CN201381570Y - Articulated curtain wall - Google Patents

Articulated curtain wall Download PDF

Info

Publication number
CN201381570Y
CN201381570Y CN200820207109U CN200820207109U CN201381570Y CN 201381570 Y CN201381570 Y CN 201381570Y CN 200820207109 U CN200820207109 U CN 200820207109U CN 200820207109 U CN200820207109 U CN 200820207109U CN 201381570 Y CN201381570 Y CN 201381570Y
Authority
CN
China
Prior art keywords
curtain wall
articulates
articulate
panel
supporting component
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN200820207109U
Other languages
Chinese (zh)
Inventor
邓军华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Fangda Jianke Group Co., Ltd
Original Assignee
China Fangda Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Fangda Group Co Ltd filed Critical China Fangda Group Co Ltd
Priority to CN200820207109U priority Critical patent/CN201381570Y/en
Application granted granted Critical
Publication of CN201381570Y publication Critical patent/CN201381570Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Curtains And Furnishings For Windows Or Doors (AREA)

Abstract

The utility model relates to an articulated curtain wall and comprises a panel component and an articulation component. The panel component comprises an upright post and a curtain wall panel fixed and arranged on the upright post. The articulation component comprises a support component and an articulation piece which are fixedly arranged. One end of the articulation piece is fixedly arranged on the panel component and the other end is hung and arranged on the support component. The panel and the upright post are made into a unit component in a factory and the assembled panel component is hung and arranged on the support component directly in a construction site. The site installation speed and the installation quality of the construction are ensured. The utility model has the advantage of convenient, quick and accurate site installation.

Description

A kind of curtain wall that articulates
Technical field
The utility model relates to building curtain wall, more particularly, relates to a kind of curtain wall that articulates.
Background technology
Building curtain wall, particularly aluminum facade, what adopt usually is that fluid sealant is broken in the fixing back of mechanical screw, promptly at the construction work scene, the aluminum facade rod member is installed earlier, the aluminum facade rod member is adjusted positioning and fixing; After the rod member installing and locating is fixing, be screwed installation panel again.Because the rod member and the panel of aluminum facade are installed separately, and all be to install at engineering site, the installation rate that this has had a strong impact on aluminum facade increases the time of whole engineering construction, and is difficult to guarantee the installation quality of engineering.
The utility model content
The technical problems to be solved in the utility model is, provide a kind of scene easy for installation, articulate curtain wall efficiently.
The technical scheme that its technical problem that solves the utility model adopts is: construct a kind of curtain wall that articulates, comprise panel assembly and hitch assembly; Described panel assembly comprises column, is fixedly mounted on the curtain wall slab on the described column; Described hitch assembly comprises supporting component and the hanging part that fixedly installs; One end of described hanging part is fixedly mounted on the described panel assembly, and the other end is hung on the described supporting component.
Articulate in the curtain wall of the present utility model, described supporting component comprises articulating bearing and being installed in described two screw rods that articulate that articulate between the bearing of separately fixedly installing.
Articulate in the curtain wall of the present utility model, lock by clamp nut the described both sides that articulate screw rod.
Articulate in the curtain wall of the present utility model, the described bearing side surface adjacent with described clamp nut that articulate is provided with screw thread.
Articulate in the curtain wall of the present utility model, be provided with packing ring between the bearing at described clamp nut and described articulating.
Articulate in the curtain wall of the present utility model, described hanging part is for articulating otic placode, and the one end is fixed on the sidewall of described column by fastening bolt, and the other end is provided with the hanging groove that is hung on the described supporting component.
Articulate in the curtain wall of the present utility model, the described otic placode that articulates is provided with height adjustment bolt, and the terminal roof pressure of described height adjustment bolt is on described supporting component.
Articulate in the curtain wall of the present utility model, the hanging part on two groups of adjacent described panel assemblies is articulated on the same described supporting component simultaneously.
Articulate in the curtain wall of the present utility model, be provided with the overlapping flanging that misplaces mutually between the described adjacent column.
Articulate in the curtain wall of the present utility model, described panel is the aluminium sheet panel.
Enforcement the utlity model has following beneficial effect: panel and column are made a unit block in factory, and only need the panel assembly that assembles directly hung to be installed on the supporting component by hanging part to get final product at engineering site, guaranteed the installation rate and the project installation quality of engineering site, have on-the-spot easy for installation, fast, advantage accurately.
Description of drawings
The utility model is described in further detail below in conjunction with drawings and Examples, in the accompanying drawing:
Fig. 1 is the cross section structure schematic diagram that the utility model articulates curtain wall;
Fig. 2 is the schematic diagram that the utility model articulates the hanging part of curtain wall.
The specific embodiment
As shown in Figure 1, be a specific embodiment that articulates curtain wall of the present utility model, comprise panel assembly and hitch assembly.This panel assembly can comprise many groups, has only schematically provided the schematic diagram of two adjacent panels assemblies among the figure.Each panel assembly comprises column 7, is fixedly mounted on the curtain wall slab 6 on the column 7.Panel 6 can be fixedly mounted on the column 7 by variety of ways such as bolt, screw, rivet, welding, forms an all-in-one-piece unit block.In the present embodiment, articulating curtain wall is that aluminium sheet articulates curtain wall, and panel 6 is an aluminium sheet panel 6; Certainly, this articulate curtain wall also can other forms of curtain wall.
This hitch assembly comprises supporting component and hanging part.This supporting component comprises articulating bearing 2 and being installed in to articulate and articulate screw rod 4 between the bearing 2 separately.As shown in the figure, this articulates bearing 2 and is corner fittings, can be fixedly mounted on the civil engineering by fixing crab-bolt 1.Pass and be arranged on two and articulate on the bearing 2 and articulate screw rod 4, and it is fastening by clamp nut 8 to articulate the two ends of screw rod 4, make that articulating screw rod 4 is fixed on and articulates on the bearing 2, forms the support member that articulates installation.
This articulates bearing 2 and clamp nut 8 adjacent side surfaces and is provided with screw thread, increases frictional force, prevents getting loose of clamp nut 8.Further, can and articulate at clamp nut 8 packing ring 9 is set between the bearing 2, to increase frictional force.
As shown in Figure 2, this hanging part is for articulating otic placode 5, and one end 51 is fixedly mounted on by fastening bolt on the sidewall of column 7, and the other end 52 is hung on and articulates on the screw rod 4, as the hanging part of panel assembly.In the present embodiment, this articulates otic placode 5 and is provided with hanging groove 53, directly is hung on by hanging groove 53 to articulate on the screw rod 4, articulates on the screw rod 4 and the whole front panel assembly hung over.
Further, be provided with flanging 54 in a side that articulates otic placode 5, height adjustment bolt 3 is installed on flanging 54, the terminal roof pressure of this height adjustment bolt 3 is articulating on the screw rod 4.By adjusting height adjustment bolt 3, can raise or reduce articulates otic placode 5 and is hung on the height that articulates on the screw rod 4, thereby adjusts the height of whole front panel assembly.
As shown in Figure 1, the otic placode 5 that articulates of the panel assembly of two adjacent groups is hung on same articulating on the screw rod 4 simultaneously, thus ease of assembly.Certainly, a plurality of otic placodes 5 that articulate that articulate 4, two groups of panel assemblies of screw rod also can be set and hang installation respectively.
Between two adjacent columns 7, further be provided with the overlapping flanging that misplaces mutually, form certain space, so that between two panels 6, play the glue sealing.
Curtain wall and column 7 are fixedly mounted in factory, only needing to articulate otic placode 5 at engineering site is fixed on the column 7 by bolt assembly 10 and (can adjusts bolt assembly 10 and regulate the position, the left and right sides that articulates otic placode 5), to articulate otic placode 5 then hangs to articulate on the screw rod 4 and can finish assembling, guaranteed the installation rate and the project installation quality of engineering site, have on-the-spot easy for installation, fast, advantage accurately.

Claims (10)

1, a kind of curtain wall that articulates is characterized in that, comprises panel assembly and hitch assembly; Described panel assembly comprises column, is fixedly mounted on the curtain wall slab on the described column; Described hitch assembly comprises supporting component and the hanging part that fixedly installs; One end of described hanging part is fixedly mounted on the described panel assembly, and the other end is hung on the described supporting component.
2, the curtain wall that articulates according to claim 1 is characterized in that, described supporting component comprises articulating bearing and being installed in described two screw rods that articulate that articulate between the bearing of separately fixedly installing.
3, the curtain wall that articulates according to claim 2 is characterized in that, lock by clamp nut the described both sides that articulate screw rod.
4, the curtain wall that articulates according to claim 3 is characterized in that, the described bearing side surface adjacent with described clamp nut that articulate is provided with screw thread.
5, the curtain wall that articulates according to claim 4 is characterized in that, is provided with packing ring between the bearing at described clamp nut and described articulating.
6, the curtain wall that articulates according to claim 1 is characterized in that, described hanging part is for articulating otic placode, and the one end is fixed on the sidewall of described column by fastening bolt, and the other end is provided with the hanging groove that is hung on the described supporting component.
7, the curtain wall that articulates according to claim 6 is characterized in that, the described otic placode that articulates is provided with height adjustment bolt, and the terminal roof pressure of described height adjustment bolt is on described supporting component.
8, the curtain wall that articulates according to claim 1 is characterized in that, the hanging part on two groups of adjacent described panel assemblies is articulated on the same described supporting component simultaneously.
9, the curtain wall that articulates according to claim 8 is characterized in that, is provided with the overlapping flanging that misplaces mutually between the described adjacent column.
10, the curtain wall that articulates according to claim 1 is characterized in that, described panel is the aluminium sheet panel.
CN200820207109U 2008-12-31 2008-12-31 Articulated curtain wall Expired - Lifetime CN201381570Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200820207109U CN201381570Y (en) 2008-12-31 2008-12-31 Articulated curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200820207109U CN201381570Y (en) 2008-12-31 2008-12-31 Articulated curtain wall

Publications (1)

Publication Number Publication Date
CN201381570Y true CN201381570Y (en) 2010-01-13

Family

ID=41525046

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200820207109U Expired - Lifetime CN201381570Y (en) 2008-12-31 2008-12-31 Articulated curtain wall

Country Status (1)

Country Link
CN (1) CN201381570Y (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535703A (en) * 2012-02-21 2012-07-04 沈阳远大铝业工程有限公司 Aluminum single plate hooking structure of opened type rectangular divided ceiling
CN102947519A (en) * 2010-05-04 2013-02-27 罗太庸 Variable fastener for fixing curtain wall
CN102966203A (en) * 2012-09-26 2013-03-13 苏州金螳螂幕墙有限公司 Vertical column hanging device for inverted type glass curtain wall
CN103343588A (en) * 2013-07-05 2013-10-09 苏州金螳螂幕墙有限公司 Large-width unit plate block curtain wall
CN104831840A (en) * 2014-02-07 2015-08-12 深圳市方大建科集团有限公司 Unit type metal board curtain wall
CN111441517A (en) * 2020-05-14 2020-07-24 中国建筑一局(集团)有限公司 Connecting node and connecting method for photovoltaic double-layer curtain wall and steel structure
CN112962835A (en) * 2021-02-23 2021-06-15 中建八局装饰工程有限公司 Connecting assembly and connecting method for curtain wall assembling structure

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102947519A (en) * 2010-05-04 2013-02-27 罗太庸 Variable fastener for fixing curtain wall
CN102947519B (en) * 2010-05-04 2015-03-25 罗太庸 Variable fastener for fixing curtain wall
CN102535703A (en) * 2012-02-21 2012-07-04 沈阳远大铝业工程有限公司 Aluminum single plate hooking structure of opened type rectangular divided ceiling
CN102966203A (en) * 2012-09-26 2013-03-13 苏州金螳螂幕墙有限公司 Vertical column hanging device for inverted type glass curtain wall
CN103343588A (en) * 2013-07-05 2013-10-09 苏州金螳螂幕墙有限公司 Large-width unit plate block curtain wall
CN104831840A (en) * 2014-02-07 2015-08-12 深圳市方大建科集团有限公司 Unit type metal board curtain wall
CN104831840B (en) * 2014-02-07 2017-08-11 深圳市方大建科集团有限公司 Modular metal plate curtain wall
CN111441517A (en) * 2020-05-14 2020-07-24 中国建筑一局(集团)有限公司 Connecting node and connecting method for photovoltaic double-layer curtain wall and steel structure
CN112962835A (en) * 2021-02-23 2021-06-15 中建八局装饰工程有限公司 Connecting assembly and connecting method for curtain wall assembling structure

Similar Documents

Publication Publication Date Title
CN201381570Y (en) Articulated curtain wall
CN201801985U (en) Framework structure of stone curtain wall
CN201581527U (en) Novel glass plate hanging device for invisible-frame curtain wall
CN103334564B (en) The method of wall brick mounting structure and installation wall brick
CN212866507U (en) Energy-saving curtain wall with transverse and vertical keels on two sides
CN203795673U (en) Steel-aluminum semi-exposed frame curtain wall system
CN105952041A (en) Adjustable corner structure and corner system for exposed frame curtain wall
CN201972281U (en) Curtain wall hitching component
CN204826342U (en) Erection joint spare for construction
CN202299037U (en) Hinge joint type connection device of unit curtain wall boards
CN215630887U (en) Panel adjusting seat for special-shaped curtain wall and special-shaped curtain wall
CN214195149U (en) Embedded unit curtain wall window easy to install and adjust
CN204001308U (en) A kind of metal decking unit curtain wall system
CN210687243U (en) Finished product support hanger
CN108331217B (en) Composite unit type curtain wall system
CN113882563A (en) Articulated slotted aluminum plate curtain wall system
CN206591697U (en) A kind of aluminium-plastic panel mounting connection structure installed for exterior wall
CN201972280U (en) Splicing hanging mechanism for unitized curtain wall
CN202349550U (en) Support of water diversion and collection device
CN204060151U (en) Fast inserted formula moves enclosing
CN204645345U (en) With the window curtain wall of splicing type aluminium sheet
CN210857654U (en) Detachable hidden frame unit curtain wall fixing device
CN215874226U (en) Assembled modularization curtain box
CN211899118U (en) Building curtain wall with fire prevention function
CN203755502U (en) Profile connection mechanism for aluminum alloy plate curtain wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: FANGDA DECORATION ENGINEERING CO., LTD., SHENZHEN

Free format text: FORMER OWNER: FANGDA GROUP CO., LTD.

Effective date: 20101115

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 518055 FANGDA INDUSTRY CITY, LONGJING, XILI TOWN, NANSHAN DISTRICT, SHENZHEN CITY, GUANGDONG PROVINCE TO: 518057 FANGDA TECHNOLOGY BUILDING, KEJI SOUTH ROAD 12, SOUTH ZONE, NEW AND HIGH TECHNOLOGY INDUSTRIAL PARK, NANSHAN DISTRICT, SHENZHEN CITY

TR01 Transfer of patent right

Effective date of registration: 20101115

Address after: 518057, Shenzhen Nanshan District hi tech Industrial Park, South District, science and technology, South Road, twelve square big science and Technology Building

Patentee after: Fangda Decoration Engineering Co., Ltd., Shenzhen City

Address before: 518055 Guangdong city of Shenzhen province Nanshan District Xili Town, Longjing Fangda industrial city

Patentee before: Fangda Group Co., Ltd.

C56 Change in the name or address of the patentee

Owner name: SHENZHEN FANGDA JIANKE GROUP CO., LTD

Free format text: FORMER NAME: FANGDA DECORATION ENGINEERING CO., LTD., SHENZHEN CITY

CP03 Change of name, title or address

Address after: 518057 Nanshan District science and Technology Industrial Park, Guangdong Province, the Southern District of science and technology in the south of the road on the way to the big science and technology building, building 19, building twelve

Patentee after: Shenzhen Fangda Jianke Group Co., Ltd

Address before: 518057, Nanshan District Shenzhen hi tech Industrial Park, Guangdong District South Science and technology, South twelve road Fangda science and Technology Building

Patentee before: Fangda Decoration Engineering Co., Ltd., Shenzhen City

CX01 Expiry of patent term

Granted publication date: 20100113

CX01 Expiry of patent term