CN204059162U CN201420556419.0U CN201420556419U CN204059162U CN 204059162 U CN204059162 U CN 204059162U CN 201420556419 U CN201420556419 U CN 201420556419U CN 204059162 U CN204059162 U CN 204059162U
Authority
CN
China
Prior art keywords
road kerb
riser
tool
road
card
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420556419.0U
Other languages
Chinese (zh)
Inventor
李春
张庆学
彭岩
张永亮
潘合斌
马烽
孙义波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Urban Construction Group Co Ltd
Original Assignee
Jinan Urban Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Urban Construction Group Co Ltd filed Critical Jinan Urban Construction Group Co Ltd
Priority to CN201420556419.0U priority Critical patent/CN204059162U/en
Application granted granted Critical
Publication of CN204059162U publication Critical patent/CN204059162U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Road kerb card tailor tool of the present utility model, is characterized in that: comprise the riser with the corresponding thickness of space width between road kerb, riser upper vertical is fixed with flat board, and flat board is used for being placed on road kerb upper surface, riser is positioned at dull and stereotyped top and is provided with circular hole.The beneficial effects of the utility model are, structure is simple, easy to use, solve road kerb and the wide uneven phenomenon of seam is installed, improve installation effectiveness, and ensure that seam is wide evenly well, the adjacent block discrepancy in elevation little, linear directly suitable, elevation is little, installs attractive in appearance, improves the presentation quality of road kerb, obtain good economic benefit and social benefit, improve city image.

Description

Road kerb card tailor tool
Technical field
The invention belongs to building engineering field, relate to a kind of road kerb card tailor tool.
Background technology
According to the engineering built up in the past, road kerb is installed and is usually adopted a dead lift, and use various different card tailor tool to install road kerb, make road kerb install labour intensity large, efficiency is low, stitches wide uneven, unsightly.
Summary of the invention
The present invention, in order to make up the deficiencies in the prior art, provides the road kerb card tailor tool that a kind of structure is simple, easy to use, stitch wide accurate positioning.
The present invention is achieved through the following technical solutions:
Road kerb card tailor tool of the present invention, is characterized in that: comprise the riser with the corresponding thickness of space width between road kerb, riser upper vertical is fixed with flat board, and flat board is used for being placed on road kerb upper surface, riser is positioned at dull and stereotyped top and is provided with circular hole.
The invention has the beneficial effects as follows, hoist tool is simple, easy to use with card tailor lamps structure, solves road kerb and installs a dead lift, installs the wide uneven phenomenon of seam; The handling of road kerb machinery, card stitch construction method adopt special road kerb hoist tool, specific special car tailor tool, reduce road kerb and labour intensity is installed, improve installation effectiveness, and ensure that seam is wide evenly well, the adjacent block discrepancy in elevation little, linear directly suitable, elevation is little, install attractive in appearance, improve the presentation quality of road kerb, obtain good economic benefit and social benefit, improve city image.
This engineering method is workable, and mounting method is easy, technical difficulty is little, and decrease workers carry and found labour intensity along stone, improve efficiency, thus save the expenditure of labour cost, the method has good economic benefit compared with conventional construction method.Through measuring and calculating, adopt road kerb " mechanical hoisting, card stitch " construction, can improve about 30% than a traditional a dead lift, installation effectiveness, direct cost every meter can reduce by 3 yuan.
Accompanying drawing explanation
Fig. 1 is schematic flow sheet of the present invention.Fig. 2 is card tailor tool schematic diagram, and Fig. 3 is hoist tool schematic diagram.
In figure, 1 road wheel, 2 vehicle frames, 3 longerons, 4 wire rope, 5 sheet rubbers, 6 handles, 7 claws, 8 clamps, 9 risers, 10 is dull and stereotyped, 11 circular holes.
Detailed description of the invention
Accompanying drawing is a kind of specific embodiment of the present invention.
The handling of road kerb of the present invention machinery, card stitch construction method, comprise the following steps: road kerb back concrete → back concrete curing → management examination is checked and accepted → built in preparation of construction → surveying setting-out → draw direction line of 10-20 rice noodles determination road kerb and altitude traverse → 1:2.5-3 cement mortar bedding cushion 3cm → install first piece of road kerb → put card tailor tool → hoist tool handling road kerb to put in place → firm multiple line → self-inspection.
During surveying setting-out, during road kerb installation, the plan-position according to road kerb design positions unwrapping wire; According to alignment, the lateral edges erected with road kerb hangs long line, and straightway elongates line, and elongate line and be generally no less than 50m, curved section bracing wire is 5-10 rice; This line is the sideline inside the upper horizontal line of road kerb and road, two ore control, thus bracing wire control must be accurate, tension, ensures vertical with the some position on concrete side.
Road kerb behind should joints cement concrete support, and goes back rammed earth earth backing compacting width and should not be less than 50cm, and highly should not be less than 15cm, degree of compaction should not be less than 90%.
Road kerb is installed: the mortar good by match ratio machine mixing is transported to scene, first piece of road kerb at mounting points position place, adopt the Special hoisting tool that lever principle makes, lifting puts in place, installs with the mortar virtual resurfacing thickness preset, and vertically checks and level check, qualified rear placement controls the wide special tool " card slit die tool " of seam, continue installation second piece, during installation, " card slit die tool " continuous more than four pieces uses, prevent from stitching jam-packed; Hang 20 rice noodles and check ordinate straight cis degree, measure higher value with steel ruler, straight cis degree≤5mm; The adjacent block discrepancy in elevation is checked, standard≤1mm by steel ruler and clearance gauge amount, wide with clearance gauge inspection seam, standard≤wide ± 1mm of standard seam; Elevation of top surface, with level gauge be measured as design altitude ± 5mm; The paragraph be up to the standards, should carry out the construction of concrete back in time; Concrete back adopts portal frame technology installation form, and self-control slide calliper rule control to build height, have built rear covering curing, have been no less than 3 days.
The hoist tool that the handling of road kerb of the present invention machinery, card stitch construction method are used, comprise and the vehicle frame 2 of road wheel 1 and the longeron 3 of a fore-and-aft direction are installed, be fixed in the middle part of longeron on vehicle frame, longitudinal beam front section is provided with steel cable 4, and the jig hung for clamping road kerb made a clean sweep of by wire rope two; Jig is scissor, and the end vertical that the front end that jig comprises cross-articulation two handles, 6, two handles is together provided with inside claw 7, two claw is provided with clamp 8, is provided with the sheet rubber 5 increasing frictional force inside clamp; Wire rope two ends hang on the hanging nose of handle rear end.
When hoist tool uses, two claws are caught from road kerb both sides, sheet rubber on clamp contacts with road kerb, by longeron rear end to pressing down, longeron front end is upturned, and two handle rear ends of jig are upwards carried at wire rope two ends, two handle front end clamping road kerbs, thus road kerb is mentioned, be transported to correct position.Then, unclamp longeron rear end, upwards, longeron front end falls in longeron rear end, and wire rope unclamps jig handle rear end, and road kerb is unclamped in handle front end, road kerb can be put down.
The card tailor tool that the handling of road kerb of the present invention machinery, card stitch construction method are used, comprise the riser 9 with the corresponding thickness of space width between road kerb, riser upper vertical is fixed with dull and stereotyped 10, and flat board is used for being placed on road kerb upper surface, riser is positioned at dull and stereotyped top and is provided with circular hole 11.
The handling of road kerb machinery, card stitch construction method are exactly have developed the special tool being conducive to handling road kerb, and have developed the special tool of card seam use, and instrument is simple, easy to use.The special tool of handling road kerb, uses the rubber jig increasing frictional force, is conducive to protection road kerb and is without prejudice, accomplish again card, puts conveniently; The special tool that card seam uses, ensure that the seam of road kerb is wide preferably, and energy prolonged application, as the instrument of negative and positive angle, becomes long-term installation road kerb, controls the special tool that seam is wide.
Road kerb is installed, and strictly controls straight cis degree, the adjacent block discrepancy in elevation, stitches wide, elevation of top surface, and straight cis degree controls allowable variation≤5mm, adjacent block highness change allowable variation≤1mm, stitches wide control allowable variation≤± 1mm, and elevation of top surface controls allowable variation≤± 5mm; Bed course adopts 1:2.5-3 cement mortar thickness 3cm, and installation builds back concrete after the assay was approved in time.Straight cis degree bracing wire controls, and adjacent block head levels chi or little flat bar, meets wide special tool, and elevation of top surface hangs altitude traverse.

Claims (1)

1. a road kerb card tailor tool, is characterized in that: comprise the riser with the corresponding thickness of space width between road kerb, riser upper vertical is fixed with flat board, and flat board is used for being placed on road kerb upper surface, riser is positioned at dull and stereotyped top and is provided with circular hole.
CN201420556419.0U 2014-09-26 2014-09-26 Road kerb card tailor tool Active CN204059162U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420556419.0U CN204059162U (en) 2014-09-26 2014-09-26 Road kerb card tailor tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420556419.0U CN204059162U (en) 2014-09-26 2014-09-26 Road kerb card tailor tool

Publications (1)

Publication Number Publication Date
CN204059162U true CN204059162U (en) 2014-12-31

Family

ID=52200706

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420556419.0U Active CN204059162U (en) 2014-09-26 2014-09-26 Road kerb card tailor tool

Country Status (1)

Country Link
CN (1) CN204059162U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104313984A (en) * 2014-09-26 2015-01-28 济南城建集团有限公司 Kerbstone mechanical-hoisting and seam-spacing method-based construction method, hoisting tool and seam-spacing tool

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104313984A (en) * 2014-09-26 2015-01-28 济南城建集团有限公司 Kerbstone mechanical-hoisting and seam-spacing method-based construction method, hoisting tool and seam-spacing tool

Similar Documents

Publication Publication Date Title
CN204057828U (en) Curb machinery hoist tool
CN104313984A (en) Kerbstone mechanical-hoisting and seam-spacing method-based construction method, hoisting tool and seam-spacing tool
CN205436860U (en) Loading attachment of profile bender
CN201297030Y (en) Movable template
CN204059162U (en) Road kerb card tailor tool
CN203940818U (en) Kink track alignment device
CN203430057U (en) Floor concrete leveling device
CN207069532U (en) Assembly type cable slot support
CN205879071U (en) Simple and easy measuring device of floor thickness
CN102561713B (en) Method for controlling building quality of concrete frame structure walls
CN202348171U (en) Lifting type drilling tool pipe frame platform for well drilling
CN205969480U (en) Can dismantle reinforcement fetal membrane frame
CN203475858U (en) Wall-building line-hanging support
CN101871258B (en) Implement for quickly and accurately pasting sanitary wall tiles and method of reserving gaps, arranging tiles, filling mortar and pasting tiles
CN205479703U (en) Pipeline mounting machine
CN204040485U (en) Bars In Poured Concrete Slab thickness and reinforcement cover control support
CN204126077U (en) A kind of temporary fastening device for prefabricated panel and steel column connection
CN206859073U (en) A kind of bridge floor mould
CN207209239U (en) Material mobile platform
CN207932952U (en) Detachable hoisting gate frame
CN210973669U (en) Lift for civil engineering
CN205954488U (en) A work dolly that is used for bridge seam form setting that wets
CN210828232U (en) Floor tile limit structure for indoor decoration
CN205503160U (en) Combine and adopt quick liquid of working face withdrawing equipment accuse leveling device
CN206736651U (en) Belgian road suspension method cast-in-place construction control system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant