CN203925503U - 一种顶管工作井维护装置 - Google Patents
一种顶管工作井维护装置 Download PDFInfo
- Publication number
- CN203925503U CN203925503U CN201420377060.0U CN201420377060U CN203925503U CN 203925503 U CN203925503 U CN 203925503U CN 201420377060 U CN201420377060 U CN 201420377060U CN 203925503 U CN203925503 U CN 203925503U
- Authority
- CN
- China
- Prior art keywords
- well
- attending device
- upper pipe
- working well
- pipe working
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Sewage (AREA)
Abstract
一种顶管工作井维护装置,包括圆柱体管体及管体预留孔。所述圆柱体管体底端闭合,顶端开口;顶端安装有用于提拉所述顶管工作井维护装置的吊环;安装于顶管顶进井、顶管接收井中,以解决现有支护方式施工工艺复杂、繁琐、施工工期长,支护结构的各部件不可拆装回收利用的问题。
Description
技术领域:
本实用新型涉及一种建设用维护装置,属于顶管工作井加固措施领域。
背景技术:
顶管施工属于一种非开挖施工方法,是一种不开挖或者少开挖的管道埋设施工技术。顶管法施工就是在工作坑内借助于顶进设备产生的顶力,克服管道与周围土壤的摩擦力,将管道按设计的坡度顶入土中,并将土方运走。一节管子完成顶入土层之后,再下第二节管子继续顶进。其原理是借助于主顶油缸及管道间、中继间等推力,把工具管或掘进机从工作坑内穿过土层一直推进到接收坑内吊起。管道紧随工具管或掘进机后,埋设在两坑之间。非开挖工程技术彻底解决了管道埋设施工中对城市建筑物的破坏和道路交通的堵塞等难题,在稳定土层和环境保护方面凸显其优势。顶管施工方法在地下管线铺设过程中因其有着综合成本少、施工周期短、环境污染低、不影响交通、安全性高等众多优点而被广泛采用。顶管工作井由顶管顶进井、顶管段、顶管接收井三部分构成,顶进井及顶管接收井侧壁设有圆孔,顶管段通过圆孔连接在顶管顶进井与顶管接收井之间。在现有施工技术中,顶管顶进井及顶管接收井直接在地面施工做出,即通过导向、定向钻进等手段,在地表合适部位开挖顶进井及接收井,然后在挖好的土体侧壁安装钢格栅,挂钢筋网,喷射混凝土等,以保证施工安全,防止工作井坍塌。上述工作井的支护方式施工工艺复杂、繁琐、施工工期长,而且支护结构是一次性投入,当管路铺设完成后,将工作井填平时,同时将支护结构埋在地下,不能重复利用,影响地下空间的正常使用,而且成本高。
我们经过检索发现,为解决上述存在的问题,本领域工作人员进行了很多尝试,如中国专利文献CN2012200262867公开了一种工作井的支护装置,该支护装置由多段支护体首尾相接组成,每相邻两段相接的支护体通过第一连接件相固定,形成能贴覆支撑在工作井土体侧壁上的螺旋筒状的整体。本支护装置虽可重复利用,但每次使用时均需逐件连接每段支护体,施工完后需要逐件拆卸每件支护体,增加施工负担。
实用新型内容:
本实用新型所要解决的技术问题是提供一种顶管工作井维护装置,安装于顶管顶进井、顶管接收井中,以解决现有支护方式施工工艺复杂、繁琐、施工工期长,支护结构的各部件不可拆装回收利用的问题。
为了解决上述存在的问题,本实用新型提供了一种顶管工作井维护装置,属于钢筋混凝土预制件,包括圆柱体管体及管体预留孔。其特征在于所述圆柱体管 体底端闭合,顶端开口;顶端安装有用于提拉所述顶管工作井维护装置的吊环;所述圆柱体管体厚度为270mm-310mm,外直径为3900mm-4300mm;所述管体预留孔位于圆柱体管体侧壁上,呈圆形,直径为3300mm-3800mm;所述管体预留孔距管材底端500-1000mm处。
本实用新型所提供的顶管工作井维护装置拆装方便,使用时,只需在地面施工做出顶管顶进井及顶管接收井,然后将顶管工作井维护装置安装到顶进井及接收井中即可,可重复多次利用,且采用钢筋混凝土材质,成本低廉。当管路铺设完成后,取出维护装置,将工作井填平,不影响地下空间的正常使用。此外,当施工完成时,该设置也可作为观察井使用,极大节省了施工材料。
附图说明:
图1为顶管工作井的结构示意图,从左至右各部分结构依次为顶管顶进井、顶管段、顶管接收井;
图2为本实用新型提供的顶管工作井维护装置的结构示意图。
具体实施方式
下面将结合附图以及具体实施例来详细说明本实用新型,此为本实用新型的示意性实施例用来解释本实用新型,但并不作为对本实用新型的限定。
实施例1
一种顶管工作井维护装置,属于钢筋混凝土预制件,包括圆柱体管体2及管体预留孔4。其特征在于所述圆柱体管体底端3闭合,顶端1开口;顶端安装有用于提拉所述顶管工作井维护装置的吊环5;所述圆柱体管体厚度为270mm,外直径为3900mm;所述管体预留孔位于圆柱体管体侧壁上,呈圆形,直径为3300mm;所述管体预留孔距管材底端600mm处。
实施例2
一种顶管工作井维护装置,属于钢筋混凝土预制件,包括圆柱体管体及管体预留孔。其特征在于所述圆柱体管体底端闭合,顶端开口;顶端安装有用于提拉所述顶管工作井维护装置的吊环;所述圆柱体管体厚度为310mm,外直径为4300mm;所述管体预留孔位于圆柱体管体侧壁上,呈圆形,直径为3800mm;所述管体预留孔距管材底端800mm处。
Claims (4)
1.一种顶管工作井维护装置,其组成包括圆柱体管体(2)及管体预留孔(4),其特征在于所述圆柱体管体底端(3)闭合,顶端(1)开口;顶端安装有用于提拉所述顶管工作井维护装置的吊环(5)。
2.如权利要求1所述的顶管工作井维护装置,其特征为圆柱体管体(2)厚度为270mm-310mm,外直径为3900mm-4300mm。
3.如权利要求1所述的顶管工作井维护装置,其特征在于所述管体预留孔(4)位于圆柱体管体侧壁上,呈圆形,直径为3300mm-3800mm。
4.如权利要求1所述的顶管工作井维护装置,其特征在于所述管体预留孔(4)距管体底端(3)500-1000mm处。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420377060.0U CN203925503U (zh) | 2014-07-08 | 2014-07-08 | 一种顶管工作井维护装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420377060.0U CN203925503U (zh) | 2014-07-08 | 2014-07-08 | 一种顶管工作井维护装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203925503U true CN203925503U (zh) | 2014-11-05 |
Family
ID=51821332
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420377060.0U Expired - Fee Related CN203925503U (zh) | 2014-07-08 | 2014-07-08 | 一种顶管工作井维护装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203925503U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106329401A (zh) * | 2015-06-19 | 2017-01-11 | 国网天津市电力公司 | 一种顶管的铺设方法 |
-
2014
- 2014-07-08 CN CN201420377060.0U patent/CN203925503U/zh not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106329401A (zh) * | 2015-06-19 | 2017-01-11 | 国网天津市电力公司 | 一种顶管的铺设方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103758123B (zh) | 人工挖孔灌注桩护壁衬的施工方法 | |
CN103469817B (zh) | 一种既有地铁车站主体结构扩建施工方法 | |
CN104047613B (zh) | 煤矿巷道底板用锚固方法 | |
CN103603342A (zh) | 大直径组合套管超长灌注桩施工方法 | |
CN103541352B (zh) | 一种在砂土地层大直径高承台桩地下地上连续施工方法 | |
CN103835648A (zh) | 一种通过地面注浆改善岩层性能反井钻井工艺 | |
CN103321244A (zh) | 砂土地基既有建筑增设地下室的施工方法 | |
CN104563147B (zh) | 适用于岩溶区的组合结构桩基础及其施工方法 | |
CN103114595A (zh) | 支护桩预留核心土双支墩斜内撑基坑支护方法及装置 | |
CN103321233B (zh) | 滑坡深层排水及滑坡体内地下水资源回收装置的制作方法 | |
CN102747729B (zh) | 一种用于钻孔灌注桩施工的套管接连装置 | |
CN105133581A (zh) | 支护结构中抗拔桩、格构柱及降水井三合一施工方法 | |
CN103410152A (zh) | 一种用于狭长深基坑土方开挖的施工方法 | |
CN106837382A (zh) | 一种地铁隧道围岩地面预注浆加固工艺 | |
CN103485347A (zh) | 一种建筑基坑支护用斜桩及其施工方法 | |
CN103215958A (zh) | 膨胀土地区深基坑降水与支护施工方法 | |
CN104863183B (zh) | 大断面隧道近接建筑物施工隔离减震桩结构及施工方法 | |
CN101161947A (zh) | 一种用于基坑支护的护壁桩与降水井合一的方法 | |
CN110080779A (zh) | 隧道隧底溶洞处理施工方法 | |
CN104074184B (zh) | 一种桩底后注浆扩底灌注桩 | |
CN105672309A (zh) | 岩溶地区嵌岩桩成孔可回收超长钢护筒护壁方法 | |
CN105545315A (zh) | 盾构法隧道施工中加固开挖面土层的常压换刀方法 | |
CN203925503U (zh) | 一种顶管工作井维护装置 | |
CN204877374U (zh) | 一种瓦斯立井壁后环空封堵装置 | |
CN104264679B (zh) | 一种输电铁塔基础大口径水下灌注桩施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141105 Termination date: 20200708 |
|