CN204371365U - Deep hole sealing filling system - Google Patents
Deep hole sealing filling system Download PDFInfo
- Publication number
- CN204371365U CN204371365U CN201420817529.8U CN201420817529U CN204371365U CN 204371365 U CN204371365 U CN 204371365U CN 201420817529 U CN201420817529 U CN 201420817529U CN 204371365 U CN204371365 U CN 204371365U
- Authority
- CN
- China
- Prior art keywords
- grouting
- reinforcing
- soil
- deep hole
- tunnel
- Prior art date
Links
- 238000007789 sealing Methods 0.000 title claims abstract description 13
- 239000002689 soil Substances 0.000 claims abstract description 40
- 230000003014 reinforcing Effects 0.000 claims abstract description 25
- 238000009412 basement excavation Methods 0.000 claims abstract description 21
- 238000010276 construction Methods 0.000 claims abstract description 20
- 239000010410 layers Substances 0.000 claims abstract description 11
- 239000002002 slurries Substances 0.000 claims abstract description 4
- XEEYBQQBJWHFJM-UHFFFAOYSA-N iron Chemical compound data:image/svg+xml;base64,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 data:image/svg+xml;base64,PD94bWwgdmVyc2lvbj0nMS4wJyBlbmNvZGluZz0naXNvLTg4NTktMSc/Pgo8c3ZnIHZlcnNpb249JzEuMScgYmFzZVByb2ZpbGU9J2Z1bGwnCiAgICAgICAgICAgICAgeG1sbnM9J2h0dHA6Ly93d3cudzMub3JnLzIwMDAvc3ZnJwogICAgICAgICAgICAgICAgICAgICAgeG1sbnM6cmRraXQ9J2h0dHA6Ly93d3cucmRraXQub3JnL3htbCcKICAgICAgICAgICAgICAgICAgICAgIHhtbG5zOnhsaW5rPSdodHRwOi8vd3d3LnczLm9yZy8xOTk5L3hsaW5rJwogICAgICAgICAgICAgICAgICB4bWw6c3BhY2U9J3ByZXNlcnZlJwp3aWR0aD0nODVweCcgaGVpZ2h0PSc4NXB4JyB2aWV3Qm94PScwIDAgODUgODUnPgo8IS0tIEVORCBPRiBIRUFERVIgLS0+CjxyZWN0IHN0eWxlPSdvcGFjaXR5OjEuMDtmaWxsOiNGRkZGRkY7c3Ryb2tlOm5vbmUnIHdpZHRoPSc4NScgaGVpZ2h0PSc4NScgeD0nMCcgeT0nMCc+IDwvcmVjdD4KPHRleHQgZG9taW5hbnQtYmFzZWxpbmU9ImNlbnRyYWwiIHRleHQtYW5jaG9yPSJzdGFydCIgeD0nMTguNzk5NicgeT0nNDcuNzk1NScgc3R5bGU9J2ZvbnQtc2l6ZTozOHB4O2ZvbnQtc3R5bGU6bm9ybWFsO2ZvbnQtd2VpZ2h0Om5vcm1hbDtmaWxsLW9wYWNpdHk6MTtzdHJva2U6bm9uZTtmb250LWZhbWlseTpzYW5zLXNlcmlmO2ZpbGw6IzNCNDE0MycgPjx0c3Bhbj5GZTwvdHNwYW4+PC90ZXh0Pgo8L3N2Zz4K [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 12
- 239000011514 iron Substances 0.000 claims description 10
- 229910052742 iron Inorganic materials 0.000 claims description 10
- 241000209094 Oryza Species 0.000 claims description 3
- 235000007164 Oryza sativa Nutrition 0.000 claims description 3
- 235000009566 rice Nutrition 0.000 claims description 3
- 239000007788 liquids Substances 0.000 abstract description 3
- 239000007787 solids Substances 0.000 abstract description 2
- 230000029578 entry into host Effects 0.000 description 6
- 239000011901 water Substances 0.000 description 5
- 238000007569 slipcasting Methods 0.000 description 2
- 230000036536 Cave Effects 0.000 description 1
- 238000009933 burial Methods 0.000 description 1
- 235000019994 cava Nutrition 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering processes Methods 0.000 description 1
- 238000000034 methods Methods 0.000 description 1
- 239000000203 mixtures Substances 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
Abstract
Description
Technical field
The utility model relates to the filling system in a kind of urban subway tunnel excavation face, particularly a kind of front of tunnel heading water content of soil high and adopt deep hole sealing filling system.
Background technology
City underground shallow burial hidden digging is constructed, usually run into soil layer moisture abundant, soil layer is immersed in water for a long time, water saturation, the situation of soil body extremely unstable, and sealing object cannot be reached by conventional per-fore pouring liquid with small pipe, the situation that water burst gushes sand, the arch soil body caves in usually is run in digging process, anhydrous operating condition cannot be reached, can not construction safety be ensured, even affect structural safety.
Summary of the invention
The utility model provides a kind of deep hole sealing filling system, solves when metro tunnel excavation soil layer is moisture to be enriched and adopts conventional per-fore pouring liquid with small pipe cannot reach the technical problem of the solid soil of sealing.
The utility model solves above technical problem by the following technical programs:
A kind of deep hole sealing filling system, comprise tunnel construction tunnel face, tunnel construction tunnel face is provided with grouting and reinforcing solum, arrange in the front of grouting and reinforcing solum and need the grouting and reinforcing soil body, tunnel construction tunnel face on the solum of grouting and reinforcing arranged be provided with wall for grouting, wall for grouting is made up of mesh sheet and dry shotcreting layer, wall for grouting is evenly equipped with deep hole grouting hole, deep hole grouting hole is successively through wall for grouting be arranged on after grouting and reinforcing solum and treat in the grouting and reinforcing soil body, the degree of depth in deep hole grouting hole is 10-12 rice, hollow drill pipe Grouting Pipe is provided with in deep hole grouting hole, hollow drill pipe Grouting Pipe and slurry filling machine link together.
Tunnel construction tunnel face is provided with excavation to top bar and excavation is got out of a predicament or an embarrassing situation, is provided with firm soil body i iron of getting out of a predicament or an embarrassing situation excavating in the wall for grouting of getting out of a predicament or an embarrassing situation on facade, be provided with firm soil body i iron of topping bar excavating in the wall for grouting of topping bar on facade.
The utility model passes through the combination of deep hole grouting and wall for grouting, and the soil layer fixed to construction anterior instability carries out sealing grouting and reinforcing, thus reaches the execution conditions of the anhydrous operation of face, ensures construction operation safety and structural safety.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the distribution map of deep hole grouting hole 14 on wall for grouting 15;
Fig. 3 is the structural representation of wall for grouting 15.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in detail:
A kind of deep hole sealing filling system, comprise tunnel construction tunnel face, tunnel construction tunnel face is provided with grouting and reinforcing solum 12, arrange in the front of grouting and reinforcing solum 12 and need the grouting and reinforcing soil body 13, tunnel construction tunnel face on the solum of grouting and reinforcing 12 arranged be provided with wall for grouting 15, wall for grouting 15 is made up of mesh sheet and dry shotcreting layer, wall for grouting 15 is evenly equipped with deep hole grouting hole 14, deep hole grouting hole 14 is successively through wall for grouting 15 be arranged on after grouting and reinforcing solum 12 and treat in the grouting and reinforcing soil body 13, the degree of depth in deep hole grouting hole 14 is 10-12 rice, hollow drill pipe Grouting Pipe is provided with in deep hole grouting hole 14, hollow drill pipe Grouting Pipe and slurry filling machine link together.
Tunnel construction tunnel face is provided with excavation to top bar and excavation is got out of a predicament or an embarrassing situation, in the wall for grouting that excavation is got out of a predicament or an embarrassing situation on facade 2, be provided with firm soil body i iron 6 of getting out of a predicament or an embarrassing situation, in the wall for grouting that excavation is topped bar on facade 5, be provided with firm soil body i iron 7 of topping bar.
Tunnel construction tunnel face is provided with Tunnel 1, tunnel construction tunnel face is respectively arranged with excavation top bar, excavation is got out of a predicament or an embarrassing situation, relief groove and Core Soil, firm soil body i iron 6 of getting out of a predicament or an embarrassing situation is provided with on excavation gets out of a predicament or an embarrassing situation facade 2, the get out of a predicament or an embarrassing situation two ends of firm soil body i iron 6 are fixed together with Tunnel 1 respectively, facade mesh sheet 8 of getting out of a predicament or an embarrassing situation is coated with on excavation gets out of a predicament or an embarrassing situation facade 2, facade mesh sheet 8 of getting out of a predicament or an embarrassing situation is fixedly installed on excavation by anchor pole 12 and gets out of a predicament or an embarrassing situation on facade 2, firm soil body i iron 7 of topping bar is provided with on excavation tops bar facade 5, the top bar two ends of firm soil body i iron 7 are fixed together with Tunnel 1 respectively, facade mesh sheet 11 of topping bar is coated with on excavation tops bar facade 5, facade mesh sheet 11 of topping bar is fixedly installed on excavation by anchor pole and tops bar on facade 5, getting out of a predicament or an embarrassing situation in facade mesh sheet 8 and all dry layer of concrete being sprayed with 20 cm thicks in facade mesh sheet 11 of topping bar.
In the relief groove of relief groove, facade 3 is coated with facade mesh sheet 9 in relief groove, in relief groove, facade mesh sheet 9 to be fixed in relief groove on facade 3 by anchor pole, the Core Soil alien invasion 4 of Core Soil is coated with Core Soil alien invasion mesh sheet 10, Core Soil alien invasion mesh sheet 10 is fixed on Core Soil alien invasion 4 by anchor pole, in relief groove in facade mesh sheet 9 and Core Soil alien invasion mesh sheet 10 on all dry layer of concrete being sprayed with 20 cm thicks.
In wall for grouting of topping bar on facade of the present utility model, the wall for grouting of getting out of a predicament or an embarrassing situation on facade, relief groove, the wall for grouting on facade and the wall for grouting on Core Soil alien invasion form wall for grouting 15 complete on face jointly, reinforcement has been carried out on the surface of the open face facade soil body, what make front of tunnel heading treats that the slip casting soil body forms the closed soil body that can carry certain pressure, make the pressure of deep hole grouting give play to effect better, be conducive to the discharge treating water in the slip casting soil body.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420817529.8U CN204371365U (en) | 2014-12-22 | 2014-12-22 | Deep hole sealing filling system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420817529.8U CN204371365U (en) | 2014-12-22 | 2014-12-22 | Deep hole sealing filling system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204371365U true CN204371365U (en) | 2015-06-03 |
Family
ID=53327594
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420817529.8U CN204371365U (en) | 2014-12-22 | 2014-12-22 | Deep hole sealing filling system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204371365U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107542479A (en) * | 2017-09-28 | 2018-01-05 | 中国建筑第八工程局有限公司 | Top pipe slurry injection reinforced construction method |
CN108005685A (en) * | 2017-12-12 | 2018-05-08 | 中铁十八局集团有限公司 | A kind of anchor spraying concrete wall for grouting construction method |
CN109057803A (en) * | 2018-08-13 | 2018-12-21 | 贵州省水利水电勘测设计研究院 | A kind of excavation method for coal and gas prominent hydraulic tunnel |
CN109139048A (en) * | 2018-09-04 | 2019-01-04 | 中铁十二局集团有限公司 | A kind of per-fore pouring liquid with small pipe structure and its construction method |
-
2014
- 2014-12-22 CN CN201420817529.8U patent/CN204371365U/en active IP Right Grant
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107542479A (en) * | 2017-09-28 | 2018-01-05 | 中国建筑第八工程局有限公司 | Top pipe slurry injection reinforced construction method |
CN108005685A (en) * | 2017-12-12 | 2018-05-08 | 中铁十八局集团有限公司 | A kind of anchor spraying concrete wall for grouting construction method |
CN108005685B (en) * | 2017-12-12 | 2019-05-31 | 中铁十八局集团有限公司 | A kind of anchor spraying concrete wall for grouting construction method |
CN109057803A (en) * | 2018-08-13 | 2018-12-21 | 贵州省水利水电勘测设计研究院 | A kind of excavation method for coal and gas prominent hydraulic tunnel |
CN109139048A (en) * | 2018-09-04 | 2019-01-04 | 中铁十二局集团有限公司 | A kind of per-fore pouring liquid with small pipe structure and its construction method |
CN109139048B (en) * | 2018-09-04 | 2020-05-15 | 中铁十二局集团有限公司 | Advanced small conduit grouting structure and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102926770B (en) | Underground draining and grouting process in thin bedrock and thick loose sand layer rich water areas | |
CN202047416U (en) | Well sealing device of pressure-reducing and dewatering well at elevator well pit | |
CN102606167B (en) | Settlement control construction method for transverse grouting guide pipe of shallow underground excavation tunnel | |
CN202496187U (en) | Severe saline -alkali area green plant-planting soil layer salt drainage system | |
CN103277120B (en) | A kind of non-fully deeply freeze vertical thaw after water burst prevention and controls | |
CN203756206U (en) | Novel soft-rock roadway floor heave governing structure | |
CN103628887A (en) | Large-section water-rich saturated fine sand railway tunnel excavation method | |
CN103498696B (en) | A kind of method from roadway in the roof grouting filling compacting goaf filling body | |
CN104879131A (en) | Large-span tunnel excavation method for upper soft and lower hard compound strata | |
CN104453913A (en) | Vertical shaft working face ahead pre-grouting method | |
CN104806267B (en) | The shield end reinforcement system and its construction method of land pebble stratum super-front large pipe shed | |
CN201771517U (en) | Tunnel support structure | |
CN105909287B (en) | A kind of coal mine fully-mechanized mining working lead abutment pressure area deep hole grouting technique and method | |
CN103526766A (en) | Method for plugging relief well of deep foundation pit | |
CN103422886A (en) | Artificial retaining dam for coal mine distributed underground reservoir and damming method thereof | |
CN104452650B (en) | A kind of lake water shunting irrigation system | |
CN203742623U (en) | Water-pressure-resistant composite structure for tunnel | |
CN103967507B (en) | A kind of curtain-grouting technique being suitable for rich water mine down-hole exploitation water blockoff | |
CN204552818U (en) | The drainage system of ditch, side, anti-tunnel bottom leaky | |
CN204311459U (en) | Oblique double soldier pile body structure before chair shape | |
CN106499408B (en) | Wholecircle full section of tunnel one-pass molding self-compacting concrete pouring construction method | |
CN204371354U (en) | The compound supporting and protection structure of a kind of Karst Tunnel | |
CN204112308U (en) | A kind of simple and easy sleeve valve grouting device based on bowlder stone, Thief zone coefficient stratum | |
CN207267975U (en) | A kind of bed stabilization structure for being used under shield tunnel wear river | |
CN205012284U (en) | Build dam dam foundation seepage prevention structure on overburden |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
C14 | Grant of patent or utility model |