Digging laneway method for arranging during heavily stressed prominent high seam top coal caving Download PDF

Info

Publication number
CN103899331B
CN103899331B CN201410165942.5A CN201410165942A CN103899331B CN 103899331 B CN103899331 B CN 103899331B CN 201410165942 A CN201410165942 A CN 201410165942A CN 103899331 B CN103899331 B CN 103899331B
Authority
CN
China
Prior art keywords
anchor
coal
mesh
bolt
driving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410165942.5A
Other languages
Chinese (zh)
Other versions
CN103899331A (en
Inventor
聂百胜
王殿录
张步勤
陈福印
李祥春
孟筠青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jizhong Energy Fengfeng Group Co ltd
China University of Mining and Technology Beijing CUMTB
Original Assignee
Jizhong Energy Fengfeng Group Co ltd
China University of Mining and Technology Beijing CUMTB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jizhong Energy Fengfeng Group Co ltd, China University of Mining and Technology Beijing CUMTB filed Critical Jizhong Energy Fengfeng Group Co ltd
Priority to CN201410165942.5A priority Critical patent/CN103899331B/en
Publication of CN103899331A publication Critical patent/CN103899331A/en
Application granted granted Critical
Publication of CN103899331B publication Critical patent/CN103899331B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

Digging laneway method for arranging when the invention discloses a kind of heavily stressed soft prominent high seam top coal caving, uses the method along top driving, and uses the way of bolt-mesh-anchor support.Can efficiently solve that ature of coal is soft, Gas Outburst serious, developmental joint fissure, affected by heavily stressed geological conditions, constructional difficulties, labor intensity are big, Drift stability the is poor projecting coal bed driving problem of high methane, production efficiency is significantly increased, has promoted the development in colliery.

Description

Digging laneway method for arranging during heavily stressed prominent high seam top coal caving
Technical field
The present invention relates to a kind of mine safety mining technology, when particularly relating to a kind of heavily stressed prominent high seam top coal caving Digging laneway method for arranging.
Background technology
Safe, fast, efficient ground digging laneway is the prerequisite of coal production, is also to ensure that coal mine excavation is normally connected Essential condition.The former tunnelling of pit coal layer of great Shu village of peak-to-peak group mainly coordinates U steel supporting based on full-seam mining, this Planting tunneling method constructional difficulties under heavily stressed geological conditions, and labor intensity is big, roadway construction the most just occurs that deformation is received Holding back serious, the response rate of coal mining efficiency and coal is the most relatively low, and safety is the poorest, and occurs drop not etc. big in driving The length fold that craven fault and form differ, has a strong impact on the normal of stope drift active workings and tunnels the end of along, and then have impact on normal raw Produce, carry out driving technology research for these problems extremely the most urgent.
Along with the development of support technology, the digging laneway of China's many mines is all widely used bolt support technology, anchor pole Support technology is because it is safe and reliable, economic dispatch advantage gets the nod and gradually instead of U steel supporting.Ore deposit, Er great Shu village is in pick Using U-shaped steel arching during entering, in process of construction, output investment ratio is higher, and excavation support sets up in transport and reclaims It not the most easily during Deng.
Tunnel is in tunneling process, and owing to ature of coal is soft, Gas Outburst is serious, and developmental joint fissure, by heavily stressed geology The impact of condition, constructional difficulties, and labor intensity are big, width side height top phenomenon usually occur, and U-shaped steel supporting is the most difficult, Drift stability is poor, and in soft-rock tunnel, support element and connector damage the most serious.Use U steel supporting, this supporting shape Formula belongs to passive protecting form, it is impossible to the basic top side stream coal that solves causes the phenomenons such as empty top, empty side, in high-ground stress effect Under, deformation of timbering is serious, and supporting effect is poor, causes repeatability construction, has a strong impact on personal security, to working face extraction And exploiting field takes over and causes extreme influence.
Summary of the invention
It is an object of the invention to provide a kind of practicality, heavily stressed prominent high seam safe, fast, efficient, small investment is put Digging laneway method for arranging during the coal mining of top.
It is an object of the invention to be achieved through the following technical solutions:
Digging laneway method for arranging during the heavily stressed soft prominent high seam top coal caving of the present invention, tunnelling uses edge Top driving, and use bolt-mesh-anchor support.
As seen from the above technical solution provided by the invention, the heavily stressed soft prominent thick coal that the embodiment of the present invention provides Digging laneway method for arranging during layer top coal caving, owing to being the method using the edge top driving different from tradition driving, and Use the way of bolt-mesh-anchor support, can efficiently solve that ature of coal is soft, Gas Outburst serious, developmental joint fissure, be subject to The impact of heavily stressed geological conditions, constructional difficulties, labor intensity is big, Drift stability the is poor projecting coal bed driving of high methane Problem, has been significantly increased production efficiency, promotes the development in colliery.
Accompanying drawing explanation
Digging laneway method for arranging during the heavily stressed soft prominent high seam top coal caving that Fig. 1 provides for the embodiment of the present invention Arrange schematic diagram.
Detailed description of the invention
The embodiment of the present invention will be described in further detail below.
Digging laneway method for arranging during the heavily stressed soft prominent high seam top coal caving of the present invention, it is preferably concrete real The mode of executing is:
Tunnelling uses along top driving, and uses bolt-mesh-anchor support.
Described in the middle of the excavation operation process of top, employing U steel gib and anchor rete cord gib, producing coal, operation completes Afterwards, anchor rete cord is used to carry out permanent supporting process to whole along top digging laneway.
Described in the middle of the excavation operation process of top, use fully-mechanized digging machine driving, the transporting equipment that produces coal uses belt conveyor and scrapes Plate transporter.
Driving face air feed uses booster, forced ventilation mode.
Described bolt-mesh-anchor support includes that top board bolt-mesh-anchor support and roadway's sides bolt-mesh-anchor support, described top board anchor rete cord prop up Protecting employing W steel band and join plastic wire supporting, described roadway's sides bolt-mesh-anchor support uses anchor pole or anchor cable, plastic wire, steel bar ladder Sub-beam combined supporting.
Digging laneway method for arranging during the heavily stressed prominent high seam top coal caving of the present invention, practical, safety, quickly, Efficiently, small investment.Can solve soft to ature of coal, Gas Outburst is serious, and developmental joint fissure, by heavily stressed geological conditions Impact, constructional difficulties, labor intensity is big, the technical barrier of Drift stability difference.
The application present invention, according to the prediction of tunneling process Gas and tunnel force analysis, determines and most preferably tunnels arrangement For along top driving.Take advance boreholes technology, in conjunction with the reasonable monitoring to top board and base plate position coal seam thickness, Prediction, along top digging laneway anterior position geological structure, determines rational supporting.In the middle of the excavation operation process of top, edge, main Fully-mechanized digging machine to be used tunnels, and manually connects coal operation, coordinates the reasonable application of drag conveyor and Belt transport machine equipment, reaches To the purpose to outward transport coal.Whole in the middle of the processing procedure of top driving, ventilation process and the guarantee in tunnel to be carried out are faced Time supporting construction effective, just can carry out the operation of producing coal of coal driving, after operation of producing coal completes, for whole along top Digging laneway uses anchor rete cord to carry out permanent supporting process.
Described piercing technique is that digging laneway is coal road along top driving.
Described is by comparing gas density, driving speed, the identical driving speed of employing and identical pick along top driving proposition Development end gas emission, roof delamination size, roadway deformation, safety, coal recovery rate and cost when entering distance Determine.
Described development machine, belt conveyor, scratch board conveyor, produce coal transporting equipment belt conveyor, scratch board conveyor To match with fully-mechanized digging machine.
Described bolt-mesh-anchor support includes top board and roadway's sides, and top board uses W steel band to join plastic wire and (makes during roof cracking With diamond mesh), roadway's sides uses anchor pole (rope), plastic wire, reinforcing bar ladder beam combined supporting.
Described driving face air feed all uses booster, forced ventilation mode.
Described permanent supporting is bolt-mesh-anchor support.
Described gib is U steel gib and anchor rete cord gib.
Specific embodiment:
As it is shown in figure 1, according to the prediction of tunneling process Gas and tunnel force analysis, determine that optimal driving arrangement is Along top driving.Along top piercing technique take tradition geological method, in binding region Basic Geological structure data and Mapping data message, is in research and analysis for the fault strike under complex geological condition.Meanwhile, For emphasis suspects location, need to take advance boreholes technical approach, it is achieved to various along the tunneling process of top It is likely to occur the conservative control of safety problem.On this basis, in the middle of the process of coal road tunnelling operation, need Carry out pushing up the detection operation of ground coal according to interval 5m~10m unit, in conjunction with to top board and base plate position coal seam thickness Rationally monitoring, reaches reasonable assessment and the judgement of top, prediction edge digging laneway anterior position geological structure situation of change, determines Reasonably supporting.
In the middle of the excavation operation process of top, main employing fully-mechanized digging machine tunnels, and manually connects coal operation, coordinates drag conveyor With the reasonable application of Belt transport machine equipment, reach the purpose to outward transport coal.Work as in the whole processing procedure along top driving In, the ventilation process in tunnel to be carried out is effective with guarantee temporary support structures, just can carry out the work that produces coal of coal driving Industry, after operation of producing coal completes, uses anchor rete cord to carry out permanent supporting process for whole along top digging laneway.
The above, the only present invention preferably detailed description of the invention, but protection scope of the present invention is not limited thereto, Any those familiar with the art in the technical scope of present disclosure, the change that can readily occur in or replace Change, all should contain within protection scope of the present invention.Therefore, protection scope of the present invention should be with claims Protection domain is as the criterion.

Claims (1)

1. digging laneway method for arranging during a heavily stressed soft prominent high seam top coal caving, it is characterised in that tunnel Driving uses along top driving, and uses bolt-mesh-anchor support;
Described in the middle of the excavation operation process of top, employing U steel gib and anchor rete cord gib, producing coal, operation completes Afterwards, anchor rete cord is used to carry out permanent supporting process to whole along top digging laneway;
Described in the middle of the excavation operation process of top, use fully-mechanized digging machine driving, the transporting equipment that produces coal uses belt conveyor and scrapes Plate transporter;
Driving face air feed uses booster, forced ventilation mode;
Described bolt-mesh-anchor support includes that top board bolt-mesh-anchor support and roadway's sides bolt-mesh-anchor support, described top board anchor rete cord prop up Protecting employing W steel band and join plastic wire supporting, described roadway's sides bolt-mesh-anchor support uses anchor pole or anchor cable, plastic wire, steel bar ladder Sub-beam combined supporting.
CN201410165942.5A 2014-04-23 2014-04-23 Digging laneway method for arranging during heavily stressed prominent high seam top coal caving Active CN103899331B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410165942.5A CN103899331B (en) 2014-04-23 2014-04-23 Digging laneway method for arranging during heavily stressed prominent high seam top coal caving

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410165942.5A CN103899331B (en) 2014-04-23 2014-04-23 Digging laneway method for arranging during heavily stressed prominent high seam top coal caving

Publications (2)

Publication Number Publication Date
CN103899331A CN103899331A (en) 2014-07-02
CN103899331B true CN103899331B (en) 2016-10-26

Family

ID=50990876

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410165942.5A Active CN103899331B (en) 2014-04-23 2014-04-23 Digging laneway method for arranging during heavily stressed prominent high seam top coal caving

Country Status (1)

Country Link
CN (1) CN103899331B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104405392B (en) * 2014-10-16 2016-06-08 河南理工大学 Three soft high seam tunnel jackings are kept on file anchor rete cord active support longwall top coal caving method
CN105758565B (en) * 2016-03-03 2018-09-28 山东科技大学 Coal roadway tunneling is met head on stress determination method and risk assessment method
CN111364996B (en) * 2020-03-30 2021-09-21 淮南矿业(集团)有限责任公司 Deep well coal uncovering method under complex geological condition of strong outburst coal seam

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3820700A1 (en) * 1988-06-18 1989-12-21 Ruhrkohle Ag Compound anchor support system
RU2430237C1 (en) * 2010-09-07 2011-09-27 Анатолий Николаевич Осипов Reinforcement method of mine workings with anchor support
CN102268998A (en) * 2011-08-02 2011-12-07 山西潞安环保能源开发股份有限公司 Dual-micro-arch span-reducing support method of large-span open-off cut
CN102817620A (en) * 2012-08-13 2012-12-12 大同煤矿集团有限责任公司 Method for supporting ultra-thick and fluffy coal roadway
CN103061788A (en) * 2013-01-11 2013-04-24 江苏建筑职业技术学院 Loose broken tunnel top plate reinforcing and supporting method
CN103174444A (en) * 2013-02-26 2013-06-26 中国矿业大学(北京) Support method and support structure for soft coal/ rock stratum alley
CN103603675A (en) * 2013-09-20 2014-02-26 张瀚 Supporting method of permeable soft broken rock stratum roadway

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3820700A1 (en) * 1988-06-18 1989-12-21 Ruhrkohle Ag Compound anchor support system
RU2430237C1 (en) * 2010-09-07 2011-09-27 Анатолий Николаевич Осипов Reinforcement method of mine workings with anchor support
CN102268998A (en) * 2011-08-02 2011-12-07 山西潞安环保能源开发股份有限公司 Dual-micro-arch span-reducing support method of large-span open-off cut
CN102817620A (en) * 2012-08-13 2012-12-12 大同煤矿集团有限责任公司 Method for supporting ultra-thick and fluffy coal roadway
CN103061788A (en) * 2013-01-11 2013-04-24 江苏建筑职业技术学院 Loose broken tunnel top plate reinforcing and supporting method
CN103174444A (en) * 2013-02-26 2013-06-26 中国矿业大学(北京) Support method and support structure for soft coal/ rock stratum alley
CN103603675A (en) * 2013-09-20 2014-02-26 张瀚 Supporting method of permeable soft broken rock stratum roadway

Also Published As

Publication number Publication date
CN103899331A (en) 2014-07-02

Similar Documents

Publication Publication Date Title
CN1963149B (en) Mining method for replacement of banded coal under building by waste rock
Tu et al. Present situation of fully mechanized mining technology for steeply inclined coal seams in China
CN101302931B (en) Method for extracting rim angle coal and re-extracting after warehouse coal extracting
CN105089668A (en) Longwall working face coal-pillar-free mining method
CN102587914A (en) Strip-type Wongawilli mining method of coal buried under building
CN101725352A (en) Method for filling solid and fully mechanizing and recovering room type coal pillar
CN101737047A (en) Method for mining coal of steeply inclined thin seam
CN103953345B (en) A kind of small section entry retaining along gob side exploitation method
CN102418525B (en) Soft coal seam long-wall high-mining-height comprehensive mechanized coal mining end mining method
CN110410076A (en) A kind of filling mining method for leaving Pillar Recovery for old pillars of a house goaf
CN105736044A (en) Rapid withdrawing method for fully mechanized coal mining face equipment of steep coal seam
CN103899331B (en) Digging laneway method for arranging during heavily stressed prominent high seam top coal caving
CN105134212B (en) A kind of method that three soft high seam tunnel ensures the rate of extraction along top driving longwall top coal caving
CN104533419A (en) Method for partial recovery of residual coal from wide coal pillar
CN104141503A (en) Sharp inclination fully mechanized coal face open-off cut square supporting method
CN101824986A (en) Coal mining process of drilling, loading, conveying and anchoring integral machine
CN104405392B (en) Three soft high seam tunnel jackings are kept on file anchor rete cord active support longwall top coal caving method
CN102031972A (en) L-shaped mining method under open-underground mining
CN104329117B (en) Installation method of comprehensive mechanized filling, coal mining and open-off cutting equipment
CN101858216B (en) Method for recovering stagnant coal pillars left by breast type coal mining method
CN102733851B (en) Control method for water-containing collapse columns in mining affected areas of combined reconstructed mines
CN110714759B (en) Method for mining lost coal
CN104989402A (en) Medium-deep hole room pillar mining method for limestone underground mine mining
CN104088642B (en) A kind of super Shortwall mining method
CN201650359U (en) Filling bag for temporarily supporting filling space

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant