CN204266584U - A kind of steel work circle and ellipse light shaft regularization construction operation platform - Google Patents

A kind of steel work circle and ellipse light shaft regularization construction operation platform Download PDF

Info

Publication number
CN204266584U
CN204266584U CN201420746945.3U CN201420746945U CN204266584U CN 204266584 U CN204266584 U CN 204266584U CN 201420746945 U CN201420746945 U CN 201420746945U CN 204266584 U CN204266584 U CN 204266584U
Authority
CN
China
Prior art keywords
boom
telescopic arm
turntable
construction
operation platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420746945.3U
Other languages
Chinese (zh)
Inventor
于科
张传通
陈玉升
迟靖宜
矫潇
李超
陈前廷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201420746945.3U priority Critical patent/CN204266584U/en
Application granted granted Critical
Publication of CN204266584U publication Critical patent/CN204266584U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a kind of steel work circle and ellipse light shaft regularization construction operation platform, comprise supporting seat, supporting seat is provided with pylon, and pylon upper end is provided with turntable, turntable is connected with boom, boom two ends symmetrical and its in the middle part of be connected with turntable; Boom two ends are provided with guide rail, and guide rail is connected with telescopic arm; The roller that telescopic arm is provided with motor and is driven by motor; Boom and telescopic arm are provided with scaffold floor, and telescopic arm end is provided with the elevating stage of band guardrail.The beneficial effect of this programme can be learnt according to describing of such scheme, structure is simple, reasonable in design, by carrying out regularization design to circular and oval Construction of Steel Structure operating platform, thus improve safety and the operability of Construction of Steel Structure operating platform, increase the utilization rate of construction operation platform with this, and then accelerate speed of application, enhance productivity, reduce costs.

Description

一种钢结构圆形和椭圆型采光井定型化施工操作平台A stereotyped construction operation platform for circular and elliptical lighting wells with steel structure

技术领域 technical field

本实用新型涉及一种圆形和椭圆型采光井施工设备,尤其涉及一种钢结构圆形和椭圆型采光井定型化施工操作平台。 The utility model relates to construction equipment for circular and elliptical lighting wells, in particular to a stereotyped construction operation platform for circular and elliptical lighting wells with steel structures.

背景技术 Background technique

随着我国城市化程度的提升,建筑业发展迅猛,各种建筑造型层出不穷,特别是钢结构造型更是占据大多数。钢结构与目前建筑领域普遍采用的钢筋混凝土结构相比,具有强度高、工程造价低、自重轻、施工周期短和可工厂化制作等优点,如此多优势得到广泛重视并迅速发展,从重大工程、标致性建筑使用钢结构到普通钢结构,呈现出了从未有过的兴旺景象。但钢结构建筑施工由于普遍搭设满堂脚手架做为操作平台并配合汽车吊安装作业,有点占地面积大,增加成本和延长工期的缺点,特别是圆形和椭圆形大面积钢结构采光井更是如此。 With the improvement of the degree of urbanization in our country, the construction industry is developing rapidly, and various architectural shapes emerge in an endless stream, especially the steel structure shapes occupy the majority. Compared with the reinforced concrete structure commonly used in the construction field at present, the steel structure has the advantages of high strength, low engineering cost, light weight, short construction period and factory production, so many advantages have been widely valued and developed rapidly. From major projects , Peugeot buildings use steel structures to ordinary steel structures, presenting a prosperous scene that has never been seen before. However, the construction of steel structure buildings has the disadvantages of large floor area, increased cost and extended construction period due to the widespread use of scaffolding as an operating platform and the installation of truck cranes, especially for circular and oval large-area steel structure lighting wells. in this way.

实用新型内容 Utility model content

本实用新型是针对现有技术所存在的不足,而提供了一种结构简单、设计合理,能加快施工速度,提高生产效率,降低成本的钢结构圆形和椭圆型采光井定型化施工操作平台。 The utility model aims at the deficiencies in the prior art, and provides a steel structure circular and elliptical lighting well stereotyped construction operation platform with simple structure and reasonable design, which can speed up the construction speed, improve the production efficiency and reduce the cost. .

为了实现上述目的,本实用新型提供了一种钢结构圆形和椭圆型采光井定型化施工操作平台,包括支撑座,所述支撑座设置有塔架,所述塔架上端设置有转台,所述转台连接有起重臂,所述起重臂两端对称且其中部与所述转台连接;所述起重臂两端均设置有导轨,所述导轨连接有伸缩臂;所述伸缩臂设置有电动机和由所述电动机驱动的滚轮;所述起重臂和伸缩臂设置有脚手板。 In order to achieve the above purpose, the utility model provides a circular and elliptical steel structure lighting well stereotyped construction operation platform, including a support base, the support base is provided with a tower, and the upper end of the tower is provided with a turntable, so The turntable is connected with a boom, and the two ends of the boom are symmetrical and the middle part is connected with the turntable; both ends of the boom are provided with guide rails, and the guide rails are connected with a telescopic arm; the telescopic arm is set There are electric motors and rollers driven by the electric motors; the lifting arm and the telescopic arm are provided with scaffolding boards.

进一步地,所述伸缩臂端部设置有带护栏的升降台。 Further, the end of the telescopic arm is provided with a lifting platform with guardrails.

组装时,先在圆形和椭圆型采光井底部的中心设置支撑座,接缝处满焊焊接形成井字型钢基座;再将事先加工好的塔架标准节用高强度螺栓组装起来,在塔架顶端安装转台和起重臂;施工时,采光井最高处的施工位置,施工人员直接站在伸缩臂的端部的升降台上进行操作,并通过转台调整施工位置。 When assembling, first set the supporting seat at the center of the bottom of the circular and elliptical lighting well, and weld the joints to form a well-shaped steel base; then assemble the pre-processed tower standard section with high-strength bolts, A turntable and a jib are installed on the top of the tower; during construction, at the highest construction position of the lighting shaft, the construction personnel directly stand on the lifting platform at the end of the telescopic arm to operate, and adjust the construction position through the turntable.

本方案的有益效果可根据对上述方案的叙述得知,结构简单,设计合理,不需要搭建满堂脚手架,大大节省了时间和材料;通过对圆形及椭圆形钢结构施工操作平台进行定型化设计,从而提高了钢结构施工操作平台的安全性及可操作性,以此增加施工操作平台的利用率,进而加快施工速度,提高生产效率,降低成本。起重臂两端对称,不但平衡了重量而且能够两端同时工作。设置伸缩臂,以方便椭圆形采光井的施工。设置防护栏和脚手板,以便工作人员施工和行走。伸缩臂端部设置升降台,有利于在扩展施工人员的纵向工作空间。 The beneficial effect of this scheme can be known from the description of the above scheme. The structure is simple, the design is reasonable, and there is no need to build a full house of scaffolding, which greatly saves time and materials; through the finalized design of the circular and oval steel structure construction operation platform , thereby improving the safety and operability of the steel structure construction operation platform, thereby increasing the utilization rate of the construction operation platform, thereby speeding up the construction speed, improving production efficiency and reducing costs. Both ends of the boom are symmetrical, which not only balances the weight but also enables both ends to work at the same time. Set the telescopic arm to facilitate the construction of the oval lighting well. Set up guardrails and scaffolding to facilitate construction and walking of the staff. A lifting platform is set at the end of the telescopic boom, which is beneficial to expand the vertical working space of the construction personnel.

附图说明 Description of drawings

图1为本实用新型具体实施方式的结构示意图; Fig. 1 is the structural representation of the specific embodiment of the utility model;

图中,1、支撑座;2、塔架;3、转台;4、起重臂;5、伸缩臂;6、护栏;7、升降台。 In the figure, 1. Support base; 2. Tower; 3. Turntable; 4. Lifting arm; 5. Telescopic arm; 6. Guardrail; 7. Lifting platform.

具体实施方式 Detailed ways

为能清楚说明本方案的技术特点,下面通过具体实施方式,对本方案进行阐述。 In order to clearly illustrate the technical features of the solution, the solution will be described below through specific implementation modes.

如图1所示,本实用新型是一种钢结构圆形和椭圆型采光井定型化施工操作平台,包括支撑座1,支撑座1设置有塔架2,塔架2上端设置有转台3,转台3连接有起重臂4,起重臂4两端对称且其中部与转台3连接;起重臂4两端均设置有导轨,导轨连接有伸缩臂5;伸缩臂5设置有电动机和由电动机驱动的滚轮;起重臂4和伸缩臂5设置有脚手板,伸缩臂5端部设置有带护栏6的升降台7。 As shown in Figure 1, the utility model is a steel structure circular and elliptical lighting well stereotyped construction operation platform, including a support base 1, the support base 1 is provided with a tower frame 2, and the upper end of the tower frame 2 is provided with a turntable 3, The turntable 3 is connected with a boom 4, the two ends of the boom 4 are symmetrical and the middle part is connected with the turntable 3; both ends of the boom 4 are provided with guide rails, and the guide rails are connected with a telescopic arm 5; the telescopic boom 5 is provided with a motor and Motor-driven rollers; the boom 4 and telescopic arm 5 are provided with a scaffolding board, and the end of the telescopic arm 5 is provided with a lifting platform 7 with a guardrail 6.

组装时,先在圆形和椭圆型采光井底部的中心设置支撑座1,接缝处满焊焊接形成井字型钢基座;再将事先加工好的塔架2标准节用高强度螺栓组装起来,在塔架2顶端安装转台3和起重臂4;施工时,采光井最高处的施工位置,施工人员直接站在伸缩臂5的端部的升降台7上进行操作,并通过转台3调整施工位置。 When assembling, first set the support base 1 at the center of the bottom of the circular and elliptical lighting well, and weld the joints to form a well-shaped steel base; then assemble the pre-processed tower 2 standard sections with high-strength bolts , the turntable 3 and the boom 4 are installed on the top of the tower 2; during construction, at the construction position of the highest part of the lighting shaft, the construction personnel directly stand on the lifting platform 7 at the end of the telescopic arm 5 to operate, and adjust it through the turntable 3 Construction location.

本实用新型未经描述的技术特征能够通过或采用现有技术实现,在此不再赘述,当然,上述说明并非是对本实用新型的限制,本实用新型也并不仅限于上述举例,本技术领域的普通技术人员在本实用新型的实质范围内所做出的变化、改型、添加或替换,也应属于本实用新型的保护范围。 The undescribed technical features of the utility model can be realized by or adopting the prior art, and will not be repeated here. Of course, the above description is not a limitation of the utility model, and the utility model is not limited to the above examples. Changes, modifications, additions or substitutions made by ordinary skilled persons within the essential scope of the present utility model shall also belong to the protection scope of the present utility model.

Claims (2)

1. steel work circle and an ellipse light shaft regularization construction operation platform, comprise supporting seat, described supporting seat is provided with pylon, described pylon upper end is provided with turntable, described turntable is connected with boom, it is characterized in that, described boom two ends symmetrical and its in the middle part of be connected with described turntable; Described boom two ends are provided with guide rail, and described guide rail is connected with telescopic arm; The roller that described telescopic arm is provided with motor and is driven by described motor; Described boom and telescopic arm are provided with scaffold floor.
2. steel work circle according to claim 1 and ellipse light shaft regularization construction operation platform, it is characterized in that, described telescopic arm end is provided with the elevating stage of band guardrail.
CN201420746945.3U 2014-12-03 2014-12-03 A kind of steel work circle and ellipse light shaft regularization construction operation platform Expired - Fee Related CN204266584U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420746945.3U CN204266584U (en) 2014-12-03 2014-12-03 A kind of steel work circle and ellipse light shaft regularization construction operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420746945.3U CN204266584U (en) 2014-12-03 2014-12-03 A kind of steel work circle and ellipse light shaft regularization construction operation platform

Publications (1)

Publication Number Publication Date
CN204266584U true CN204266584U (en) 2015-04-15

Family

ID=52801456

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420746945.3U Expired - Fee Related CN204266584U (en) 2014-12-03 2014-12-03 A kind of steel work circle and ellipse light shaft regularization construction operation platform

Country Status (1)

Country Link
CN (1) CN204266584U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106081948A (en) * 2016-08-18 2016-11-09 无锡石油化工起重机有限公司 Tower crane with lift unmanned plane airplane parking area

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106081948A (en) * 2016-08-18 2016-11-09 无锡石油化工起重机有限公司 Tower crane with lift unmanned plane airplane parking area

Similar Documents

Publication Publication Date Title
CN105735140B (en) An aerial work platform device on the side of a bridge
CN206408952U (en) A kind of construction adhesion type lifts discharging platform
CN106698208A (en) Hoisting equipment and hoisting method for external transportation of super high-rise building
CN202299574U (en) Plug-in type communication base station lifting tower
CN206562264U (en) A kind of hanging device for transport outside high-rise building
CN204625045U (en) A kind of steel structure hoisting door shaped stent formula hanging apparatus
CN205527400U (en) Lifting mechanism
CN104291222B (en) The inner hard protection of a kind of high-rise building Core Walls Structure hangs integrated system with row
CN202882375U (en) Elevator shaftway tool type scaffold operation platform
CN202729645U (en) Tower crane with elevator
CN204802839U (en) Jacking equipment for building
CN203867198U (en) Slip equipment for high-rise steel structure transfer layer truss
CN204938802U (en) For the rail supported system of tower crane
CN103359625A (en) Automatic construction equipment for building hoisting and platform elevating of new rural construction
CN207608234U (en) A kind of assembly type curtain wall hanging apparatus
CN102733612B (en) Mounting method of electric hoist orbit
CN105366559A (en) Small hoisting machine fixed on channel steel framework
CN201722937U (en) Sliding platform for installation of net rack
CN206784891U (en) A kind of prefabricated hoistway operation platform
CN204823735U (en) Crane girder structure
CN203924695U (en) A kind of indirect cool tower mould-lifting device
CN103821339B (en) Operation platform modular unit and operation platform thereof
CN204418626U (en) A kind of circular arc ceiling gallery construction movable Scaffold
CN204626923U (en) A kind of lifting being applicable to climbing frame base turns to girder steel
CN205151577U (en) Fix small -size hoisting machine on steel support of groove

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150415