CN204024669U - A kind of concrete prefabricated parts supporting being applicable to mining tunnel - Google Patents

A kind of concrete prefabricated parts supporting being applicable to mining tunnel Download PDF

Info

Publication number
CN204024669U
CN204024669U CN201420413296.5U CN201420413296U CN204024669U CN 204024669 U CN204024669 U CN 204024669U CN 201420413296 U CN201420413296 U CN 201420413296U CN 204024669 U CN204024669 U CN 204024669U
Authority
CN
China
Prior art keywords
back timber
column
round steel
concrete
applicable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420413296.5U
Other languages
Chinese (zh)
Inventor
罗尚银
罗绍龙
周永兴
穆世平
王礼珊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YUNNAN CHUXIONG MINING AND METALLURGY CO Ltd
Original Assignee
YUNNAN CHUXIONG MINING AND METALLURGY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YUNNAN CHUXIONG MINING AND METALLURGY CO Ltd filed Critical YUNNAN CHUXIONG MINING AND METALLURGY CO Ltd
Priority to CN201420413296.5U priority Critical patent/CN204024669U/en
Application granted granted Critical
Publication of CN204024669U publication Critical patent/CN204024669U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a kind of concrete prefabricated parts supporting being applicable to mining tunnel, comprise back timber, column, below described back timber two ends, column is set; Described back timber, column are reinforced concrete structure; Described back timber two ends arranges overlap joint step; Described column and back timber link arrange overlap joint step; Described back timber, the junction of column arrange pre-buried connection round steel.Back timber of the present utility model, column adopt reinforced concrete structure, and back timber arranges column below two ends, and back timber, column are provided with longitudinal round steel, horizontal lacing wire, concrete, pre-buried connection round steel.Concrete (concrete) is C25 steel reinforced concrete.After back timber, column adopt reinforced concrete structure, application life can reach 10 ~ 15 years, does not need during use to drop into maintenance cost; And eliminate potential safety hazard, and then improve the economic benefit of enterprise.The utility model structure is simple, and easily, cheap, reliable operation, is applicable to the supporting of mining tunnel in construction.

Description

A kind of concrete prefabricated parts supporting being applicable to mining tunnel
Technical field
The utility model belongs to mining equiment technical field, belongs to mining safety support apparatus technical field further, is specifically related to a kind of structure simply, and easily, cheap, reliable operation, is applicable to the concrete prefabricated parts supporting of mining tunnel in construction.
Background technology
China is ore extraction big country, is dispersed with many mines throughout the country.In ore extraction, often to dig tunnel and dig up mine to ore body, and ore is transported from tunnel.Because the geologic structure in mine differs greatly, some geologic structures is broken, and the supporting of intensive railway carriage or compartment must be adopted to ensure that tunnel is complete, guarantees that personal security is passed through and the transport of ore.The roadway support of prior art, general employing wood carries out intensive wooden railway carriage or compartment supporting, but due to rock stratum, tunnel more broken, ground pressure is larger, wood railway carriage or compartment Support Deformation rots very fast, annual each point at least needs to change the supporting of wooden railway carriage or compartment once, and Local topography needs to change wooden railway carriage or compartment supporting two to three times, and use cost is high, Maintenance and Repair expense is large, and there is larger potential safety hazard, what often impact was produced normally carries out, and then have impact on the economic benefit of enterprise.For this reason, research and develop a kind of structure simple, easily, cheap, reliable operation, the concrete prefabricated parts supporting being applicable to mining tunnel is the key addressed this problem in construction.
Utility model content
It is simple that the purpose of this utility model is to provide a kind of structure, and easily, cheap, reliable operation, is applicable to the concrete prefabricated parts supporting of prospect tunnel in construction.
The purpose of this utility model is achieved in that and comprises back timber, column, arranges column below described back timber two ends; Described back timber, column are reinforced concrete structure; Described back timber two ends arranges overlap joint step; Described column and back timber link arrange overlap joint step; Described back timber, the junction of column arrange pre-buried connection round steel.
Back timber of the present utility model, column adopt reinforced concrete structure, and back timber arranges column below two ends, and back timber, column are provided with longitudinal round steel, horizontal lacing wire, concrete, pre-buried connection round steel.Concrete (concrete) is C25 steel reinforced concrete, and every cubic metre of consumptive material is respectively: cement 390kg; Sand 0.47m3/665kg; Rubble 0.82m3/1254kg.After back timber, column adopt reinforced concrete structure, application life can reach 10 ~ 15 years, and does not need during use to drop into maintenance cost; Avoid Maintenance and Repair haulage drift simultaneously and affect normal production operation; And eliminate haulage drift often to cave in the potential safety hazard brought, the personnel of ensure that pass through and the safety of Ore Transportation, and then improve the economic benefit of enterprise.The utility model structure is simple, and easily, cheap, reliable operation, is applicable to the supporting of mining tunnel in construction.
Accompanying drawing explanation
Fig. 1 is the utility model overall structure schematic diagram;
Fig. 2 is the back timber schematic diagram of the utility model;
Fig. 3 is the schematic top plan view of Fig. 2;
Fig. 4 is the column schematic diagram of the utility model;
Fig. 5 is the schematic top plan view of Fig. 4;
In figure: 1-back timber, 2-column, the longitudinal round steel of 3-, the horizontal lacing wire of 4-, 5-concrete, the pre-buried connection round steel of 6-.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail, but limited the utility model never in any form, based on any conversion that the utility model training centre is done, all falls into the utility model protection domain.
As shown in Fig. 1 ~ 5, comprise back timber 1, column 2, below described back timber 1 two ends, column 2 is set; Described back timber 1, column 2 are reinforced concrete structure; Described back timber 1 two ends arranges overlap joint step; Described column 2 arranges overlap joint step with back timber 1 link; Described back timber 1, the junction of column 2 arrange pre-buried connection round steel 6.
Described back timber 1, the concrete of column 2 are C25 steel reinforced concrete.
The rectangular shape of cross section of described back timber 1, the length of rectangle and the ratio of width are 1.1 ~ 1.3.
The rectangular shape of cross section of described column 2, the length of rectangle and the ratio of width are 1.1 ~ 1.3.
Described back timber 1 comprises longitudinal round steel 3, horizontal lacing wire 4, concrete 5, pre-buried connection round steel 6, and described back timber 1 arranges four longitudinal round steel 3; Between described longitudinal round steel 3, horizontal lacing wire 4 is set; Described back timber 1 two ends arrange pre-buried connection round steel 6; Between described longitudinal round steel 3, horizontal lacing wire 4, pre-buried connection round steel 6, concrete 5 is set.
The spacing of the horizontal lacing wire 4 of described back timber 1 is 270 ~ 300mm.
Described column 2 comprises longitudinal round steel 3, horizontal lacing wire 4, concrete 5, pre-buried connection round steel 6, and described column 2 arranges four longitudinal round steel 3; Between described longitudinal round steel 3, horizontal lacing wire 4 is set; Described column 2 upper end and medial surface arrange pre-buried connection round steel 6; Between described longitudinal round steel 3, horizontal lacing wire 4, pre-buried connection round steel 6, concrete 5 is set.
The spacing of the horizontal lacing wire 4 of described column 2 is 300 ~ 350mm.
Described longitudinal round steel 3 is 8# ~ 10# round steel, and horizontal lacing wire 4, pre-buried connection round steel 6 are 6# ~ 8# round steel.
Described longitudinal round steel 3 is 20mm apart from the distance on back timber 1, column 2 surface.
operating principle of the present utility model and the course of work:
Back timber 1 of the present utility model, column 2 adopt reinforced concrete structure, and back timber 1 arranges column 2 below two ends, and back timber 1, column 2 are provided with longitudinal round steel 3, horizontal lacing wire 4, concrete 5, pre-buried connection round steel 6.Concrete (concrete) is C25 steel reinforced concrete, and every cubic metre of consumptive material is respectively: cement 390kg; Sand 0.47m3/665kg; Rubble 0.82m3/1254kg.After back timber, column adopt reinforced concrete structure, application life can reach 10 ~ 15 years, does not need during use to drop into maintenance cost; Avoid Maintenance and Repair haulage drift simultaneously and affect normal production operation; And eliminate haulage drift often to cave in the potential safety hazard brought, the personnel of ensure that pass through and the safety of Ore Transportation.

Claims (10)

1. be applicable to a concrete prefabricated parts supporting for mining tunnel, comprise back timber (1), column (2), below described back timber (1) two ends, column (2) is set; It is characterized in that: described back timber (1), column (2) are reinforced concrete structure; Described back timber (1) two ends arranges overlap joint step; Described column (2) and back timber (1) link arrange overlap joint step; Described back timber (1), the junction of column (2) arrange pre-buried connection round steel (6).
2. the concrete prefabricated parts supporting being applicable to mining tunnel according to claim 1, is characterized in that: described back timber (1), the concrete of column (2) are C25 steel reinforced concrete.
3. the concrete prefabricated parts supporting being applicable to mining tunnel according to claim 1, is characterized in that: the rectangular shape of cross section of described back timber (1), the length of rectangle and the ratio of width are 1.1 ~ 1.3.
4. the concrete prefabricated parts supporting being applicable to mining tunnel according to claim 1, is characterized in that: the rectangular shape of cross section of described column (2), the length of rectangle and the ratio of width are 1.1 ~ 1.3.
5. the concrete prefabricated parts supporting being applicable to mining tunnel according to claim 1, it is characterized in that: described back timber (1) comprises longitudinal round steel (3), horizontal lacing wire (4), concrete (5), pre-buried connection round steel (6), described back timber (1) arranges four longitudinal round steel (3); Between described longitudinal round steel (3), horizontal lacing wire (4) is set; Described back timber (1) two ends arrange pre-buried connection round steel (6); Between described longitudinal round steel (3), horizontal lacing wire (4), pre-buried connection round steel (6), concrete (5) is set.
6. be applicable to the concrete prefabricated parts supporting of mining tunnel according to claim 1 or 5, it is characterized in that: the spacing of the horizontal lacing wire (4) of described back timber (1) is 270 ~ 300mm.
7. the concrete prefabricated parts supporting being applicable to mining tunnel according to claim 1, it is characterized in that: described column (2) comprises longitudinal round steel (3), horizontal lacing wire (4), concrete (5), pre-buried connection round steel (6), described column (2) arranges four longitudinal round steel (3); Between described longitudinal round steel (3), horizontal lacing wire (4) is set; Described column (2) upper end and medial surface arrange pre-buried connection round steel (6); Between described longitudinal round steel (3), horizontal lacing wire (4), pre-buried connection round steel (6), concrete (5) is set.
8. the concrete prefabricated parts supporting being applicable to mining tunnel according to claim 1 or 7, is characterized in that: the spacing of the horizontal lacing wire (4) of described column (2) is 300 ~ 350mm.
9. the concrete prefabricated parts supporting being applicable to mining tunnel according to claim 5 or 7, is characterized in that: described longitudinal round steel (3) is 8# ~ 10# round steel, and horizontal lacing wire (4), pre-buried connection round steel (6) are 6# ~ 8# round steel.
10. the concrete prefabricated parts supporting being applicable to mining tunnel according to claim 5 or 7, is characterized in that: described longitudinal round steel (3) distance back timber (1), the distance on column (2) surface are 20mm.
CN201420413296.5U 2014-07-25 2014-07-25 A kind of concrete prefabricated parts supporting being applicable to mining tunnel Active CN204024669U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420413296.5U CN204024669U (en) 2014-07-25 2014-07-25 A kind of concrete prefabricated parts supporting being applicable to mining tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420413296.5U CN204024669U (en) 2014-07-25 2014-07-25 A kind of concrete prefabricated parts supporting being applicable to mining tunnel

Publications (1)

Publication Number Publication Date
CN204024669U true CN204024669U (en) 2014-12-17

Family

ID=52064553

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420413296.5U Active CN204024669U (en) 2014-07-25 2014-07-25 A kind of concrete prefabricated parts supporting being applicable to mining tunnel

Country Status (1)

Country Link
CN (1) CN204024669U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105443145A (en) * 2015-12-18 2016-03-30 马钢(集团)控股有限公司 Ladder plate girder for sinking and driving engineering

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105443145A (en) * 2015-12-18 2016-03-30 马钢(集团)控股有限公司 Ladder plate girder for sinking and driving engineering
CN105443145B (en) * 2015-12-18 2018-02-16 马钢(集团)控股有限公司 Well lane engineering gangboard beam

Similar Documents

Publication Publication Date Title
CN103321654B (en) The method of flexible air-bag process coal mine roadway roof collapse
CN103161480B (en) Initiatively support the method for roadside packing gob side entry retaining
US20190301283A1 (en) Method for recovering room-mining coal pillars by solid filling in synergy with artificial pillars
WO2015090128A1 (en) Skip-mining type wangeviry stope branch roadway filling and coal mining method
US20170138194A1 (en) Method for removing hydraulic support for solid filling coal mining
CN105089668A (en) Longwall working face coal-pillar-free mining method
CN103775084B (en) High inclination-angle, mining height workface equipment cross geological structure crushed zone construction technology
CN103244123B (en) High-dipping medium thick ore body mining method
CN104533419A (en) Method for partial recovery of residual coal from wide coal pillar
CN204000932U (en) Lower channel in safety in a kind of deep foundation pit construction operation
CN204024669U (en) A kind of concrete prefabricated parts supporting being applicable to mining tunnel
CN207813629U (en) A kind of strong dynamic load anti-impact supporting new structure in tunnel
CN202731938U (en) Super-soft rock stratum coal bunker well wall ring beam support device
CN102493819B (en) Method for controlling stability of surrounding rocks of laneway in coal seam
CN205135648U (en) Rib wall caving anchor
CN103899331B (en) Digging laneway method for arranging during heavily stressed prominent high seam top coal caving
CN204783112U (en) Mining novel air door wall body
CN201902216U (en) Passage supporting device
CN204729111U (en) A kind of assembled bolt
CN203891905U (en) Leg-free shed support
CN204938782U (en) A kind of lifting conveying device for combining vertical shaft
CN201981452U (en) Mining I-steel sleeper
Xiao et al. Numerical research on the floor heave control of deep roadway in coal mining
Seo et al. A numerical study of pillar reinforcing effect in underground cavern underneath existing structures
CN204311439U (en) A kind of steel pipe column hand excavated pile for building operations

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant