CN104213632B - Promotion formula building and construction process thereof - Google Patents

Promotion formula building and construction process thereof Download PDF

Info

Publication number
CN104213632B
CN104213632B CN201410455558.9A CN201410455558A CN104213632B CN 104213632 B CN104213632 B CN 104213632B CN 201410455558 A CN201410455558 A CN 201410455558A CN 104213632 B CN104213632 B CN 104213632B
Authority
CN
China
Prior art keywords
wall
terrace
roof truss
support
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410455558.9A
Other languages
Chinese (zh)
Other versions
CN104213632A (en
Inventor
陈明
唐鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI OPEN STEEL JOIST CO Ltd
Original Assignee
SHANGHAI OPEN STEEL JOIST CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI OPEN STEEL JOIST CO Ltd filed Critical SHANGHAI OPEN STEEL JOIST CO Ltd
Priority to CN201410455558.9A priority Critical patent/CN104213632B/en
Publication of CN104213632A publication Critical patent/CN104213632A/en
Application granted granted Critical
Publication of CN104213632B publication Critical patent/CN104213632B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention provides a kind of promotion formula building, including terrace, body of wall, metal roofing board;Its feature is directly fixed on described terrace at described body of wall, if being also evenly arranged with under dry wall basis on the terrace under described body of wall;Also be evenly arranged with some row's center pillars on terrace in described body of wall, described wall-body energy saving is provided with continuous shaped steel, and described center pillar is installed with steel roof truss, and described steel roof truss two ends are respectively fixedly connected with on described continuous shaped steel;The promotion formula building of the present invention and construction process method thereof, connect support with roof/wall surface and replace eyelid covering to carry out Transfer of Shear so that method for designing more meets domestic specification;Promoting body of wall is i.e. fender member, is also main carrying and Force transmission parts, and it is at the indoor terrace poured prefabricated (containing decorating structure), uses crane to install location, utilizes temporary support to support simultaneously;That alien invasion is handsome in appearance is durable, construction is more safe and efficient.

Description

Promotion formula building and construction process thereof
Technical field
The present invention relates to industry and residential construction area, particularly relate to a kind of promotion formula building And construction process.
Background technology
Portal Frame Light Steel Structure is widely used in Factory Building, depot establishment, uses shaped steel to make portal-rigid frames, Light gauge cold-formed steel shape is made purlin and wall beam, profiled sheet or light-weight laminboard and is made roofing, metope building enclosure. On the one hand, colored steel exterior wall needs often to safeguard, typically changes every 20 years needs;On the other hand, colored steel Exterior wall is done manual work and is required height, cannot require the highest to details such as receiving limit.
Such as U.S.'s Tilt-up building system is in the low-rise building field of non-inhabitation, applies extremely wide, Such as logistics center, commercial center, low layer office building, almost major part all uses this system.Tilt-up Body of wall is armored concrete, and intensity is big, impact resistant, it is not necessary to often safeguard;Meanwhile, Tilt-up body of wall exists In-situ precast, utilizes the mould flexibly of base plate, can make various lines, chamfering, in conjunction with various surfaces Process, as smart as a new pin.
But, the roofing of Tilt-up building system, it is necessary to have the most flat in-plane stiffness, main utilization is thicker Deck plate and truss purlins form eyelid covering.Roofing eyelid covering is used for transmitting main body system wind load or geological process is produced Raw shearing is to Tilt-up body of wall.
Therefore it provides a kind of new Factory Building, depot establishment system (promotion building system) and construction method thereof, Lacking specification in order to solve domestic technique, the problem of shear-resistant membrane research and application is necessary.
Summary of the invention
To achieve these goals, the present invention provides a kind of promotion formula building.
The promotion formula building of the present invention includes terrace, body of wall, metal roofing board;
Described body of wall is directly fixed on described terrace, if being also evenly arranged with on the terrace under described body of wall Basis under dry wall;Some row's center pillars, described wall-body energy saving also it is evenly arranged with on terrace in described body of wall Being provided with continuous shaped steel, described center pillar is installed with steel roof truss, described steel roof truss two ends are fixing respectively to be connected It is connected on described continuous shaped steel;
Steel roof truss on described center pillar is provided with some tie-rods between any two;Described some tie-rods are between any two It is additionally provided with roof truss horizontal support;
Being fixedly uniformly arranged with some purlins on described steel roof truss, described some purlins are between any two by solid Fixed pole is fixing to be connected;
Described metal roofing board surrounding and described wall connecting.
Further, described some purlins are additionally provided with roof/wall surface between any two and connect support.
Further, described promotion formula building also includes that temporary support, described temporary support one end are supported in ground Level ground, the other end is supported in body of wall.
Further, if described body of wall is made up of drywall panel, described wallboard is fire-retardant wall plate or precast reinforced coagulation Cob wall panel.
Further, described roof/wall surface connection support is arranged to Guan Bi.
Further, described center pillar is reinforced column or steel column, and suspension column is in rigid frame direction with the most just Frame direction is all provided with being set to just connect.
Further, described center pillar lower end is additionally provided with middle column foundation, and described middle column foundation is fixedly installed describedly In level ground.
Further, described horizontal support along promoting body of wall to arrange, gather together by twice, its middle and upper part or outside, Ensure to promote body of wall to have a fulcrum every 2~3 meters.
The present invention also provides for a kind of construction process promoting formula to build, it is characterised in that: comprise the steps:
A. terrace is poured, including basic under wall and middle column foundation;
B. precast wall body on the indoor terrace poured, uses crane to install location, and uses temporary support Support and promote body of wall;
C. install or cast-in-place center pillar install steel roof truss, tie-rod and roof truss horizontal support after center pillar is installed;
D., roof purline and metal roofing board are installed;
E., roof/wall surface is installed and connects support;
F. facade decorative model, removes the temporary support promoting metope, and later work terminates.
Further, described step C is installed steel roof truss, tie-rod and roof truss horizontal support expansion joint should be set, Described expansion joint should be arranged along the steel roof truss of both sides.
Further, described step D is installed the connection of described roof/wall surface and supports in addition to roof structure demand, Ying Bu It is set to Guan Bi.
Wherein:
Use roof/wall surface connection support to can substitute for eyelid covering and carry out Transfer of Shear;
Body of wall is i.e. fender member, is also main carrying and Force transmission parts, and it is at the indoor terrace poured Prefabricated (containing decorating structure), uses crane to install location, utilizes temporary support to support simultaneously;
Continuous shaped steel is arranged, it is ensured that shearing is along promoting wall at steel roof truss described in the horizontal support of described body of wall Uniformly transferring of body.
The promotion formula building of the present invention and construction process method thereof, connect support with roof/wall surface and replace eyelid covering to pass Pass shearing so that method for designing more meets domestic specification;Promoting body of wall is i.e. fender member, is also main Carrying and Force transmission parts, it is at the indoor terrace poured prefabricated (containing decorating structure), uses crane to install Location, utilizes temporary support to support simultaneously;That alien invasion is handsome in appearance is durable, construction is more safe and efficient.
Accompanying drawing explanation
Fig. 1 is the structural representation of the promotion formula building of the present invention
Figure indicates: 1 be body of wall, 2 be basis under wall, 3 be terrace, 4 be center pillar, 5 be steel roof truss, 6 For roof/wall surface connect support, 7 be roof truss horizontal support, 8 for tie-rod, 9 for purlin, 10 be metal roofing board, 11 be temporary support, 12 for continuous shaped steel.
Detailed description of the invention
Below with reference to the accompanying drawings embodiments of the invention are described.An accompanying drawing or a kind of embodiment party in the present invention Element and feature described in formula can be with the elements shown in one or more other accompanying drawings or embodiment Combine with feature.It should be noted that, for purposes of clarity, accompanying drawing and explanation eliminate with the present invention without That close, parts known to persons of ordinary skill in the art or the expression of process and description.
Below in conjunction with the accompanying drawings the present invention is described further.
The promotion formula building of the present invention as shown in Figure 1.
The promotion formula building of the present invention includes terrace 3, body of wall 1, metal roofing board 10;
Described body of wall 1 is directly fixed on described terrace 3, on the terrace 3 under described body of wall 1 the most uniformly If being provided with under dry wall basis 2;3 row's center pillars 4, institute also it is evenly arranged with on terrace 3 in described body of wall 1 State body of wall 1 inner surface and be provided with continuous shaped steel 12, described center pillar 4 is installed with steel roof truss 5, described Steel roof truss 5 two ends are respectively fixedly connected with on described continuous shaped steel 12;
Steel roof truss on described center pillar is provided with 1 tie-rod between any two;Described tie-rod the most also sets It is equipped with roof truss horizontal support 7;
Being fixedly uniformly arranged with 26 purlins on described steel roof truss 5, described purlin 9 is between any two by solid Fixed pole is fixing to be connected;
Described metal roofing board 10 surrounding is connected with described body of wall 1.
Described purlin 9 is additionally provided with roof/wall surface between any two and connects support 6.
Described promotion formula building also includes that temporary support 11, described temporary support 11 one end are supported in terrace, The other end is supported in body of wall.
Described body of wall 1 is made up of 26 blocks of wallboards, and described wallboard is fire-retardant wall plate or prefabricated reinforced concrete metope Plate.
Described roof/wall surface connects support 6 and is arranged to Guan Bi.
Described center pillar 4 is reinforced column or steel column, and suspension column is in rigid frame direction and vertical rigid frame direction It is all provided with being set to just connect.
Described center pillar 4 lower end is additionally provided with middle column foundation, and described middle column foundation is fixedly installed in described terrace 3.
Described continuous shaped steel along promoting body of wall to arrange, gather together by twice, its middle and upper part or outside, it is ensured that carries Pull out body of wall and have a fulcrum every 2~3 meters.
The present invention also provides for a kind of construction process promoting formula to build, it is characterised in that: comprise the steps:
A. terrace 3 is poured, including basis 2 and middle column foundation under wall;
B. precast wall body 1 on the indoor terrace poured, uses crane to install location, and uses interim Support: 11 promote body of wall;
C. install or cast-in-place center pillar 4 and after center pillar 4 is installed, steel roof truss 5 is installed, tie-rod 8 and roof truss level are propped up Support 7;
D., roof purline 9 and metal roofing board 10 are installed;
E., roof/wall surface is installed and connects support 6;
F. facade decorative model, removes the temporary support 11 promoting metope, and later work terminates.
Described step C is installed steel roof truss 5, tie-rod 8 and roof truss horizontal support 7 expansion joint should be set, described Expansion joint should be arranged along the steel roof truss of both sides.
Described step D is installed described roof/wall surface connection 6 support in addition to roof structure demand, should be arranged to close Close.
The promotion formula building of the present invention and construction process method thereof, connect support with roof/wall surface and replace eyelid covering to pass Pass shearing so that method for designing more meets domestic specification;Promoting body of wall is i.e. fender member, is also main Carrying and Force transmission parts, it is at the indoor terrace poured prefabricated (containing decorating structure), uses crane to install Location, utilizes temporary support to support simultaneously;That alien invasion is handsome in appearance is durable, construction is more safe and efficient.
Although the present invention of being described in detail and advantage thereof it should be appreciated that without departing from by appended power Profit can carry out various change in the case of requiring the spirit and scope of the present invention limited, substitute and convert. And, scope of the present application is not limited only to the process described by description, equipment, means, method and steps Specific embodiment.One of ordinary skilled in the art will readily appreciate that from the disclosure, root According to the present invention can use execution the function essentially identical to corresponding embodiment described herein or acquisition and its Essentially identical result, existing and the most to be developed process, equipment, means, method or step. Therefore, appended claim is directed in the range of them including such process, equipment, means, side Method or step.

Claims (10)

1. promote formula building, including terrace, body of wall, metal roofing board for one kind;It is characterized in that:
Described body of wall is directly fixed on described terrace, if being also evenly arranged with under dry wall basis on the terrace under described body of wall;Also being evenly arranged with some row's center pillars on terrace in described body of wall, described wall-body energy saving is provided with continuous shaped steel, and described center pillar is installed with steel roof truss, and described steel roof truss two ends are respectively fixedly connected with on described continuous shaped steel;
Steel roof truss on described center pillar is provided with some tie-rods between any two;Described some tie-rods are additionally provided with roof truss horizontal support between any two;
Being fixedly uniformly arranged with some purlins on described steel roof truss, described some purlins connect by fixing bar is fixing between any two;
Described metal roofing board surrounding and described wall connecting.
Promotion formula the most according to claim 1 is built, it is characterised in that: described some purlins are additionally provided with roof/wall surface between any two and connect support.
Promotion formula the most according to claim 1 is built, it is characterised in that: described promotion formula building also includes that temporary support, described temporary support one end are supported in terrace, and the other end is supported in body of wall.
Promotion formula the most according to claim 1 is built, it is characterised in that: if described body of wall is made up of drywall panel, described wallboard is fire-retardant wall plate or prefabricated reinforced concrete shingle nail.
Promotion formula the most according to claim 2 is built, it is characterised in that: described roof/wall surface connects support and is arranged to Guan Bi.
Promotion formula the most according to claim 1 is built, it is characterised in that: described center pillar is reinforced column or steel column, and suspension column is in rigid frame direction and vertical rigid frame direction and is all provided with being set to just connect.
Promotion formula the most according to claim 1 is built, it is characterised in that: described center pillar lower end is additionally provided with middle column foundation, and described middle column foundation is fixedly installed in described terrace.
Promotion formula the most according to claim 1 is built, it is characterised in that: described horizontal support along promoting body of wall to arrange, gather together by twice, its middle and upper part or outside, it is ensured that promotes body of wall to have a fulcrum every 2~3 meters.
9. the construction process promoting formula to build, it is characterised in that: comprise the steps:
A. terrace is poured, including basic under wall and middle column foundation;
B. precast wall body on the indoor terrace poured, uses crane to install location, and uses temporary support to support promotion body of wall;
C. install or cast-in-place center pillar install steel roof truss, tie-rod and roof truss horizontal support after center pillar is installed;
D., roof purline and metal roofing board are installed;
E., roof/wall surface is installed and connects support;
F. facade decorative model, removes the temporary support promoting metope, and later work terminates.
A kind of construction process promoting formula to build the most according to claim 9, it is characterised in that: installing steel roof truss, tie-rod and roof truss horizontal support in described step C and should arrange expansion joint, described expansion joint should be arranged along the steel roof truss of both sides.
CN201410455558.9A 2014-09-09 2014-09-09 Promotion formula building and construction process thereof Active CN104213632B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410455558.9A CN104213632B (en) 2014-09-09 2014-09-09 Promotion formula building and construction process thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410455558.9A CN104213632B (en) 2014-09-09 2014-09-09 Promotion formula building and construction process thereof

Publications (2)

Publication Number Publication Date
CN104213632A CN104213632A (en) 2014-12-17
CN104213632B true CN104213632B (en) 2016-08-17

Family

ID=52095514

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410455558.9A Active CN104213632B (en) 2014-09-09 2014-09-09 Promotion formula building and construction process thereof

Country Status (1)

Country Link
CN (1) CN104213632B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111877537A (en) * 2020-07-23 2020-11-03 江阴市华厦建设工程有限公司 Lifting type building and building method thereof

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3798856A (en) * 1972-05-24 1974-03-26 W Gloskowski Tilt-up wall panel brace assembly
US4802316A (en) * 1987-07-28 1989-02-07 The Burke Company Eave truss and method for supporting and reinforcing a concrete or masonry wall and metal roof structure
US5491948A (en) * 1993-12-22 1996-02-20 Harris; Dallas L. Tilt-up concrete pad and method of forming and erecting the tilt-up concrete pad
US20070234664A1 (en) * 2006-03-23 2007-10-11 Kenneth Matthew Tucker Method of forming a decorative concrete wall
CN201526173U (en) * 2008-07-11 2010-07-14 金胜财 Assembly type portable housing with double slopes
CN201276862Y (en) * 2008-09-27 2009-07-22 李永峰 Heat-preserving environment-friendly shockproof house
US8245446B2 (en) * 2009-06-23 2012-08-21 Hp Doors, Llc Tilt-up door
US20110047895A1 (en) * 2009-09-02 2011-03-03 Finch Larry O Tilt-up wall brace dolly and method of use
CN204139308U (en) * 2014-09-09 2015-02-04 上海欧本钢结构有限公司 Promotion formula is built

Also Published As

Publication number Publication date
CN104213632A (en) 2014-12-17

Similar Documents

Publication Publication Date Title
CN104947788B (en) A kind of modular assembly formula building systems and its method of construction
CN103374986B (en) A kind of multifunction combined light weight concrete construction curtain wall and preparation method thereof
CN203866966U (en) Novel assembly type frame core tube steel structure residential housing system
CN204983131U (en) DGC modularization prefabricated buildings system
CN204940928U (en) Packaged type aluminium alloys house
CN206570920U (en) One kind utilizes ALC plates design production assembled architecture
CN106193311A (en) Modular assembled building structure
CN103982038B (en) A kind of for solar energy separate house modularization rapid-assembling construction method
CN106703201A (en) Fabricated integrated building and production method thereof
CN106088667A (en) A kind of Windproof anti-seismic, the movable dwellings of employing steel construction herringbone beam
CN105089149A (en) Side elevation system of aluminum alloy house
CN105040813B (en) The preceding facade system in aluminium alloy house
CN201972417U (en) Lightweight wood structure roof system
CN104213632B (en) Promotion formula building and construction process thereof
CN204919800U (en) Back facade system in aluminum alloy house
CN204919802U (en) Preceding facade system in aluminum alloy house
CN105040811B (en) The rear facade system in aluminium alloy house
CN204919808U (en) Side direction facade system in aluminum alloy house
CN204940529U (en) The side elevation system in aluminium alloys house
CN204139316U (en) A kind of steel structure shear wall structure system
CN203412312U (en) Thermal-insulating integrated template wallboard construction building
CN106193410A (en) A kind of precast concrete small-sized self waterproofing heat insulation house surface system
CN204139308U (en) Promotion formula is built
CN105089148B (en) The lateral facade system in aluminium alloy house
CN102251581B (en) Steel beam-reinforced concrete floor structure and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant