CN204002528U - The overlapping bamboo bimber stair with connecting elements - Google Patents

The overlapping bamboo bimber stair with connecting elements Download PDF

Info

Publication number
CN204002528U
CN204002528U CN201420377764.8U CN201420377764U CN204002528U CN 204002528 U CN204002528 U CN 204002528U CN 201420377764 U CN201420377764 U CN 201420377764U CN 204002528 U CN204002528 U CN 204002528U
Authority
CN
China
Prior art keywords
arc cell
bimber stair
bamboo bimber
main support
cell body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420377764.8U
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING LUHAO AGRICULTURAL DEVELOPMENT Co Ltd
Original Assignee
CHONGQING LUHAO AGRICULTURAL DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING LUHAO AGRICULTURAL DEVELOPMENT Co Ltd filed Critical CHONGQING LUHAO AGRICULTURAL DEVELOPMENT Co Ltd
Priority to CN201420377764.8U priority Critical patent/CN204002528U/en
Application granted granted Critical
Publication of CN204002528U publication Critical patent/CN204002528U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model relates to the agricultural overlapping bamboo of fruit-bearing forest bimber stair, a kind of overlapping bamboo bimber stair with connecting elements specifically, comprise at least two bamboo bimber stair monomers, this bamboo bimber stair monomer is fixed as one two main support columns that are symmetricly set on crossbeam pole for climbing two ends to form by crossbeam pole for climbing; Wherein: on the vertical top cylinder of main support column and bottom cylinder, be provided with horizontal installation groove and longitudinal installing hole, this is laterally installed groove and is positioned at main support column in a lateral direction, and described longitudinal mounting hole site is on the longitudinal direction of main support column; Between described bamboo bimber stair monomer, by connecting elements, be fixed as one; Described connecting elements comprises again two symmetrically arranged arc cell bodies, and the deep-slotted chip breaker of these two arc cell bodies is oppositely arranged, and the diameter of deep-slotted chip breaker is greater than the diameter of main support column.The utility model is because the advantage that described structure has is: climb safety, reduced carrying difficulty, be convenient to handling and reduced energy consumption.

Description

The overlapping bamboo bimber stair with connecting elements
Technical field
The utility model relates to the agricultural overlapping bamboo of fruit-bearing forest bimber stair, especially a kind of overlapping bamboo bimber stair with connecting elements that improves climbing safety, reduction carrying difficulty, is convenient to handling and reduction energy consumption.
Background technology
Bamboo bimber stair is widely used in people's daily production, for example, for agricultural product being realized to the transfer between lower position and eminence position, for fruit-picking and for pruning the daily productions such as branch of fruit tree.
The bamboo bimber stair of prior art generally comprises symmetrically arranged two main support columns, between two main support columns, by some crossbeam pole for climbing, connect as one, during use, people climb up step by step by crossbeam pole for climbing, realize the transfer of the position that hoists from lower position.The general height of bamboo bimber stair of this structure is 10 meters of left and right, and the bamboo bimber stair that general rural households use, just can not leave in indoor and cannot carry indoor with interior [being all generally 8 meters] at 10 meters because long.
Yet, people are in actual production process, the stair that often need to grow are realized the fruit of higher position [this higher position, place refers to the height that exceeds 10 meters] are plucked, and the fruit tree branch of higher position [this higher position, place refers to the height that exceeds 10 meters] is pruned.The common way of people is exactly that the main support column of two stair is overlapping, then by rope or steel wire, bundlees the fixing overlapping bamboo bimber stair [realizing the lengthening of bamboo bimber stair] that forms.Which has solved people to a certain extent aborning to exceeding the demand of stair height itself.But, in use, often, because the pliability of rope causes two stair to depart from from binding, cause security incident, and in binding process, for guaranteeing the fastness of binding, people kill knot by rope often, after finishing using, with cutter, cut off rope, realize the separation of two stair, the rope that cutter cuts off cannot utilize again, waste resource; Strong than rope binding by the stair fastness of steel wire bundle, but binding with separated in quite consuming time, the handling difficulty of two stair is large.In the time need to being carried to other fruit-bearing forest from a slice fruit-bearing forest, because the stair handling difficulty of steel wire bundle is large, is all generally that the long stair after binding are directly carried, in handling process because long stair are easy to be stopped by other trees or house, difficult.
In sum, the problem that the overlapping bamboo bimber stair of prior art exists is: climbing safety is low, carrying difficulty is large, handling difficulty and energy consumption large.
Summary of the invention
The purpose of this utility model is to provide a kind of overlapping bamboo bimber stair with connecting elements that improves climbing safety, reduction carrying difficulty, is convenient to handling and reduction energy consumption.
The technical scheme adopting is for achieving the above object such, it is a kind of overlapping bamboo bimber stair with connecting elements, comprise at least two bamboo bimber stair monomers, this bamboo bimber stair monomer is fixed as one two main support columns that are symmetricly set on crossbeam pole for climbing two ends to form by crossbeam pole for climbing; Wherein: on the vertical top cylinder of main support column and bottom cylinder, be provided with horizontal installation groove and longitudinal installing hole, this is laterally installed groove and is positioned at main support column in a lateral direction, and described longitudinal mounting hole site is on the longitudinal direction of main support column;
Between described bamboo bimber stair monomer, by connecting elements, be fixed as one;
Described connecting elements comprises again two symmetrically arranged arc cell bodies, and the deep-slotted chip breaker of these two arc cell bodies is oppositely arranged, and the diameter of deep-slotted chip breaker is greater than the diameter of main support column;
In the outer wall footpath of arc cell body, be upwards provided with two longitudinal mounting grooves, the angle between these two longitudinal mounting grooves is 180 °; Described longitudinal mounting groove upwards connects the outer wall bottom to arc cell body from the outer wall top of arc cell body in the outer wall footpath of arc cell body;
On arc cell body between described two longitudinal mounting grooves, be provided with two heavy stand hole is laterally installed, these two the upper and lower that heavy stand hole lays respectively at arc cell body is laterally installed, horizontal installation heavy stand hole and the distance between arc cell body top on arc cell body top are greater than in the horizontal installation heavy stand hole of arc cell body bottom and the distance between arc cell body bottom, and the interior angle forming between heavy stand hole and deep-slotted chip breaker body axis is laterally installed and is equated, this interior angle is obtuse angle;
In described longitudinal mounting groove, be provided with at least two installing holes, a mounting hole site in described at least two installing holes is in the top of longitudinal mounting groove, and the another one mounting hole site in described at least two installing holes is in the bottom of longitudinal mounting groove;
In adjacent two bamboo bimber stair monomers, be positioned at the top that deep-slotted chip breaker is inserted in the main support column bottom of the bamboo bimber stair monomer of top position, by a double threaded screw I, through being positioned at longitudinal installing hole of main support column bottom of bamboo bimber stair monomer of top position and the installing hole that is positioned at longitudinal mounting groove top, arc cell body and the bamboo bimber stair monomer that is positioned at top position be fixed as one at longitudinal direction;
The bottom of deep-slotted chip breaker is inserted at the main support column top that is positioned at the bamboo bimber stair monomer of lower position in adjacent two bamboo bimber stair monomers, by another double threaded screw I, through being positioned at longitudinal installing hole at main support column top of bamboo bimber stair monomer of lower position and the installing hole that is positioned at longitudinal mounting groove bottom, arc cell body and the bamboo bimber stair monomer that is positioned at lower position is fixed as one at longitudinal direction;
Two terminations of described double threaded screw I pass respectively two longitudinal mounting grooves on arc cell body, and two nuts that are positioned at this double threaded screw I termination are tight against respectively the bottom land at described two longitudinal mounting grooves;
Described two arc cell bodies are fixed as one by double threaded screw II and double threaded screw III; Described double threaded screw II is successively through being arranged in the horizontal installation heavy stand hole on an arc cell body top in two arc cell bodies, adjacent bamboo bimber stair monomer behind the horizontal installation heavy stand hole of the horizontal installation groove on the main support column top on horizontal installation groove on the main support column bottom on the left side of place, top position bamboo bimber stair monomer, the right that adjacent bamboo bimber stair monomer is arranged in lower position bamboo bimber stair monomer, two another piece arc cell body bottoms of arc cell body by nut check;
Described double threaded screw III is successively through being arranged in horizontal installation groove, adjacent bamboo bimber stair monomer on the main support column top on the left side of lower position bamboo bimber stair monomer in the horizontal installation heavy stand hole of an arc cell body bottom in two arc cell bodies, adjacent bamboo bimber stair monomer and being arranged in behind the horizontal installation heavy stand hole on the horizontal installation groove on the main support column bottom on the right of place, top position bamboo bimber stair monomer, two another piece arc cell body tops of arc cell body by nut check.
The utility model is because the advantage that said structure has is: simple in structure, be easy to manufacture; Relatively short stair are transported to using area and assemble again, be convenient to transportation, load and unload simple and quick; Adopt said structure the shorter stair of multi-section to be connected into the longer stair of proper height, steadiness is strong, the vertical and horizontal of stair are all firmly fixed, make adjacent two stair at the stress equalization of the either direction of junction, improved climbing safety, after described connecting elements dismounting, can again utilize and reduce energy consumption.
Accompanying drawing explanation
The non-limiting embodiment that the utility model can provide by accompanying drawing further illustrates.
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the stereoscopic-state structural representation of the utility model connecting elements;
Fig. 3 is the plan structure schematic diagram of Fig. 2.
Fig. 4 is the sectional structure schematic diagram that the single arc cell body of the utility model is laterally installed place, heavy stand hole.
Fig. 5 is the sectional structure schematic diagram that the utility model is laterally installed place, heavy stand hole.
In figure: 1, arc cell body; 2, deep-slotted chip breaker; 3, heavy stand hole is laterally installed; 4, longitudinal mounting groove; 5, installing hole; 6, double threaded screw I; 7, double threaded screw II; 8, double threaded screw III; α, interior angle; 9, bamboo bimber stair monomer; 10, crossbeam pole for climbing; 11, main support column; 12, groove is laterally installed; 13, longitudinal installing hole.
The specific embodiment
Below in conjunction with drawings and Examples, the utility model is described in further detail:
Referring to accompanying drawing 1 to 5, the overlapping bamboo bimber stair with connecting elements in figure, comprise at least two bamboo bimber stair monomers 9, this bamboo bimber stair monomer 9 is fixed as one two main support columns 11 that are symmetricly set on crossbeam pole for climbing 10 two ends to form by crossbeam pole for climbing 10; It is characterized in that: on the vertical top cylinder of main support column 11 and bottom cylinder, be provided with horizontal installation groove 12 and longitudinal installing hole 13, this is laterally installed groove 12 and is positioned at main support column 11 in a lateral direction, and described longitudinal installing hole 13 is positioned on the longitudinal direction of main support column 11;
Between described bamboo bimber stair monomer 9, by connecting elements, be fixed as one;
Described connecting elements comprises again two symmetrically arranged arc cell bodies 1, and the deep-slotted chip breaker 2 of these two arc cell bodies 1 is oppositely arranged, and the diameter of deep-slotted chip breaker 2 is greater than the diameter of main support column 11;
In the outer wall footpath of arc cell body 1, be upwards provided with two longitudinal mounting grooves 4, the angle between these two longitudinal mounting grooves 4 is 180 °; Described longitudinal mounting groove 4 upwards connects the outer wall bottom to arc cell body 1 from the outer wall top of arc cell body 1 in the outer wall footpath of arc cell body 1;
On arc cell body 1 between described two longitudinal mounting grooves 4, be provided with two heavy stand hole 3 is laterally installed, these two the upper and lower that heavy stand hole 3 lays respectively at arc cell body 1 is laterally installed, horizontal installation heavy stand hole 3 and the distance between arc cell body 1 top on arc cell body 1 top are greater than in the horizontal installation heavy stand hole 3 of arc cell body 1 bottom and the distance between arc cell body 1 bottom, and the interior angle α forming between heavy stand hole 3 and arc cell body 1 axis is laterally installed and equates, this interior angle α is obtuse angle;
In described longitudinal mounting groove 4, be provided with at least two installing holes 5, an installing hole 5 in described at least two installing holes 5 is positioned at the top of longitudinal mounting groove 4, and the another one installing hole 5 in described at least two installing holes 5 is positioned at the bottom of longitudinal mounting groove 4;
In adjacent two bamboo bimber stair monomers 9, be positioned at the top that deep-slotted chip breakers 2 are inserted in main support column 11 bottoms of the bamboo bimber stair monomer 9 of top position, by a double threaded screw I 6, through being positioned at longitudinal installing hole 13 of main support column 11 bottoms of bamboo bimber stair monomer 9 of top position and the installing hole 5 that is positioned at longitudinal mounting groove 4 tops, arc cell body 1 and the bamboo bimber stair monomer 9 that is positioned at top position be fixed as one at longitudinal direction;
In adjacent two bamboo bimber stair monomers 9, be positioned at the bottom that deep-slotted chip breakers 2 are inserted at main support column 11 tops of the bamboo bimber stair monomer 9 of lower position, by another double threaded screw I 6, through being positioned at longitudinal installing hole 13 at main support column 11 tops of bamboo bimber stair monomer 9 of lower position and the installing hole 5 that is positioned at longitudinal mounting groove 4 bottoms, arc cell body 1 and the bamboo bimber stair monomer 9 that is positioned at lower position be fixed as one at longitudinal direction;
Two terminations of described double threaded screw I 6 pass respectively two longitudinal mounting grooves 4 on arc cell body 1, and two nuts that are positioned at these double threaded screw I 6 terminations are tight against respectively the bottom land at described two longitudinal mounting grooves 4;
Described two arc cell bodies 1 are fixed as one by double threaded screw II 7 and double threaded screw III 8, described double threaded screw II 7 is passed the horizontal installation heavy stand hole 3 on arc cell body 1 top in two arc cell bodies 1 successively, in adjacent bamboo bimber stair monomer 9, be positioned at the horizontal installation groove 12 on main support column 11 bottoms on the left side of top position place bamboo bimber stair monomer 9, in adjacent bamboo bimber stair monomer 9, be positioned at the horizontal installation groove 12 on main support column 11 tops on the right of lower position bamboo bimber stair monomer 9, in two arc cell bodies 1 behind the horizontal installation heavy stand hole 3 of another piece arc cell body 1 bottom by nut check,
Described double threaded screw III 8 is passed the horizontal installation heavy stand hole 3 of arc cell body 1 bottom in two arc cell bodies 1 successively, in adjacent bamboo bimber stair monomer 9, be positioned at the horizontal installation groove 12 on main support column 11 tops on the left side of lower position bamboo bimber stair monomer 9, in adjacent bamboo bimber stair monomer 9, be positioned at the horizontal installation groove 12 on main support column 11 bottoms on the right of top position place bamboo bimber stair monomer 9, in two arc cell bodies 1 behind the horizontal installation heavy stand hole 3 on another piece arc cell body 1 top by nut check.
For ease of batch production, in above-described embodiment, preferably: described two arc cell bodies 1 are semicircle shape, after this two arc cell bodies, 1 laminating, form the cylindrical shell of circle shape.
For further improving the steadiness of adjacent stair junction, in above-described embodiment, preferably: described installing hole 5 is four, wherein two installing holes 5 are positioned at longitudinal mounting groove 4 tops, and two other installing hole 5 is positioned at longitudinal mounting groove 4 bottoms.
For further improving the steadiness of adjacent stair junction, in above-described embodiment, preferably: be provided with plastic cement elastomeric pad between the bottom land of the nut of described double threaded screw I 6 and longitudinally mounting groove 4.Between the heavy stand in the nut of described double threaded screw II 7 and laterally installation heavy stand hole 3, be provided with plastic cement elastomeric pad.Between the heavy stand in the nut of described double threaded screw III 8 and laterally installation heavy stand hole 3, be provided with plastic cement elastomeric pad.
In above-mentioned all embodiment, each parts of connecting elements all can adopt metal, alloy material or hard PVC material to make, and optimal selection is hard PVC material.
Obviously, above-mentioned all embodiment are a part of embodiment of the present utility model, rather than whole embodiment.Based on embodiment described in the utility model, those skilled in the art are not making all other embodiment that obtain under creative work prerequisite, all belong to the category of the utility model protection.
In sum, due to said structure, improved climbing safety, reduced carrying difficulty, be convenient to handling and reduced energy consumption.

Claims (6)

1. an overlapping bamboo bimber stair with connecting elements, comprise at least two bamboo bimber stair monomers (9), two main support columns (11) that this bamboo bimber stair monomer (9) will be symmetricly set on crossbeam pole for climbing (10) two ends by crossbeam pole for climbing (10) are fixed as one and form; It is characterized in that: on the vertical top cylinder of main support column (11) and bottom cylinder, be provided with horizontal installation groove (12) and longitudinal installing hole (13), this is laterally installed groove (12) and is positioned at main support column (11) in a lateral direction, and described longitudinal installing hole (13) is positioned on the longitudinal direction of main support column (11);
Between described bamboo bimber stair monomer (9), by connecting elements, be fixed as one;
Described connecting elements comprises again two symmetrically arranged arc cell bodies (1), and the deep-slotted chip breaker (2) of these two arc cell bodies (1) is oppositely arranged, and the diameter of deep-slotted chip breaker (2) is greater than the diameter of main support column (11);
In the outer wall footpath of arc cell body (1), be upwards provided with two longitudinal mounting grooves (4), the angle between these two longitudinal mounting grooves (4) is 180 °; Described longitudinal mounting groove (4) upwards connects to the outer wall bottom of arc cell body (1) from the outer wall top of arc cell body (1) in the outer wall footpath of arc cell body (1);
On arc cell body (1) between described two longitudinal mounting grooves (4), be provided with two heavy stand hole (3) is laterally installed, these two the upper and lower that heavy stand hole (3) lays respectively at arc cell body (1) is laterally installed, being positioned at the horizontal installation heavy stand hole (3) on arc cell body (1) top and the distance between arc cell body (1) top is greater than and is positioned at the horizontal installation heavy stand hole (3) of arc cell body (1) bottom and the distance between arc cell body (1) bottom, and the interior angle (α) forming between heavy stand hole (3) and arc cell body (1) axis is laterally installed to be equated, this interior angle (α) is obtuse angle,
In described longitudinal mounting groove (4), be provided with at least two installing holes (5), an installing hole (5) in described at least two installing holes (5) is positioned at the top of longitudinal mounting groove (4), and the another one installing hole (5) in described at least two installing holes (5) is positioned at the bottom of longitudinal mounting groove (4);
In adjacent two bamboo bimber stair monomers (9), be positioned at the top that deep-slotted chip breaker (2) is inserted in main support column (11) bottom of the bamboo bimber stair monomer (9) of top position, by a double threaded screw I (6), through being positioned at longitudinal installing hole (13) of main support column (11) bottom of bamboo bimber stair monomer (9) of top position and the installing hole (5) that is positioned at longitudinal mounting groove (4) top, arc cell body (1) and the bamboo bimber stair monomer (9) that is positioned at top position be fixed as one at longitudinal direction;
In adjacent two bamboo bimber stair monomers (9), be positioned at the bottom that deep-slotted chip breaker (2) is inserted at main support column (11) top of the bamboo bimber stair monomer (9) of lower position, by another double threaded screw I (6), through being positioned at longitudinal installing hole (13) at main support column (11) top of bamboo bimber stair monomer (9) of lower position and the installing hole (5) that is positioned at longitudinal mounting groove (4) bottom, arc cell body (1) and the bamboo bimber stair monomer (9) that is positioned at lower position be fixed as one at longitudinal direction;
Two terminations of described double threaded screw I (6) pass respectively two the longitudinal mounting grooves (4) on arc cell body (1), and two nuts that are positioned at this double threaded screw I (6) termination are tight against respectively the bottom land at described two longitudinal mounting grooves (4);
Described two arc cell bodies (1) are fixed as one by double threaded screw II (7) and double threaded screw III (8), described double threaded screw II (7) is passed the horizontal installation heavy stand hole (3) on an arc cell body (1) top in two arc cell bodies (1) successively, in adjacent bamboo bimber stair monomer (9), be positioned at the horizontal installation groove (12) on main support column (11) bottom on the left side of top position place bamboo bimber stair monomer (9), in adjacent bamboo bimber stair monomer (9), be positioned at the horizontal installation groove (12) on main support column (11) top on the right of lower position bamboo bimber stair monomer (9), in two arc cell bodies (1) behind the horizontal installation heavy stand hole (3) of another piece arc cell body (1) bottom by nut check,
Described double threaded screw III (8) is passed the horizontal installation heavy stand hole (3) of an arc cell body (1) bottom in two arc cell bodies (1) successively, in adjacent bamboo bimber stair monomer (9), be positioned at the horizontal installation groove (12) on main support column (11) top on the left side of lower position bamboo bimber stair monomer (9), in adjacent bamboo bimber stair monomer (9), be positioned at the horizontal installation groove (12) on main support column (11) bottom on the right of top position place bamboo bimber stair monomer (9), in two arc cell bodies (1) behind the horizontal installation heavy stand hole (3) on another piece arc cell body (1) top by nut check.
2. the overlapping bamboo bimber stair with connecting elements according to claim 1, is characterized in that: described two arc cell bodies (1) are semicircle shape, forms the cylindrical shell of circle shape after this two arc cell bodies (1) laminating.
3. the overlapping bamboo bimber stair with connecting elements according to claim 1, it is characterized in that: described installing hole (5) is four, wherein two installing holes (5) are positioned at longitudinal mounting groove (4) top, and two other installing hole (5) is positioned at longitudinal mounting groove (4) bottom.
4. the overlapping bamboo bimber stair with connecting elements according to claim 1, is characterized in that: between the bottom land of the nut of described double threaded screw I (6) and longitudinally mounting groove (4), be provided with plastic cement elastomeric pad.
5. the overlapping bamboo bimber stair with connecting elements according to claim 1, is characterized in that: between the heavy stand in the nut of described double threaded screw II (7) and laterally installation heavy stand hole (3), be provided with plastic cement elastomeric pad.
6. the overlapping bamboo bimber stair with connecting elements according to claim 1, is characterized in that: between the heavy stand in the nut of described double threaded screw III (8) and laterally installation heavy stand hole (3), be provided with plastic cement elastomeric pad.
CN201420377764.8U 2014-07-10 2014-07-10 The overlapping bamboo bimber stair with connecting elements Expired - Fee Related CN204002528U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420377764.8U CN204002528U (en) 2014-07-10 2014-07-10 The overlapping bamboo bimber stair with connecting elements

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420377764.8U CN204002528U (en) 2014-07-10 2014-07-10 The overlapping bamboo bimber stair with connecting elements

Publications (1)

Publication Number Publication Date
CN204002528U true CN204002528U (en) 2014-12-10

Family

ID=52042548

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420377764.8U Expired - Fee Related CN204002528U (en) 2014-07-10 2014-07-10 The overlapping bamboo bimber stair with connecting elements

Country Status (1)

Country Link
CN (1) CN204002528U (en)

Similar Documents

Publication Publication Date Title
CN204002510U (en) There is the overlapping bamboo bimber stair of bindiny mechanism
CN203827767U (en) Y-shaped pruning mode support system for fruit trees
CN201011796Y (en) Novel rain protection cover for fruit trees
CN104770241A (en) Banana lodging-proof support and support net formed by utilizing structure of banana lodging-proof support
CN204157372U (en) Bamboo frame wind-resistant device of greenhouse
CN204498924U (en) A kind of banana lodging-prevention support and the support network utilizing it to construct
CN105532365A (en) Actinidia chinensis cultivation model
CN204002528U (en) The overlapping bamboo bimber stair with connecting elements
CN105309242A (en) Combined type wind barrier for plantation
CN204030426U (en) Rope bar is put in a kind of treetop, power construction middle peasant forest zone
CN204002526U (en) The overlapping bamboo bimber stair with connector
CN204002530U (en) Pluck bamboo bimber stair connecting elements for high-order fruit
CN204002531U (en) The overlapping bamboo bimber stair with contiguous block
CN204002532U (en) The overlapping bamboo bimber stair with shape of a hoof contiguous block
CN104686281A (en) Novel grape trellis
CN204060496U (en) Pluck high-order fruit bamboo bimber stair bindiny mechanism
CN204002527U (en) Pluck high-order fruit bamboo bimber stair connector
CN204002529U (en) Pluck high-order fruit bamboo bimber stair contiguous block
CN203814302U (en) Jackstay for controlling direction of felled trees and bamboos in obstacle clearing process of line
CN204060497U (en) There is the overlapping bamboo bimber stair of shape of a hoof connecting elements
CN203327645U (en) Greenhouse contraction and release combination support
CN203985079U (en) Pluck high-order fruit bamboo bimber stair shape of a hoof connecting elements
CN204443229U (en) Mushroom mushroom producing multi-layer shelf
CN204024443U (en) Adopt the bamboo ladder stand of connector overlapping
CN203243767U (en) Kiwi fruit garden support

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141210

Termination date: 20150710