CN204024707U - A kind of tailwater tunnel working tunnel discharge structure - Google Patents

A kind of tailwater tunnel working tunnel discharge structure Download PDF

Info

Publication number
CN204024707U
CN204024707U CN201420407948.4U CN201420407948U CN204024707U CN 204024707 U CN204024707 U CN 204024707U CN 201420407948 U CN201420407948 U CN 201420407948U CN 204024707 U CN204024707 U CN 204024707U
Authority
CN
China
Prior art keywords
tunnel
tailwater
working
working tunnel
power house
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420407948.4U
Other languages
Chinese (zh)
Inventor
杨威
钱玉英
刘静
杜贤军
李振中
张震
景浩源
杜晓京
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Beijing Engineering Corp Ltd
Original Assignee
PowerChina Beijing Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Beijing Engineering Corp Ltd filed Critical PowerChina Beijing Engineering Corp Ltd
Priority to CN201420407948.4U priority Critical patent/CN204024707U/en
Application granted granted Critical
Publication of CN204024707U publication Critical patent/CN204024707U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a kind of discharge structure of tailwater tunnel working tunnel, it is in conjunction with underground power house collector drain combined layout; Comprise tailwater tunnel working tunnel and underground power house lower floor collector drain, be embedded with drainage pipe in the occluding body of described tailwater tunnel working tunnel, described tailwater tunnel working tunnel is communicated with described underground power house lower floor collector drain.Solve the runtime draining of tailwater tunnel working tunnel, avoiding forming ponding Construction unit in runtime working tunnel cannot patrol; Avoid setting working tunnel being re-started to draining evacuation system, save engineering operation expense.

Description

A kind of tailwater tunnel working tunnel discharge structure
Technical field
The utility model relates to Hydraulic and Hydro-Power Engineering technical field, particularly relates to a kind of pumped storage underground power house tailwater tunnel working tunnel discharge structure.
Background technology
Pumped storage hydropower plant tailwater tunnel is constructed, and generally for the engineering that tailwater tunnel is longer, need arrange the construction passage of working tunnel as tailwater tunnel.And for the working tunnel of tailwater tunnel, be all that hole is high, in hole the end, and thus construction period draining often adopts interim sump and water pump evacuation system in hole to solve.Enter the runtime at completion of works, after interim evacuation system is withdrawn, working tunnel is without effective discharge structure, easily ponding is formed in a hole, run unit cannot carry out scene inspection, and the later stage rearranges the comparatively complicated difficulty of evacuation system again, and investment is larger.
Utility model content
The purpose of this utility model is the discharge structure providing a kind of tailwater tunnel working tunnel, thus solves the foregoing problems existed in prior art.
To achieve these goals, the technical solution adopted in the utility model is as follows:
A kind of tailwater tunnel working tunnel discharge structure, in conjunction with underground power house collector drain combined layout; Comprise tailwater tunnel working tunnel and underground power house lower floor collector drain, be embedded with drainage pipe in the occluding body of described tailwater tunnel working tunnel, described tailwater tunnel working tunnel is communicated with described underground power house lower floor collector drain.
Preferably, described tailwater tunnel working tunnel is communicated with by underground power house lower floor collector drain extension or linkage section with described underground power house lower floor collector drain.
Preferably, described pipeline is steel pipe.
Preferably, described steel pipe is the steel pipe of DN200mm.
The beneficial effects of the utility model are:
(1) solve the runtime draining of tailwater tunnel working tunnel, avoiding forming ponding Construction unit in runtime working tunnel cannot patrol; (2) avoid setting working tunnel being re-started to draining evacuation system, save engineering operation expense.
Accompanying drawing explanation
Fig. 1 is the floor map of tailwater tunnel working tunnel discharge structure of the present utility model;
Wherein: 1---tailwater tunnel working tunnel; 2---embedded steel tube 3---block section; 4---lower floor collector drain extension (linkage section); 5---underground power house lower floor collector drain; 6---collecting well; 7---tailwater tunnel; 8---factory building bottom working tunnel.
Detailed description of the invention
In order to make the purpose of this utility model, technical scheme and advantage clearly understand, below in conjunction with accompanying drawing, the utility model is further elaborated.Should be appreciated that detailed description of the invention described herein only in order to explain the utility model, and be not used in restriction the utility model.
As shown in Figure 1, the utility model discloses a kind of discharge structure of tailwater tunnel working tunnel, it is in conjunction with underground power house collector drain combined layout; Comprise tailwater tunnel working tunnel and underground power house lower floor collector drain, be embedded with drainage pipe in the occluding body of described tailwater tunnel working tunnel, described tailwater tunnel working tunnel is communicated with described underground power house lower floor collector drain.Described tailwater tunnel working tunnel is communicated with by underground power house lower floor collector drain extension or linkage section with described underground power house lower floor collector drain.Described pipeline is steel pipe.By the infiltration of tailwater tunnel working tunnel country rock discharged to factory building lower floor collector drain extension or linkage section, finally enter factory building collecting well or Artesian Drainage water hole.
1 further illustrate by reference to the accompanying drawings for certain large pumped storage power plant that have employed technical solutions of the utility model below:
Certain pumped storage power plant tail water tunnel construction layout of adits is in tailwater tunnel adit section, tailwater tunnel working tunnel is in conjunction with factory building bottom working tunnel combined layout, tailwater tunnel working tunnel low spot is positioned at tailwater tunnel adit section, and the construction period adopts interim sump and water pump evacuation system in hole to carry out draining.Runtime discharge structure is in conjunction with underground power house lower floor collector drain combined layout, lower floor's collector drain is extended to tailwater tunnel working tunnel from underground power house, at the draining steel pipe of the pre-buried DN200mm in working tunnel block section, by the infiltration of tail water working tunnel country rock discharged to underground power house lower floor collector drain extension, finally enter factory building collecting well.
By adopting technique scheme disclosed in the utility model, obtain effect useful as follows:
(1) solve the runtime draining of tailwater tunnel working tunnel, avoiding forming ponding Construction unit in runtime working tunnel cannot patrol; (2) avoid setting working tunnel being re-started to draining evacuation system, save engineering operation expense.
The above is only preferred embodiment of the present utility model; it should be pointed out that for those skilled in the art, under the prerequisite not departing from the utility model principle; can also make some improvements and modifications, these improvements and modifications also should look protection domain of the present utility model.

Claims (4)

1. a tailwater tunnel working tunnel discharge structure, is characterized in that, in conjunction with underground power house collector drain combined layout; Comprise tailwater tunnel working tunnel and underground power house lower floor collector drain, be embedded with drainage pipe in the occluding body of described tailwater tunnel working tunnel, described tailwater tunnel working tunnel is communicated with described underground power house lower floor collector drain.
2. tailwater tunnel working tunnel discharge structure according to claim 1, is characterized in that, described tailwater tunnel working tunnel is communicated with by underground power house lower floor collector drain extension or linkage section with described underground power house lower floor collector drain.
3. tailwater tunnel working tunnel discharge structure according to claim 1 and 2, is characterized in that, described pipeline is steel pipe.
4. tailwater tunnel working tunnel discharge structure according to claim 3, is characterized in that, described steel pipe is the steel pipe of DN200mm.
CN201420407948.4U 2014-07-22 2014-07-22 A kind of tailwater tunnel working tunnel discharge structure Expired - Fee Related CN204024707U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420407948.4U CN204024707U (en) 2014-07-22 2014-07-22 A kind of tailwater tunnel working tunnel discharge structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420407948.4U CN204024707U (en) 2014-07-22 2014-07-22 A kind of tailwater tunnel working tunnel discharge structure

Publications (1)

Publication Number Publication Date
CN204024707U true CN204024707U (en) 2014-12-17

Family

ID=52064591

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420407948.4U Expired - Fee Related CN204024707U (en) 2014-07-22 2014-07-22 A kind of tailwater tunnel working tunnel discharge structure

Country Status (1)

Country Link
CN (1) CN204024707U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117051789A (en) * 2023-09-05 2023-11-14 广东省水利电力勘测设计研究院有限公司 Drainage overhauling channel of water diversion branch pipe plug of pumped storage power station

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117051789A (en) * 2023-09-05 2023-11-14 广东省水利电力勘测设计研究院有限公司 Drainage overhauling channel of water diversion branch pipe plug of pumped storage power station

Similar Documents

Publication Publication Date Title
CN201650362U (en) Maintainable tunnel drainage system
CN105386452A (en) Construction method for assisting in sinking of open caisson through high-pressure water
CN204371365U (en) Deep hole sealing filling system
CN105297755A (en) High-pressure water aid-sinking type construction device of open caisson
CN204532364U (en) Tunneling boring rock tunnel development machine engineering method subway tunnel pressure release type liner structure
CN203796321U (en) Balanced drain system in tunnel
CN203441529U (en) Shaft multiple section parallel interception device
CN102787606B (en) Guard method to surrounding environment in a kind of excavation of foundation pit Precipitation Process
CN204024707U (en) A kind of tailwater tunnel working tunnel discharge structure
CN204676504U (en) The emptying maintenance structure of a kind of long tailwater tunnel group without gravity flow ejectment condition
CN203768881U (en) Water seepage draining device for corridors of mountain and dam body
CN203741851U (en) Full-ring vacuum precipitation system for quicksand tunnel
CN103556989B (en) A kind of construction freezing method pit shaft country rock water-pressure survey and restricted discharge device and construction method thereof
CN206928255U (en) The maintenance arrangement of the permanent plug of induced joint diversion tunnel
CN203114340U (en) Drainage device for constructing inclined shaft
CN201574401U (en) Underground continuous wall
CN204282384U (en) Processing structure for high-water-head karst cave crossing dam impervious curtain
CN201751474U (en) Double water-collecting well basement drainage system
CN204456024U (en) For the grounding apparatus of power station water-conveyance tunnel steel lining section
CN104088664B (en) A kind of mine wastewater treatment method and system of upwards filling mining
CN101363317A (en) Developing method for large-scale strip mine
CN204081028U (en) For the jacking mechanism of underground pipe culvert engineering
CN104213628B (en) Jacking mechanism for underground pipe culvert engineering
CN208545859U (en) Convenient for the top plate of underground parking garage structure of cable laying
CN203879548U (en) Sealing wall for water plugging of mine roadway

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141217