CN204001308U - A kind of metal decking unit curtain wall system - Google Patents

A kind of metal decking unit curtain wall system Download PDF

Info

Publication number
CN204001308U
CN204001308U CN201420382108.7U CN201420382108U CN204001308U CN 204001308 U CN204001308 U CN 204001308U CN 201420382108 U CN201420382108 U CN 201420382108U CN 204001308 U CN204001308 U CN 204001308U
Authority
CN
China
Prior art keywords
metal decking
curtain wall
wall system
horizontal secondary
unit curtain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420382108.7U
Other languages
Chinese (zh)
Inventor
古铁山
王生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GOLDEN CURTAIN WALL GROUP Co Ltd
Original Assignee
GOLDEN CURTAIN WALL GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GOLDEN CURTAIN WALL GROUP Co Ltd filed Critical GOLDEN CURTAIN WALL GROUP Co Ltd
Priority to CN201420382108.7U priority Critical patent/CN204001308U/en
Application granted granted Critical
Publication of CN204001308U publication Critical patent/CN204001308U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of metal decking unit curtain wall system, comprise metal decking, the vertical some columns that arrange and be erected at some crossbeams of horizontally set between column, each metal decking is provided with some horizontal secondary joists parallel to each other, on each horizontal secondary joist, is equipped with the hitch assembly that can be fixed on crossbeam.This metal decking unit curtain wall system all arranges the hitch assembly of horizontal secondary joist and fixed lateral secondary joist and crossbeam on each metal decking, thereby can before metal decking is installed, carry out pre-assembled to metal decking and horizontal secondary joist, then by integral hoisting, metal decking is fast installed, and this curtain wall system structure can more conveniently safeguard and change each metal decking, this utility model is for building curtain wall field.

Description

A kind of metal decking unit curtain wall system
Technical field
The utility model relates to building curtain wall field, particularly relates to a kind of metal decking unit curtain wall system.
Background technology
Nowadays the outer curtain wall of increasing heavy construction adopts metal decking, and this best embodies modern sense, the science and technology sense of building, and the moulding of metal decking curtain wall is complicated and changeable, is also easy to realize the complicated appearance of building.
General aluminum facade is to be provided with flanging at aluminium sheet edge, with self-plugging rivet, L shaped aluminium corner code is fixed on aluminium sheet flanging, or arranges secondary frame in aluminium sheet surrounding in factory, uses the modes such as welding screw, structure glue that it is connected with aluminium sheet.And whole metal decking unit is directly fixing by screw, or be fixed on curtain skeleton by the annex such as briquetting, secondary frame.In traditional aluminum facade system, aluminium sheet four limits all need there being keel steelframe, as run into the requirement of irregular outward appearance lattice, the keel steel using amount needing is just large, and needs a large amount of Site Welding constructions, is unfavorable for effective utilization of material, cost is higher, and keel welding precision is difficult to ensure.Common aluminum facade generally adopts the on-the-spot splicing of separate panels to install, can not the integral hoisting of forming unit plate, and installation work is loaded down with trivial details, consuming time longer, and cannot ensure globality and the planeness of curved surface curtain wall.When the on-the-spot installation of aluminum facade, how to carry out construction operation in outside, this is for highrise building, super highrise building, not only difficulty of construction is large, dangerous high, and after the utmost point is unfavorable for that engineering comes into operation, curtain wall is keeped in repair and panel is changed, the above technical disadvantages of metal decking cell curtain wall, all urgently improves and improves.
Utility model content
For addressing the above problem, the utility model provides one can facilitate integral hoisting to install, the metal decking unit curtain wall system of conveniently keep in repair, panel being changed.
The utility model solves the technical scheme that its technical problem adopts:
A kind of metal decking unit curtain wall system, comprise metal decking, the vertical some columns that arrange and be erected at some crossbeams of horizontally set between column, each metal decking is provided with some horizontal secondary joists parallel to each other, on each horizontal secondary joist, is equipped with the hitch assembly that can be fixed on crossbeam.
Be further used as the improvement of technical solutions of the utility model, metal decking is made Mitsubishi's cone by a panel bending, and metal decking is triangle along the cross section of horizontal secondary joist direction.
Be further used as the improvement of technical solutions of the utility model, laterally the length of secondary joist is less than the cross-sectional length of horizontal secondary joist installation site metal decking, the two ends that are positioned at horizontal secondary joist on metal decking are provided with flanging, between the end face of flanging and metal decking, are fixed by welding.
Be further used as the improvement of technical solutions of the utility model, on two adjacent metal deckings, between two adjacent horizontal secondary joists, be provided with fastening bolt.
Be further used as the improvement of technical solutions of the utility model, hitch assembly comprises the U-shaped Piece hanging holder being fixed on crossbeam and is fixed on the aluminium alloys suspension member on horizontal secondary joist, aluminium alloys suspension member is provided with hanging groove, be provided with and articulate screw rod through the dual-side of U-shaped Piece hanging holder, aluminium alloys suspension member hang on and articulates on screw rod, articulate screw rod through the horizontal slotted hole that is positioned at U-shaped Piece hanging holder both sides, and lock by clamp nut, aluminium alloys suspension member is provided with screwed hole, can setting height(from bottom) adjusting bolt penetrate aluminium alloys suspension member and push up to articulating screw rod.
Be further used as the improvement of technical solutions of the utility model, the two adjacent metal deckings that are positioned at same level height are spliced into a parallelogram sturcutre each other.
Be further used as the improvement of technical solutions of the utility model, between two adjacent columns, be provided with splash guard.
Be further used as the improvement of technical solutions of the utility model, be also provided with it by the square tube connector being welded to connect along the short transverse of column, the both sides of square tube connector are provided with steel angle hitch, and the termination of crossbeam is fixed on steel angle hitch.
The beneficial effects of the utility model: this metal decking unit curtain wall system all arranges the hitch assembly of horizontal secondary joist and fixed lateral secondary joist and crossbeam on each metal decking, thereby can before metal decking is installed, carry out pre-assembled to metal decking and horizontal secondary joist, then by integral hoisting, metal decking is fast installed, and this curtain wall system structure can more conveniently be safeguarded and change each metal decking.
Brief description of the drawings
Below in conjunction with accompanying drawing, the utility model is described in further detail:
Fig. 1 is the utility model embodiment overall structure schematic diagram;
Fig. 2 is a cross-sectional structural representation in keel place wherein on the utility model embodiment metal decking;
Fig. 3 is another cross-sectional structural representation in keel place on the utility model embodiment metal decking;
Fig. 4 is the utility model embodiment hitch assembly perspective view;
Fig. 5 is the utility model embodiment hitch assembly structural front view.
Detailed description of the invention
With reference to Fig. 1~Fig. 5, the utility model is a kind of metal decking unit curtain wall system, comprise metal decking 3, the vertical some columns 1 that arrange and be erected at some crossbeams 2 of horizontally set between column 1, each metal decking 3 is provided with some horizontal secondary joists 4 parallel to each other, on each horizontal secondary joist 4, is equipped with the hitch assembly 5 that can be fixed on crossbeam 2.
This metal decking unit curtain wall system all arranges the hitch assembly 5 of horizontal secondary joist 4 and fixed lateral secondary joist 4 and crossbeam 2 on each metal decking 3, thereby can before metal decking 3 is installed, carry out pre-assembled to metal decking 3 and horizontal secondary joist 4, then by integral hoisting, metal decking 3 is fast installed, and this curtain wall system structure can more conveniently be safeguarded and change each metal decking 3.
As the utility model preferred embodiment, metal decking 3 is made Mitsubishi's cone by a panel bending, and metal decking 3 is triangle along the cross section of horizontal secondary joist 4 directions.
As the utility model preferred embodiment, the two adjacent metal deckings 3 that are positioned at same level height are spliced into a parallelogram sturcutre each other.
Metal decking 3 in this metal decking unit curtain wall system is bent into Mitsubishi's wimble structure, and the metal decking 3 of Mitsubishi's wimble structure can conveniently fixedly form numerous shapes by being affiliated on crossbeam 2, thereby meets the multifarious requirement of unit curtain wall system outward appearance.
By being assembled into parallelogram, the metal decking of Mitsubishi's wimble structure 3 can meet the requirement of the curtain wall system of prevailing facade structures.Certainly, the structure of the triangle metal panel 3 of this curtain wall system also can be made simple change, is conveniently assembled into needed multiple abnormally-structured.
As the utility model preferred embodiment, laterally the length of secondary joist 4 is less than the cross-sectional length of horizontal secondary joist 4 installation site metal deckings 3, the two ends that are positioned at horizontal secondary joist 4 on metal decking 3 are provided with flanging 31, between the end face of flanging 31 and metal decking 3, are fixed by welding.
Metal decking 3 is aluminium alloy panel, two side positions at metal decking 3 arrange flanging 31, can be by welding between flanging 31 and the two ends of horizontal secondary joist 4, form curtain wall slab unit, thereby can form the curtain wall slab unit that can directly lift or directly change install hitch assembly 5 on horizontal secondary joist 4 after.
As the utility model preferred embodiment, on two adjacent metal deckings 3, two 4 adjacent of horizontal secondary joists are provided with fastening bolt 32.
Two 4 adjacent of horizontal secondary joists connect termination by fastening bolt 32, can the integrally-built stability of enhancement unit curtain wall system.
As the utility model preferred embodiment, hitch assembly 5 comprises the U-shaped Piece hanging holder 51 being fixed on crossbeam 2 and is fixed on the aluminium alloys suspension member 52 on horizontal secondary joist 4, aluminium alloys suspension member 52 is provided with hanging groove 53, be provided with and articulate screw rod 54 through the dual-side of U-shaped Piece hanging holder 51, aluminium alloys suspension member 52 hang on and articulates on screw rod 54, articulate screw rod 54 through the horizontal slotted hole that is positioned at U-shaped Piece hanging holder 51 both sides, and lock by clamp nut 55, aluminium alloys suspension member 52 is provided with screwed hole, can setting height(from bottom) adjusting bolt 56 penetrate aluminium alloys suspension member 52 and push up to articulating screw rod 54.
In the integral hoisting installation and repair and replacement process of metal decking 3, hitch assembly 5 has been simplified the fixed form of metal decking 3, can facilitate fastening installation, also can conveniently carry out dismounting and change.
Metal decking 3 hangs over to articulate on screw rod 54 by aluminium alloys suspension member 52 metal decking 3 is fixed, can be by regulating hanging groove 53, height adjustment bolt 56 relatively to articulate the position of screw rod 54, height is carried out in the installation site of metal decking 3 to be regulated, regulate along level turnover direction with respect to U-shaped Piece hanging holder 51 by articulating screw rod 54, and be adjusted to after correct position, lock the clamp nut 55 of U-shaped Piece hanging holder 51 both sides and realize fixing.
As the utility model preferred embodiment, two 1 adjacent, columns are provided with splash guard 6.
Metal decking 3 is positioned at the outside of unit curtain wall system, and splash guard 6 is positioned at the indoor of cell curtain wall curtain wall system, and the installation process of splash guard 6 is simple, and can play waterproof action to unit curtain wall system.
As the utility model preferred embodiment, be also provided with it by the square tube connector 11 being welded to connect along the short transverse of column 1, the both sides of square tube connector 11 are provided with steel angle hitch 12, and the termination of crossbeam 2 is fixed on steel angle hitch 12.
Crossbeam 2 by set up on steel angle hitch 12 realize with column 1 between fix, this sets up mode and can be conveniently the angle between two adjacent crossbeam 2 and crossbeam 2 and columns 1 be adjusted, thereby is more conducive to the diversified setting of metal decking unit curtain wall system outward appearance.
Certainly, the utility model is created and is not limited to above-mentioned embodiment, those of ordinary skill in the art also can make equivalent variations or replacement under the prerequisite without prejudice to the utility model spirit, and the modification that these are equal to or replacement are all included in the application's claim limited range.

Claims (8)

1. a metal decking unit curtain wall system, it is characterized in that: comprise metal decking (3), the vertical some columns (1) that arrange and be erected at some crossbeams (2) of horizontally set between described column (1), each described metal decking (3) is provided with some horizontal secondary joists (4) parallel to each other, is equipped with the hitch assembly (5) that can be fixed on crossbeam (2) on each described horizontal secondary joist (4).
2. metal decking unit curtain wall system according to claim 1, is characterized in that: described metal decking (3) is made Mitsubishi's cone by a panel bending, and described metal decking (3) is triangle along the cross section of horizontal secondary joist (4) direction.
3. metal decking unit curtain wall system according to claim 2, it is characterized in that: the length of described horizontal secondary joist (4) is less than the cross-sectional length of horizontal secondary joist (4) installation site metal decking (3), the two ends that are positioned at horizontal secondary joist (4) on described metal decking (3) are provided with flanging (31), between the end face of described flanging (31) and metal decking (3), are fixed by welding.
4. according to the metal decking unit curtain wall system described in any one in claim 1~3, it is characterized in that: between the upper two adjacent horizontal secondary joists (4) of two adjacent described metal deckings (3), be provided with fastening bolt (32).
5. according to the metal decking unit curtain wall system described in any one in claim 1~3, it is characterized in that: described hitch assembly (5) comprises the U-shaped Piece hanging holder (51) being fixed on crossbeam (2) and is fixed on the aluminium alloys suspension member (52) on horizontal secondary joist (4), described aluminium alloys suspension member (52) is provided with hanging groove (53), be provided with and articulate screw rod (54) through the dual-side of U-shaped Piece hanging holder (51), described aluminium alloys suspension member (52) hang on and articulates on screw rod (54), the described screw rod (54) that articulates is through the horizontal slotted hole that is positioned at U-shaped Piece hanging holder (51) both sides, and by clamp nut (55) locking, described aluminium alloys suspension member (52) is provided with screwed hole, can setting height(from bottom) adjusting bolt (56) penetrate aluminium alloys suspension member (52) and push up to articulating screw rod (54).
6. according to the metal decking unit curtain wall system described in claim 2 or 3, it is characterized in that: the two adjacent described metal deckings (3) that are positioned at same level height are spliced into a parallelogram sturcutre each other.
7. according to the metal decking unit curtain wall system described in any one in claim 1~3, it is characterized in that: between two adjacent described columns (1), be provided with splash guard (6).
8. according to the metal decking unit curtain wall system described in any one in claim 1~3, it is characterized in that: be also provided with it by the square tube connector (11) being welded to connect along the short transverse of described column (1), the both sides of described square tube connector (11) are provided with steel angle hitch (12), and the termination of described crossbeam (2) is fixed on steel angle hitch (12).
CN201420382108.7U 2014-07-10 2014-07-10 A kind of metal decking unit curtain wall system Withdrawn - After Issue CN204001308U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420382108.7U CN204001308U (en) 2014-07-10 2014-07-10 A kind of metal decking unit curtain wall system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420382108.7U CN204001308U (en) 2014-07-10 2014-07-10 A kind of metal decking unit curtain wall system

Publications (1)

Publication Number Publication Date
CN204001308U true CN204001308U (en) 2014-12-10

Family

ID=52041331

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420382108.7U Withdrawn - After Issue CN204001308U (en) 2014-07-10 2014-07-10 A kind of metal decking unit curtain wall system

Country Status (1)

Country Link
CN (1) CN204001308U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104120811A (en) * 2014-07-10 2014-10-29 金刚幕墙集团有限公司 Metal panel unitized curtain wall system
CN108442588A (en) * 2018-04-02 2018-08-24 武汉凌云建筑装饰工程有限公司 The design method of irregular stereo polygonal element curtain wall

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104120811A (en) * 2014-07-10 2014-10-29 金刚幕墙集团有限公司 Metal panel unitized curtain wall system
CN108442588A (en) * 2018-04-02 2018-08-24 武汉凌云建筑装饰工程有限公司 The design method of irregular stereo polygonal element curtain wall
CN108442588B (en) * 2018-04-02 2020-11-10 武汉凌云建筑装饰工程有限公司 Method for designing special-shaped three-dimensional polygonal unit curtain wall

Similar Documents

Publication Publication Date Title
CN2832995Y (en) Suspension scaffold supporting device of light hanging type brandreth
CN102493622B (en) Wallboard installing component
CN104120811B (en) A kind of metal decking unit curtain wall system
CN104963407A (en) Building structure and construction method thereof
CN102979312B (en) Indoor aluminum honeycomb board suspended ceiling reverse installation technology
CN204781452U (en) Section bar and possess framework of this section bar
CN204001308U (en) A kind of metal decking unit curtain wall system
CN201381570Y (en) Articulated curtain wall
CN204139322U (en) A kind of glass sunlight house
CN204475513U (en) A kind of building structure
CN105821964A (en) Aluminum alloy section
CN103669675A (en) Connecting device for suspended ceiling
WO2020143222A1 (en) Fabricated suspended ceiling structure and installation method therefor
CN203867040U (en) Suspended ceiling side keel component
CN206245552U (en) A kind of plug-in Pierced Aluminum Plank connecting member system of glass curtain wall
CN203795589U (en) Integrated house based on lightweight steel construction
CN216552593U (en) Mounting structure of outer facade aluminum plate big lines
CN206753015U (en) One kind decoration rearmounted wall-connecting piece device of scaffold
CN106013558B (en) A kind of mounting connection structure and installation method of GRC Side fascias complex region
JP3159980U (en) Metal support beam
CN205421619U (en) Cross wall plate structure of steel construction factory building
CN204781366U (en) Basis post connection structure
CN203769149U (en) Decorative curtain wall system with cast aluminum splicing structure
CN203795669U (en) Slotted type non-beam semi-unitized aluminum plate curtain wall system
CN204418715U (en) A kind of removable operating platform of encorbelmenting

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20141210

Effective date of abandoning: 20160817

C25 Abandonment of patent right or utility model to avoid double patenting