CN203814302U - Jackstay for controlling direction of felled trees and bamboos in obstacle clearing process of line - Google Patents

Jackstay for controlling direction of felled trees and bamboos in obstacle clearing process of line Download PDF

Info

Publication number
CN203814302U
CN203814302U CN201420190118.0U CN201420190118U CN203814302U CN 203814302 U CN203814302 U CN 203814302U CN 201420190118 U CN201420190118 U CN 201420190118U CN 203814302 U CN203814302 U CN 203814302U
Authority
CN
China
Prior art keywords
shaped fork
fixed
bamboo
tree
strut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420190118.0U
Other languages
Chinese (zh)
Inventor
吴全初
程国安
李洪胜
何均衡
万志萍
李建华
洪永忠
程峰
胡强
章逸民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Power Supply Branch Guo Wang Jiangxi Province Utilities Electric Co Fuzhou City
State Grid Corp of China SGCC
Original Assignee
Power Supply Branch Guo Wang Jiangxi Province Utilities Electric Co Fuzhou City
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Power Supply Branch Guo Wang Jiangxi Province Utilities Electric Co Fuzhou City filed Critical Power Supply Branch Guo Wang Jiangxi Province Utilities Electric Co Fuzhou City
Priority to CN201420190118.0U priority Critical patent/CN203814302U/en
Application granted granted Critical
Publication of CN203814302U publication Critical patent/CN203814302U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Catching Or Destruction (AREA)

Abstract

本实用新型公开了一种控制线路清障树竹倒向撑杆,它由撑杆本体和U型叉组成,在撑杆本体的顶端固定有开口朝前的U型叉,在U型叉中间朝前的底部固定有前端尖锐的防滑刺,在U型叉一侧朝后的底部固定有向后的倒钩,且撑杆本体为伸缩杆,由2-4节支杆组成。本实用新型省去了作业人员攀登树木绑扎的过程,避免了作业人员高空坠落的风险,大幅缩短了安措准备时间,提高了架空输电线路通道清障作业效率,具有节省工作时间、工作效率高、降低作业人员的劳动强度、操作简单、安全可靠、携带方便的优点。

The utility model discloses a tree and bamboo inverted support bar for clearing obstacles of a control line, which is composed of a support bar body and a U-shaped fork. The bottom facing forward is fixed with a sharp anti-skid thorn at the front end, and the bottom facing backward on one side of the U-shaped fork is fixed with a backward barb. The utility model saves the process of operators climbing trees and binding them, avoids the risk of operators falling from high altitude, greatly shortens the preparation time for safety measures, improves the efficiency of clearing obstacles in the overhead transmission line channel, and has the advantages of saving working time and high working efficiency , Reduce the labor intensity of operators, simple operation, safe and reliable, and easy to carry.

Description

控制线路清障树竹倒向撑杆Control Line Clearance Tree Bamboo Inverted Pole

技术领域 technical field

本实用新型涉及输电线路施工工具,尤其是涉及一种控制线路清障树竹倒向撑杆。  The utility model relates to a construction tool for a power transmission line, in particular to a tree and bamboo inverted support rod for clearing obstacles of a control line. the

背景技术 Background technique

由于输电线路大多架设在旷野和山区运行,线路途经林场、毛竹生长区、自然保护区、经济林区等特殊区域,因此在线路通道内每年都生长着大量的树竹,为了保证输电线路的安全运行,必须根据《DL/T 741-2010架空输电线路运行规程》,对不能满足运行要求的树竹必须进行砍伐。因为是临近高压带电线路进行作业,作业前必须做好控制树竹倒向的安全措施,传统作业方法是由人员爬上树竹的顶端绑好拉绳的一端,然后由多位作业人员拽住拉绳的另一端,控制住树竹的倒向,防止树竹倒向线路一侧,压坏线路,另一名作业人员用电锯锯树竹的根部,才能完成清障任务,这样不仅浪费时间,工作效率较低,而且作业人员的劳动强度也大,安全性差。  Since most of the transmission lines are erected in the wilderness and mountainous areas, and the lines pass through special areas such as forest farms, moso bamboo growth areas, nature reserves, and economic forest areas, a large number of trees and bamboos grow in the line passages every year. In order to ensure the safe operation of the transmission lines , according to the "DL/T 741-2010 Operation Regulations for Overhead Transmission Lines", the trees and bamboos that cannot meet the operation requirements must be felled. Because the work is carried out near the high-voltage live line, safety measures must be taken to control the fall of the tree and bamboo before the operation. The traditional operation method is to climb up to the top of the tree and bamboo and tie one end of the rope, and then several workers hold it The other end of the pull rope controls the falling of the trees and bamboos to prevent the trees and bamboos from falling to the side of the line and crushing the lines. Another operator can use a chainsaw to saw the roots of the trees and bamboos to complete the task of clearing obstacles, which not only wastes Time, work efficiency is low, and the labor intensity of operator is also big, and safety is poor. the

发明内容 Contents of the invention

本实用新型的目的在于提供一种节省工作时间、工作效率高、降低作业人员的劳动强度、操作简单、安全可靠、携带方便的控制线路清障树竹倒向撑杆。  The purpose of the utility model is to provide a control circuit clearing tree and bamboo inverted support bar which saves working time, has high working efficiency, reduces the labor intensity of operators, is simple to operate, safe and reliable, and is convenient to carry. the

本实用新型的目的是这样实现的:  The purpose of this utility model is achieved in that:

一种控制线路清障树竹倒向撑杆,包括长条管形的撑杆本体,特征是:在撑杆本体的顶端固定有开口朝前的U型叉,在U型叉中间朝前的底部固定有前端尖锐的防滑刺,在U型叉一侧朝后的底部固定有向后的倒钩。 A tree and bamboo inverted stay for controlling line clearing obstacles, including a long tubular stay body, characterized in that: a U-shaped fork with an opening facing forward is fixed on the top of the stay body, and a front-facing fork in the middle of the U-shaped fork The bottom is fixed with a sharp anti-skid thorn at the front end, and a backward barb is fixed at the bottom of the U-shaped fork facing backward.

 U型叉中间朝后的底部为一柱状体,柱状体插入撑杆本体顶端的管孔中,用螺丝将U型叉固定在撑杆本体的顶端。  The rear bottom in the middle of the U-shaped fork is a columnar body, which is inserted into the tube hole at the top of the strut body, and the U-shaped fork is fixed on the top of the strut body with screws.

长条管形的撑杆本体为伸缩杆,由2-4节支杆组成,相邻两节的支杆之间通过可旋转的接头螺杆固定或松开。 The elongated tube-shaped strut body is a telescopic rod, which is composed of 2-4 sections of support rods, and the adjacent two-section support rods are fixed or loosened by rotatable joint screws.

在撑杆本体的底端套有防滑的塑料把手。 A non-slip plastic handle is sheathed on the bottom end of the strut body.

实用新型由撑杆本体和U型叉组成,在撑杆本体的顶端固定有开口朝前的U型叉,在U型叉中间朝前的底部固定有前端尖锐的防滑刺,在U型叉一侧朝后的底部固定有向后的倒钩,且撑杆本体为伸缩杆,由2-4节支杆组成。在进行线路清理树障作业时,①如树竹生长的高度不超过12米,主杆又较粗壮,可不需绑扎控制倒向的绳索,而用三根支杆组成的撑杆本体成30o-45o角进行控制,具体操作方法为:作业人员先调节好撑杆本体的长度,手握撑杆本体,将U型叉对准树干重心用力推刺,使防滑刺的尖头刺入树干不会滑动,同样将另一根撑杆本体的防滑刺的尖头也刺入树干,然后呈30o-45o角用力向倒向方向推送。②如树竹的生长高度超过12米且主杆粗大,则利用撑杆本体进行控制倒向绳索的绑扎,而不用作业人员攀爬树竹,从而达到杜绝作业人员高空坠落风险及缩短安措准备时间的效果,具体操作方法为:首先将控制绳索挂在2U型叉内,利用撑杆本体举到树竹的重心高度并穿过树枝,然后利用另一根撑杆本体的3倒钩勾住控制绳索的挂环下拉至地面,由作业人员将控制绳索放入控制绳索的挂环内进行收紧,在由另一名作业人员用电锯锯树竹的根部时将待砍伐的树竹拉向安全的倒向区域,完成砍伐。③如毛竹、杨树、杉树等树径较小、生长快的树种,可直接将U型叉中间的防滑刺插入树干进行推送,可大量节约安措准备时间,提高工作效率。 The utility model consists of a strut body and a U-shaped fork. A U-shaped fork with an opening facing forward is fixed on the top of the strut body. A sharp anti-slip thorn is fixed at the bottom of the U-shaped fork facing forward. The rear-facing bottom is fixed with backward barbs, and the strut body is a telescopic rod consisting of 2-4 sections of struts. When clearing tree barriers on the line, ① if the height of the trees and bamboos does not exceed 12 meters, and the main pole is relatively strong, it is not necessary to bind the rope to control the inversion, but the pole body composed of three poles is 30o-45o The specific operation method is as follows: the operator first adjusts the length of the strut body, holds the strut body in hand, aligns the U-shaped fork with the center of gravity of the trunk and pushes it hard, so that the pointed end of the non-slip thorn will not penetrate into the trunk. Slide, and also pierce the pointed end of the anti-skid thorn of the other pole body into the tree trunk, and then forcefully push it in the backward direction at an angle of 30o-45o. ②If the growth height of the tree and bamboo exceeds 12 meters and the main pole is thick, use the main body of the pole to control the tying of the backward rope, instead of the operator climbing the tree and bamboo, so as to eliminate the risk of workers falling from high altitude and shorten the safety measures The effect of time, the specific operation method is: first hang the control rope in the 2U-shaped fork, use the pole body to lift to the height of the center of gravity of the tree bamboo and pass through the branches, and then use the 3 barbs of the other pole body to hook The hanging loop of the control rope is pulled down to the ground, and the operator puts the control rope into the hanging loop of the control rope to tighten it. When another operator uses a chainsaw to saw the roots of the bamboo, the bamboo to be cut is pulled Move to a safe falling area and complete the felling. ③ For tree species with small diameter and fast growth, such as moso bamboo, poplar, fir, etc., you can directly insert the non-slip thorn in the middle of the U-shaped fork into the trunk for pushing, which can save a lot of preparation time for safety measures and improve work efficiency.

本实用新型省去了作业人员攀登树木绑扎的过程,避免了作业人员高空坠落的风险,大幅缩短了安措准备时间,提高了架空输电线路通道清障作业效率,具有节省工作时间、工作效率高、降低作业人员的劳动强度、操作简单、安全可靠、携带方便的优点。  The utility model saves the process of operators climbing trees and binding them, avoids the risk of operators falling from high altitude, greatly shortens the preparation time for safety measures, improves the efficiency of clearing obstacles in the overhead transmission line channel, and has the advantages of saving working time and high working efficiency , Reduce the labor intensity of operators, simple operation, safe and reliable, and easy to carry. the

  附图说明 Description of drawings

图1为本实用新型的结构示意图。 Fig. 1 is the structural representation of the utility model.

具体实施方式 Detailed ways

下面结合实施例并对照附图对本实用新型作进一步详细说明。  Below in conjunction with embodiment and with reference to accompanying drawing, the utility model is described in further detail. the

一种控制线路清障树竹倒向撑杆本体,包括长条管形的撑杆本体1,在撑杆本体1的顶端固定有开口朝前的U型叉2,在U型叉2中间朝前的底部固定有前端尖锐的防滑刺21,在U型叉2一侧朝后的底部固定有向后的倒钩22。  A control line clearing tree bamboo inverted strut body, comprising a long tube-shaped strut body 1, a U-shaped fork 2 with an opening facing forward is fixed on the top of the strut body 1, and a U-shaped fork 2 facing forward is fixed in the middle of the U-shaped fork 2. The front bottom is fixed with a sharp anti-slip thorn 21 at the front end, and a backward barb 22 is fixed at the rear bottom of the U-shaped fork 2 side. the

U型叉2中间朝后的底部为一柱状体23,柱状体23插入撑杆本体1顶端的管孔11中,用螺丝12将U型叉固定在撑杆本体1的顶端。  The rear bottom of the U-shaped fork 2 is a columnar body 23, and the columnar body 23 is inserted into the tube hole 11 at the top of the strut body 1, and the U-shaped fork is fixed on the top of the strut body 1 with screws 12. the

长条管形的撑杆本体1为伸缩杆,由2-4节支杆13组成,相邻两节的支杆13之间通过可旋转的接头螺杆14固定或松开。整根撑杆本体1的高度可根据需砍伐的树竹高度进行调节。  The elongated tubular strut body 1 is a telescopic rod, which is composed of 2-4 joints of struts 13, and two adjacent joints of struts 13 are fixed or loosened by rotatable joint screw rods 14. The height of the whole strut body 1 can be regulated according to the height of the trees and bamboos to be felled. the

在撑杆本体1的底端套有防滑的塑料把手15。  A non-slip plastic handle 15 is sheathed on the bottom end of the strut body 1 . the

Claims (4)

1.一种控制线路清障树竹倒向撑杆,包括长条管形的撑杆本体,其特征在于:在撑杆本体的顶端固定有开口朝前的U型叉,在U型叉中间朝前的底部固定有前端尖锐的防滑刺,在U型叉一侧朝后的底部固定有向后的倒钩。 1. A tree and bamboo inverted strut for controlling line clearing obstacles, comprising a long tubular strut body, characterized in that: a U-shaped fork with an opening facing forward is fixed on the top of the strut body, and in the middle of the U-shaped fork The bottom facing forward is fixed with a sharp anti-slip thorn at the front end, and the bottom facing backward on one side of the U-shaped fork is fixed with a backward barb. 2.根据权利要求1所述的控制线路清障树竹倒向撑杆,其特征在于:U型叉中间朝后的底部为一柱状体,柱状体插入撑杆本体顶端的管孔中,用螺丝将U型叉固定在撑杆本体的顶端。 2. The control line clearing tree and bamboo inverted strut according to claim 1 is characterized in that: the bottom of the U-shaped fork facing backward is a columnar body, and the columnar body is inserted into the tube hole at the top of the strut body. Screws fix the U-shaped fork on the top of the strut body. 3.根据权利要求1所述的控制线路清障树竹倒向撑杆,其特征在于:长条管形的撑杆本体为伸缩杆,由2-4节支杆组成,相邻两节的支杆之间通过可旋转的接头螺杆固定或松开。 3. The tree and bamboo reverse pole for clearing obstacles of the control line according to claim 1, characterized in that: the elongated tubular pole body is a telescopic pole, consisting of 2-4 poles, two adjacent poles The poles are fixed or loosened by rotatable joint screws. 4.根据权利要求1所述的控制线路清障树竹倒向撑杆,其特征在于:在撑杆本体的底端套有防滑的塑料把手。 4. The tree and bamboo inverted pole for clearing obstacles of control lines according to claim 1, characterized in that: the bottom end of the pole body is covered with a non-slip plastic handle.
CN201420190118.0U 2014-04-18 2014-04-18 Jackstay for controlling direction of felled trees and bamboos in obstacle clearing process of line Expired - Fee Related CN203814302U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420190118.0U CN203814302U (en) 2014-04-18 2014-04-18 Jackstay for controlling direction of felled trees and bamboos in obstacle clearing process of line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420190118.0U CN203814302U (en) 2014-04-18 2014-04-18 Jackstay for controlling direction of felled trees and bamboos in obstacle clearing process of line

Publications (1)

Publication Number Publication Date
CN203814302U true CN203814302U (en) 2014-09-10

Family

ID=51469862

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420190118.0U Expired - Fee Related CN203814302U (en) 2014-04-18 2014-04-18 Jackstay for controlling direction of felled trees and bamboos in obstacle clearing process of line

Country Status (1)

Country Link
CN (1) CN203814302U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106508450A (en) * 2016-11-09 2017-03-22 国网四川省电力公司广元供电公司 Drawing hook for tree felling nearby power transmission lines
CN108812173A (en) * 2018-04-28 2018-11-16 国家电网公司 A kind of trees fall direction controller
CN109874634A (en) * 2019-04-12 2019-06-14 广东电网有限责任公司 A tree push-pull device
CN119547704A (en) * 2024-11-05 2025-03-04 国网四川省电力公司南充供电公司 A tree-pulling auxiliary tool for obstacle removal

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106508450A (en) * 2016-11-09 2017-03-22 国网四川省电力公司广元供电公司 Drawing hook for tree felling nearby power transmission lines
CN108812173A (en) * 2018-04-28 2018-11-16 国家电网公司 A kind of trees fall direction controller
CN109874634A (en) * 2019-04-12 2019-06-14 广东电网有限责任公司 A tree push-pull device
CN119547704A (en) * 2024-11-05 2025-03-04 国网四川省电力公司南充供电公司 A tree-pulling auxiliary tool for obstacle removal

Similar Documents

Publication Publication Date Title
CN202907558U (en) Tree- bamboo falling direction controller
CN202211037U (en) Tree pruning, felling and pulling tools
CN203505206U (en) Pulling tool for tree cutting
CN205431331U (en) Controller is swung to to trees
CN204047294U (en) A kind of overhead branch pruning saw
CN204206814U (en) A kind of forestry Multifunctional trimming cutter
CN202918744U (en) High-altitude tree scissors
CN205213528U (en) Fruit tree branches of tall trees are pruned, fruit picking device
CN203968752U (en) A kind of tree pruning tool
CN203675706U (en) Multifunctional forestry branch trimming shovel
CN206061610U (en) A kind of branch pruning device
CN203057914U (en) Super-long barrier removing tool
CN212936849U (en) Tall tree and branch ground treatment kit
CN205105669U (en) Simple fruit picking device
CN202857377U (en) Urban road green tree trimmer
CN203467279U (en) Lopping shear
CN118472837A (en) Transmission line corridor obstacle removal device and obstacle removal method
CN203912677U (en) Electronic pair of saw trimmer of a kind of orbital motion
CN206909200U (en) A kind of strength trimmer
CN205666539U (en) Electrified beta pruning instrument of trees under transmission line line
CN202333618U (en) Hook special for clearing tree below line
CN205093223U (en) Can increase and decrease insulating spiller of length
CN203072432U (en) Improved secateurs capable of being lengthened
CN204540042U (en) A kind of portable multifunctional secateur for high branch
CN203756715U (en) Multifunctional pull rod connector

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Free format text: FORMER OWNER: FUZHOU POWER SUPPLY COMPANY, STATE GRID JIANGXI ELECTRIC POWER CO., LTD.

Effective date: 20150106

Owner name: FUZHOU POWER SUPPLY COMPANY, STATE GRID JIANGXI EL

Effective date: 20150106

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 344000 FUZHOU, JIANGXI PROVINCE TO: 100086 XICHENG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20150106

Address after: 100086 West Chang'an Avenue, Beijing, No. 86, No.

Patentee after: State Grid Corporation of China

Patentee after: Power supply branch, Guo Wang Jiangxi Province Utilities Electric Co. Fuzhou City

Address before: 344000 No. 566 East Gan Road, Jiangxi, Fuzhou

Patentee before: Power supply branch, Guo Wang Jiangxi Province Utilities Electric Co. Fuzhou City

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140910

Termination date: 20150418

EXPY Termination of patent right or utility model