 204139308U
- Authority
- CN
- China
- Prior art keywords
- wall
- terrace
- promotion formula
- steel
- roof truss
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
The utility model provides a kind of promotion formula to build, and comprises terrace, body of wall, metal roofing board; Its feature is directly fixed on described terrace at described body of wall, basic under the terrace under described body of wall being also evenly provided with some walls; Terrace in described body of wall is also evenly provided with some row's center pillars, described wall-body energy saving is provided with continuous shaped steel, described center pillar is installed with steel roof truss, and described steel roof truss two ends are fixedly connected on described continuous shaped steel respectively; Promotion formula building of the present utility model, connects support with roof/wall surface and replaces covering to carry out Transfer of Shear, make method for designing more meet domestic specification; Promoting body of wall to be namely fender member, is also main carrying and Force transmission parts, the indoor terrace that it is being built prefabricated (containing decorating structure), adopts crane to install location, utilizes temporary support to support simultaneously; That alien invasion is handsome in appearance is durable, construction is more safe and efficient.
Description
Technical field
The utility model relates to the utility model and relates to industry and residential construction area, particularly relates to a kind of promotion formula building.
Background technology
Portal Frame Light Steel Structure is widely used in factory building, depot establishment, and adopt shaped steel to make portal-rigid frames, light gauge cold-formed steel shape makes purlin and wall beam, and profiled sheet or light-weight laminboard make roofing, metope space enclosing structure.On the one hand, colored steel exterior wall needs often to safeguard, generally needs to change every Two decades years; On the other hand, colored steel exterior wall workmanship requires high, cannot require too high to details such as receipts limits.
Such as U.S. Tilt-up building system is in the low-rise building field of non-inhabitation, application is very extensive, and such as logistics center, commercial centre, low layer office building, almost major part all adopts this system.Tilt-up body of wall is steel concrete, and intensity is large, impact resistant, without the need to frequent maintenance; Meanwhile, Tilt-up body of wall is prefabricated at the scene, utilizes the mould flexibly of base plate, can make various lines, chamfering, in conjunction with various surfacing, as smart as a new pin.
But the roofing of Tilt-up building system, must have enough flat in-plane stiffness, main thicker Deck plate and the truss purlins of utilizing forms covering.Roofing covering is used for transmitting shearing that main body system wind load or geological process produce to Tilt-up body of wall.
Therefore, provide a kind of new factory building, depot establishment system (promotion building system) and construction method thereof, lack specification in order to solve domestic technique, the problem of shear-resistant membrane investigation and application is necessary.
Utility model content
To achieve these goals, the utility model provides a kind of promotion formula to build.
Promotion formula building of the present utility model comprises terrace, body of wall, metal roofing board;
Described body of wall is directly fixed on described terrace, basic under the terrace under described body of wall being also evenly provided with some walls; Terrace in described body of wall is also evenly provided with some row's center pillars, described wall-body energy saving is provided with continuous shaped steel, described center pillar is installed with steel roof truss, and described steel roof truss two ends are fixedly connected on described continuous shaped steel respectively;
Steel roof truss on described center pillar is provided with some tie-rods between any two; Described some tie-rods are also provided with roof truss horizontal support between any two;
Described steel roof truss is evenly fixedly installed some purlins, and described some purlins are fixedly connected with by fixed bar between any two;
Described metal roofing board surrounding and described wall connecting.
Further, described some purlins are also provided with roof/wall surface between any two and connect support.
Further, described promotion formula building also comprises temporary support, and described temporary support one end is supported in terrace, and the other end is supported in body of wall.
Further, described body of wall is made up of some wallboards, and described wallboard is fire-retardant wall plate or prefabricated reinforced concrete shingle nail.
Further, described roof/wall surface connection supports cloth is set to closed.
Further, described center pillar is reinforced concrete post or steel column, and suspension column is in rigid frame direction is all arranged to just connect with vertical rigid frame direction.
Further, described center pillar lower end is also provided with middle patten, and described middle patten is fixedly installed in described terrace.
Further, described horizontal support arranges twice along promoting body of wall, and its middle and upper part (or outside) gathers together, ensures to promote body of wall to have a fulcrum every 2 ~ 3 meters.
Wherein:
Adopting roof/wall surface to connect support can replace covering to carry out Transfer of Shear;
Namely body of wall is fender member, is also main carrying and Force transmission parts, the indoor terrace that it is being built prefabricated (containing decorating structure), adopts crane to install location, utilizes temporary support to support simultaneously;
Described in the horizontal support of described body of wall, steel roof truss place arranges shaped steel continuously, ensures that shearing is along the even transmission of promoting body of wall.
Promotion formula building of the present utility model, connects support with roof/wall surface and replaces covering to carry out Transfer of Shear, make method for designing more meet domestic specification; Promoting body of wall to be namely fender member, is also main carrying and Force transmission parts, the indoor terrace that it is being built prefabricated (containing decorating structure), adopts crane to install location, utilizes temporary support to support simultaneously; That alien invasion is handsome in appearance is durable, construction is more safe and efficient.
Accompanying drawing explanation
Fig. 1 is the structural representation of the embodiment 1 of promotion formula of the present utility model building
Fig. 2 is the structural representation of the embodiment 2 of promotion formula of the present utility model building
Indicate in figure: 1 be body of wall, 2 be indoor terrace, 4 be center pillar, 5 be steel roof truss, 6 support for roof/wall surface connects, 7 be roof truss horizontal support, 8 be tie-rod, 9 be purlin, 10 be metal roofing board, 11 be temporary support, 12 be continuous shaped steel for basis, 3 under wall.
Detailed description of the invention
Below with reference to the accompanying drawings embodiment of the present utility model is described.The element described in an accompanying drawing of the present utility model or a kind of embodiment and feature can combine with the element shown in one or more other accompanying drawings or embodiment and feature.It should be noted that for purposes of clarity, accompanying drawing and eliminate expression and the description of parts that have nothing to do with the utility model, known to persons of ordinary skill in the art or process in illustrating.
Below in conjunction with accompanying drawing, the utility model is described further.
Promotion formula building of the present utility model as shown in Figure 1.
Promotion formula building of the present utility model comprises terrace 3, body of wall 1, metal roofing board 10;
Described body of wall 1 is directly fixed on described terrace 3, the terrace 3 under described body of wall 1 is also evenly provided with basis 2 under some walls; Terrace 3 in described body of wall 1 is also evenly provided with 3 row's center pillars 4, described body of wall 1 inner surface is provided with continuous shaped steel 12, described center pillar 4 is installed with steel roof truss 5, described steel roof truss 5 two ends are fixedly connected on described continuous shaped steel 12 respectively;
Steel roof truss on described center pillar is provided with 1 tie-rod between any two; Described tie-rod is also provided with roof truss horizontal support 7 between any two;
Described steel roof truss 5 is evenly fixedly installed 26 purlins, described purlin 9 is fixedly connected with by fixed bar between any two;
Described metal roofing board 10 surrounding is connected with described body of wall 1.
Described purlin 9 is also provided with roof/wall surface between any two and connects support 6.
Described promotion formula building also comprises temporary support 11, and described temporary support 11 one end is supported in terrace, and the other end is supported in body of wall.
Described body of wall 1 is made up of 26 blocks of wallboards, and described wallboard is fire-retardant wall plate or prefabricated reinforced concrete shingle nail.
Described roof/wall surface connects support 6 and is arranged to close.
Described center pillar 4 is reinforced concrete post or steel column, and suspension column is in rigid frame direction is all arranged to just connect with vertical rigid frame direction.
Described center pillar 4 lower end is also provided with middle patten, and described middle patten is fixedly installed in described terrace 3.
Described continuous shaped steel arranges twice along promoting body of wall, and its middle and upper part (or outside) gathers together, ensures to promote body of wall to have a fulcrum every 2 ~ 3 meters.
Wherein, described temporary support 11 in particular cases can be used as supplemental support effect the movement of this building needs.
Embodiment 2;
Promotion formula building of the present utility model as shown in Figure 2,
Embodiment 2 is substantially the same manner as Example 1, and unique difference is that embodiment 2 li does not arrange temporary support 11.
Promotion formula building of the present utility model, connects support with roof/wall surface and replaces covering to carry out Transfer of Shear, make method for designing more meet domestic specification; Promoting body of wall to be namely fender member, is also main carrying and Force transmission parts, the indoor terrace that it is being built prefabricated (containing decorating structure), adopts crane to install location, utilizes temporary support to support simultaneously; That alien invasion is handsome in appearance is durable, construction is more safe and efficient.
Although described the utility model and advantage thereof in detail, be to be understood that and can have carried out various change when not exceeding the spirit and scope of the present utility model limited by appended claim, substituting and conversion.And the scope of the application is not limited only to the specific embodiment of process, equipment, means, method and step described by manual.One of ordinary skilled in the art will readily appreciate that from disclosure of the present utility model, can use perform the function substantially identical with corresponding embodiment described herein or obtain and its substantially identical result, existing and that will be developed in the future process, equipment, means, method or step according to the utility model.Therefore, appended claim is intended to comprise such process, equipment, means, method or step in their scope.
Claims (8)
1. promote formula building for one kind, comprise terrace, body of wall, metal roofing board; It is characterized in that:
Described body of wall is directly fixed on described terrace, basic under the terrace under described body of wall being also evenly provided with some walls; Terrace in described body of wall is also evenly provided with some row's center pillars, described wall-body energy saving is provided with continuous shaped steel, described center pillar is installed with steel roof truss, and described steel roof truss two ends are fixedly connected on described continuous shaped steel respectively;
Steel roof truss on described center pillar is provided with some tie-rods between any two; Described some tie-rods are also provided with roof truss horizontal support between any two;
Described steel roof truss is evenly fixedly installed some purlins, and described some purlins are fixedly connected with by fixed bar between any two;
Described metal roofing board surrounding and described wall connecting.
2. promotion formula building according to claim 1, is characterized in that: described some purlins are also provided with roof/wall surface between any two and connect support.
3. promotion formula building according to claim 1, is characterized in that: described promotion formula building also comprises temporary support, and described temporary support one end is supported in terrace, and the other end is supported in body of wall.
4. promotion formula building according to claim 1, it is characterized in that: described body of wall is made up of some wallboards, described wallboard is fire-retardant wall plate or prefabricated reinforced concrete shingle nail.
5. promotion formula building according to claim 2, is characterized in that: described roof/wall surface connects supports cloth and is set to closed.
6. promotion formula according to claim 1 building, is characterized in that: described center pillar is reinforced concrete post or steel column, and suspension column is in rigid frame direction is all arranged to just connect with vertical rigid frame direction.
7. promotion formula building according to claim 1, it is characterized in that: described center pillar lower end is also provided with middle patten, described middle patten is fixedly installed in described terrace.
8. promotion formula building according to claim 1, is characterized in that: described horizontal support arranges twice along promoting body of wall, gathers together in its middle and upper part or outside, ensures to promote body of wall to have a fulcrum every 2 ~ 3 meters.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420514824.6U CN204139308U (en) | 2014-09-09 | 2014-09-09 | Promotion formula is built |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420514824.6U CN204139308U (en) | 2014-09-09 | 2014-09-09 | Promotion formula is built |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204139308U true CN204139308U (en) | 2015-02-04 |
Family
ID=52416005
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420514824.6U Withdrawn - After Issue CN204139308U (en) | 2014-09-09 | 2014-09-09 | Promotion formula is built |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204139308U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104213632A (en) * | 2014-09-09 | 2014-12-17 | 上海欧本钢结构有限公司 | Lifting type building and construction method thereof |
-
2014
- 2014-09-09 CN CN201420514824.6U patent/CN204139308U/en not_active Withdrawn - After Issue
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104213632A (en) * | 2014-09-09 | 2014-12-17 | 上海欧本钢结构有限公司 | Lifting type building and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104947788B (en) | A kind of modular assembly formula building systems and its method of construction | |
CN204983131U (en) | DGC modularization prefabricated buildings system | |
CN203097361U (en) | Novel steel structure workshop | |
CN106193311A (en) | Modular assembled building structure | |
CN205475682U (en) | Prefabricated light board building structure system of light steel of assembled | |
CN102561513A (en) | Unit cabin type building system | |
CN205153114U (en) | Lightweight steel structure modularized residential building | |
CN205935217U (en) | Modular assembly formula building structure | |
CN202273317U (en) | Detachable single-layer lightweight steel construction movable house | |
CN107338907A (en) | A kind of cross lowly reinforced external wrapping concrete shaped steel Special-Shaped Column | |
CN205875823U (en) | Close rib steel structure of transformer substation's assembled | |
CN105089149A (en) | Side elevation system of aluminum alloy house | |
CN105040813B (en) | The preceding facade system in aluminium alloy house | |
CN204139308U (en) | Promotion formula is built | |
CN205475877U (en) | Compound outer thermal insulation walling system of assembled self preservation temperature wallboard | |
CN204919808U (en) | Side direction facade system in aluminum alloy house | |
CN204919802U (en) | Preceding facade system in aluminum alloy house | |
CN204940529U (en) | The side elevation system in aluminium alloys house | |
CN204919800U (en) | Back facade system in aluminum alloy house | |
CN104213632B (en) | Promotion formula building and construction process thereof | |
CN203412312U (en) | Thermal-insulating integrated template wallboard construction building | |
CN105040811A (en) | Rear vertical face system of aluminum alloy house | |
CN107542223A (en) | A kind of T-shaped lowly reinforced external wrapping concrete shaped steel Special-Shaped Column | |
CN204959980U (en) | Simple to operate's floor connection structure | |
CN105089148A (en) | Side elevation system of aluminum alloy house |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20150204 Effective date of abandoning: 20160817 |
|
C25 | Abandonment of patent right or utility model to avoid double patenting |