CN104213632B - Promotion formula building and construction process thereof - Google Patents
Promotion formula building and construction process thereof Download PDFInfo
- Publication number
- CN104213632B CN104213632B CN201410455558.9A CN201410455558A CN104213632B CN 104213632 B CN104213632 B CN 104213632B CN 201410455558 A CN201410455558 A CN 201410455558A CN 104213632 B CN104213632 B CN 104213632B
- Authority
- CN
- China
- Prior art keywords
- wall
- terrace
- roof truss
- support
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The present invention provides a kind of promotion formula building, including terrace, body of wall, metal roofing board;Its feature is directly fixed on described terrace at described body of wall, if being also evenly arranged with under dry wall basis on the terrace under described body of wall;Also be evenly arranged with some row's center pillars on terrace in described body of wall, described wall-body energy saving is provided with continuous shaped steel, and described center pillar is installed with steel roof truss, and described steel roof truss two ends are respectively fixedly connected with on described continuous shaped steel;The promotion formula building of the present invention and construction process method thereof, connect support with roof/wall surface and replace eyelid covering to carry out Transfer of Shear so that method for designing more meets domestic specification;Promoting body of wall is i.e. fender member, is also main carrying and Force transmission parts, and it is at the indoor terrace poured prefabricated (containing decorating structure), uses crane to install location, utilizes temporary support to support simultaneously;That alien invasion is handsome in appearance is durable, construction is more safe and efficient.
Description
Technical field
The present invention relates to industry and residential construction area, particularly relate to a kind of promotion formula building
And construction process.
Background technology
Portal Frame Light Steel Structure is widely used in Factory Building, depot establishment, uses shaped steel to make portal-rigid frames,
Light gauge cold-formed steel shape is made purlin and wall beam, profiled sheet or light-weight laminboard and is made roofing, metope building enclosure.
On the one hand, colored steel exterior wall needs often to safeguard, typically changes every 20 years needs;On the other hand, colored steel
Exterior wall is done manual work and is required height, cannot require the highest to details such as receiving limit.
Such as U.S.'s Tilt-up building system is in the low-rise building field of non-inhabitation, applies extremely wide,
Such as logistics center, commercial center, low layer office building, almost major part all uses this system.Tilt-up
Body of wall is armored concrete, and intensity is big, impact resistant, it is not necessary to often safeguard;Meanwhile, Tilt-up body of wall exists
In-situ precast, utilizes the mould flexibly of base plate, can make various lines, chamfering, in conjunction with various surfaces
Process, as smart as a new pin.
But, the roofing of Tilt-up building system, it is necessary to have the most flat in-plane stiffness, main utilization is thicker
Deck plate and truss purlins form eyelid covering.Roofing eyelid covering is used for transmitting main body system wind load or geological process is produced
Raw shearing is to Tilt-up body of wall.
Therefore it provides a kind of new Factory Building, depot establishment system (promotion building system) and construction method thereof,
Lacking specification in order to solve domestic technique, the problem of shear-resistant membrane research and application is necessary.
Summary of the invention
To achieve these goals, the present invention provides a kind of promotion formula building.
The promotion formula building of the present invention includes terrace, body of wall, metal roofing board;
Described body of wall is directly fixed on described terrace, if being also evenly arranged with on the terrace under described body of wall
Basis under dry wall;Some row's center pillars, described wall-body energy saving also it is evenly arranged with on terrace in described body of wall
Being provided with continuous shaped steel, described center pillar is installed with steel roof truss, described steel roof truss two ends are fixing respectively to be connected
It is connected on described continuous shaped steel;
Steel roof truss on described center pillar is provided with some tie-rods between any two;Described some tie-rods are between any two
It is additionally provided with roof truss horizontal support;
Being fixedly uniformly arranged with some purlins on described steel roof truss, described some purlins are between any two by solid
Fixed pole is fixing to be connected;
Described metal roofing board surrounding and described wall connecting.
Further, described some purlins are additionally provided with roof/wall surface between any two and connect support.
Further, described promotion formula building also includes that temporary support, described temporary support one end are supported in ground
Level ground, the other end is supported in body of wall.
Further, if described body of wall is made up of drywall panel, described wallboard is fire-retardant wall plate or precast reinforced coagulation
Cob wall panel.
Further, described roof/wall surface connection support is arranged to Guan Bi.
Further, described center pillar is reinforced column or steel column, and suspension column is in rigid frame direction with the most just
Frame direction is all provided with being set to just connect.
Further, described center pillar lower end is additionally provided with middle column foundation, and described middle column foundation is fixedly installed describedly
In level ground.
Further, described horizontal support along promoting body of wall to arrange, gather together by twice, its middle and upper part or outside,
Ensure to promote body of wall to have a fulcrum every 2~3 meters.
The present invention also provides for a kind of construction process promoting formula to build, it is characterised in that: comprise the steps:
A. terrace is poured, including basic under wall and middle column foundation;
B. precast wall body on the indoor terrace poured, uses crane to install location, and uses temporary support
Support and promote body of wall;
C. install or cast-in-place center pillar install steel roof truss, tie-rod and roof truss horizontal support after center pillar is installed;
D., roof purline and metal roofing board are installed;
E., roof/wall surface is installed and connects support;
F. facade decorative model, removes the temporary support promoting metope, and later work terminates.
Further, described step C is installed steel roof truss, tie-rod and roof truss horizontal support expansion joint should be set,
Described expansion joint should be arranged along the steel roof truss of both sides.
Further, described step D is installed the connection of described roof/wall surface and supports in addition to roof structure demand, Ying Bu
It is set to Guan Bi.
Wherein:
Use roof/wall surface connection support to can substitute for eyelid covering and carry out Transfer of Shear;
Body of wall is i.e. fender member, is also main carrying and Force transmission parts, and it is at the indoor terrace poured
Prefabricated (containing decorating structure), uses crane to install location, utilizes temporary support to support simultaneously;
Continuous shaped steel is arranged, it is ensured that shearing is along promoting wall at steel roof truss described in the horizontal support of described body of wall
Uniformly transferring of body.
The promotion formula building of the present invention and construction process method thereof, connect support with roof/wall surface and replace eyelid covering to pass
Pass shearing so that method for designing more meets domestic specification;Promoting body of wall is i.e. fender member, is also main
Carrying and Force transmission parts, it is at the indoor terrace poured prefabricated (containing decorating structure), uses crane to install
Location, utilizes temporary support to support simultaneously;That alien invasion is handsome in appearance is durable, construction is more safe and efficient.
Accompanying drawing explanation
Fig. 1 is the structural representation of the promotion formula building of the present invention
Figure indicates: 1 be body of wall, 2 be basis under wall, 3 be terrace, 4 be center pillar, 5 be steel roof truss, 6
For roof/wall surface connect support, 7 be roof truss horizontal support, 8 for tie-rod, 9 for purlin, 10 be metal roofing board,
11 be temporary support, 12 for continuous shaped steel.
Detailed description of the invention
Below with reference to the accompanying drawings embodiments of the invention are described.An accompanying drawing or a kind of embodiment party in the present invention
Element and feature described in formula can be with the elements shown in one or more other accompanying drawings or embodiment
Combine with feature.It should be noted that, for purposes of clarity, accompanying drawing and explanation eliminate with the present invention without
That close, parts known to persons of ordinary skill in the art or the expression of process and description.
Below in conjunction with the accompanying drawings the present invention is described further.
The promotion formula building of the present invention as shown in Figure 1.
The promotion formula building of the present invention includes terrace 3, body of wall 1, metal roofing board 10;
Described body of wall 1 is directly fixed on described terrace 3, on the terrace 3 under described body of wall 1 the most uniformly
If being provided with under dry wall basis 2;3 row's center pillars 4, institute also it is evenly arranged with on terrace 3 in described body of wall 1
State body of wall 1 inner surface and be provided with continuous shaped steel 12, described center pillar 4 is installed with steel roof truss 5, described
Steel roof truss 5 two ends are respectively fixedly connected with on described continuous shaped steel 12;
Steel roof truss on described center pillar is provided with 1 tie-rod between any two;Described tie-rod the most also sets
It is equipped with roof truss horizontal support 7;
Being fixedly uniformly arranged with 26 purlins on described steel roof truss 5, described purlin 9 is between any two by solid
Fixed pole is fixing to be connected;
Described metal roofing board 10 surrounding is connected with described body of wall 1.
Described purlin 9 is additionally provided with roof/wall surface between any two and connects support 6.
Described promotion formula building also includes that temporary support 11, described temporary support 11 one end are supported in terrace,
The other end is supported in body of wall.
Described body of wall 1 is made up of 26 blocks of wallboards, and described wallboard is fire-retardant wall plate or prefabricated reinforced concrete metope
Plate.
Described roof/wall surface connects support 6 and is arranged to Guan Bi.
Described center pillar 4 is reinforced column or steel column, and suspension column is in rigid frame direction and vertical rigid frame direction
It is all provided with being set to just connect.
Described center pillar 4 lower end is additionally provided with middle column foundation, and described middle column foundation is fixedly installed in described terrace 3.
Described continuous shaped steel along promoting body of wall to arrange, gather together by twice, its middle and upper part or outside, it is ensured that carries
Pull out body of wall and have a fulcrum every 2~3 meters.
The present invention also provides for a kind of construction process promoting formula to build, it is characterised in that: comprise the steps:
A. terrace 3 is poured, including basis 2 and middle column foundation under wall;
B. precast wall body 1 on the indoor terrace poured, uses crane to install location, and uses interim
Support: 11 promote body of wall;
C. install or cast-in-place center pillar 4 and after center pillar 4 is installed, steel roof truss 5 is installed, tie-rod 8 and roof truss level are propped up
Support 7;
D., roof purline 9 and metal roofing board 10 are installed;
E., roof/wall surface is installed and connects support 6;
F. facade decorative model, removes the temporary support 11 promoting metope, and later work terminates.
Described step C is installed steel roof truss 5, tie-rod 8 and roof truss horizontal support 7 expansion joint should be set, described
Expansion joint should be arranged along the steel roof truss of both sides.
Described step D is installed described roof/wall surface connection 6 support in addition to roof structure demand, should be arranged to close
Close.
The promotion formula building of the present invention and construction process method thereof, connect support with roof/wall surface and replace eyelid covering to pass
Pass shearing so that method for designing more meets domestic specification;Promoting body of wall is i.e. fender member, is also main
Carrying and Force transmission parts, it is at the indoor terrace poured prefabricated (containing decorating structure), uses crane to install
Location, utilizes temporary support to support simultaneously;That alien invasion is handsome in appearance is durable, construction is more safe and efficient.
Although the present invention of being described in detail and advantage thereof it should be appreciated that without departing from by appended power
Profit can carry out various change in the case of requiring the spirit and scope of the present invention limited, substitute and convert.
And, scope of the present application is not limited only to the process described by description, equipment, means, method and steps
Specific embodiment.One of ordinary skilled in the art will readily appreciate that from the disclosure, root
According to the present invention can use execution the function essentially identical to corresponding embodiment described herein or acquisition and its
Essentially identical result, existing and the most to be developed process, equipment, means, method or step.
Therefore, appended claim is directed in the range of them including such process, equipment, means, side
Method or step.
Claims (10)
1. promote formula building, including terrace, body of wall, metal roofing board for one kind;It is characterized in that:
Described body of wall is directly fixed on described terrace, if being also evenly arranged with under dry wall basis on the terrace under described body of wall;Also being evenly arranged with some row's center pillars on terrace in described body of wall, described wall-body energy saving is provided with continuous shaped steel, and described center pillar is installed with steel roof truss, and described steel roof truss two ends are respectively fixedly connected with on described continuous shaped steel;
Steel roof truss on described center pillar is provided with some tie-rods between any two;Described some tie-rods are additionally provided with roof truss horizontal support between any two;
Being fixedly uniformly arranged with some purlins on described steel roof truss, described some purlins connect by fixing bar is fixing between any two;
Described metal roofing board surrounding and described wall connecting.
Promotion formula the most according to claim 1 is built, it is characterised in that: described some purlins are additionally provided with roof/wall surface between any two and connect support.
Promotion formula the most according to claim 1 is built, it is characterised in that: described promotion formula building also includes that temporary support, described temporary support one end are supported in terrace, and the other end is supported in body of wall.
Promotion formula the most according to claim 1 is built, it is characterised in that: if described body of wall is made up of drywall panel, described wallboard is fire-retardant wall plate or prefabricated reinforced concrete shingle nail.
Promotion formula the most according to claim 2 is built, it is characterised in that: described roof/wall surface connects support and is arranged to Guan Bi.
Promotion formula the most according to claim 1 is built, it is characterised in that: described center pillar is reinforced column or steel column, and suspension column is in rigid frame direction and vertical rigid frame direction and is all provided with being set to just connect.
Promotion formula the most according to claim 1 is built, it is characterised in that: described center pillar lower end is additionally provided with middle column foundation, and described middle column foundation is fixedly installed in described terrace.
Promotion formula the most according to claim 1 is built, it is characterised in that: described horizontal support along promoting body of wall to arrange, gather together by twice, its middle and upper part or outside, it is ensured that promotes body of wall to have a fulcrum every 2~3 meters.
9. the construction process promoting formula to build, it is characterised in that: comprise the steps:
A. terrace is poured, including basic under wall and middle column foundation;
B. precast wall body on the indoor terrace poured, uses crane to install location, and uses temporary support to support promotion body of wall;
C. install or cast-in-place center pillar install steel roof truss, tie-rod and roof truss horizontal support after center pillar is installed;
D., roof purline and metal roofing board are installed;
E., roof/wall surface is installed and connects support;
F. facade decorative model, removes the temporary support promoting metope, and later work terminates.
A kind of construction process promoting formula to build the most according to claim 9, it is characterised in that: installing steel roof truss, tie-rod and roof truss horizontal support in described step C and should arrange expansion joint, described expansion joint should be arranged along the steel roof truss of both sides.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410455558.9A CN104213632B (en) | 2014-09-09 | 2014-09-09 | Promotion formula building and construction process thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410455558.9A CN104213632B (en) | 2014-09-09 | 2014-09-09 | Promotion formula building and construction process thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104213632A CN104213632A (en) | 2014-12-17 |
CN104213632B true CN104213632B (en) | 2016-08-17 |
Family
ID=52095514
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410455558.9A Active CN104213632B (en) | 2014-09-09 | 2014-09-09 | Promotion formula building and construction process thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104213632B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111877537A (en) * | 2020-07-23 | 2020-11-03 | 江阴市华厦建设工程有限公司 | Lifting type building and building method thereof |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3798856A (en) * | 1972-05-24 | 1974-03-26 | W Gloskowski | Tilt-up wall panel brace assembly |
US4802316A (en) * | 1987-07-28 | 1989-02-07 | The Burke Company | Eave truss and method for supporting and reinforcing a concrete or masonry wall and metal roof structure |
US5491948A (en) * | 1993-12-22 | 1996-02-20 | Harris; Dallas L. | Tilt-up concrete pad and method of forming and erecting the tilt-up concrete pad |
US20070234664A1 (en) * | 2006-03-23 | 2007-10-11 | Kenneth Matthew Tucker | Method of forming a decorative concrete wall |
CN201526173U (en) * | 2008-07-11 | 2010-07-14 | 金胜财 | Assembly type portable housing with double slopes |
CN201276862Y (en) * | 2008-09-27 | 2009-07-22 | 李永峰 | Heat-preserving environment-friendly shockproof house |
US8245446B2 (en) * | 2009-06-23 | 2012-08-21 | Hp Doors, Llc | Tilt-up door |
US20110047895A1 (en) * | 2009-09-02 | 2011-03-03 | Finch Larry O | Tilt-up wall brace dolly and method of use |
CN204139308U (en) * | 2014-09-09 | 2015-02-04 | 上海欧本钢结构有限公司 | Promotion formula is built |
-
2014
- 2014-09-09 CN CN201410455558.9A patent/CN104213632B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN104213632A (en) | 2014-12-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104947788B (en) | A kind of modular assembly formula building systems and its method of construction | |
CN103374986B (en) | A kind of multifunction combined light weight concrete construction curtain wall and preparation method thereof | |
CN203866966U (en) | Novel assembly type frame core tube steel structure residential housing system | |
CN204983131U (en) | DGC modularization prefabricated buildings system | |
CN204940928U (en) | Packaged type aluminium alloys house | |
CN206570920U (en) | One kind utilizes ALC plates design production assembled architecture | |
CN106193311A (en) | Modular assembled building structure | |
CN103982038B (en) | A kind of for solar energy separate house modularization rapid-assembling construction method | |
CN106703201A (en) | Fabricated integrated building and production method thereof | |
CN106088667A (en) | A kind of Windproof anti-seismic, the movable dwellings of employing steel construction herringbone beam | |
CN105089149A (en) | Side elevation system of aluminum alloy house | |
CN105040813B (en) | The preceding facade system in aluminium alloy house | |
CN201972417U (en) | Lightweight wood structure roof system | |
CN104213632B (en) | Promotion formula building and construction process thereof | |
CN204919800U (en) | Back facade system in aluminum alloy house | |
CN204919802U (en) | Preceding facade system in aluminum alloy house | |
CN105040811B (en) | The rear facade system in aluminium alloy house | |
CN204919808U (en) | Side direction facade system in aluminum alloy house | |
CN204940529U (en) | The side elevation system in aluminium alloys house | |
CN204139316U (en) | A kind of steel structure shear wall structure system | |
CN203412312U (en) | Thermal-insulating integrated template wallboard construction building | |
CN106193410A (en) | A kind of precast concrete small-sized self waterproofing heat insulation house surface system | |
CN204139308U (en) | Promotion formula is built | |
CN105089148B (en) | The lateral facade system in aluminium alloy house | |
CN102251581B (en) | Steel beam-reinforced concrete floor structure and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |