CN204212791U - Driving face Novel front canopy hoisting ring device - Google Patents

Driving face Novel front canopy hoisting ring device Download PDF

Info

Publication number
CN204212791U
CN204212791U CN201420636157.9U CN201420636157U CN204212791U CN 204212791 U CN204212791 U CN 204212791U CN 201420636157 U CN201420636157 U CN 201420636157U CN 204212791 U CN204212791 U CN 204212791U
Authority
CN
China
Prior art keywords
steel pipe
adjusting rod
chain
fixedly mounted
angle bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420636157.9U
Other languages
Chinese (zh)
Inventor
高松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420636157.9U priority Critical patent/CN204212791U/en
Application granted granted Critical
Publication of CN204212791U publication Critical patent/CN204212791U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses driving face Novel front canopy hoisting ring device, it relates to underground tunneling roadway application, it comprises steel pipe, nut, adjusting rod, chain, pin, angle bar, suspension ring, one end of steel pipe is provided with nut, adjusting rod is fixedly mounted on the other end of steel pipe, and one end of chain is fixedly mounted on the upper end of adjusting rod by pin, and the other end of chain is fixedly mounted on angle bar, angle bar is arranged on inside one end of steel pipe, and the lower end of adjusting rod is provided with suspension ring.Its reasonable in design, simple to operate, easy to use, when constructing front anchor pole, jumbolter directly according to design attitude construction armature boring, can need not move forestope, not only reduce work operation, improve efficiency, the potential safety hazard that frequent mobile forestope brings can also be eliminated.

Description

Driving face Novel front canopy hoisting ring device
Technical field
The utility model relates to driving face Novel front canopy hoisting ring device, belongs to underground tunneling roadway applied technical field.
Background technology
At present, the forestope of existing anchor guipure rope supported laneway is made up of the 15kg/m track of three L=4m, every root forestope is provided with three metal suspension ring, suspension ring adopt 16mm steel plate and 29U shaped steel to be processed into, and suspension ring are firmly fixed on back anchor pole (be fixed on support anchor rod and expose 30 ~ 40mm rolled thread place).But due to forestope and anchor pole position, front point-blank, so when constructing front anchor pole, forestope must be offset some distances to both sides and could construct armature boring, this brings much inconvenient and potential safety hazards to construction.
Utility model content
For the problems referred to above, the technical problems to be solved in the utility model is to provide driving face Novel front canopy hoisting ring device.
Driving face Novel front canopy hoisting ring device of the present utility model, it comprises steel pipe, nut, adjusting rod, chain, pin, angle bar, suspension ring, one end of steel pipe is provided with nut, adjusting rod is fixedly mounted on the other end of steel pipe, one end of chain is fixedly mounted on the upper end of adjusting rod by pin, the other end of chain is fixedly mounted on angle bar, and angle bar is arranged on inside one end of steel pipe, and the lower end of adjusting rod is provided with suspension ring.
As preferably, the thickness of described steel pipe is 1-10mm.
As preferably, described suspension ring adopt steel pipe and 29U shaped steel to be processed into, and have wear-resisting with feature that is long service life.
The beneficial effects of the utility model: its reasonable in design, simple to operate, easy to use, when constructing front anchor pole, jumbolter directly according to design attitude construction armature boring, can need not move forestope, not only reduce work operation, improve efficiency, the potential safety hazard that frequent mobile forestope brings can also be eliminated.
Accompanying drawing explanation
For ease of illustrating, the utility model is described in detail by following concrete enforcement and accompanying drawing.
Fig. 1 is structural representation of the present utility model;
Fig. 2 is using state structural representation of the present utility model.
1-steel pipe; 2-nut; 3-adjusting rod; 4-chain; 5-pin; 6-angle bar; 7-suspension ring.
Detailed description of the invention
As Fig. 1, shown in Fig. 2, this detailed description of the invention is by the following technical solutions: it comprises steel pipe 1, nut 2, adjusting rod 3, chain 4, pin 5, angle bar 6, suspension ring 7, one end of steel pipe 1 is provided with nut 2, adjusting rod 3 is fixedly mounted on the other end of steel pipe 1, and one end of chain 4 is fixedly mounted on the upper end of adjusting rod 3 by pin 5, and the other end of chain 4 is fixedly mounted on angle bar 6, angle bar 6 is arranged on inside one end of steel pipe 1, and the lower end of adjusting rod 3 is provided with suspension ring 7.
Wherein, the thickness of described steel pipe 1 is 5mm; Described suspension ring 7 adopt steel pipe and 29U shaped steel to be processed into, and have wear-resisting and feature that is long service life.
This detailed description of the invention reasonable in design, simple to operate, easy to use, when constructing front anchor pole, jumbolter directly according to design attitude construction armature boring, can need not move forestope, not only reduce work operation, improve efficiency, the potential safety hazard that frequent mobile forestope brings can also be eliminated.
More than show and describe general principle of the present utility model and principal character and advantage of the present utility model.The technician of the industry should understand; the utility model is not restricted to the described embodiments; what describe in above-described embodiment and manual just illustrates principle of the present utility model; under the prerequisite not departing from the utility model spirit and scope; the utility model also has various changes and modifications, and these changes and improvements all fall within the scope of claimed the utility model.The claimed scope of the utility model is defined by appending claims and equivalent thereof.

Claims (3)

1. driving face Novel front canopy hoisting ring device, it is characterized in that: it comprises steel pipe (1), nut (2), adjusting rod (3), chain (4), pin (5), angle bar (6), suspension ring (7), one end of steel pipe (1) is provided with nut (2), adjusting rod (3) is fixedly mounted on the other end of steel pipe (1), one end of chain (4) is fixedly mounted on the upper end of adjusting rod (3) by pin (5), the other end of chain (4) is fixedly mounted on angle bar (6), angle bar (6) is arranged on inside one end of steel pipe (1), the lower end of adjusting rod (3) is provided with suspension ring (7).
2. driving face Novel front canopy hoisting ring device according to claim 1, is characterized in that: the thickness of described steel pipe (1) is 1-10mm.
3. driving face Novel front canopy hoisting ring device according to claim 1, is characterized in that: described suspension ring (7) adopt steel pipe and 29U shaped steel to be processed into.
CN201420636157.9U 2014-10-30 2014-10-30 Driving face Novel front canopy hoisting ring device Expired - Fee Related CN204212791U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420636157.9U CN204212791U (en) 2014-10-30 2014-10-30 Driving face Novel front canopy hoisting ring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420636157.9U CN204212791U (en) 2014-10-30 2014-10-30 Driving face Novel front canopy hoisting ring device

Publications (1)

Publication Number Publication Date
CN204212791U true CN204212791U (en) 2015-03-18

Family

ID=52981472

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420636157.9U Expired - Fee Related CN204212791U (en) 2014-10-30 2014-10-30 Driving face Novel front canopy hoisting ring device

Country Status (1)

Country Link
CN (1) CN204212791U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106285741A (en) * 2016-10-13 2017-01-04 王玉林 A kind of front canopy hoisting ring
CN108301854A (en) * 2017-12-20 2018-07-20 龙口矿业集团有限公司 Chain type forestope fixed ring

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106285741A (en) * 2016-10-13 2017-01-04 王玉林 A kind of front canopy hoisting ring
CN108301854A (en) * 2017-12-20 2018-07-20 龙口矿业集团有限公司 Chain type forestope fixed ring

Similar Documents

Publication Publication Date Title
CN205294696U (en) Construct small -size traveling hoist
CN204212791U (en) Driving face Novel front canopy hoisting ring device
CN202324567U (en) Moving type large-scale operation platform
CN204371387U (en) A kind of arc hydraulic prop anchor pole
CN204371384U (en) Anchor Agent boost motor
CN204001790U (en) A kind of built with ribbed bricks wall prefabricated construction guide
CN203270439U (en) Prestressed anchorage device used for road and bridge construction
CN204195809U (en) A kind of glass fibre reinforced plastics rockbolts cutting machine
CN204172905U (en) Multistage lifting formula mining cable car
CN204001927U (en) The power transmission steel pipe tower cross-arm handle that strides
CN207761678U (en) A kind of device of the first branch steel arch-shelf shear stability of raising
CN206376889U (en) A kind of new scale formula grouted anchor bar
CN202611105U (en) Fixed end anchor mechanism for steel buildings
CN203096624U (en) Cantilever pouring bridge high-attitude construction bracket
CN202928580U (en) Suspension device of mine laneway laser orientation instrument
CN103683164A (en) Small mobile device used for cable of coal mining machine
CN204123369U (en) Architectural engineering multi-functional hammer
CN205187502U (en) Cable hoisting frame
CN205205790U (en) Hierarchical energy dissipation row of high strength high stability mud -rock flow leads device
CN203114312U (en) Supporting system of prestress anchor bar for mine
CN204716264U (en) A kind of forestope temporary lining
CN204139571U (en) Straddle block formula hitch
CN203813388U (en) Novel head end cable carrying trolley
CN203130132U (en) Top beam of end support assembly comprising double supports
CN202544759U (en) Front canopy type temporary supporting device for anchor pole supporting tunnel construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150318

Termination date: 20151030

EXPY Termination of patent right or utility model