CN205969480U - Can dismantle reinforcement fetal membrane frame - Google Patents

Can dismantle reinforcement fetal membrane frame Download PDF

Info

Publication number
CN205969480U
CN205969480U CN201620673296.8U CN201620673296U CN205969480U CN 205969480 U CN205969480 U CN 205969480U CN 201620673296 U CN201620673296 U CN 201620673296U CN 205969480 U CN205969480 U CN 205969480U
Authority
CN
China
Prior art keywords
plate
main muscle
positioning plate
cage bar
top positioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620673296.8U
Other languages
Chinese (zh)
Inventor
陈浩
马建荣
李文章
朱伟
李玲玉
朱敏涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction Building Materials Technology Group Co Ltd
Original Assignee
Shanghai Jiangong Construction Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jiangong Construction Material Co Ltd filed Critical Shanghai Jiangong Construction Material Co Ltd
Priority to CN201620673296.8U priority Critical patent/CN205969480U/en
Application granted granted Critical
Publication of CN205969480U publication Critical patent/CN205969480U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

The utility model discloses a can dismantle reinforcement fetal membrane frame, this fetal membrane put up including main muscle top positioning plate, main muscle bottom locating plate, side channel steel framework and bottom channel steel framework, main muscle top positioning plate and main muscle bottom locating plate parallel arrangement are on same vertical face, be equipped with the top constant head tank on the main muscle top positioning plate, be equipped with the bottom constant head tank on the locating plate of main muscle bottom, the top constant head tank sets up with bottom constant head tank one -to -one, main muscle top positioning plate's both ends link to each other with side channel steel framework through the nut respectively, and weld with bottom channel steel framework respectively at the both ends of main muscle bottom locating plate, laterally is equipped with the sleeve pipe on the channel steel framework, be equipped with main muscle location telescopic link in the sleeve pipe, main muscle top positioning plate's top is equipped with the rebar positioning end plate. The utility model discloses rebar positioning, the steel reinforcement cage of successfully having solved the reinforcement in -process conveniently hang out the problem that the fetal membrane put up fast, not only guaranteed the size accuracy of steel reinforcement cage but also improved work efficiency.

Description

A kind of detachable reinforcing bar binding tire film frame
Technical field
The utility model belongs to prefabricated components construction field, more particularly, to a kind of detachable reinforcing bar binding tire film frame.
Background technology
In the manufacturing process of prefabricated components, reinforcing bar binding is a wherein important link, for a kind of belt surface dress The making of the large-scale overweight precast pier column of decorations, bridge column adopts the armored concrete prefabricated rectangle terrace with edge of tyre stone moulding Bridge pier, every root post is divided into two-step pouring shaping, pours column housing for the first time, column housing is divided into 4 pieces of concrete Native plate, the advanced accommodating prefabricated making that lies low of 4 blocks of plates, pour column inner core for the second time.
Steel reinforcement cage cage bar used by column inner core is Large-size rebar, is distributed in surrounding, the internal reinforcing bar slightly smaller for size As stirrup.Although steel reinforcement cage section is relatively simple, laterally longitudinally vertical all have the steel obstructing steel reinforcement cage to leave tire film frame Muscle exists.Accordingly, it would be desirable to a kind of can solve the problem that the easy and convenient detachable reinforcing bar binding tire film frame hanging out tire film frame of steel reinforcement cage.
Utility model content
For problems of the prior art, the utility model provides a kind of detachable reinforcing bar binding tire film frame, to solve The certainly reinforcing bar positioning during reinforcing bar binding, the quick and convenient problem hanging out tire film frame of steel reinforcement cage.
For achieving the above object, the utility model employs the following technical solutions:
A kind of detachable reinforcing bar binding tire film frame, this tire film frame includes cage bar top positioning plate, cage bar bottom location-plate, side Face chan frame and bottom chan frame, main ribs top positioning plate and cage bar bottom location-plate are set in parallel in same vertical On face, main ribs top positioning plate is provided with top locating slot, and cage bar bottom location-plate is provided with bottom locating slot, described top Portion's locating slot corresponds setting with bottom locating slot;The two ends of cage bar top positioning plate pass through nut and lateral groove steel framework respectively Frame is connected, and the two ends of cage bar bottom location-plate are welded with bottom chan frame respectively, are provided with sleeve pipe, institute on the chan frame of side State and in sleeve pipe, be provided with cage bar positioning expansion link, the top of main ribs top positioning plate is provided with reinforcing bar locating end plate.
Described side chan frame and bottom chan frame all take advantage of the wide a size of rectangular tube of 40*60mm using length.
Described top locating slot is evenly distributed on cage bar top positioning plate;Bottom locating slot is evenly distributed on cage bar bottom On location-plate.
The quantity of main ribs top positioning plate and cage bar bottom location-plate is at least two.
The utility model reinforcing bar binding tire film frame is detachable, by four cage bar top positioning plates(Detachably), four Cage bar bottom location-plate, 14 cage bar both sides position expansion link(Every side 7, can horizontal extension), reinforcing bar locating end plate and fixation And constitute the composition such as channel-section steel and rectangular tube of framework.After steel reinforcement cage colligation finishes, by four cage bar top positioning plates from fetal membrane Disassemble on frame, and cage bar both sides positioning expansion link is extracted to outside tire film frame simultaneously, place determining of cage bar with some Nut, after steel reinforcement cage colligation is complete, can be backed out, top is positioned by position groove and often two screw nuts that can conveniently dismantle in end Plate is pulled down, and just can hang out the good steel reinforcement cage of colligation from tire film frame.Four cage bar top positioning plates can be reinstalled in situ, main Muscle both sides positioning expansion link also can be screwed onto appropriate location, ready for the colligation of next steel reinforcement cage.
Compared with prior art, the beneficial effects of the utility model are:1. the utility model facilitates the reinforcing bar that colligation finishes Cage easily hangs out, and removes and installs light, manually simple to operate, reinforcing bar accurate positioning and be difficult changing position in process of binding; 2. successfully solve the problems, such as that the reinforcing bar during reinforcing bar binding positions, steel reinforcement cage is quick and convenient and hang out tire film frame, both ensure that The size of steel reinforcement cage accurately improves operating efficiency again.
Brief description
Fig. 1 is the integrally-built front view of the utility model.
Fig. 2 is the side view of Fig. 1.
Fig. 3 is the top view of Fig. 1.
Fig. 4 is the structural representation of the utility model cage bar top positioning plate.
Fig. 5 is the side view of Fig. 4.
Fig. 6 is the structural representation of the utility model cage bar bottom location-plate.
Fig. 7 is the side view of Fig. 6.
Specific embodiment
Come below in conjunction with the accompanying drawings the technical solution of the utility model is described in further detail, in the hope of apparent bright Understand the utility model in vain, but protection domain of the present utility model can not be limited with this.
As shown in figs. 1-7, the present embodiment detachable reinforcing bar binding tire film frame, this tire film frame include cage bar top positioning plate 1, Cage bar bottom location-plate 2, side chan frame 3 and bottom chan frame 4, main ribs top positioning plate 1 and cage bar bottom are fixed Position plate 2 is set in parallel on same vertical plane, and main ribs top positioning plate 1 is provided with top locating slot 11, and cage bar bottom is fixed Position plate 2 is provided with bottom locating slot 21, and described top locating slot 11 corresponds setting with bottom locating slot 21;Cage bar top is fixed The two ends of position plate 1 are connected with side chan frame 3 by nut 8 respectively, the two ends of cage bar bottom location-plate 2 respectively with base channel Steel frame 4 welds, and is provided with sleeve pipe 5 on side chan frame 3, is provided with cage bar positioning expansion link 6, described master in described sleeve pipe 5 The top of muscle top positioning plate 1 is provided with reinforcing bar locating end plate 7.
Preferably, side chan frame 3 described in the present embodiment and bottom chan frame 4 all take advantage of width a size of using length The rectangular tube of 40*60mm.
As further preferred, described in the present embodiment, top locating slot 11 is evenly distributed on cage bar top positioning plate 1;Bottom Portion's locating slot 21 is evenly distributed on cage bar bottom location-plate 2.
The quantity of the present embodiment main ribs top positioning plate 1 and cage bar bottom location-plate 2 is four.
Although above-described embodiment makes specific descriptions to the utility model, for those of ordinary skill in the art For it is understood that can within without departing from spirit and scope of the present utility model be based on the utility model disclosed in interior Hold and modify or improve, these modification and improvement are all within spirit and scope of the present utility model.

Claims (4)

1. a kind of detachable reinforcing bar binding tire film frame is it is characterised in that this tire film frame includes cage bar top positioning plate(1), cage bar Bottom location-plate(2), side chan frame(3)With bottom chan frame(4), main ribs top positioning plate(1)With cage bar bottom Portion's location-plate(2)It is set in parallel on same vertical plane, main ribs top positioning plate(1)It is provided with top locating slot(11), Cage bar bottom location-plate(2)It is provided with bottom locating slot(21), described top locating slot(11)With bottom locating slot(21)One by one It is correspondingly arranged;Cage bar top positioning plate(1)Two ends respectively pass through nut(8)With side chan frame(3)It is connected, cage bar bottom Location-plate(2)Two ends respectively with bottom chan frame(4)Welding, in side chan frame(3)It is provided with sleeve pipe(5), described Sleeve pipe(5)In be provided with cage bar positioning expansion link(6), main ribs top positioning plate(1)Top be provided with reinforcing bar locating end plate (7).
2. detachable reinforcing bar binding tire film frame according to claim 1 is it is characterised in that described side chan frame(3) With bottom chan frame(4)All the wide a size of rectangular tube of 40*60mm is taken advantage of using length.
3. detachable reinforcing bar binding tire film frame according to claim 1 is it is characterised in that described top locating slot(11)All Even it is distributed in cage bar top positioning plate(1)On;Bottom locating slot(21)It is evenly distributed on cage bar bottom location-plate(2)On.
4. detachable reinforcing bar binding tire film frame according to claim 1 is it is characterised in that main ribs top positioning plate (1)With cage bar bottom location-plate(2)Quantity be at least two.
CN201620673296.8U 2016-06-30 2016-06-30 Can dismantle reinforcement fetal membrane frame Active CN205969480U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620673296.8U CN205969480U (en) 2016-06-30 2016-06-30 Can dismantle reinforcement fetal membrane frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620673296.8U CN205969480U (en) 2016-06-30 2016-06-30 Can dismantle reinforcement fetal membrane frame

Publications (1)

Publication Number Publication Date
CN205969480U true CN205969480U (en) 2017-02-22

Family

ID=58022728

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620673296.8U Active CN205969480U (en) 2016-06-30 2016-06-30 Can dismantle reinforcement fetal membrane frame

Country Status (1)

Country Link
CN (1) CN205969480U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107524167A (en) * 2017-08-31 2017-12-29 中交第四航务工程局有限公司 A kind of large-scale reinforcement cage bar spacing control method
CN108385526A (en) * 2018-01-31 2018-08-10 中国建筑第六工程局有限公司 A kind of pier stud reinforcing bar security protection integration sizing moulding bed

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107524167A (en) * 2017-08-31 2017-12-29 中交第四航务工程局有限公司 A kind of large-scale reinforcement cage bar spacing control method
CN108385526A (en) * 2018-01-31 2018-08-10 中国建筑第六工程局有限公司 A kind of pier stud reinforcing bar security protection integration sizing moulding bed

Similar Documents

Publication Publication Date Title
CN203712840U (en) Small box girder concrete pouring mold
CN205969480U (en) Can dismantle reinforcement fetal membrane frame
CN204183688U (en) A kind of flue mould
CN105421781A (en) Synchronous pouring construction method and formwork system for concrete ridge platform and structural floor slab
CN204772928U (en) Cement flower bucket is pour and is used centre form
CN206562765U (en) For the alter-pouring strips mould plate and ahead of time branch stake tool of dismantling concrete framework template
CN203603467U (en) Simple pouring hopper of constructional column
CN211122410U (en) Concrete mixture unit weight detection device
CN201972715U (en) Integrated ditch cable trough mould frame
CN209163440U (en) A kind of easy-to-dismount late poured band support reinforcing construction
CN206953256U (en) A kind of prefabricated components flat-die quick die change device
CN203531381U (en) Temporary hanging and supporting device used for steel bar truss formworks
CN206070404U (en) Oblique formwork support structure at the section haunch of box culvert top
CN211523432U (en) Municipal works production is with pouring template
CN208633518U (en) Prestressed concrete laminated floor slab hangs mould pouring construction structure
CN203755682U (en) Secondary pouring form board constructing structure for small opening of concrete structure floor slab
CN203004045U (en) Hopper for concrete falling
CN204357118U (en) Form removal bracing frame behind a kind of beam slab ater-casting
CN202272818U (en) Plaster die for producing quartz crucibles
CN204081467U (en) Adjustable wallboard quarter bend template
CN205185021U (en) Haydite wallboard mould
CN205329686U (en) Modular supplementary formwork grudging post of single pile bored concrete pile circle template
CN212270610U (en) Quick formwork fixing device of apron side ditch
CN109537899A (en) Pump line plugging device for preventing concrete unrestrained
CN205291221U (en) Prefabricated mould of concrete guardrail

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 200120 Southwest District, 2123 Pudong Road, Pudong New Area, Shanghai.

Patentee after: Shanghai Construction Engineering Building Materials Technology Group Co., Ltd

Address before: 200086 Siping Road 848, Shanghai, Hongkou District

Patentee before: SHANGHAI JIANGONG CONSTRUCTION MATERIAL Co.,Ltd.