CN204266584U - A kind of steel work circle and ellipse light shaft regularization construction operation platform - Google Patents

A kind of steel work circle and ellipse light shaft regularization construction operation platform Download PDF

Info

Publication number
CN204266584U
CN204266584U CN201420746945.3U CN201420746945U CN204266584U CN 204266584 U CN204266584 U CN 204266584U CN 201420746945 U CN201420746945 U CN 201420746945U CN 204266584 U CN204266584 U CN 204266584U
Authority
CN
China
Prior art keywords
boom
telescopic arm
turntable
operation platform
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420746945.3U
Other languages
Chinese (zh)
Inventor
于科
张传通
陈玉升
迟靖宜
矫潇
李超
陈前廷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201420746945.3U priority Critical patent/CN204266584U/en
Application granted granted Critical
Publication of CN204266584U publication Critical patent/CN204266584U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a kind of steel work circle and ellipse light shaft regularization construction operation platform, comprise supporting seat, supporting seat is provided with pylon, and pylon upper end is provided with turntable, turntable is connected with boom, boom two ends symmetrical and its in the middle part of be connected with turntable; Boom two ends are provided with guide rail, and guide rail is connected with telescopic arm; The roller that telescopic arm is provided with motor and is driven by motor; Boom and telescopic arm are provided with scaffold floor, and telescopic arm end is provided with the elevating stage of band guardrail.The beneficial effect of this programme can be learnt according to describing of such scheme, structure is simple, reasonable in design, by carrying out regularization design to circular and oval Construction of Steel Structure operating platform, thus improve safety and the operability of Construction of Steel Structure operating platform, increase the utilization rate of construction operation platform with this, and then accelerate speed of application, enhance productivity, reduce costs.

Description

A kind of steel work circle and ellipse light shaft regularization construction operation platform
Technical field
The utility model relates to a kind of circular and ellipse light shaft construction equipment, particularly relates to a kind of steel work circle and ellipse light shaft regularization construction operation platform.
Background technology
Along with the lifting of Chinese Urbanization degree, construction industry development is swift and violent, and various architectural image emerges in an endless stream, and particularly steel work moulding occupies great majority especially.Compared with the reinforced concrete structure that steel work and current building field generally adopt, have that intensity is high, construction costs is low, from heavy and light, short construction period and can the advantage such as batch production making, so many advantage earns widespread respect and develops rapidly, use steel work to normal steel structure from Important Project, beautiful property building, present the prosperous scene had no precedent.But steel building construction coordinates mobile crane installation exercise owing to generally setting up full hall scaffold as operating platform, has a floor space large, increase cost and extend the shortcoming of duration, particularly circular and oval large steel space truss light shaft is all the more so.
Utility model content
The utility model is for the deficiency existing for prior art, and it is simple, reasonable in design to provide a kind of structure, can accelerate speed of application, enhances productivity, the steel work circle reduced costs and ellipse light shaft regularization construction operation platform.
To achieve these goals, the utility model provides a kind of steel work circle and ellipse light shaft regularization construction operation platform, comprise supporting seat, described supporting seat is provided with pylon, described pylon upper end is provided with turntable, described turntable is connected with boom, described boom two ends symmetrical and its in the middle part of be connected with described turntable; Described boom two ends are provided with guide rail, and described guide rail is connected with telescopic arm; The roller that described telescopic arm is provided with motor and is driven by described motor; Described boom and telescopic arm are provided with scaffold floor.
Further, described telescopic arm end is provided with the elevating stage of band guardrail.
During assembling, the center first bottom circle and ellipse light shaft arranges supporting seat, and the welding of seam crossing full weld forms intersecting parallels base steel seat; Again the pylon standard knot high-strength bolt processed in advance is assembled, on pylon top, turntable and boom are installed; During construction, the construction location of light shaft highest point, constructor stands directly on the enterprising line operate of elevating stage of the end of telescopic arm, and adjusts construction location by turntable.
The beneficial effect of this programme can be learnt according to describing of such scheme, and structure is simple, reasonable in design, does not need to build full hall scaffold, greatly saves time and materials; By carrying out regularization design to circular and oval Construction of Steel Structure operating platform, thus improve safety and the operability of Construction of Steel Structure operating platform, increase the utilization rate of construction operation platform with this, and then accelerate speed of application, enhance productivity, reduce costs.Boom two ends are symmetrical, not only balance weight but also can work at two ends simultaneously.Telescopic arm is set, to facilitate the construction of oval light shaft.Protective guard and scaffold floor are set, so that staff's construction and walking.Telescopic arm end arranges elevating stage, is conducive to the longitudinal working space expansion construction personnel.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model detailed description of the invention;
In figure, 1, supporting seat; 2, pylon; 3, turntable; 4, boom; 5, telescopic arm; 6, guardrail; 7, elevating stage.
Detailed description of the invention
For the technical characterstic of this programme can be clearly demonstrated, below by detailed description of the invention, this programme is set forth.
As shown in Figure 1, the utility model is a kind of steel work circle and ellipse light shaft regularization construction operation platform, comprises supporting seat 1, supporting seat 1 is provided with pylon 2, pylon 2 upper end is provided with turntable 3, and turntable 3 is connected with boom 4, boom 4 two ends symmetrical and its in the middle part of be connected with turntable 3; Boom 4 two ends are provided with guide rail, and guide rail is connected with telescopic arm 5; The roller that telescopic arm 5 is provided with motor and is driven by motor; Boom 4 and telescopic arm 5 are provided with scaffold floor, and telescopic arm 5 end is provided with the elevating stage 7 of band guardrail 6.
During assembling, the center first bottom circle and ellipse light shaft arranges supporting seat 1, and the welding of seam crossing full weld forms intersecting parallels base steel seat; Again the pylon 2 standard knot high-strength bolt processed in advance is assembled, on pylon 2 top, turntable 3 and boom 4 are installed; During construction, the construction location of light shaft highest point, constructor stands directly on the enterprising line operate of elevating stage 7 of the end of telescopic arm 5, and adjusts construction location by turntable 3.
The utility model can pass through without the technical characteristic described or adopt existing techniques in realizing; do not repeat them here; certainly; above-mentioned explanation is not to restriction of the present utility model; the utility model is also not limited in above-mentioned citing; the change that those skilled in the art make in essential scope of the present utility model, remodeling, interpolation or replacement, also should belong to protection domain of the present utility model.

Claims (2)

1. steel work circle and an ellipse light shaft regularization construction operation platform, comprise supporting seat, described supporting seat is provided with pylon, described pylon upper end is provided with turntable, described turntable is connected with boom, it is characterized in that, described boom two ends symmetrical and its in the middle part of be connected with described turntable; Described boom two ends are provided with guide rail, and described guide rail is connected with telescopic arm; The roller that described telescopic arm is provided with motor and is driven by described motor; Described boom and telescopic arm are provided with scaffold floor.
2. steel work circle according to claim 1 and ellipse light shaft regularization construction operation platform, it is characterized in that, described telescopic arm end is provided with the elevating stage of band guardrail.
CN201420746945.3U 2014-12-03 2014-12-03 A kind of steel work circle and ellipse light shaft regularization construction operation platform Expired - Fee Related CN204266584U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420746945.3U CN204266584U (en) 2014-12-03 2014-12-03 A kind of steel work circle and ellipse light shaft regularization construction operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420746945.3U CN204266584U (en) 2014-12-03 2014-12-03 A kind of steel work circle and ellipse light shaft regularization construction operation platform

Publications (1)

Publication Number Publication Date
CN204266584U true CN204266584U (en) 2015-04-15

Family

ID=52801456

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420746945.3U Expired - Fee Related CN204266584U (en) 2014-12-03 2014-12-03 A kind of steel work circle and ellipse light shaft regularization construction operation platform

Country Status (1)

Country Link
CN (1) CN204266584U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106081948A (en) * 2016-08-18 2016-11-09 无锡石油化工起重机有限公司 Tower crane with lift unmanned plane airplane parking area

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106081948A (en) * 2016-08-18 2016-11-09 无锡石油化工起重机有限公司 Tower crane with lift unmanned plane airplane parking area

Similar Documents

Publication Publication Date Title
CN202299574U (en) Plug-in type communication base station lifting tower
CN204342297U (en) A kind of transfer crane with jib structure
CN203794533U (en) Light portable mobile lifting equipment
CN204266584U (en) A kind of steel work circle and ellipse light shaft regularization construction operation platform
CN201809960U (en) Platform for overhung scaffold of net bracket structure
CN202324567U (en) Moving type large-scale operation platform
CN204224128U (en) A kind of safe tower crane
CN204873680U (en) Portable portable building lifting machine device
CN203889839U (en) Construction hoist for buildings
CN203461720U (en) Simple cantilever hoisting machine
CN201722937U (en) Sliding platform for installation of net rack
CN104355238A (en) Portal crane with jib structure
CN204265347U (en) Minor crane
CN204384733U (en) Bus plug-in strip Lift-on/Lift-off System
CN206844614U (en) A kind of external wall construction construction platform
CN202897730U (en) Tilting type freight ladder capable of adjusting angle
CN202787930U (en) Hanging basket for high-place operations
CN204418626U (en) A kind of circular arc ceiling gallery construction movable Scaffold
CN204310718U (en) Single girder gantry crane
CN203269430U (en) Hoisting equipment for high-rise building stand pipe
CN104003264A (en) Construction hoist for building
CN104891371A (en) Portable and movable building hoist device
CN203795817U (en) Multifunctional reinforcement tying platform
CN202575754U (en) High-altitude hoisting movable hanging bracket for secondary truss of space pipe truss structure
CN204012445U (en) Scissors crossing ladder

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150415

CF01 Termination of patent right due to non-payment of annual fee