CN204059360U - A kind of internal support of foundation pit construction stage sightseeing teaching platform - Google Patents

A kind of internal support of foundation pit construction stage sightseeing teaching platform Download PDF

Info

Publication number
CN204059360U
CN204059360U CN201420346266.7U CN201420346266U CN204059360U CN 204059360 U CN204059360 U CN 204059360U CN 201420346266 U CN201420346266 U CN 201420346266U CN 204059360 U CN204059360 U CN 204059360U
Authority
CN
China
Prior art keywords
sightseeing
support column
foundation pit
teaching platform
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420346266.7U
Other languages
Chinese (zh)
Inventor
王崇强
刘达
姬祥
王洪
景永兴
董华东
周浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
China Construction Industrial and Energy Engineering Group Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd, First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201420346266.7U priority Critical patent/CN204059360U/en
Application granted granted Critical
Publication of CN204059360U publication Critical patent/CN204059360U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a kind of internal support of foundation pit construction stage sightseeing teaching platform, comprise concrete bed and support column, described support column lower end is provided with suspension column, and suspension column is connected with concrete bed by expansion bolt; Support column upper end is connected with main joist, and main joist upper surface is provided with gripper shoe, is connected between described adjacent supports post by cross raker beam; Diagonal brace connector is provided with in the middle part of cross raker beam; Support column and main joist form rectangular frame structure; Support column arranged outside has upper people to mark time.The utility model internal support of foundation pit construction stage sightseeing teaching platform, lifting is convenient, and installation rate is fast, and planeness is easy to control, good integrity, uniform force, is arranged in inner support, has good operability for the project that site area is narrow and small.The sightseeing platform visual field is good, can show the characteristic of project better.Sightseeing platform, as teaching platform, can allow and newly enter workman and understand on-site actual situations better.

Description

A kind of internal support of foundation pit construction stage sightseeing teaching platform
Technical field
The utility model relates to a kind of construction platform, specifically, relates to a kind of internal support of foundation pit construction stage sightseeing teaching platform.
Background technology
Building site needs a large amount of construction workers, and construction worker's educational level is low, and flowing is large, and experienced operator is few, and therefore, the construction worker newly recruited, must carry out safety and skills training.The place that present building site worker training is not applicable to, because construction worker's awareness of safety of newly recruiting is poor, is unfamiliar with building site concrete condition, easily causes the accident and personal injury when training.
Existing sightseeing platform is all arranged at foundation ditch limit, can not go deep into visiting in foundation ditch.
Utility model content
Technical problem to be solved in the utility model is: for above-mentioned deficiency of the prior art, and the utility model provides a kind of and meets the construction worker newly recruited, easy construction, broad view, the internal support of foundation pit construction stage sightseeing teaching platform that result of training is good.
For solving the problems of the technologies described above, the technical solution of the utility model is: a kind of internal support of foundation pit construction stage sightseeing teaching platform, comprise concrete bed and support column, described support column lower end is provided with suspension column, and suspension column is connected with concrete bed by expansion bolt; Support column upper end is connected with main joist, is provided with secondary joist between main joist; Main joist upper surface is provided with gripper shoe, and gripper shoe surface is provided with anti-slip veins; Be connected by cross raker beam between described adjacent supports post; Diagonal brace connector is provided with in the middle part of cross raker beam; Support column and main joist form rectangular frame structure; Support column arranged outside has upper people to mark time.
Preferably, described support plate edge is provided with guardrail, and guardrail height is 1.2-1.5 rice.
Preferably, described diagonal brace connector and cross raker beam are for being flexibly connected.
Have employed technique scheme, the beneficial effects of the utility model are: the utility model internal support of foundation pit construction stage sightseeing teaching platform, lifting is convenient, installation rate is fast, planeness is easy to control, good integrity, uniform force, be arranged in inner support, for the project that site area is narrow and small, there is good operability.The sightseeing platform visual field is good, can show the characteristic of project better.Sightseeing platform, as teaching platform, can allow and newly enter workman and understand on-site actual situations better.
Accompanying drawing explanation
Fig. 1 is the utility model internal support of foundation pit construction stage sightseeing teaching platform layout plan;
Fig. 2 is the A-A sectional structure schematic diagram of Fig. 1;
Fig. 3 is the B-B sectional structure schematic diagram of Fig. 1.
Wherein: 1, concrete bed 2, support column
3, suspension column 4, expansion bolt
5, main joist 6, secondary joist
7, gripper shoe 8, retaining wall
9, cross raker beam 10, diagonal brace connector
11, upper people mark time 12, guardrail.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is further illustrated.
As shown in Figure 1, accompanying drawing 1-3 is known, and a kind of internal support of foundation pit construction stage sightseeing teaching platform, comprises concrete bed 1 and support column 2, and described support column 2 lower end is provided with suspension column 3, and suspension column 3 is connected with concrete bed 1 by expansion bolt 4; Support column 2 upper end is connected with main joist 5, is provided with secondary joist 6 between main joist 5; Main joist 5 upper surface is provided with gripper shoe 7, and gripper shoe 7 surface is provided with anti-slip veins; Be connected by cross raker beam 9 between described adjacent supports post 2; Diagonal brace connector 10 is provided with in the middle part of cross raker beam 9; Support column 2 and main joist 5 form rectangular frame structure; Support column 2 arranged outside has upper people to mark time 11.
In the present embodiment, described gripper shoe 7 edge is provided with guardrail 12, and guardrail height is 1.2-1.5 rice.
In addition, described diagonal brace connector 10 and cross raker beam are for being flexibly connected.
The utility model internal support of foundation pit construction stage sightseeing teaching platform, lifting is convenient, and installation rate is fast, and planeness is easy to control, good integrity, uniform force, is arranged in inner support, has good operability for the project that site area is narrow and small.The sightseeing platform visual field is good, can show the characteristic of project better.Sightseeing platform, as teaching platform, can allow and newly enter workman and understand on-site actual situations better.
The utility model is not limited to above-mentioned concrete embodiment, and those of ordinary skill in the art is from above-mentioned design, and without performing creative labour, done all conversion, all drop within protection domain of the present utility model.

Claims (3)

1. internal support of foundation pit construction stage sightseeing teaching platform, is characterized in that: comprise concrete bed and support column, described support column lower end is provided with suspension column, and suspension column is connected with concrete bed by expansion bolt; Support column upper end is connected with main joist, is provided with secondary joist between main joist; Main joist upper surface is provided with gripper shoe, and gripper shoe surface is provided with anti-slip veins; Be connected by cross raker beam between described adjacent supports post; Diagonal brace connector is provided with in the middle part of cross raker beam; Support column and main joist form rectangular frame structure; Support column arranged outside has upper people to mark time.
2. internal support of foundation pit construction stage sightseeing teaching platform according to claim 1, it is characterized in that: described support plate edge is provided with guardrail, guardrail height is 1.2-1.5 rice.
3. internal support of foundation pit construction stage sightseeing teaching platform according to claim 1, is characterized in that: described diagonal brace connector and cross raker beam are for being flexibly connected.
CN201420346266.7U 2014-06-27 2014-06-27 A kind of internal support of foundation pit construction stage sightseeing teaching platform Expired - Fee Related CN204059360U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420346266.7U CN204059360U (en) 2014-06-27 2014-06-27 A kind of internal support of foundation pit construction stage sightseeing teaching platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420346266.7U CN204059360U (en) 2014-06-27 2014-06-27 A kind of internal support of foundation pit construction stage sightseeing teaching platform

Publications (1)

Publication Number Publication Date
CN204059360U true CN204059360U (en) 2014-12-31

Family

ID=52200904

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420346266.7U Expired - Fee Related CN204059360U (en) 2014-06-27 2014-06-27 A kind of internal support of foundation pit construction stage sightseeing teaching platform

Country Status (1)

Country Link
CN (1) CN204059360U (en)

Similar Documents

Publication Publication Date Title
CN101935986B (en) Overwater large-span steel tube pile cast-in-situ trestle and building method thereof
CN205134327U (en) Concrete diclinic props row -pile support system
CN203795458U (en) Bearing-platform-free lattice-type tower crane foundation device capable of traversing basement
CN103132537A (en) Steel latticed column homocentric-square-shaped concrete bearing platform combination type tower crane base structure and construction method
CN203487803U (en) Safety protection structure for elevator shaft construction
CN204715366U (en) A kind of large-area deep foundation pit subregion is along the support system under inverse operating mode
CN104518473A (en) Suspension protection structure and method of cable box culvert pipeline
CN203007994U (en) Construction joint structure of high-low fundamental baseplate position
CN202969971U (en) Elevator shaft protection device
CN205024600U (en) A work platform that is used for bridge aquatic pile foundation to be under construction
CN103967332B (en) The construction method of a kind of building site enclosing
CN203213019U (en) Cast-in-situ construction bracket system of long cantilever bent cap
CN202530465U (en) Foundation pit drainage structure
CN204570491U (en) A kind of bridge deck construction hanging basket device
CN204059360U (en) A kind of internal support of foundation pit construction stage sightseeing teaching platform
CN204801846U (en) Civil engineering pipe fitting rack
CN204370827U (en) Face frontier defense guard fence
CN205617771U (en) Construction operation platform and pipe -line transportation integrated device in high residential building elevartor shaft
CN203361170U (en) Supporting upright column pile for building foundation pit support
CN203429557U (en) Anchor pole back beam applied to underpass bridge jacking construction
CN203066082U (en) Temporary trestle on edge of anchor rod support type foundation pit
CN202990418U (en) Slurry-leaking protection device preventing cast-in-place concrete column root from rotting
CN206267039U (en) A kind of jack support platform of hollow slab girder jack-up construction
CN206328762U (en) The deep foundation pit supporting structure of super large floor height basement structure
CN206053345U (en) A kind of pump line support meanss

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141231

Termination date: 20150627