CN204111457U - Can the unitization water purification project assembly of assembly flexibly - Google Patents

Can the unitization water purification project assembly of assembly flexibly Download PDF

Info

Publication number
CN204111457U
CN204111457U CN201420078488.5U CN201420078488U CN204111457U CN 204111457 U CN204111457 U CN 204111457U CN 201420078488 U CN201420078488 U CN 201420078488U CN 204111457 U CN204111457 U CN 204111457U
Authority
CN
China
Prior art keywords
water
bucket
assembly
sieve plate
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420078488.5U
Other languages
Chinese (zh)
Inventor
刘德周
张文秀
刘威
刘韬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420078488.5U priority Critical patent/CN204111457U/en
Application granted granted Critical
Publication of CN204111457U publication Critical patent/CN204111457U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Water Treatment By Sorption (AREA)

Abstract

Can the unitization water purification project assembly of assembly flexibly be No. 1 bucket (1), No. 2 void columns (2), 3 ring shape sieve plate (3), No. 4 pre-treatment cylinders (4), No. 5 raw water boxs (5), No. 6 top covers (6), No. 7 sieve plate important actors (7); Described (1), (2), (3), (4), (5), (6) these six modules can be selected, code integralization water treatment station main framework (OKOK); Described (1), (6) these two modules can be selected, (1), (2), (4), (5), (6) these five modules, and (1), (7), (3), (6) these four modules; Code becomes the cistern assembly main framework (OK1) of diversity water treatment station respectively, pretreatment box module body framework (OK2), charcoal bed box assembly main frame (OK3).

Description

Can the unitization water purification project assembly of assembly flexibly
Technical field
The utility model relates to water treatment field, for problem be: how to produce several unitization module, selectively their piles being got up, is exactly the main framework at an integrated purifying station, or the main framework of certain assembly in a diversity water treatment station.
Background technology
In the face of reasons such as industrialization pollution, chlorination, conduit deteriorates, cause the reality that tap water suffers organism, heavy metal, chlorine residue is polluted that in family, water tap flows out, the Correct Technique route solving cities and towns healthy water problem is:
" grab two (water conservation and terminal process); in the middle of band (optimization of waterworks common process and the transformation of water transfer pipe network); with tap water, the homogeneity that tap water, domestic water carry out is supplied water; change tap water into and only supply domestic water, tap water is combined to the supplying water in different qualities that tap water carries out secondary treatment acquisition by household water filter ".
Grab two (water conservation and terminal process), just as " timely ", Suo Qiguo is " too impatient to wait " then; In the middle of band (optimization of waterworks common process and the transformation of water transfer pipe network), just as " making something perfect even more perfect ", Suo Qiguo can " do what one is capable of "; Meet national conditions completely.
Water conservation effects a permanent cure, and is the emphasis in emphasis!
Terminal process is treated both principal and secondary aspect of disease, and is the difficult point in difficult point!
For cracking for this most difficult key of terminal process: the product taking on terminal process is divided into two large classes, and one is the household water filter for each family provides safety and Health to drink water; Two is the water treatment stations for each unit provides safety and Health to drink water.
For household water filter, the evil of the organism that the tap water that innovation team of the present invention flows out for water tap in family contains, heavy metal, chlorine residue, the feature of 10 people and injection moulding manufacturing process is no more than in conjunction with general family, invent utility model patent ZL201320075397.1, application number is the patent of invention of 201310052269.X, passes through first trial; The product " oxygen disinfecting type household water filter " developed have successfully completed on the spot, practical, actual measurement experiment.
For the water treatment station of unit: comprised underground water, surface water and tap water by the former water of water treatment station process.Trace element in former water and mineral substance are precious, and organism, heavy metal and chlorine are misfortunes.Remove the misfortune in former water, the treasured stayed in former water, the drinking-water producing safety and Health is the purpose of water treatment station engineering of water treatment.From technological layer, now use reverse osmosis membrane not as using nanofiltration membrane!
Because when using reverse osmosis membrane, no matter the material in its water is misfortune is precious, completely " clear off ", and nanofiltration membrane can " go misfortune to stay treasured ".
But use nanofiltration membrane to be nothing like and use activated carbon capillary to filter!
Because when using nanofiltration membrane, three, four bowls of water just go out Waterlilyleaf Goldenray, a large amount of waste water resources; And its not dechlorination, be also afraid of chlorine; Water funk unlimpid again, stifled is fast; Thus cause the high of manufacturing cost, running cost and after cost, manufacture great obstacle to the universal of nanofiltration membrane; And the fatal short slab of reverse osmosis membrane and nanofiltration membrane, the huge advantage place of but activated carbon capillary filtration exactly.As can be seen here, activated carbon capillary filtration is the optimal selection of water treatment station engineering of water treatment " except misfortune stays treasured ".
The LML that innovation team of the present invention creates is theoretical, i.e. the mathematical model of guide product exploitation is: the prerequisite giving full play to activated carbon capillary filtration " except misfortune stays treasured " effect is that amounts of activated carbon is sufficient, water technology is complete; Sufficient condition is slow filter, charcoal bed does not harden.
The national machinery industry technological standard giving full play to activated carbon capillary filtration " except misfortune stays treasured " effect is: JB/T2032-1999; The present invention follows this technological standard.
The not number of commensurability, from tens people to people up to ten thousand, to the demand of drinking-water, very different; So, for adapting to the difference needs of not commensurability, being filtered into the water treatment station of core processing technique with activated carbon capillary, small-sized integral structure should be had; Useful external pipe is by different module adjoins large-scale diversity structure together again.
" teaching how to fish "! If several unitization module can be produced, as required their codes are got up, the main framework at an integrated purifying station can be built; Again can according to the needs building diversity water treatment station, pile goes out the words of main framework of required water tank, pretreatment box, these assemblies of filter bed case, will constituent parts, particularly difficult small business, nursing house, rural primary and secondary school ... have the ability by the strength of oneself, allow our unit personnel drink up the hope of sweet water as early as possible, come true.
Summary of the invention
The purpose of this utility model, produces several unitization module exactly, as required their codes is got up, can build the main framework at an integrated purifying station; Again can according to the needs building diversity water treatment station, pile goes out the main framework of required water tank, pretreatment box, these assemblies of filter bed case, meets different needs when building diversity water treatment station.
The beneficial effects of the utility model show: produce several unitization module, can structurally pretreatment box, filter bed case, clear water tanks, three casings are organic is integrated for this, again can in water technology, make the pre-treatment of turbidity removal, the core processing of adsorptivity filter bed, the optimizing water quality showdown process that can carry out in clear water tanks, three techniques staple together, and are " killing two birds with one stone ", thus guarantee the perfect dulling of water treatment station treatment function.
The purpose of this utility model is realized by following technique measures, as shown in Figure 1:
Can the unitization water purification project assembly of assembly flexibly comprise:
No. 1 bucket (1) No. 2 void column (2) 3 ring shape sieve plate (3)
No. 4 pre-treatment cylinders (4) No. 5 raw water boxs (5) No. 6 top covers (6)
No. 7 sieve plate important actors (7);
The bottom of described No. 1 bucket (1) is provided with indent platform (11), locating dowel (12), locating slot (13), water hole, top (14), water hole, bottom (15);
The bottom of described No. 2 void columns (2) is provided with evagination barrel mast (21), water conservancy diversion sieve aperture (22);
The plate face of described 3 ring shape sieve plate (3) is provided with densely covered water distribution sieve aperture (31);
The bottom of described No. 4 pre-treatment cylinders (4) is provided with groove post (41), discharge orifice (42);
Described No. 5 raw water boxs (5) are about one penetrating structure, top is provided with location groove (51), it is lower is former pond (52), former pond has ladder platform (53), its underpart is current by pass (54), and the end face of location groove (51) has positioning convex column (511);
The lower end of described No. 6 top covers (6) is provided with locating groove along (61);
Described No. 7 sieve plate important actors (7) are by table top (71), and important actor (72) forms, and table top and important actor have been covered with water hole (73).
Above-mentioned 7 unitization water purification project assemblies perfection can realize object of the present invention, as:
1. by No. 1 bucket (1), No. 2 void columns (2), 3 ring shape sieve plate (3), No. 4 pre-treatment cylinders (4), No. 5 raw water boxs (5) and No. 6 these 6 modules of top cover (6), just the main framework (OKOK) at integrated purifying station can be formed, as shown in Figure 2; It is characterized in that:
The evagination barrel mast (21) of described No. 2 void columns, is mounted on the outside of the locating dowel (12) of No. 1 bucket;
Described 3 ring shape sieve plate (3), is placed on the support that built by the indent platform (11) of No. 1 bucket and the evagination barrel mast (21) of No. 2 void columns;
Described No. 4 pre-treatment cylinders (4) are positioned at No. 2 void columns, and the groove post (41) of its lower end is placed in the locating slot (13) of No. 1 bucket;
The positioned edge groove (51) of described No. 5 raw water boxs (5), be placed on the top of No. 1 bucket (1), meanwhile, the top of No. 2 void columns (2) and the top of No. 4 pre-treatment cylinders (4), also support the ladder of ladder platform (53).
The locating groove of described No. 6 top covers, along (61), is placed in the positioning convex column (511) of No. 5 raw water box end faces.
2., by No. 1 bucket (1) and No. 6 these two modules of top cover (6), just can form the cistern assembly main framework (OK1) of diversity water treatment station, as shown in Figure 3; It is characterized in that:
The locating groove of described No. 6 top covers, along (61), inserts the top of No. 1 bucket (1).
3. with No. 1 bucket (1), No. 2 void columns (2), No. 4 pre-treatment cylinders (4), No. 5 raw water boxs (5) and No. 6 top covers (6), these 5 modules just can form the pretreatment box module body framework (OK2) of diversity water treatment station; It is characterized in that:
The evagination barrel mast (21) of described No. 2 void columns, is mounted on the outside of the locating dowel (12) of No. 1 bucket;
The locating slot (13) of No. 1 bucket put into by the groove post (41) of described No. 4 pre-treatment cylinders;
The positioned edge groove (51) of described No. 5 raw water boxs is put on the top of No. 1 bucket, and meanwhile, the ladder platform (53) of No. 5 raw water boxs drops on the top of No. 2 void columns and No. 4 pre-treatment cylinders automatically.
The locating groove of described No. 6 top covers, along (61), is placed in the positioning convex column (511) of No. 5 raw water box end faces.
4. with No. 1 bucket (1), No. 7 sieve plate important actors (7), 3 ring shape sieve plate (3) and No. 6 these 4 modules of top cover (6), just can form charcoal bed box assembly main framework (OK3) of diversity water treatment station; It is characterized in that:
The important actor (72) of described No. 7 sieve plate important actors, is mounted on the outside of No. 1 bucket locating dowel (12), and now, the table top (71) of No. 7 sieve plate important actors and the indent platform (11) of No. 1 bucket are on same horizontal plane;
Described 3 ring shape sieve plate (3) is inserted with in No. 1 bucket (1), simultaneously, 3 ring shape sieve plate (3), drops on the indent platform (11) of No. 1 bucket and the table top (71) of No. 7 sieve plate important actors automatically;
The locating groove of described No. 6 top covers, along (61), is mounted in the positioning convex column (511) of No. 5 raw water box end faces.
Below in conjunction with drawings and Examples in detail, the technical solution of the utility model is described in detail.
Accompanying drawing illustrates:
Accompanying drawing 1 can the unitization water purification project unit construction schematic diagram of assembly flexibly;
Accompanying drawing 2 integrated purifying station main framework (OKOK) schematic diagram;
Cistern assembly main framework (OK1) schematic diagram in accompanying drawing 3 diversity water treatment station;
Pretreatment box module body framework (OK2) schematic diagram in accompanying drawing 4 diversity water treatment station
Charcoal bed box assembly main framework (OK3) schematic diagram in accompanying drawing 5 diversity water treatment station;
Accompanying drawing 6 integrated purifying station schematic diagram;
Cistern assembly (A) schematic diagram in accompanying drawing 7 diversity water treatment station;
Pretreatment box assembly (B) schematic diagram in accompanying drawing 8 diversity water treatment station;
Charcoal bed box assembly (C) schematic diagram in accompanying drawing 9 diversity water treatment station;
Accompanying drawing 10 ozone and activated carbon advanced treatment diversity water treatment station schematic diagram.
Description of reference numerals:
No. 1 bucket (1) indent platform (11) locating dowel (12)
Locating slot (13) water hole, top (14) water hole, bottom (15);
No. 2 void columns (2) evagination barrel mast (21) water conservancy diversion sieve aperture (22);
3 ring shape sieve plate (3) water distribution sieve aperture (31);
No. 4 pre-treatment cylinders (4) groove post (41) discharge orifice (42);
No. 5 raw water boxs (5) groove (51) former pond, location (52)
Ladder platform (53) current by pass (54) positioning convex column (511);
No. 6 top cover (6) locating grooves are along (61);
No. 7 sieve plate important actors (7) table top (71) important actor (72) water hole (73);
One-level pre-treatment filtrate (M1) secondary pre-treatment filtrate (M2)
Gac (MM) optimizing water quality filtrate (MM1);
Clear water faucet (S1) recoil tap (S2) float switch (S3) ozonizer (O3);
Water tank main framework (OK1) pre-treatment main framework (OK2) charcoal bed box main body framework (OK3);
Cistern assembly (A) pre-processing assembly (B) charcoal bed box assembly (C);
Standard pipe web member 1 (L1) standard pipe web member 2 (L2)
Standard pipe web member 3 (L3) standard pipe web member 4 (L4)
Standard external pipe 1 (Z1) standard external pipe 2 (Z2).
Embodiment
The complete water treatment main process being filtered into core processing with activated carbon capillary comprises:
1. to remove the pre-treatment that turbidity is main purpose;
2. with the activated carbon capillary filter kernel process that " remove the evil and stay treasured " is main purpose;
3. to optimize the showdown process that clarity and disinfection are main purpose further.
The complete water treatment main body hardware being filtered into core processing with activated carbon capillary comprises:
1. with the raw water box providing former water to be main purpose continually;
2. with the filtrate case filling pre-treatment, core processing, optimization process filtrate are main purpose;
3. the clear water tanks that the water purification produced with storage is main purpose.
Described water treatment main body hardware, all has the function embedding various additional device.
Below by embodiment, set forth the present invention how by the main framework (OKOK) at integrated purifying station, with the cistern assembly main framework (OK1) in diversity water treatment station, pretreatment box module body framework (OK2), charcoal bed box assembly main framework (OK3), water treatment main process three ring of integrated purifying station and diversity water treatment station is made to staple together respectively, water treatment main body hardware three case (district) one integrated mass, realizes " teaching how to fish " in this field.
embodiment 1
For small-sized integrated structure water treatment station:
Integrated purifying station main framework (OKOK) shown in (accompanying drawing 2), for the particular case of not commensurability, can construct different integrated purifying stations.
Integrated purifying station shown in (accompanying drawing 6), only one wherein, it only by described integrated purifying station main framework (OKOK), need carry out assembly by following content:
1. by No. 1 bucket (1), No. 2 void columns (2), in the space that 3 ring shape sieve plate (3) is formed jointly, be packed into the appropriate filtrate gac (MM) as core processing and optimizing water quality filtrate (MM1) successively;
2., in No. 4 pre-treatment cylinders (4), be packed into appropriate one-level pre-treatment filtrate (M1);
3. be embedded in float switch (S3) and ozonizer (O3) at No. 6 top cover (6) top boards; The ball float of float switch (S3) and the cloth balloon of ozonizer (O3) fall all naturally among the former pond (52) of raw water box;
4. on the water hole, top (14) of No. 1 bucket, access clear water faucet (S1), water hole, top (15) upper access recoil tap (S2).
So, the associated component in (accompanying drawing 6) is bought, each unit at a glance all " can fill, can with, can repair " " fool " water treatment station just can build up smoothly.
Its water treatment technological process is:
---------------gac (MM) millipore filtration " except misfortune stays treasured "---optimizing water quality filtrate (MM1) turbidity removal---water purification is stored in clean water area (filtrate (MM1) top) to sieve plate (3) water distribution uniformity to the omnidistance fungi-proofing sterilization of ozone pre-oxidation to former water (tap water), and water purification is oxygen enrichment by ozone simultaneously in one-level pre-treatment filtrate (M1) turbidity removal in raw water box storage.
In the design of water treatment station, the technological standard that the present invention performs is the machinery industry standard JB/T2032-1999 that country formulates; JB/T2032-1999 specifies:
The velocity of flow of former water in active-carbon bed: V < 10 meters/time, and
The flowing time of former water in active-carbon bed: T > 6 minutes
Follow this technological standard, the present invention designs by following principle:
W/S < 10 meters/time (16.66 centimeters/minute) and
H/ (W/S) > 6 minutes
In formula: the max water yield (note: obtain by simulation test) of W---clear water faucet
S---sieve plate area
The total height of H---carbon leaching material.
embodiment 2
Build the water treatment station of large-scale diversity structure, proceed in two phases:
The first step: according to the design of diversity structure water treatment station, the cistern assembly main framework (OK1) in diversity water treatment station, pretreatment box module body framework (OK2), charcoal bed box assembly main framework (OK3), combine the cistern assembly (A) that available external Standard fittings links up respectively, pretreatment box assembly (B), charcoal bed box assembly (C).
Second step: according to the design of diversity structure water treatment station, with standard external pipe cistern assembly (A), pretreatment box assembly (B), charcoal bed box assembly (C) connects into an entirety.
Facts have proved in decades both at home and abroad: ozone biological activated carbon depth-averaged model technique is a kind of advanced practical technology; (accompanying drawing 10) is a design adopting the diversity water treatment station of ozone biological activated carbon depth-averaged model technique; Below as example in detail, the specific practice of above-mentioned two steps is described in detail.
The first step: according to design relevant module body framework, combine corresponding assembly
1., the pretreatment box module body framework (OK2) of (accompanying drawing 4), combine the pretreatment box assembly (B) shown in (accompanying drawing 8); Method is:
A. in (accompanying drawing 4), to the water hole, bottom (15) of No. 1 bucket, recoil tap (S2) is loaded onto;
B. in (accompanying drawing 4), by No. 1 bucket (1), in No. 2 common spaces formed of void column (2), appropriate secondary pre-treatment filtrate (M2) is packed into;
C., in (accompanying drawing 4), to the water hole, top (14) of No. 1 bucket, standard pipe web member 1 (L1) is loaded onto;
D. in (accompanying drawing 4), to No. 4 pre-treatment cylinders (4), appropriate one-level pre-treatment filtrate (M1) is packed into;
E., in (accompanying drawing 4), float switch (S3) and ozonizer (O3) is embedded at No. 6 top cover (6) top boards; The ball float of float switch (S3) and the cloth balloon of ozonizer (O3) fall all naturally among the former pond (52) of raw water box.
2., charcoal bed box assembly main framework (OK3) of (accompanying drawing 5), combine the charcoal bed box assembly (C) shown in (accompanying drawing 9); Method is:
A., in (accompanying drawing 5), to the water hole, bottom (15) of No. 1 bucket, standard pipe web member 3 (L3) is loaded onto;
B. in (accompanying drawing 5), by No. 1 bucket (1), No. 7 sieve plate important actors (7), in the space that 3 ring shape sieve plate (3) is formed jointly, are packed into the appropriate filtrate gac (MM) as core processing;
C., in (accompanying drawing 5), to the water hole, top (14) of No. 1 bucket, standard pipe web member 2 (L2) is loaded onto.
D., in (accompanying drawing 5), ozonizer (O3) is embedded at No. 6 top cover (6) top boards; The cloth balloon of ozonizer (O3) falls the top of gac (MM) filtrate naturally.
3., the cistern assembly main framework (OK1) of (accompanying drawing 3), combine the cistern assembly (A) shown in (accompanying drawing 7); Method is:
A. the water hole, top (14) described in the cistern assembly main framework (OK1) of (accompanying drawing 3) is connected with clear water faucet (S1);
B. the water hole, bottom (15) described in the cistern assembly main framework (OK1) of (accompanying drawing 3), be fitted together with standard pipe web member 4 (L4).
Cistern assembly (A) is used to storage water purification in (accompanying drawing 10), so be also referred to as clear water tanks.
So far, the first step work just all completes.
Second step: according to described design, links together each assembly with external pipe
1., with standard external pipe 1 (Z1), the standard pipe web member 1 (L1) of handle component (B) and the standard pipe web member 2 (L2) of assembly (C), link together;
2., with standard external pipe 2 (Z2), the standard pipe web member 3 (L3) of handle component (C) and the standard pipe web member 4 (L4) of assembly (A), link together;
So far, shown in (accompanying drawing 10), adopt the diversity water treatment station of ozone biological activated carbon depth-averaged model technique just all to build up.
From law of connected vessels, (B), (C), top water-level when (A) is in static state, for float switch (S3) close water inlet time, the top water-level of former water in (B); When clear water faucet (S1) exports water purification, just the waterhead between (B), (C), (A) is caused, so just automatically start to carry out new one to take turns water treatment, until during top water-level when (B), (C), (A) come back to static state; Its water treatment technological process automatically carried out is:
Former water (tap water)---stores in raw water box that------------what ozone secondary oxidation carried out goes the auxiliary treatment of organism and heavy metal---carrying out aerobic biologic membrane and activated carbon capillary filtration treatment in gac (MM)---, and water purification is stored in clear water tanks ozone pre-oxidation fungi-proofing sterilization, and meanwhile water purification is by oxygen enrichment on ozone sterilization for the anaerobe film carried out in secondary pre-treatment filtrate (M2) and turbidity removal process in the turbidity removal process carried out in one-level pre-treatment filtrate (M1).
According to national machinery industry technological standard JB/T2032-1999, the feature of this novel process of combined with ozone biological activated carbon, adopts at present the standard performed by waterworks of this technique to be: the velocity of flow of the former water after ozone oxidation in active-carbon bed: V < 10 meters/time and former water after the ozone oxidation flowing time in active-carbon bed: T > 12 minutes.
Follow this technological standard, the present invention designs by following principle:
W/S < 10 meters/time and
H/ (W/S) > 12 minutes.
In formula: the max water yield of W---clear water faucet (note: these data can simulated experiment record)
S---sieve plate area
The total height of H---carbon leaching material.
Example as can be seen from the diversity water treatment station of above-mentioned employing ozone biological activated carbon depth-averaged model technique:
Cistern assembly main framework (OK1), pretreatment box module body framework (OK2), charcoal bed box assembly main framework (OK3) these " three-major-items ", can make the pre-treatment of diversity water treatment station water technology, core processing, showdown process three ring staple together; And these " three-major-items " functionally, can " cope with shifting events by changing "; From structure, can " cope with shifting events by sticking to a fundamental principle "; So these " three-major-items " can meet the needs of various large purification engineering.
Such as water tank, structure, water tank is exactly an empty container; Functionally, when being used for filling processed former water, be exactly individual raw water box; When being used for filling the water purification handled well, it is exactly individual clear water tanks; When carrying out coagulation, flocculation, precipitation process to the former water filled inside raw water box, raw water box just becomes a coagulation case; When carrying out ozone and UV treatment to the former water filled inside raw water box, raw water box just becomes a photochemical oxidation device, and so on.
Equally, pretreatment box and charcoal bed case are also containers, compared with the container of this sky of water tank, its difference is: in pretreatment box and these two containers of charcoal bed case, there is the device carrying different filtrate, and this bogey, can structurally ensure perfect play fill the water treatment efficiency of filtrate, again can the organically auxiliary process of additional ozone, ultraviolet, microbial film and so on and float switch, pipe fitting, the first-class additional device of the fire hose; As can be seen here, pretreatment box is the same with water tank with charcoal bed case, also has functionally " coping with shifting events by changing "; The characteristic that structure " is coped with shifting events by sticking to a fundamental principle ".
< China Economic Weekly > (second phase in 2013) be entitled as " running water safety? " report in one literary composition: there is more than 4000 waterworks in the whole nation, more than 400,000,000, city resident above county level supplies more than 6,000 ten thousand tons of tap water every day; Because water source is polluted, the water technology of the waterworks in the whole nation more than 80%, should upgrade to ozone biological activated carbon advanced treatment, just can reach 106 the national safe drinking water indexs enforced due on July 1st, 2012; , up to the present, the whole nation only in Beijing, Shanghai, Guangzhou, the ground such as Hangzhou part water factory, adopt this advanced treatment process, less than sum 2%! Its difficulty is big as can be seen here.
There is the have more than is needed PE bucket how much just can manufacture rotational molding technique of constituent parts of the present invention, the unitization water purification project assembly getting final product flexible assembly buys, mix all commercially available filtrate in this locality, electricity piece, pipe fitting, oneself shine figure heap pile code, just can build up a constituent parts all " can fill, can with, can repair " " fool " water treatment station, and adopt be advanced, meet JB/T2032-1999 technological standard, ozone biological activated carbon depth-averaged model technique.

Claims (4)

1. can the unitization water purification project assembly of assembly flexibly comprise: No. 1 bucket (1), No. 2 void columns (2), 3 ring shape sieve plate (3), No. 4 pre-treatment cylinders (4), No. 5 raw water boxs (5), No. 6 top covers (6);
The bottom of described No. 1 bucket (1) is provided with indent platform (11), locating dowel (12), locating slot (13), water hole, top (14), water hole, bottom (15);
The bottom of described No. 2 void columns (2) is provided with evagination barrel mast (21), water conservancy diversion sieve aperture (22);
The plate face of described 3 ring shape sieve plate (3) is provided with densely covered water distribution sieve aperture (31);
The bottom of described No. 4 pre-treatment cylinders (4) is provided with groove post (41), discharge orifice (42);
Described No. 5 raw water boxs (5) are about one penetrating structure, top is provided with location groove (51), it is lower is former pond (52), former pond has ladder platform (53), its underpart is current by pass (54), and the end face of location groove (51) has positioning convex column (511);
The lower end of described No. 6 top covers (6) is provided with locating groove along (61);
These 6 assemblies can the main framework (OKOK) of being integrally formed water treatment station; It is characterized in that:
The evagination barrel mast (21) of described No. 2 void columns, is mounted on the outside of the location (12) of No. 1 bucket;
Described 3 ring shape sieve plate (3), is placed on the support that built by the indent platform (11) of No. 1 bucket and the evagination barrel mast (21) of No. 2 void columns;
Described No. 4 pre-treatment cylinders (4) are positioned at No. 2 void columns, and the groove post (41) of its lower end is placed in the locating slot (13) of No. 1 bucket;
The positioned edge groove (51) of described No. 5 raw water boxs (5), be placed on the top of No. 1 bucket (1), meanwhile, the top of No. 2 void columns (2) and the top of No. 4 pre-treatment cylinders (4), also support the ladder of ladder platform (53);
The locating groove of described No. 6 top covers, along (61), is placed in the positioning convex column (511) of No. 5 raw water box end faces.
2. can the unitization water purification project assembly of assembly flexibly comprise: No. 1 bucket (1) and No. 6 top covers (6);
The bottom of described No. 1 bucket (1) is provided with indent platform (11), locating dowel (12), locating slot (13), water hole, top (14), water hole, bottom (15);
The lower end of described No. 6 top covers (6) is provided with locating groove along (61);
These 2 assemblies can form the cistern assembly main framework (OK1) of diversity water treatment station; It is characterized in that:
The locating groove of described No. 6 top covers, along (61), inserts the top of No. 1 bucket (1).
3. can the unitization water purification project assembly of assembly flexibly comprise: No. 1 bucket (1), No. 2 void columns (2), No. 4 pre-treatment cylinders (4), No. 5 raw water boxs (5), No. 6 top covers (6);
The bottom of described No. 1 bucket (1) is provided with indent platform (11), locating dowel (12), locating slot (13), water hole, top (14), water hole, bottom (15);
The bottom of described No. 2 void columns (2) is provided with evagination barrel mast (21), water conservancy diversion sieve aperture (22);
The bottom of described No. 4 pre-treatment cylinders (4) is provided with groove post (41), discharge orifice (42);
Described No. 5 raw water boxs (5) are about one penetrating structure, top is provided with location groove (51), it is lower is former pond (52), former pond has ladder platform (53), its underpart is current by pass (54), and the end face of location groove (51) has positioning convex column (511);
The lower end of described No. 6 top covers (6) is provided with locating groove along (61);
These 5 modules, can form the pretreatment box module body framework (OK2) of diversity water treatment station; It is characterized in that:
The evagination barrel mast (21) of described No. 2 void columns, is mounted on the outside of the locating dowel (12) of No. 1 bucket;
The locating slot (13) of No. 1 bucket put into by the groove post (41) of described No. 4 pre-treatment cylinders;
The positioned edge groove (51) of described No. 5 raw water boxs is put on the top of No. 1 bucket, and meanwhile, the ladder platform (53) of No. 5 raw water boxs drops on the top of No. 2 void columns and No. 4 pre-treatment cylinders automatically;
The locating groove of described No. 6 top covers, along (61), is placed in the positioning convex column (511) of No. 5 raw water box end faces.
4. can the unitization water purification project assembly of assembly flexibly comprise: No. 1 bucket (1), 3 ring shape sieve plate (3), No. 6 top covers (6) and No. 7 sieve plate important actors (7);
The bottom of described No. 1 bucket (1) is provided with indent platform (11), locating dowel (12), locating slot (13), water hole, top (14), water hole, bottom (15);
The plate face of described 3 ring shape sieve plate (3) is provided with densely covered water distribution sieve aperture (31);
The lower end of described No. 6 top covers (6) is provided with locating groove along (61);
Described No. 7 sieve plate important actors (7) are by table top (71), and important actor (72) forms, and table top and important actor have been covered with water hole (73);
These 4 modules, can form charcoal bed box assembly main framework (OK3) of diversity water treatment station; It is characterized in that:
The important actor (72) of described No. 7 sieve plate important actors, is mounted on the outside of No. 1 bucket locating dowel (12), and now the table top (71) of No. 7 sieve plate important actors and the indent platform (11) of No. 1 bucket are on same horizontal plane;
Described 3 ring shape sieve plate (3) is inserted with in No. 1 bucket (1), simultaneously, 3 ring shape sieve plate (3), drops on the indent platform (11) of No. 1 bucket and the table top (71) of No. 7 sieve plate important actors automatically;
The locating groove of described No. 6 top covers, along (61), is mounted in the positioning convex column (511) of No. 5 raw water box end faces.
CN201420078488.5U 2014-02-25 2014-02-25 Can the unitization water purification project assembly of assembly flexibly Expired - Fee Related CN204111457U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420078488.5U CN204111457U (en) 2014-02-25 2014-02-25 Can the unitization water purification project assembly of assembly flexibly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420078488.5U CN204111457U (en) 2014-02-25 2014-02-25 Can the unitization water purification project assembly of assembly flexibly

Publications (1)

Publication Number Publication Date
CN204111457U true CN204111457U (en) 2015-01-21

Family

ID=52328791

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420078488.5U Expired - Fee Related CN204111457U (en) 2014-02-25 2014-02-25 Can the unitization water purification project assembly of assembly flexibly

Country Status (1)

Country Link
CN (1) CN204111457U (en)

Similar Documents

Publication Publication Date Title
CN104556474A (en) Water purification process and device of water supply plant
CN104591408A (en) Up-flow biological pretreatment filter tank
CN204111457U (en) Can the unitization water purification project assembly of assembly flexibly
CN107162191A (en) A kind of countryside sewage treatment equipment
CN204981520U (en) Integration sewage treatment integrated equipment
CN205473162U (en) But family expenses water purifier of water reuse
CN203866149U (en) Modularized module adopting horizontal structure
CN210711144U (en) Modularized backwashing constructed wetland device
Barnes et al. The biosand filter, siphon filter and rainwater harvesting
CN206109164U (en) Ecological utilization module is used at family
CN104860434A (en) Seven modularized water purification engineering modules capable of realizing flexibly assembling
Van Der Hoek et al. Green Village Delft–integration of an autarkic water supply in a local sustainable energy system
CN209161755U (en) A kind of modularization wet land system
CN114084962A (en) Multifunctional denitrification and dephosphorization modular wetland pilot test device
CN208378653U (en) A kind of combined stabilization pond that antiseepage film is linked together processing livestock breeding wastewater system
CN202543006U (en) Buried domestic sewage treatment device
CN205313216U (en) Artifical rapid infiltration layer sewage treatment system
CN204529605U (en) To live light sewage ecological treatment system
CN108585353A (en) A kind of sewage disposal system and its working method
CN203946961U (en) The unitization module of a set of horizontal type structure
CN204111539U (en) The unitization module of one group of horizontal type structure
CN204138501U (en) A kind of printing and dyeing wastewater treatment system
CN216445091U (en) Have multi-functional nitrogen and phosphorus removal modularization wetland pilot scale test device concurrently
CN204237625U (en) Serially connected sanitary sewage center loop aeration and biological treating plant
CN207646013U (en) A kind of integrated membrane biological fluidized bed urban wastewater treatment device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150121