CN203972719U - Mining card cable production line - Google Patents

Mining card cable production line Download PDF

Info

Publication number
CN203972719U
CN203972719U CN201420372725.9U CN201420372725U CN203972719U CN 203972719 U CN203972719 U CN 203972719U CN 201420372725 U CN201420372725 U CN 201420372725U CN 203972719 U CN203972719 U CN 203972719U
Authority
CN
China
Prior art keywords
chassis
section bar
heating furnace
roll
punch press
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420372725.9U
Other languages
Chinese (zh)
Inventor
冯政
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420372725.9U priority Critical patent/CN203972719U/en
Application granted granted Critical
Publication of CN203972719U publication Critical patent/CN203972719U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A mining card cable production line, structure is comprised of chassis, heating furnace, punch press.On chassis, be provided with a row and drag and roll, be placed on and drag the section bar that rolls on can the translation flexibly with dragging the running of rolling.On chassis, be provided with butt welding machine, joint for fabricated structural shape, unlatching is dragged to roll spin and is turned, section bar enters in heating furnace and is heated from chassis, a side at heating furnace is provided with punch press, on punch press, be provided with the particular manufacturing craft of producing card cable, in a side of mould, with cutting knife, the section bar coming from chassis enters into punch forming on the mould of punch press after by heating.Remaining section bar is chopped off by neat mouthful of the cutting knife of mould when forging and stamping.

Description

Mining card cable production line
Technical field
A mining card cable production line, belongs to mining equiment field.
Background technology
Mining card cable is than indispensable secure component during mine produces, as " U-shaped steel collapsible tunnel supporting groove steel card cable ", the patent No.: 200720041066.0, its traditional processing technology is the production method of " two forge a heat ", first with punch press, stock shapes (steel band) is cut into segment, then with baker be heated to rubescent after, send into the punch press hot-roll forming with mould, this needs two punch presses and operating personnel, respectively by blocking, moulding two procedures just can complete, therefore optimize not.
Summary of the invention
The application's object is that a kind of above-mentioned mining card cable production line will be provided, and replaces above-mentioned old production line, thereby reach the object reducing costs with it.The structure of this production line is comprised of chassis, heating furnace, punch press.The Selecting Complete Set rail four-wheel board carriage of chassis, chassis has drive unit, and chassis can move around along track between stock ground and heating furnace.On the platform of chassis, be provided with a row and drag and roll (several identical dragging are rolled), drag to roll by motor to drive synchronous rotary, the switch of motor is arranged on the operating desk of punch press.Drag between rolling and be parallel to each other, be provided with groove dragging to roll on, groove just in time can be put into (keeping flat) section bar; Be placed on drag the section bar that rolls on can be in groove the translation flexibly with dragging the running of rolling.
On chassis, be provided with butt welding machine, for overlapping the joint of section bar, butt welding machine can will drag the termination of two blocks of section bars that roll on integrally welded, and the projection of the sectional material joint after welding is no more than 3 millimeters, otherwise affects forging forming.On butt welding machine, be provided with castor, during welding, butt welding machine can move simultaneously with section bar a segment distance, the requirement that while meeting welding with this, section bar can move on the platform of chassis.
Heating furnace is selected gas furnace or intermediate frequency furnace, and gas furnace adopts comburant oxygen stove, the technological requirement when temperature of heating furnace can make section bar reach hot rolling, and the design temperature of heating furnace and firing rate can be adjusted, and heating furnace is fixed on track one end of chassis.Unlatching is dragged to roll spin and is turned, and section bar can enter the thermal treatment zone of heating furnace and be heated at this from chassis, for the forging forming of section bar ready.
A side at heating furnace is provided with punch press, is provided with the particular manufacturing craft of producing card cable on punch press, and in a side of mould, with cutting knife (upper and lower two), the section bar shipping from chassis can enter on the mould of punch press the thermal treatment zone by heating furnace.
While going into operation, open chassis and load onto section bar to stock ground, section bar is rolled on by being manually placed on to drag, chassis is anchored in to a side of heating furnace; Unlatching motor makes to drag to roll spin and turns, dragging to roll drives section bar to enter into the thermal treatment zone heating of heating furnace, adjust firing rate, make the heat time of section bar in heating furnace equal the punching press time that punch press completes a workpiece, the drift of opening punch press is up, the section bar heating is entered in mould, the drift of opening punch press is descending, section bar has just become half of card cable under the forging and stamping of mould, remaining section bar is chopped off by neat mouthful of the cutting knife of mould when forging and stamping, and the section bar after chopping off is with dragging the rotation of rolling to enter into continuously next punching course.
Accompanying drawing explanation
Fig. 1, mining card cable production line front view
1, chassis, 2, butt welding machine, 3, heating furnace, 4, punch press, 5, cutting knife, 6, section bar, 7, mould, 8, drag and roll, 9, motor, 10, castor.
2, the specific embodiment
As shown in Figure 1, a kind of mining card cable production line, the structure of this production line is comprised of chassis 1, heating furnace 3, punch press 4.The Selecting Complete Set rail four-wheel board carriage of chassis 1, chassis 1 has drive unit, and chassis 1 can move around along track between stock ground and heating furnace 3.On the platform of chassis 1, be provided with a row and drag and roll 8 (several identical dragging are rolled), drag and roll 8 and drive synchronous rotaries by motor 9, the switch of motor 9 is arranged on the operating desk of punch press 4.Drag between rolling 8 and be parallel to each other, be provided with groove dragging to roll on 8, groove just in time can be put into (keeping flat) section bar 6; Be placed on and drag the section bar 6 that rolls on 8 can be in groove with dragging, to roll 8 running and translation flexibly.
On chassis 1, be provided with butt welding machine 2, for overlapping the joint of section bar 6, butt welding machine 2 can by dragging, to roll the termination of two blocks of section bars 6 on 8 integrally welded, and the projection of section bar 6 joints after welding is no more than 3 millimeters, otherwise affects forging forming.On butt welding machine 2, be provided with castor 10, during welding, butt welding machine 2 can move simultaneously with section bar 6 segment distance, the requirement that while meeting welding with this, section bar 6 can move on the platform of chassis 1.
Heating furnace 3 is selected gas furnace or intermediate frequency furnace, and gas furnace adopts comburant oxygen stove, the technological requirement when temperature of heating furnace 3 can make section bar 6 reach hot rolling, and the design temperature of heating furnace 3 and firing rate can be adjusted, and heating furnace 3 is fixed on track one end of chassis 1.Unlatching is dragged and is rolled 8 rotations, and section bar 6 can enter the thermal treatment zone of heating furnace 3 and be heated at this from chassis 1, for the forging forming of section bar 6 ready.
A side at heating furnace 3 is provided with punch press 4, is provided with the particular manufacturing craft 7 of producing card cable on punch press 4, and in a side of mould 7, with cutting knife 5, the section bar 6 shipping from chassis 1 can enter on the mould 7 of punch press 4 thermal treatment zone by heating furnace 3.
While going into operation, open chassis 1 and to stock ground, load onto section bar 6, section bar 6 is rolled on 8 by being manually placed on to drag, chassis 1 is anchored in to a side of heating furnace 3; Opening motor 9 makes to drag and rolls 8 rotations, drag and roll the thermal treatment zone heating that 8 drive section bars 6 enter into heating furnace 3, adjust firing rate, make the heat time of section bar 6 in heating furnace 3 equal the punching press time that punch press 4 completes a workpiece, the drift of opening punch press 4 is up, the section bar heating 6 is entered in mould 7, the drift of opening punch press 4 is descending, section bar 6 has just become half of card cable under the forging and stamping of mould 7, remaining section bar 6 is chopped off by neat mouthful of the cutting knife 5 of mould 7 when forging and stamping, and the section bar 6 after chopping off is with dragging the rotation of rolling to enter into continuously next punching course.

Claims (1)

1. a mining card cable production line, feature is: the structure of this production line is comprised of chassis (1), heating furnace (3), punch press (4); The Selecting Complete Set rail four-wheel board carriage of chassis (1), chassis (1) has drive unit, and chassis (1) can move around along track between stock ground and heating furnace (3); On the platform of chassis (1), be provided with a row and drag and roll (8), drag and roll (8) and drive synchronous rotary by motor (9), the switch of motor (9) is arranged on the operating desk of punch press (4); Drag to roll between (8) to be parallel to each other, be provided with groove dragging to roll on (8), groove just in time can be put into section bar (6); Be placed on and drag the section bar (6) rolling on (8) can in groove, with dragging, roll the running of (8) and flexibly translation;
On chassis (1), be provided with butt welding machine (2), be used for overlapping the joint of section bar (6), it is integrally welded that butt welding machine (2) can roll by dragging the termination of the two blocks of section bars (6) on (8), and the projection of the section bar after welding (6) joint is no more than 3 millimeters; On butt welding machine (2), be provided with castor (10), butt welding machine during welding (2) can move simultaneously with section bar (6) segment distance, the requirement that while meeting welding with this, section bar (6) can move on the platform of chassis (1);
Heating furnace (3) is selected gas furnace or intermediate frequency furnace, gas furnace adopts comburant oxygen stove, the technological requirement when temperature of heating furnace (3) can make section bar (6) reach hot rolling, design temperature and the firing rate of heating furnace (3) can be adjusted, and heating furnace (3) is fixed on track one end of chassis (1); Unlatching drag roll (8) rotation, section bar (6) can enter the thermal treatment zone of heating furnace (3) and be heated at this from chassis (1), for the forging forming of section bar (6) ready;
A side at heating furnace (3) is provided with punch press (4), on punch press (4), be provided with the particular manufacturing craft (7) of producing card cable, in a side of mould (7) with cutting knife (5), from chassis (1) and the section bar (6) coming can enter on the mould (7) of punch press (4) the thermal treatment zone by heating furnace (3).
CN201420372725.9U 2014-06-27 2014-06-27 Mining card cable production line Withdrawn - After Issue CN203972719U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420372725.9U CN203972719U (en) 2014-06-27 2014-06-27 Mining card cable production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420372725.9U CN203972719U (en) 2014-06-27 2014-06-27 Mining card cable production line

Publications (1)

Publication Number Publication Date
CN203972719U true CN203972719U (en) 2014-12-03

Family

ID=51970205

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420372725.9U Withdrawn - After Issue CN203972719U (en) 2014-06-27 2014-06-27 Mining card cable production line

Country Status (1)

Country Link
CN (1) CN203972719U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104128544A (en) * 2014-06-27 2014-11-05 冯政 Mine clamping cable production line
CN107243584A (en) * 2017-06-05 2017-10-13 江阴振宏重型锻造有限公司 A kind of open-close type heater and the wind power principal axis forging technology using the heater

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104128544A (en) * 2014-06-27 2014-11-05 冯政 Mine clamping cable production line
CN107243584A (en) * 2017-06-05 2017-10-13 江阴振宏重型锻造有限公司 A kind of open-close type heater and the wind power principal axis forging technology using the heater

Similar Documents

Publication Publication Date Title
CN103551822B (en) A kind of full automatic bearing ring forging line
CN104117855A (en) Full-automatic continuous production line of annular forgings
CN104384430B (en) The Forging Technology of heavy wall high tubular ring forging
CN205851625U (en) The hot press-formed production line of unimach
CN107030106A (en) Utilize the method for continuous small-size production line of bar type of production product made from steel
CN203972719U (en) Mining card cable production line
CN104259745B (en) A kind of forming method of annular forging piece with flange and the mould used
CN203956508U (en) The full-automatic tinuous production of annular forging piece
CN104984996A (en) Heating furnace and hot rolling mill distribution mode on tungsten and molybdenum plate production line
CN205732618U (en) Heat stamping and shaping production line
CN111531104A (en) Novel oil drill pipe joint production line
CN102764762A (en) Continuous casting and rolling device and method for producing long profiles
CN104128544B (en) Mining card cable production line
CN104128543B (en) The using method of mining card cable production line
CN203018467U (en) Steel bar cold bed aligning baffle
CN106734202A (en) Bar Wire Product and arrowband rolling line and its production method
CN104313293B (en) Compact chain vertical ring hot extrusion process
CN203779097U (en) Double-side milling online feeding system for board
CN206643127U (en) Bar Wire Product and arrowband rolling line
CN205165380U (en) Pipe heading machine material feeding unit
CN204549132U (en) A kind of load transfer device of hot aluminium bar
CN206222935U (en) A kind of induction heater bar feeding auxiliaries control system
MXPA05008002A (en) Method of continuously hot rolling a heated billet into a plurality of finished products.
CN104438365B (en) Extractor positioner
CN104942214A (en) Forging technology for race used for large-scale mine vehicle wheel

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20141203

Effective date of abandoning: 20160420

C25 Abandonment of patent right or utility model to avoid double patenting