CN204139070U - A kind of chamfering formwork for road and bridge construction - Google Patents

A kind of chamfering formwork for road and bridge construction Download PDF

Info

Publication number
CN204139070U
CN204139070U CN201420608921.1U CN201420608921U CN204139070U CN 204139070 U CN204139070 U CN 204139070U CN 201420608921 U CN201420608921 U CN 201420608921U CN 204139070 U CN204139070 U CN 204139070U
Authority
CN
China
Prior art keywords
steel pipe
back cord
gripper shoe
plate
pulling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420608921.1U
Other languages
Chinese (zh)
Inventor
董国桢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fifth Engineering Co Ltd of China Railway Construction Bridge Engineering Bureau Group Co Ltd
Original Assignee
Fifth Engineering Co Ltd of China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fifth Engineering Co Ltd of China Railway Construction Bridge Engineering Bureau Group Co Ltd filed Critical Fifth Engineering Co Ltd of China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority to CN201420608921.1U priority Critical patent/CN204139070U/en
Application granted granted Critical
Publication of CN204139070U publication Critical patent/CN204139070U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of chamfering formwork for road and bridge construction, primarily of back cord (1), base plate (2), gripper shoe (3), elongated steel pipe (4), pulling-on piece (5), pull bar (6), backing plate (7) and steel plate for sealing water (8) are formed, described back cord (1) is arranged on fender post side, the horizontal and vertical vertical interlaced of elongated steel pipe (4) forms net surface structure, the wire side that gripper shoe (3) and elongated steel pipe (4) are formed is fixed on back cord (1) by pulling-on piece (5), the wire side that gripper shoe (3) chamfered portion and elongated steel pipe (4) are formed is fixed on base plate (2) by pull bar (6), steel plate for sealing water (8) is arranged on back cord (1) top middle portion.The utility model structure is simple, easy to loading and unloading, can make each position uniform stressed of chamfering, reduces when loading and unloading the damage of watering building body.

Description

A kind of chamfering formwork for road and bridge construction
Technical field
The utility model relates to road and bridge construction field, specifically refers to a kind of chamfering formwork for road and bridge construction.
Background technology
Wedge angle is there is in concrete casting building body angle in road and bridge construction, need to build chamfering in casting process, manyly build the situation that chamfering all exists damaged and rough surface crack, corner, and traditional chamfering formwork is all the mode by being welded in template, template will be dismantled after having built, such operation is loaded down with trivial details and likely produce damage to the chamfering of having built.
Utility model content
The purpose of this utility model is to provide a kind of for the simple to operate of road and bridge construction and can not to the chamfering formwork of building chamfering and produce damage.
The utility model is achieved through the following technical solutions:
A kind of chamfering formwork for road and bridge construction, form primarily of back cord, base plate, gripper shoe, elongated steel pipe, pulling-on piece, pull bar, backing plate and steel plate for sealing water, described back cord is arranged on fender post side, elongated steel pipe transverse and longitudinal vertical interlaced form net surface structure, the wire side that gripper shoe and elongated steel pipe are formed is fixed on back cord by pulling-on piece, the wire side that gripper shoe chamfered portion and elongated steel pipe are formed is fixed on base plate by pull bar, and steel plate for sealing water is arranged on back cord top middle portion.
Further, described pulling-on piece one end is welded on back cord, and the pulling-on piece other end is by fixation steel plate and be bolted on the net surface structure of elongated steel pipe formation.
Further, described pull bar one end is welded on base plate, and the pull bar other end is by fixation steel plate and be bolted on the net surface structure of elongated steel pipe formation.
Further, described cross binding plate bottom arranges backing plate and gripper shoe is supported on base plate.
During installation, close contact between base plate and back cord and the concrete of having built, prevent concreting spillage, after base plate and back cord install location, gripper shoe is vertically close to back cord, gripper shoe lower end supports by backing plate, and the net surface structure that elongated steel pipe is formed is close in gripper shoe side, and with fixation steel plate and bolt, pulling-on piece and pull bar and said structure and base plate and back cord is fixed.The dismounting of post, beam, template die plate must treat that concrete reaches the demoulding strength of design or code requirement, column template should when concrete strength can ensure that its surface and corner angle are not damaged because of form removal, can remove, plate and beam bottom mother plate should reach 100% of design strength at beam slab concrete strength, and have cured under same condition form removal pressure testing to report, sign and issue form removal through management examination & approval and notify that rear is dismountable.During dismounting, first pull down pulling-on piece bolt, extract pulling-on piece out, reinforcing bar and gripper shoe are pulled down, afterwards stay-bolt, extract pull bar out, reinforcing bar and gripper shoe are pulled down, then will move after back cord and base plate or hang away.
Compared with prior art, the beneficial effect had is the utility model: structure is simple, easy to loading and unloading, can make each position uniform stressed of chamfering, reduces when loading and unloading the damage of watering building body.
Accompanying drawing explanation
Fig. 1 chamfering formwork structure chart.
Wherein: 1-back cord; 2-base plate; 3-gripper shoe; 4-elongated steel pipe; 5-pulling-on piece; 6-pull bar; 7-backing plate; 8-steel plate for sealing water; 9-fixation steel plate; 10-bolt.
Detailed description of the invention
Below in conjunction with embodiment, the utility model is described in further detail, but embodiment of the present utility model is not limited thereto.
Embodiment 1:
As shown in Figure 1, a kind of chamfering formwork for road and bridge construction, form primarily of back cord 1, base plate 2, gripper shoe 3, elongated steel pipe 4, pulling-on piece 5, pull bar 6, backing plate 7 and steel plate for sealing water 8, described back cord 1 is arranged on fender post side, the horizontal and vertical vertical interlaced of elongated steel pipe 4 forms net surface structure, the wire side that gripper shoe 3 and described elongated steel pipe 4 are formed is fixed on back cord 1 by pulling-on piece 5 successively, the wire side that gripper shoe 3 chamfered portion and described elongated steel pipe 4 are formed by pull bar 6 is successively fixing on a base plate 2, and steel plate for sealing water 8 is arranged on back cord 1 top middle portion.Described pulling-on piece 5 one end is welded on back cord 1, and pulling-on piece 5 other end is fixed on the net surface structure of elongated steel pipe 4 formation by fixation steel plate 9 and bolt 10.On a base plate 2, pull bar 6 other end is fixed on the net surface structure of elongated steel pipe 4 formation by fixation steel plate 9 and bolt 10 welding of described pull bar 6 one end.Described cross binding plate 3 bottom arranges backing plate 7 and gripper shoe 3 is supported on a base plate 2.
During installation, close contact between base plate and back cord and the concrete of having built, prevent concreting spillage, after base plate and back cord install location, gripper shoe is vertically close to back cord, gripper shoe lower end supports by backing plate, and the net surface structure that elongated steel pipe is formed is close in gripper shoe side, and with fixation steel plate and bolt, pulling-on piece and pull bar and said structure and base plate and back cord is fixed.Form removable should be carried out according to the regulation of matching board design, follows first to prop up and tears open afterwards, first non-weight bearing area rear load-bearing position, top-down principle.Forbid during form removal firmly to pound hard sled with sledgehammer and crowbar.During dismounting, first pull down pulling-on piece bolt, extract pulling-on piece out, reinforcing bar and gripper shoe are pulled down, afterwards stay-bolt, extract pull bar out, reinforcing bar and gripper shoe are pulled down, then will move after back cord and base plate or hang away.
The above; it is only preferred embodiment of the present utility model; not do any pro forma restriction to the utility model, every any simple modification, equivalent variations done above embodiment according to technical spirit of the present utility model, all falls within protection domain of the present utility model.

Claims (4)

1. the chamfering formwork for road and bridge construction, it is characterized in that: primarily of back cord (1), base plate (2), gripper shoe (3), elongated steel pipe (4), pulling-on piece (5), pull bar (6), backing plate (7) and steel plate for sealing water (8) are formed, described back cord (1) is arranged on fender post side, the horizontal and vertical vertical interlaced of elongated steel pipe (4) forms net surface structure, the wire side that gripper shoe (3) and elongated steel pipe (4) are formed is fixed on back cord (1) by pulling-on piece (5), the net surface structure that gripper shoe (3) chamfered portion and elongated steel pipe (4) are formed is fixed on base plate (2) by pull bar (6), steel plate for sealing water (8) is arranged on back cord (1) top middle portion.
2. a kind of chamfering formwork for road and bridge construction according to claim 1, it is characterized in that: described pulling-on piece (5) one end is welded on back cord (1), pulling-on piece (5) other end is fixed on the net surface structure that elongated steel pipe (4) formed by fixation steel plate (9) and bolt (10).
3. a kind of chamfering formwork for road and bridge construction according to claim 1, it is characterized in that: described pull bar (6) one end is welded on base plate (2), pull bar (6) other end is fixed on the net surface structure that elongated steel pipe (4) formed by fixation steel plate (9) and bolt (10).
4. a kind of chamfering formwork for road and bridge construction according to claim 1, is characterized in that: described cross binding plate (3) bottom arranges backing plate (7) and gripper shoe (3) is supported on base plate (2).
CN201420608921.1U 2014-10-21 2014-10-21 A kind of chamfering formwork for road and bridge construction Expired - Fee Related CN204139070U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420608921.1U CN204139070U (en) 2014-10-21 2014-10-21 A kind of chamfering formwork for road and bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420608921.1U CN204139070U (en) 2014-10-21 2014-10-21 A kind of chamfering formwork for road and bridge construction

Publications (1)

Publication Number Publication Date
CN204139070U true CN204139070U (en) 2015-02-04

Family

ID=52415767

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420608921.1U Expired - Fee Related CN204139070U (en) 2014-10-21 2014-10-21 A kind of chamfering formwork for road and bridge construction

Country Status (1)

Country Link
CN (1) CN204139070U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107165410A (en) * 2017-05-04 2017-09-15 中交第二航务工程局有限公司 A kind of construction formwork and its construction method for slope concrete

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107165410A (en) * 2017-05-04 2017-09-15 中交第二航务工程局有限公司 A kind of construction formwork and its construction method for slope concrete
CN107165410B (en) * 2017-05-04 2022-11-01 中交第二航务工程局有限公司 Construction formwork for slope concrete and construction method thereof

Similar Documents

Publication Publication Date Title
CN206784913U (en) A kind of two-part superimposed sheet seam hangs die worker's tool
CN104453224A (en) Formwork support structure of basement exterior wall and construction method of formwork support structure
CN102900024B (en) Using method for overturning die plate for large-scale concrete structure and
CN102926504B (en) Construction method of steel and concrete overlapped beam combined part
CN204940860U (en) One prevents Form floating part
CN103452328B (en) Post brutal bracing means and method is subtracted for reinforced concrete member
CN205501843U (en) Consolidate rigid framed arch bridge
CN204139070U (en) A kind of chamfering formwork for road and bridge construction
CN203462754U (en) Free-disassembly suspension template
CN204152551U (en) A kind of reusable mine down-hole filling barricade
CN204199188U (en) A kind of head tower vertical turning lifting mechanism
CN204530482U (en) A kind of variable cross-section truncated cone-shaped bridge abutment moulding plate
CN207176527U (en) Bridge Crack bracing means
CN203285056U (en) Stair formwork supporting base
CN105317146A (en) Steel structure earthquake-resistant floor for construction and manufacturing method
CN206205905U (en) A kind of chassis suitable for City Subway Station abnormity big cross section lining cutting one-piece casting
CN203145273U (en) Dismountable steel-concrete composite floor
CN102704490B (en) Assembled waist rail
CN204753600U (en) System is strutted in quick installation of steel shotcrete
CN205677089U (en) There is coupled column and the base node structure of horizontal anti-seismic performance
CN103526698B (en) Cast-in-cantilever construction 0# block concrete supporting system and construction method
CN102154989A (en) Steel-concrete structure hanging box and dismantling method thereof
CN203145017U (en) Large-sized chute device for pouring mass concrete into deep foundation pit
CN209336568U (en) Prefabricated bench transport device
CN202390844U (en) Detachable reinforcing device for supporting pile of deep foundation pit

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150204

Termination date: 20171021

CF01 Termination of patent right due to non-payment of annual fee