CN204001790U - A kind of built with ribbed bricks wall prefabricated construction guide - Google Patents

A kind of built with ribbed bricks wall prefabricated construction guide Download PDF

Info

Publication number
CN204001790U
CN204001790U CN201420481529.5U CN201420481529U CN204001790U CN 204001790 U CN204001790 U CN 204001790U CN 201420481529 U CN201420481529 U CN 201420481529U CN 204001790 U CN204001790 U CN 204001790U
Authority
CN
China
Prior art keywords
hook
built
wall
prefabricated construction
guide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420481529.5U
Other languages
Chinese (zh)
Inventor
王凤来
刁领双
孙绪杰
王伟然
于景萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HARBIN DACHENG GREEN BUILDING TECHNOLOGY DEVELOPMENT Co Ltd
Original Assignee
HARBIN DACHENG GREEN BUILDING TECHNOLOGY DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HARBIN DACHENG GREEN BUILDING TECHNOLOGY DEVELOPMENT Co Ltd filed Critical HARBIN DACHENG GREEN BUILDING TECHNOLOGY DEVELOPMENT Co Ltd
Priority to CN201420481529.5U priority Critical patent/CN204001790U/en
Application granted granted Critical
Publication of CN204001790U publication Critical patent/CN204001790U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A kind of built with ribbed bricks wall prefabricated construction guide, it relates to a kind of guide, is specifically related to a kind of built with ribbed bricks wall prefabricated construction guide.The utility model when solving existing built with ribbed bricks wall assembling construction, because wall sheet is higher, makes its hoisted in position more difficult, often needs staff to climb to wall top and removes to wear reinforcing bar, causes inefficiency, problem that labour intensity is high.Guide described in the utility model comprises telescoping tube and base tube, and the lower end of telescoping tube is inserted in the upper end of base tube, is arranged with the first hook and the second hook on the lateral wall of telescoping tube upper end, and upward, the mouth of hook of the second hook down for the mouth of hook of the first hook.The utility model is for built with ribbed bricks wall prefabricated construction.

Description

A kind of built with ribbed bricks wall prefabricated construction guide
Technical field
The utility model relates to a kind of guide, is specifically related to a kind of built with ribbed bricks wall prefabricated construction guide.
Background technology
Built with ribbed bricks house, the feature of the green building such as have low-carbon (LC), environmental protection, cost is low, performance is good has stronger competitiveness in current construction market.Use built with ribbed bricks prefabricated construction technology, need to first build hollow block wall sheet by laying bricks or stones, and wall sheet is limited to correspondence position, and then build by laying bricks or stones, because wall sheet is higher, make its hoisted in position more difficult.While building by laying bricks or stones, also need configuration level reinforcing bar, drop on the mortar in hole, to assemble in bottom, clean out need be set separately to be removed, clean out also needs shutoff before concrete perfusion, clean out is arranged on wall top, often need staff to climb to wall top and remove to wear reinforcing bar, cause inefficiency, labour intensity high.
Utility model content
When the utility model is constructed for solving existing built with ribbed bricks wall assembling, because wall sheet is higher, make its hoisted in position more difficult, often need staff to climb to wall top and remove to wear reinforcing bar, cause inefficiency, problem that labour intensity is high, and then propose a kind of built with ribbed bricks wall prefabricated construction guide.
The utility model is to address the above problem the technical scheme of taking to be: guide described in the utility model comprises telescoping tube and base tube, the lower end of telescoping tube is inserted in the upper end of base tube, on the lateral wall of telescoping tube upper end, be arranged with the first hook and the second hook, upward, the mouth of hook of the second hook down for the mouth of hook of the first hook.
The beneficial effects of the utility model are: one first hook and one second hook are set on the lateral wall of the utility model by the guiding tube head of a scalable adjusting, can meet the requirement of higher body of wall, the second hook is used for guiding wall sheet, use second to hook wall sheet, wall sheet is limited to correspondence position, the hoisted in position of wall sheet is simplified, the first hook is used for guiding reinforcing bar to penetrate wall sheet, do not need staff to climb to wall top and remove to wear reinforcing bar, reduce labour intensity, improved operating efficiency more than 82%.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model, and Fig. 2 is the enlarged drawing of telescoping tube head.
Detailed description of the invention
Detailed description of the invention one: present embodiment is described in conjunction with Fig. 1 and Fig. 2, described in present embodiment, guide comprises telescoping tube 1 and base tube 2, the lower end of telescoping tube 1 is inserted in the upper end of base tube 2, on the lateral wall of telescoping tube 1 upper end, be arranged with the first hook 3 and the second hook 4, upward, the mouth of hook of the second hook 4 down for the mouth of hook of the first hook 3.
In present embodiment, the first hook 3 and the second hook 4 are symmetrical arranged, and have ensured that they can not interact in the time of work.
Detailed description of the invention two: in conjunction with Fig. 1 and Fig. 2, present embodiment is described, the first hook 3 is L shaped hooks that tabular bonding jumper is made described in present embodiment, and the second hook 4 is L shaped hooks that metal bar is made.So arrange, when the first hook 3 hooks are established to the bottom of base tube 2, do not take up space, facilitate penetrating of reinforcing bar, the second hook 4 is made by metal bar, conveniently hook wall sheet, and load bearing effect is good.Other compositions are identical with detailed description of the invention one with annexation.
Detailed description of the invention three: in conjunction with Fig. 1 and Fig. 2, present embodiment is described, telescoping tube 1 is the telescoping tube 1 that aluminium alloys is made described in present embodiment, and base tube 2 is base tube 2 that aluminium alloys is made.So arrange, aluminum alloy materials is lighter, facilitates staff to operate, and can also ensure the working strength of telescoping tube 1 and base tube 2 simultaneously, has extended its application life.Other compositions are identical with detailed description of the invention one with annexation.
Operating principle
The utility model, in the time of work, when wall sheet is lifted on construction part top, uses the second hook 4 of two guides that wall sheet is limited to corresponding position, and keeps static; Unclamp a guide, 3 trigger base tube 2 with its first hook, and adjust its position, the lower end aligned reinforcing bar that makes base tube 2, entangles reinforcing bar by base tube 2, puts down base tube 2, base tube 2 is under Gravitative Loads, relatively move with reinforcing bar, make reinforcing bar pierce into guide, successively each reinforcing bar is pierced into guide; Again utilize the second hook 4 of two guides to hook wall sheet, in the process that wall sheet is slowly put down, reinforcing bar all pierces into wall sheet, in this process, ensured all the time the position of wall sheet by guide, in the time that wall sheet drops to certain altitude, remove guide, manual setting wall sheet position.

Claims (3)

1. a built with ribbed bricks wall prefabricated construction guide, it is characterized in that: described guide comprises telescoping tube (1) and base tube (2), the lower end of telescoping tube (1) is inserted in the upper end of base tube (2), on the lateral wall of telescoping tube (1) upper end, be arranged with the first hook (3) and the second hook (4), upward, the mouth of hook of the second hook (4) down for the mouth of hook of the first hook (3).
2. a kind of built with ribbed bricks wall prefabricated construction guide according to claim 1, it is characterized in that: the first hook (3) is the L shaped hook that tabular bonding jumper is made, the second hook (4) is the L shaped hook that metal bar is made.
3. a kind of built with ribbed bricks wall prefabricated construction guide according to claim 1, it is characterized in that: telescoping tube (1) is the telescoping tube (1) that aluminium alloys is made, base tube (2) is the base tube (2) that aluminium alloys is made.
CN201420481529.5U 2014-08-25 2014-08-25 A kind of built with ribbed bricks wall prefabricated construction guide Expired - Fee Related CN204001790U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420481529.5U CN204001790U (en) 2014-08-25 2014-08-25 A kind of built with ribbed bricks wall prefabricated construction guide

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420481529.5U CN204001790U (en) 2014-08-25 2014-08-25 A kind of built with ribbed bricks wall prefabricated construction guide

Publications (1)

Publication Number Publication Date
CN204001790U true CN204001790U (en) 2014-12-10

Family

ID=52041813

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420481529.5U Expired - Fee Related CN204001790U (en) 2014-08-25 2014-08-25 A kind of built with ribbed bricks wall prefabricated construction guide

Country Status (1)

Country Link
CN (1) CN204001790U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106193616A (en) * 2016-08-31 2016-12-07 哈尔滨达城绿色建筑技术开发股份有限公司 The sizing of a kind of glomeration building limit is worn muscle device and uses what this wore muscle device to wear muscle method
CN106193607A (en) * 2016-08-31 2016-12-07 哈尔滨达城绿色建筑技术开发股份有限公司 A kind of glomeration building prefabricated construction wall sheet is worn muscle method and is worn muscle instrument
CN112875559A (en) * 2019-11-29 2021-06-01 浙江阜康机械有限公司 Telescopic pipe of motor home jack

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106193616A (en) * 2016-08-31 2016-12-07 哈尔滨达城绿色建筑技术开发股份有限公司 The sizing of a kind of glomeration building limit is worn muscle device and uses what this wore muscle device to wear muscle method
CN106193607A (en) * 2016-08-31 2016-12-07 哈尔滨达城绿色建筑技术开发股份有限公司 A kind of glomeration building prefabricated construction wall sheet is worn muscle method and is worn muscle instrument
CN106193607B (en) * 2016-08-31 2018-06-08 哈尔滨达城绿色建筑技术开发股份有限公司 A kind of glomeration building prefabricated construction wall piece wears muscle method and wears muscle tool
CN106193616B (en) * 2016-08-31 2018-06-12 哈尔滨达城绿色建筑技术开发股份有限公司 A kind of glomeration building limit type wears muscle device and wears muscle method using what this wore muscle device
CN112875559A (en) * 2019-11-29 2021-06-01 浙江阜康机械有限公司 Telescopic pipe of motor home jack

Similar Documents

Publication Publication Date Title
CN204001790U (en) A kind of built with ribbed bricks wall prefabricated construction guide
CN204224128U (en) A kind of safe tower crane
CN202039851U (en) Lifting device of shaft sleeve inner wall construction assembling template
CN203823361U (en) Modularization precast rapid installation outdoor large-screen supporting structure
CN201794305U (en) Supporting device for elevator shaft mold
CN202449171U (en) Construction device based on sectioned pull-in method
CN204386631U (en) A kind of Portable protective net
CN204212791U (en) Driving face Novel front canopy hoisting ring device
CN208869166U (en) Precast stair suspender
CN204510768U (en) A kind of without support operation frame
CN202897816U (en) Steel bar lifting hook
CN202575684U (en) Prefabricated-slab hoisting tool
CN105569326A (en) Handling frame without support and exterior wall construction method thereof
CN203284040U (en) Cement building prefabricated hoisting part
CN206104949U (en) Roof drilling equipment
CN204266584U (en) A kind of steel work circle and ellipse light shaft regularization construction operation platform
CN204848024U (en) Girder steel hoist device for construction
CN212893602U (en) Reinforced block masonry wall assembly construction hoisting structure
CN204418696U (en) Vertical reinforcement spreading lifting assistor
CN218714109U (en) Light steel wall body and floor overall structure that antidetonation type steadiness is strong
CN203420641U (en) Lifting frame for drilling machine
CN204163367U (en) Cat ladder frame operating platform
CN202627980U (en) Simple dowel bracket for drilled hole of electric hammer
CN201297057Y (en) Artificial pole erecting tool
CN205047139U (en) Building outdoor activity cat ladder

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141210

Termination date: 20150825

EXPY Termination of patent right or utility model