CN204023475U - For the building operations cleaning dust remover of Sloping field in mountain area - Google Patents
For the building operations cleaning dust remover of Sloping field in mountain area Download PDFInfo
- Publication number
- CN204023475U CN204023475U CN201420424165.7U CN201420424165U CN204023475U CN 204023475 U CN204023475 U CN 204023475U CN 201420424165 U CN201420424165 U CN 201420424165U CN 204023475 U CN204023475 U CN 204023475U
- Authority
- CN
- China
- Prior art keywords
- communicated
- rainwater
- spray
- mountain area
- purifying pond
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A20/00—Water conservation; Efficient water supply; Efficient water use
- Y02A20/108—Rainwater harvesting
Landscapes
- Water Treatment By Sorption (AREA)
Abstract
The utility model discloses a kind of building operations cleaning dust remover for Sloping field in mountain area, comprise spray system, also comprise rainwater-collecting cleaning system, rainwater-collecting cleaning system comprises rainwater-collecting pipeline and purifying pond, and rainwater-collecting pipeline comprises main line and branch line; One end of branch line is communicated with the hollow place in hillside fields, and the other end of branch line is communicated with the sidewall of main line, and one end of main line is communicated with the hollow place in hillside fields, and the other end of main line is communicated with purifying pond, and purifying pond is connected with spray system.The utility model overcomes existing building operations building site and cleans dedusting and usually use tap water to spray, waste water resource, or adopt and utilize underground water spray dust, the sustainable poor and shortcoming that cost is higher, thering is provided a kind of utilizes the rainwater collected to carry out spray dust to construction site at Sloping field in mountain area, the sustainable strong and building operations cleaning dust remover for Sloping field in mountain area that cost is low.
Description
Technical field
The utility model to belong to spray liquid to the device field on road surface, is specifically related to a kind of building operations cleaning dust remover for Sloping field in mountain area.
Background technology
Building engineering construction dust pollution is one of important step of air ambient pollution control, building engineering construction sidewalk mostly is clay bound macadam, construction plant is also is mostly places of non-hardened process, during construction, due to cement, concrete, the transport repeatedly of the material such as building stones or backfill, and the on-the-spot earthwork arranges, the operating process such as concrete-agitating, unhardened ground dust can be kicked up or produce airborne dust by transport and operating process usually, therefore in construction site, often there is pioneer road, construction plant stirs up a cloud of dust, the severe air pollution problem that yellow ground is all over the sky, and at torridity summer especially this outstanding problem.
In order to head it off, spray irrigation is carried out to the vehicle in turnover building site usually in construction site, dust on the wheel of vehicle is rinsed well, or connect tap water in the region that construction site dust is more with multiple nozzle cluster to spray construction site, thus by moistening for the airborne dust in air depositing dust, but building site shower nozzle is connected with tap water, waste water resource, and cost is higher.
Chinese patent notification number is: CN 203049522 U, patent name is: for the automatic sprinkler fire-extinguishing system of construction site temporary road depositing dust, disclose a kind of automatic sprinkler fire-extinguishing system for construction site temporary road depositing dust, comprise a pipeline structure, described pipeline structure connects a plurality of concentrated water tank, and described concentrated water tank connects the foundation pit dewatering system of described construction site further.Groundwater resources are made full use of by foundation pit dewatering system, cost-saving.But, the water resource of foundation pit dewatering system is limited after all, the continuable utilization of resources cannot be reached, in addition, foundation pit dewatering system is connected with automatic sprinkler fire-extinguishing system, needs to use suction pump and is extracted in water tank by the water in foundation ditch, in spray process, also need booster pump to give the certain pressure of the water in pipeline, drencher head could be utilized to be sprayed by water, and therefore, cost is higher.
Utility model content
The technical problems to be solved in the utility model cleans dedusting for existing building operations building site usually to use tap water to spray, waste water resource, or adopt and utilize underground water spray dust, the sustainable poor and shortcoming that cost is higher, provides a kind of and utilizes the rainwater collected to carry out spray dust to construction site and the low building operations cleaning dust remover for Sloping field in mountain area of cost at Sloping field in mountain area.
In order to solve the problems of the technologies described above, the utility model provides following technical scheme: for the building operations cleaning dust remover of Sloping field in mountain area, comprise spray system, also comprise rainwater-collecting cleaning system, rainwater-collecting cleaning system comprises rainwater-collecting pipeline and purifying pond, and rainwater-collecting pipeline comprises main line and branch line; One end of branch line is communicated with the hollow place in hillside fields, the other end of branch line is communicated with the sidewall of main line, one end of main line is communicated with the hollow place in hillside fields, the other end of main line is communicated with purifying pond, purifying pond is connected with spray system, be provided with regulating gate between purifying pond and spray system, the level height of purifying pond is higher than the level height at least 20m of spray system.
Adopt the building operations cleaning dust remover for Sloping field in mountain area of technical solutions of the utility model, spray system is spray water of being sprayed water to construction site by spray equipment, reaches the object of depositing dust after airborne dust is moistening.Also comprise rainwater-collecting cleaning system, rainwater-collecting cleaning system comprises rainwater-collecting pipeline and purifying pond, and rainwater-collecting pipeline comprises main line and branch line; Rainwater-collecting pipeline utilizes main line and branch line by rainwater-collecting, and rainwater flow in purifying pond along main line, branch line, and purifying pond is used for carrying out purified treatment to natural rainfall.One end of branch line is communicated with the hollow place in hillside fields, the other end of branch line is communicated with the sidewall of main line, one end of main line is communicated with the hollow place in hillside fields, the other end of main line is communicated with purifying pond, purifying pond is connected with spray system, be provided with regulating gate between purifying pond and spray system, the level height of described purifying pond is higher than the level height at least 20m of spray system, branch line, one end of main line is all communicated with the hollow place in hillside fields, the hollow in hillside fields can store rainwater when being in rainfall, then along main line and branch line, the rainwater-collecting of storage is transported in purifying pond, rainwater in purifying pond is sprayed to construction site by spray system after purification, control gate valve to flow out for the water controlled in purifying pond, because the height of purifying pond is higher than the height at least 20m of spray system, open after controlling gate valve, when water in purifying pond flows into spray system, produce hydraulic pressure, thus ejection water smoke, inapplicable booster pump etc. can increase pressure, spray dust can be completed.
Operating principle of the present utility model and beneficial effect are: utilize mountain area, performance that hillside fields is beneficial to rainwater storage, by main line and branch line, the rainwater of storage is drained to purifying pond from all directions, rainwater after purifying pond purification again, rainwater after purification flows down from eminence, because potential energy is kinetic energy, produce enough hydraulic pressure, construction site is sprayed to again by spray system, thus saving tap water, do not use booster pump, utilize the geography in mountain area can reach the object of spraying and dedusting, cost is low; Moreover make full use of after rainfall is preserved and implement spray dust, sustainability is strong.
Further, described purifying pond comprises the sedimentation basin and adsorption tank that connect successively from main line to spray system.Sedimentation basin is used for the large granular impurity precipitation in the rainwater collected to remove, and adsorption tank is used for removing the fine grained Impurity removal in deimpurity rainwater, improves the degree of purification of spray rainwater.
Further, the level height of described purifying pond is higher than spray system 30m.The difference in height of 30m makes hydraulic pressure large, and the spraying spraying intensity of generation is larger, and the length of flow of the difference in height of 30m from purifying pond to spray system is suitable.
Further, described purifying pond comprises the first stage precipitation tank, second-level settling pond and the activated carbon adsorption tank that connect successively from main line to spray system.First stage precipitation tank and second-level settling pond are by twice to the bulky grain precipitation in the rainwater collected, and the granule in the rainwater of collection adsorbs by activated carbon adsorption tank, and the high adsorption capacity of active carbon, further increase the degree of purification of the rainwater of collection.
Further, described first stage precipitation tank, second-level settling pond are connected by bypass channel with the top of activated carbon adsorption tank.
Further again, described spray system comprises connecting pipe, main pipeline, lateral and spray piping, connecting pipe one end is communicated with activated carbon adsorption tank, the other end of connecting pipe is communicated with main pipeline, regulating gate is located in connecting pipe, main pipeline is longitudinally arranged along road side, and on the tube wall that main pipeline is located in lateral segmentation and one end is connected with main pipeline tube wall, and the junction of lateral and main pipeline is provided with valve; Spray piping comprises the upper pipe tunnel and lower pipe tunnel that be arranged in parallel with road side, being communicated with lower pipe tunnel of lateral, and be communicated with by one group of vertical duct between upper pipe tunnel and lower pipe tunnel, the inner side of upper pipe tunnel is provided with shower nozzle.Rainwater after purification in activated carbon adsorption tank is drained to main pipeline by connecting pipe, regulating gate is located in connecting pipe, whether flow in main pipeline from connecting pipe for the rainwater controlled in the activated carbon adsorption tank of purifying pond, connection segment lateral on main pipeline, for segmentation, construction site is sprayed, when this section airborne dust is more, only open the valve between the lateral in this section and main pipeline, current in main pipeline then flow in lateral, flow to again in spray piping, upper pipe tunnel is flow to from the lower pipe tunnel of spray piping, and then be mist-like ejection by the shower nozzle on spray piping, depositing dust object is reached after airborne dust is moistening, segmentation sprays, and economizes on resources, and avoids waste.
Further, described spray piping is provided with two, is located at the both sides of road respectively and is connected between two spray pipings.Spray respectively road from road both sides, dust removing effects is better.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, technical solutions of the utility model are further illustrated:
Fig. 1 is the schematic diagram of the utility model for the building operations cleaning dust remover embodiment of Sloping field in mountain area.
Detailed description of the invention
As shown in Figure 1, the utility model is used for the building operations cleaning dust remover of Sloping field in mountain area, comprises spray system, also comprises rainwater-collecting cleaning system, rainwater-collecting cleaning system comprises rainwater-collecting pipeline and purifying pond, and rainwater-collecting pipeline comprises main line 1 and branch line 2; One end of branch line 2 is communicated with the hollow place in hillside fields, the other end of branch line 2 is communicated with the sidewall of main line 1, one end of main line 1 is communicated with the hollow place in hillside fields, the other end of main line 1 is communicated with purifying pond, purifying pond is connected with spray system, be provided with regulating gate 3 between purifying pond and spray system, the level height of purifying pond is higher than the level height 30m of spray system; Described purifying pond comprises the first stage precipitation tank 4, second-level settling pond 5 and the activated carbon adsorption tank 6 that connect successively from main line 1 to spray system; Described first stage precipitation tank 4, second-level settling pond 5 are connected by bypass channel 7 with the top of activated carbon adsorption tank 6; Described spray system comprises connecting pipe 8, main pipeline 9, lateral 10 and spray piping, connecting pipe 8 one end is communicated with activated carbon adsorption tank 6, the other end of connecting pipe 8 is communicated with main pipeline 9, regulating gate 3 is located in connecting pipe 8, main pipeline 9 is longitudinally arranged along road side, on the tube wall that main pipeline 9 is located in lateral 10 segmentation and one end is connected with main pipeline 9 tube wall, and lateral 10 is provided with valve 12 with the junction of main pipeline 9; Spray piping comprises the upper pipe tunnel 14 and lower pipe tunnel 15 that be arranged in parallel with road side, being communicated with lower pipe tunnel 15 of lateral 10, be communicated with by one group of vertical duct 11 between upper pipe tunnel 14 and lower pipe tunnel 15, the inner side of upper pipe tunnel 14 is provided with shower nozzle 13; Described spray piping is provided with two, is located at the both sides of road respectively and is connected between two spray pipings.
In specific implementation process, lateral 10 is provided with four, one end of lateral 10 is communicated with main pipeline 9, the other end is communicated with the lower pipe tunnel 15 of road side, certainly, according to the length in section, eight, ten or more laterals 10 can be set, the lateral 10 of both sides is distributed on main pipeline 9 also within protection domain, and the lower pipe tunnel 15 of two spray pipings is communicated with by one group of connecting pipe, and one group of connecting pipe is provided with 4, valve 12 all adopts ball valve to control, the ball type device of ball valve is positioned at the junction of main pipeline 9 and lateral 10, spherical rod member is connected with control rod member, controlling rod member is positioned at outside main pipeline 9 and lateral 10, the junction that main pipeline 9 and lateral 10 were closed or opened to ball type device is controlled by controlling rod member, thus open goods sealing liquid path, the concrete mode that regulating gate 3 adopts is the same with valve 12, the path of same employing ball valve control connection pipeline 8, connecting pipe 8 one end is connected to the middle part of activated carbon adsorption tank 6, both most of rainwater can have been made to discharge, the mud after by precipitation is avoided again to discharge.During concrete operations, regulating gate 3 and valve 12 are in closed condition, when rainfall, rainwater drops on hillside, be gathered in the hollow place on hillside, the rainwater at hollow place flow in the first stage precipitation tank 4 of purifying pond by the main line 1 that is communicated with it and branch line 2, flocculant etc. can be added in first stage precipitation tank 4 large granular impurity is precipitated, when in first stage precipitation tank 4, rain water-harvesting is too much, when exceeding the height of bypass channel 7, rainwater then flows in second-level settling pond 5 by bypass channel 7, flocculant can be added in second-level settling pond 5 equally large granular impurity is precipitated, when rain water-harvesting in second-level settling pond 5 is too much, when exceeding the height of bypass channel 7, rainwater then flows in activated carbon adsorption tank 6 by bypass channel 7, active carbon is added by granule contamination precipitation in activated carbon adsorption tank 6, obtain the rainwater after filtering, be gathered in activated carbon adsorption tank 6, when needs are to airborne dust road dedusting, then open the valve 12 in regulating gate 3 and dedusting section, the rainwater assembled in activated carbon adsorption tank 6 is then passed through by the connecting pipe 8 be communicated in the middle part of activated carbon adsorption tank 6, fall from the height of 30m, flow in main pipeline 9, water in main pipeline 9 then flows in lateral 10 from the valve 12 opened, and then entered in the lower pipe tunnel 15 of coupled road side by lateral 10, upper pipe tunnel 14 is entered again by vertical duct 11, and then spray mist-like by shower nozzle 13, road opposite side then enters connecting pipe by the lower pipe tunnel 15 of road side, and then enter the lower pipe tunnel 15 of road opposite side, enter vertical duct 11 again, then pipe tunnel 14 is entered, last shower nozzle 13 sprays mist-like, thus realize then the airborne dust road being soaked from the rainwater of both sides ejection, airborne dust is sedimentation then, thus the airborne dust on road is cleaned.
Certainly; if the level height of purifying pond is higher than spray system 25m, 35m, 40m, 45m, 50m or higher height; purifying pond is provided with the sedimentation basin of three, four, five or greater number, is provided with the adsorption tank of two, three, four or greater number all within protection domain.
For a person skilled in the art; under the prerequisite not departing from the utility model structure; can also make some distortion and improvement, these also should be considered as protection domain of the present utility model, and these all can not affect effect and the practical applicability of the utility model enforcement.
Claims (7)
1. for the building operations cleaning dust remover of Sloping field in mountain area, comprise spray system, it is characterized in that: also comprise rainwater-collecting cleaning system, rainwater-collecting cleaning system comprises rainwater-collecting pipeline and purifying pond, and rainwater-collecting pipeline comprises main line and branch line; One end of branch line is communicated with the hollow place in hillside fields, the other end of branch line is communicated with the sidewall of main line, one end of main line is communicated with the hollow place in hillside fields, the other end of main line is communicated with purifying pond, purifying pond is connected with spray system, be provided with regulating gate between purifying pond and spray system, the level height of purifying pond is higher than the level height at least 20m of spray system.
2. as claimed in claim 1 for the building operations cleaning dust remover of Sloping field in mountain area, it is characterized in that: described purifying pond comprises the sedimentation basin and adsorption tank that connect successively from main line to spray system.
3., as claimed in claim 2 for the building operations cleaning dust remover of Sloping field in mountain area, it is characterized in that: the level height of described purifying pond is higher than spray system 30m.
4. as claimed in claim 2 for the building operations cleaning dust remover of Sloping field in mountain area, it is characterized in that: described purifying pond comprises the first stage precipitation tank, second-level settling pond and the activated carbon adsorption tank that connect successively from main line to spray system.
5., as claimed in claim 4 for the building operations cleaning dust remover of Sloping field in mountain area, it is characterized in that: described first stage precipitation tank, second-level settling pond are connected by bypass channel with the top of activated carbon adsorption tank.
6. as claimed in claim 5 for the building operations cleaning dust remover of Sloping field in mountain area, it is characterized in that: described spray system comprises connecting pipe, main pipeline, lateral and spray piping, connecting pipe one end is communicated with activated carbon adsorption tank, the other end of connecting pipe is communicated with main pipeline, regulating gate is located in connecting pipe, main pipeline is longitudinally arranged along road side, on the tube wall that main pipeline is located in lateral segmentation and one end is connected with main pipeline tube wall, and the junction of lateral and main pipeline is provided with valve; Spray piping comprises the upper pipe tunnel and lower pipe tunnel that be arranged in parallel with road side, being communicated with lower pipe tunnel of lateral, and be communicated with by one group of vertical duct between upper pipe tunnel and lower pipe tunnel, the inner side of upper pipe tunnel is provided with shower nozzle.
7. as claimed in claim 6 for the building operations cleaning dust remover of Sloping field in mountain area, it is characterized in that: described spray piping is provided with two, be located at the both sides of road respectively and be connected between two spray pipings.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420424165.7U CN204023475U (en) | 2014-07-30 | 2014-07-30 | For the building operations cleaning dust remover of Sloping field in mountain area |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420424165.7U CN204023475U (en) | 2014-07-30 | 2014-07-30 | For the building operations cleaning dust remover of Sloping field in mountain area |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204023475U true CN204023475U (en) | 2014-12-17 |
Family
ID=52063362
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420424165.7U Expired - Fee Related CN204023475U (en) | 2014-07-30 | 2014-07-30 | For the building operations cleaning dust remover of Sloping field in mountain area |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204023475U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105239658A (en) * | 2015-09-01 | 2016-01-13 | 中国十七冶集团有限公司 | Construction method for suppressing dust by sprinkling collected rainwater to construction site road |
CN107675772A (en) * | 2017-11-03 | 2018-02-09 | 浙江海洋大学 | A kind of automatic drain system for rinsing tank farm silt |
CN108193759A (en) * | 2018-03-01 | 2018-06-22 | 美丽国土(北京)生态环境工程技术研究院有限公司 | The landscape effect lifting system and its implementation of falling zone |
CN108755520A (en) * | 2018-06-13 | 2018-11-06 | 苏州若依玫信息技术有限公司 | A kind of automation mountain rank cleaning equipment and its system |
-
2014
- 2014-07-30 CN CN201420424165.7U patent/CN204023475U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105239658A (en) * | 2015-09-01 | 2016-01-13 | 中国十七冶集团有限公司 | Construction method for suppressing dust by sprinkling collected rainwater to construction site road |
CN107675772A (en) * | 2017-11-03 | 2018-02-09 | 浙江海洋大学 | A kind of automatic drain system for rinsing tank farm silt |
CN107675772B (en) * | 2017-11-03 | 2019-11-19 | 浙江海洋大学 | A kind of automatic drain system rinsing tank farm silt |
CN108193759A (en) * | 2018-03-01 | 2018-06-22 | 美丽国土(北京)生态环境工程技术研究院有限公司 | The landscape effect lifting system and its implementation of falling zone |
CN108755520A (en) * | 2018-06-13 | 2018-11-06 | 苏州若依玫信息技术有限公司 | A kind of automation mountain rank cleaning equipment and its system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103088896B (en) | Ecological road shock resistance rainwater utilization system | |
CN107386418B (en) | A kind of urban road rainwater recycle reuse method and system | |
CN209779370U (en) | Urban road rainwater is collected and is utilized and discharge system | |
CN204023475U (en) | For the building operations cleaning dust remover of Sloping field in mountain area | |
CN206090587U (en) | School dropout's attitude system of watering is gathered to side slope | |
CN106835972A (en) | A kind of rain-water accumulating system of sponge-type ecology bridge | |
CN206941744U (en) | sponge urban underground drainage system | |
CN206844282U (en) | The collection and purification of town road rainfall runoff utilize system | |
CN206385001U (en) | Retaining water cleaning systems under a kind of sponge urban land | |
CN206674690U (en) | A kind of slope vegetation conserves spray irrigation system | |
KR101070783B1 (en) | Road with heat island reduction function | |
CN204598768U (en) | A kind of water saving greenbelt | |
CN209178817U (en) | A kind of bridge drain system | |
CN111592191A (en) | Low rainwater branch matter is handled and recycling system under development of influence | |
CN109629601A (en) | A kind of pipe gallery waterproof construction of sponge urban ecology system | |
CN211172270U (en) | Forebay rainwater garden system for large roof | |
CN205557763U (en) | A multistage baffling formula rainwater garden system for handling initial stage rainwater | |
CN205061699U (en) | Biological filter | |
CN204356726U (en) | A kind of urban road is from drenching dirt device | |
CN207243686U (en) | A kind of overpass rain processing system | |
CN105239658A (en) | Construction method for suppressing dust by sprinkling collected rainwater to construction site road | |
CN206308915U (en) | A kind of roof greening rainwater collection irrigation device based on sponge the idea of the city | |
CN105735085A (en) | Kerb | |
CN214126357U (en) | Urban road afforestation irrigation equipment | |
CN108187427A (en) | A kind of dust pelletizing system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141217 Termination date: 20170730 |
|
CF01 | Termination of patent right due to non-payment of annual fee |