CN204112246U - Suspension type double-layer flexible shed tunnel - Google Patents
Suspension type double-layer flexible shed tunnel Download PDFInfo
- Publication number
- CN204112246U CN204112246U CN201420530855.0U CN201420530855U CN204112246U CN 204112246 U CN204112246 U CN 204112246U CN 201420530855 U CN201420530855 U CN 201420530855U CN 204112246 U CN204112246 U CN 204112246U
- Authority
- CN
- China
- Prior art keywords
- steel column
- stratum reticulare
- steel
- domatic
- suspension type
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
Problems such as the utility model discloses a kind of suspension type Double-layer flexible shed tunnel, the cost solving existing rock-fall proof equipment is high, difficulty of construction large, protection energy level is low.This suspension type Double-layer flexible shed tunnel comprises the steel frame connected and composed by steel column and girder steel, wherein, steel column is arranged at highway side, girder steel one end is connected with steel column, the other end is connected with the domatic of steel column opposite side, the two-layer flexible protective stratum reticulare arranged up and down is provided with in end, described steel column upper end, flexible protective stratum reticulare two ends are connected with steel column and the domatic of steel column opposite side respectively, wherein, upper strata flexible protective stratum reticulare and domatic link position are higher than the link position of itself and steel column, lower floor's flexible protective stratum reticulare and domatic link position are then lower than the link position of itself and steel column.The utility model not only structure is simple, with low cost, and good looking appearance, and protection energy level is high.For it is applied on a large scale, establish solid foundation.
Description
Technical field
The utility model belongs to rock-fall proof and small-sized mud-rock flow technical field, specifically, relates to a kind of suspension type Double-layer flexible shed tunnel.
Background technology
Existing rock-fall proof and small-sized mud-rock flow technology have open cut tunnel, steel concrete rigidity hangar tunnel, and hangar tunnel has polytype with the difference of landform and geological conditions, but its essential structure has interior wall, outside-supporting structure and top plate supporting structure.When foundation condition is more weak, also needs to arrange lower support structure, be equivalent to the brace summer of culvert.Interior wall can make armored concrete slab and external bracing forms stake board-like barricade jointly; Exterior wall braced structures can make rigid frame formula, pillar and wall-according to the difference of landform and geological condition.Outside plate can adopt tee girder, I type beam or hollow slab beam cross section prefabricate and install component.After making for preventing hangar tunnel, still may have landslide, caving in, collapse body enters in hangar tunnel, the board-like body of wall of stake can higher than top cross braced structures.The defect that prior art exists is as follows: traditional steel concrete rigidity bright tunnel volume, weight are very big, higher to fundamental importance, often need the basis that buried depth is large, cross dimensions is large; Difficulty of construction is large, has greater environmental impacts; Construction cost is relatively high.
Utility model content
The purpose of this utility model is to overcome above-mentioned defect, provides the suspension type Double-layer flexible shed tunnel that a kind of structure is simple, cost is low, protection energy level is high.
To achieve these goals, to have employed technical scheme as follows for the utility model:
A kind of suspension type Double-layer flexible shed tunnel, comprise the steel frame connected and composed by steel column and girder steel, wherein, steel column is arranged at highway side, girder steel one end is connected with steel column, the other end is connected with the domatic of steel column opposite side, the two-layer flexible protective stratum reticulare arranged up and down is provided with in end, described steel column upper end, flexible protective stratum reticulare two ends are connected with steel column and the domatic of steel column opposite side respectively, wherein, upper strata flexible protective stratum reticulare and domatic link position are higher than the link position of itself and steel column, lower floor's flexible protective stratum reticulare and domatic link position are then lower than the link position of itself and steel column.
In order to improve protection effect, described flexible protective stratum reticulare is connected with domatic by anchor pole, and is also connected with between anchor pole and steel column and draws anchor line.
Preferably, the link position of two sheets of flexible protection stratum reticulare and steel column is in same level.
Further, be also provided with intercolumniation by anchor pole between steel column top end and ground and draw anchor line, described steel column is provided with some along trend of road, and the intercolumniation between adjacent steel column draws anchor line to combine formation " V " font.
Specifically, described flexible protective stratum reticulare comprises annular or grid stratum reticulare as protecting main body, is arranged on annular or the perimeter support rope of grid stratum reticulare periphery for preventing it from collapsing.
Preferably, the angle between described steel column and girder steel is acute angle.
Compared with prior art, the beneficial effects of the utility model are:
(1) the utility model adopt large span steel framed structure again in conjunction with flexible protective stratum reticulare as safeguard, compared with prior art, good looking appearance, cost obviously reduces, and it is little to conduct oneself with dignity, to foundation bearing capacity require lower; Hangar tunnel construction period, the blockage effects to traffic was little, and construction is fast, as usual can construct, not need curing time, do not need large-area foundation excavation, both protected natural, ecological, also protect massif in sleet sky; On the other hand, main member of the present utility model is easily dismantled and is changed, and facilitate later stage falling rocks cleaning and safeguard, the location being particluarly suitable for execution conditions complexity uses.
(2) the utility model adopts two sheets of flexible protection stratum reticulare, and protection energy level is high, and first falling rocks drops down onto the protection stratum reticulare on upper strata, by protecting the distortion dissipation rock-fall impact energy of stratum reticulare, and guides falling rocks from side direction landing, without the need to cleaning; Lower floor's protection stratum reticulare plays multilayer proofing guarantee, adds the reliability of protector.
Accompanying drawing explanation
Fig. 1 is structural representation one of the present utility model.
Fig. 2 is structural representation two of the present utility model.
Reference numeral title corresponding in accompanying drawing is as follows: 1-steel column, 2-girder steel, 3-flexible protective stratum reticulare, 4-anchor pole, and 5-draws anchor line, and 6-intercolumniation draws anchor line, 7-hinged-support, 8-concrete foundation;
31-annular or grid stratum reticulare, 32-perimeter support rope.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail.Embodiment of the present utility model includes but not limited to the following example.
Embodiment
As shown in Figure 1, 2, present embodiments provide a kind of suspension type Double-layer flexible shed tunnel, it adopts the steel framed structure of large span to coordinate flexible protective stratum reticulare, guide falling rocks from side direction landing, drastically increase protection energy level, and facilitate the cleaning of falling rocks, be especially applicable to the road prevention below cliff.
Steel frame is connected and composed by steel column 1 and girder steel 2, and specifically, steel column is vertically mounted in the concrete foundation 8 on ground, and its installation site is relative with domatic.End, steel column upper end is connected with the end, one end of girder steel by hinged-support 7, the other end of girder steel by anchor pole 4 be connected to domatic on, preferably, the angle between girder steel and steel column is acute angle.Steel column is furnished with some along the trend of road, and the spacing between adjacent steel column is even, and accordingly, the quantity of girder steel also should be consistent with steel column.Also be provided with intercolumniation by anchor pole between steel column 1 top end and ground and draw anchor line 6, on this basis, be also provided with intercolumniation by anchor pole between steel column 1 top end and ground and draw anchor line 6.
Further, the present embodiment is provided with the two-layer flexible protective stratum reticulare 3 arranged up and down in end, steel column 1 upper end, specifically, flexible protective stratum reticulare 3 comprises annular or grid stratum reticulare 31 as protecting main body, is arranged on annular or the perimeter support rope 32 of grid stratum reticulare 31 periphery for preventing it from collapsing.Two sheets of flexible protection stratum reticulare plays Double-protection effect, and protection energy level is high.
The concrete set-up mode of flexible protective stratum reticulare is as follows: flexible protective stratum reticulare 3 two ends respectively with domatic connection of steel column 1 and steel column 1 opposite side, wherein, upper strata flexible protective stratum reticulare 3 and domatic link position are higher than its link position with steel column 1, and lower floor's flexible protective stratum reticulare 3 and domatic link position are then lower than the link position of itself and steel column 1.Flexible protective stratum reticulare 3 is connected with domatic by anchor pole 4, and is also connected with between anchor pole and steel column 1 and draws anchor line 5, and the angle of inclination of anchor line of drawing of upper end is not less than 50 °.Preferably, two sheets of flexible protection stratum reticulare 3 is in same level with the link position of steel column 1.The open-shaped state of two sheets of flexible protection stratum reticulare, the set-up mode that its two ends are one high and one low, successfully can guide to side landing by the falling rocks falling thereon, avoids piling up.
Operating principle of the present utility model is as follows: when falling rocks tumbles to upper strata, flexible hangar tunnel top protection stratum reticulare from massif, protection stratum reticulare is by distortion dissipation rock-fall impact energy, and guiding falling rocks from side direction landing, falling rocks can not be deposited in above hangar tunnel, avoids the secondary disaster that rock-drop accumulations causes.If upper strata protection stratum reticulare is ruined, damage, then protects stratum reticulare by lower floor and be responsible for keeping out falling rocks, play the effect of Double-protection.
According to above-described embodiment, just the utility model can be realized well.What deserves to be explained is; under prerequisite based on above-mentioned design principle; for solving same technical problem; even if some making on architecture basics disclosed in the utility model are without substantial change or polishing; the essence of the technical scheme adopted is still the same with the utility model, therefore it also should in protection domain of the present utility model.
Claims (6)
1. a suspension type Double-layer flexible shed tunnel, it is characterized in that, comprise the steel frame connected and composed by steel column (1) and girder steel (2), wherein, steel column (1) is arranged at highway side, girder steel (2) one end is connected with steel column (1), the domatic connection of the other end and steel column (1) opposite side, the two-layer flexible protective stratum reticulare (3) arranged up and down is provided with in described steel column (1) end, upper end, flexible protective stratum reticulare (3) two ends respectively with domatic connection of steel column (1) and steel column (1) opposite side, wherein, upper strata flexible protective stratum reticulare (3) and domatic link position are higher than the link position of itself and steel column (1), lower floor's flexible protective stratum reticulare (3) and domatic link position are then lower than the link position of itself and steel column (1).
2. suspension type Double-layer flexible shed tunnel according to claim 1, is characterized in that, described flexible protective stratum reticulare (3) is connected with domatic by anchor pole (4), and is also connected with between anchor pole and steel column (1) and draws anchor line (5).
3. suspension type Double-layer flexible shed tunnel according to claim 2, is characterized in that, two sheets of flexible protection stratum reticulare (3) is in same level with the link position of steel column (1).
4. suspension type Double-layer flexible shed tunnel according to claim 3, it is characterized in that, steel column (1) is also provided with intercolumniation by anchor pole between top end and ground and draws anchor line (6), described steel column (1) is provided with some along trend of road, and the intercolumniation between adjacent steel column (1) draws anchor line (6) to combine formation " V " font.
5. the suspension type Double-layer flexible shed tunnel according to any one of Claims 1-4, it is characterized in that, described flexible protective stratum reticulare (3) comprises annular or grid stratum reticulare (31) as protecting main body, is arranged on annular or the perimeter support rope (32) of grid stratum reticulare (31) periphery for preventing it from collapsing.
6. suspension type Double-layer flexible shed tunnel according to claim 5, is characterized in that, the angle between described steel column (1) and girder steel (2) is acute angle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420530855.0U CN204112246U (en) | 2014-09-16 | 2014-09-16 | Suspension type double-layer flexible shed tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420530855.0U CN204112246U (en) | 2014-09-16 | 2014-09-16 | Suspension type double-layer flexible shed tunnel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204112246U true CN204112246U (en) | 2015-01-21 |
Family
ID=52329575
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420530855.0U Expired - Fee Related CN204112246U (en) | 2014-09-16 | 2014-09-16 | Suspension type double-layer flexible shed tunnel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204112246U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105133672A (en) * | 2015-09-18 | 2015-12-09 | 四川交大工程检测咨询有限公司 | Dynamic impact test platform for flexible protection system |
CN106758895A (en) * | 2016-12-27 | 2017-05-31 | 广西交通科学研究院有限公司 | A kind of shed hole structure and its construction method for preventing and treating High Side Slope of Highway disease |
CN107245961A (en) * | 2017-06-05 | 2017-10-13 | 四川蜀通顺成建筑劳务有限公司 | Flexible hangar tunnel |
CN109853408A (en) * | 2018-12-10 | 2019-06-07 | 西南交通大学 | A kind of double grading flexible protection systems and its design method for high gradient slope Lin Ya highway |
-
2014
- 2014-09-16 CN CN201420530855.0U patent/CN204112246U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105133672A (en) * | 2015-09-18 | 2015-12-09 | 四川交大工程检测咨询有限公司 | Dynamic impact test platform for flexible protection system |
CN105133672B (en) * | 2015-09-18 | 2017-01-25 | 四川交大工程检测咨询有限公司 | Dynamic impact test platform for flexible protection system |
CN106758895A (en) * | 2016-12-27 | 2017-05-31 | 广西交通科学研究院有限公司 | A kind of shed hole structure and its construction method for preventing and treating High Side Slope of Highway disease |
CN107245961A (en) * | 2017-06-05 | 2017-10-13 | 四川蜀通顺成建筑劳务有限公司 | Flexible hangar tunnel |
CN109853408A (en) * | 2018-12-10 | 2019-06-07 | 西南交通大学 | A kind of double grading flexible protection systems and its design method for high gradient slope Lin Ya highway |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101560770B (en) | Novel deep building foundation pit supporting system | |
CN205776249U (en) | A kind of combined inner supporting structure | |
CN204112246U (en) | Suspension type double-layer flexible shed tunnel | |
CN204898537U (en) | Half gentle semi -rigid hangar tunnel protective structure | |
CN105089670B (en) | Construction method for enlarging and excavating subway station on basis of parallel interval shield tunnel | |
CN101235649A (en) | Covered digging system for pit | |
CN105464134A (en) | Top-down and bottom-up combined construction method and supporting structure of multi-layer underground space below existing facility | |
CN103321243B (en) | A kind of mini pile and the limited embankment protection structure of barricade combination type | |
KR101017295B1 (en) | Hybrid type safety structure for preventing falling rocks | |
CN204959762U (en) | Barricade formula portal crane track girder construction | |
CN204283438U (en) | Portal supporting and protection structure | |
CN207176700U (en) | A kind of solid matter perfusion inner support of pile foundation ditch permanent support structure under complex environment | |
CN206111238U (en) | Prevent that tunnel from just propping up structure of seepage and drainage system thereof | |
CN205277434U (en) | Tunnel portal pre -reinforcing structure | |
CN108252307A (en) | A kind of foundation pit construction method for underground tunnel upper | |
CN205171532U (en) | Permanent side slope supporting construction | |
CN109487793A (en) | Inner support of pile foundation pit permanent support structure is perfused in a kind of solid matter under complex environment | |
CN111535333A (en) | Complicated reconstruction foundation pit engineering pile foundation structure and construction method | |
CN203668978U (en) | Anti-floating structure for subway tunnel | |
CN204691784U (en) | A kind of subway station antidetonation partition wall | |
CN206616421U (en) | A kind of interim bedding structure across Metro station excavation | |
CN205776258U (en) | A kind of Pile-Anchor Supporting for Deep Excavation system | |
CN110424282B (en) | Peripheral rockfall prevention enclosure device for open caisson construction | |
CN201671103U (en) | Integral construction forming platform of underwater pier cap drilled pile | |
CN101408024B (en) | Undercrossing subway tunnel pit supporting and protecting structure of high-rise building or super high-rise building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150121 Termination date: 20200916 |
|