CN203921852U - A kind of slow-recovery sponge pillow delivery system - Google Patents
A kind of slow-recovery sponge pillow delivery system Download PDFInfo
- Publication number
- CN203921852U CN203921852U CN201420311742.1U CN201420311742U CN203921852U CN 203921852 U CN203921852 U CN 203921852U CN 201420311742 U CN201420311742 U CN 201420311742U CN 203921852 U CN203921852 U CN 203921852U
- Authority
- CN
- China
- Prior art keywords
- guide rail
- closed loop
- district
- conveying belt
- driving
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000011084 recovery Methods 0.000 title claims abstract description 12
- 239000010687 lubricating oil Substances 0.000 claims description 20
- 230000011218 segmentation Effects 0.000 claims description 12
- 239000000446 fuel Substances 0.000 claims description 9
- 239000003921 oil Substances 0.000 claims description 9
- 239000000945 filler Substances 0.000 claims description 6
- 229910000838 Al alloy Inorganic materials 0.000 claims description 3
- 239000004677 Nylon Substances 0.000 claims description 3
- 238000001125 extrusion Methods 0.000 claims description 3
- 229920001778 nylon Polymers 0.000 claims description 3
- 238000000034 method Methods 0.000 abstract description 3
- 238000005187 foaming Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 238000005452 bending Methods 0.000 description 1
- 239000006260 foam Substances 0.000 description 1
- 230000035479 physiological effects, processes and functions Effects 0.000 description 1
- 230000007306 turnover Effects 0.000 description 1
Landscapes
- Machines For Laying And Maintaining Railways (AREA)
Abstract
The utility model relates to a kind of slow-recovery sponge pillow delivery system, its innovative point is: comprise guide rail, driving and conveying belt and driver train, the one closed loop guide rail in the S-shaped setting in the horizontal direction of factory building top, closed loop guide rail has at least one Shang Jian district, Yi Ge deburring district and Yi Gexiajian district; One is built in the driving and conveying belt in closed loop guide rail, and this driving and conveying belt is comprised of chain link, carrier bar, track adjusting wheel and road wheel; Some hanging baskets that are suspended on driving and conveying belt; Some driver trains that are distributed on closed loop guide rail.The utility model has the advantage of: driving and conveying belt is driven with certain speed and slowly moved forward and keep by driver train, by hanging basket move to respective regions carry out upper, deburring and lower, and complete slaking in this process, whole delivery system is mainly suspended on the top of factory building, seldom take closely space of planes, space availability ratio is improved greatly, and utilize delivery system to transport between each station, without manually being undertaken by travelling bogie frequently, greatly reduce producers' labour intensity.
Description
Technical field
The utility model relates to a kind of sponge pillow delivery system, particularly high, the rationally distributed slow-recovery sponge pillow delivery system of a kind of space availability ratio.
Background technology
Along with the raising of people's living standard, people are also more and more higher to the requirement of quality of the life.Pillow can be used to regulate the contact point of human body and berth to obtain more comfortable angle, the normal physiological bending of protection neck, and when maintaining people and sleeping, normal physiology is lived, and for people's life, working and learning, has vital impact.Wherein, slow rebound sponge pillow is extensively subject to liking of people owing to having good comfort level.
In producing the process of slow resilience sponge pillow, need to carry out foaming in foaming district, by travelling bogie, move to deburring district again, matched moulds seam place to sponge carries out after artificial deburring, by travelling bogie, being placed into warehouse again stores, in warehouse, at least stop and within 72 hours, carry out, after slaking, circulating into next procedure.This kind of mode shortcoming is: need to shift by travelling bogie, and turnover trouble, work capacity is large, and needs very large place to carry out slaking wait.
Summary of the invention
It is high and can significantly reduce the slow-recovery sponge pillow delivery system of labour intensity that the technical problems to be solved in the utility model is to provide a kind of space availability ratio.
For solving the problems of the technologies described above, the technical solution of the utility model is: a kind of slow-recovery sponge pillow delivery system, its innovative point is: comprise guide rail, driving and conveying belt and driver train, the one closed loop guide rail in the S-shaped setting in the horizontal direction of factory building top, this closed loop guide rail is comprised of some guide rail segmentations, guide rail is segmented into the aluminium alloy extrusions that an outline is rectangle, and it has a T-shaped groove that Open Side Down; Described closed loop guide rail has at least one Shang Jian district, Yi Ge deburring district and Yi Gexiajian district, and Shang Jian district guide rail comprises part section and the ascent stage A that tilts in the inclination descent stage A that sets gradually, low level level; Deburring district comprises part section and the ascent stage B that tilts in the inclination descent stage B that sets gradually, low level level; Xia Jian district comprises part section and the ascent stage C that tilts under the inclination descent stage C that sets gradually, low level level; One is built in closed loop guide rail and the driving and conveying belt arranging along closed loop guide rail bearing of trend, and this driving and conveying belt is comprised of chain link, carrier bar, track adjusting wheel and road wheel, and some chain links are connected by bearing pin successively with carrier bar; The track adjusting wheel that axis is vertical direction is installed at chain link center, and described track adjusting wheel is positioned at the large end slot body of T-shaped groove of guide rail segmentation, and leads by large end slot body sidewall; The road wheel that a pair of axis is horizontal direction is installed in each carrier bar outside, and described road wheel is positioned on the T-shaped groove step surface of guide rail segmentation; Some hanging baskets that are suspended on driving and conveying belt, hanging basket has several layers of horizontally disposed holder frame, in holder frame, nylon wire is set; Some driver trains that are distributed on closed loop guide rail, each described driver train has an output chain gear that can mesh with chain link or the carrier bar of driving and conveying belt.
Preferably, on described closed loop guide rail, also there is several lubricated districts, each lubricated district is provided with Lubricating oil adding device, described Lubricating oil adding device comprises fuel filler pipe, nozzle, compressed air tube, flexible pipe, the front end of fuel filler pipe has an oil nozzle, middle part sidewall is provided with a lubricating oil oil-feed port, and rear end has a compressed air inlet; Oil nozzle connects nozzle by flexible pipe, and lubricating oil oil-feed port is connected with lubricating oil oil drum by fuel feed pipe, and compressed air inlet is communicated with compressed air tube, and electromagnetic valve is installed on compressed air tube; On the closed loop guide rail in described lubricated district, there is one section of top end opening; This opening of the nozzle alignment of Lubricating oil adding device.
The utility model has the advantage of: driving and conveying belt is driven with certain speed and slowly moved forward and keep by driver train, it is consistent with the sponge curing time that single hanging basket Cong Shangjian district moves to time in Xia Jian district, and sponge foaming district is arranged on a side in Shang Jian district; Hanging basket, when moving to Shang Jian district, drops to suitable manually-operated height gradually from factory building top, after foam pillow foaming, be placed on successively in the hanging basket that moves to Shang Jian district, and hanging basket rises again gets back to factory building top; When hanging basket moves to behind deburring district, drop to gradually suitable manually-operated height and carry out deburring processing, then rise and get back to the top of factory building; Last Cong Xiajian cancels the sponge pillow after slaking in district.Whole delivery system is mainly suspended on the top of factory building, seldom take closely space of planes, space availability ratio is improved greatly, and utilize delivery system to transport between each station, without manually being undertaken by travelling bogie frequently, greatly reduce producers' labour intensity.
Accompanying drawing explanation
Fig. 1 is the utility model slow-recovery sponge pillow delivery system local structure schematic diagrams.
Fig. 2 is the utility model slow-recovery sponge pillow delivery system schematic layout pattern.
Fig. 3 is the utility model middle guide segmentation cutaway view.
Fig. 4 is part plot structure schematic diagram in the utility model slow-recovery sponge pillow delivery system.
Fig. 5 is the utility model driving and conveying belt structural representation.
Fig. 6 is that in the utility model, road wheel coordinates schematic diagram with guide rail segmentation.
Fig. 7 is the utility model Lubricating oil adding device structural representation.
The specific embodiment
Embodiment
Refer to Fig. 1,2,3, the utility model has disclosed a kind of slow-recovery sponge pillow delivery system, comprises guide rail 1, driving and conveying belt and driver train,
The one closed loop guide rail 1 in the S-shaped setting in the horizontal direction of factory building top, this closed loop guide rail 1 is comprised of some guide rail segmentation 1a, and guide rail segmentation 1a is that an outline is the aluminium alloy extrusions of rectangle, and it has a T-shaped groove that Open Side Down.
This closed loop guide rail 1 has at least one Shang Jian district 11,12He Yi Gexiajian district, Yi Ge deburring district 13, and as shown in Figure 4, Shang Jian district 11 guide rails comprise part section 112 and the ascent stage A113 that tilts in the inclination descent stage A111 that sets gradually, low level level; Deburring district 12 comprises part section and the ascent stage B that tilts in the inclination descent stage B that sets gradually, low level level; Xia Jian district 13 comprises part section and the ascent stage C that tilts under the inclination descent stage C that sets gradually, low level level.The form in deburring district 12,13Yu Shangjian district, Xia Jian district 11 is basically identical, repeats no more here.
One is built in closed loop guide rail and the driving and conveying belt 2 arranging along closed loop guide rail bearing of trend, as shown in Figure 5, this driving and conveying belt 2 is comprised of chain link 21, carrier bar 22, track adjusting wheel 23 and road wheel 24, and some chain links 21 are connected by bearing pin 25 successively with carrier bar 22; The track adjusting wheel 23 that axis is vertical direction is installed at chain link 21 centers, and track adjusting wheel 23 is positioned at the large end slot body of T-shaped groove of guide rail segmentation, and leads by large end slot body sidewall; As shown in Figure 6, the road wheel 24 that a pair of axis is horizontal direction is installed in each carrier bar 22 outsides, and road wheel 24 is positioned on the T-shaped groove step surface of guide rail segmentation;
Some hanging baskets 3 that are suspended on driving and conveying belt 2, hanging basket 3 has several layers of horizontally disposed holder frame, in holder frame, nylon wire is set;
Some driver trains 4 that are distributed on closed loop guide rail, each driver train 4 has an output chain gear that can mesh with chain link or the carrier bar of driving and conveying belt 2.Output chain gear by driver train 4 drives driving and conveying belt 2 at the uniform velocity to advance with certain speed.
On closed loop guide rail 1, also there are several lubricated districts, each lubricated district is provided with Lubricating oil adding device, as shown in Figure 7, Lubricating oil adding device comprises fuel filler pipe 51, nozzle 52, compressed air tube 53, flexible pipe 54, the front end of fuel filler pipe 51 has an oil nozzle a, middle part sidewall is provided with a lubricating oil oil-feed port b, and rear end has a compressed air inlet c; Oil nozzle a connects nozzle 52 by flexible pipe 54, and lubricating oil oil-feed port b is connected with lubricating oil oil drum by fuel feed pipe, and compressed air inlet c is communicated with compressed air tube 53, and electromagnetic valve 55 is installed on compressed air tube 53; On the closed loop guide rail in lubricated district, there is one section of top end opening; The nozzle 52 of Lubricating oil adding device is aimed at this opening.This Lubricating oil adding device can regularly be opened electromagnetic valve 55 by Controlled by Programmable Controller and be lubricated oily interpolation when moving.
Claims (2)
1. slow-recovery sponge is rested the head on a delivery system, it is characterized in that: comprise guide rail, driving and conveying belt and driver train,
The one closed loop guide rail in the S-shaped setting in the horizontal direction of factory building top, this closed loop guide rail is comprised of some guide rail segmentations, and guide rail is segmented into the aluminium alloy extrusions that an outline is rectangle, and it has a T-shaped groove that Open Side Down;
Described closed loop guide rail has at least one Shang Jian district, Yi Ge deburring district and Yi Gexiajian district, and Shang Jian district guide rail comprises part section and the ascent stage A that tilts in the inclination descent stage A that sets gradually, low level level; Deburring district comprises part section and the ascent stage B that tilts in the inclination descent stage B that sets gradually, low level level; Xia Jian district comprises part section and the ascent stage C that tilts under the inclination descent stage C that sets gradually, low level level;
One is built in closed loop guide rail and the driving and conveying belt arranging along closed loop guide rail bearing of trend, and this driving and conveying belt is comprised of chain link, carrier bar, track adjusting wheel and road wheel, and some chain links are connected by bearing pin successively with carrier bar; The track adjusting wheel that axis is vertical direction is installed at chain link center, and described track adjusting wheel is positioned at the large end slot body of T-shaped groove of guide rail segmentation, and leads by large end slot body sidewall; The road wheel that a pair of axis is horizontal direction is installed in each carrier bar outside, and described road wheel is positioned on the T-shaped groove step surface of guide rail segmentation;
Some hanging baskets that are suspended on driving and conveying belt, hanging basket has several layers of horizontally disposed holder frame, in holder frame, nylon wire is set;
Some driver trains that are distributed on closed loop guide rail, each described driver train has an output chain gear that can mesh with chain link or the carrier bar of driving and conveying belt.
2. slow-recovery sponge according to claim 1 is rested the head on delivery system, it is characterized in that: on described closed loop guide rail, also there is several lubricated districts, each lubricated district is provided with Lubricating oil adding device, described Lubricating oil adding device comprises fuel filler pipe, nozzle, compressed air tube, flexible pipe, the front end of fuel filler pipe has an oil nozzle, middle part sidewall is provided with a lubricating oil oil-feed port, and rear end has a compressed air inlet; Oil nozzle connects nozzle by flexible pipe, and lubricating oil oil-feed port is connected with lubricating oil oil drum by fuel feed pipe, and compressed air inlet is communicated with compressed air tube, and electromagnetic valve is installed on compressed air tube; On the closed loop guide rail in described lubricated district, there is one section of top end opening; This opening of the nozzle alignment of Lubricating oil adding device.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420311742.1U CN203921852U (en) | 2014-06-12 | 2014-06-12 | A kind of slow-recovery sponge pillow delivery system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420311742.1U CN203921852U (en) | 2014-06-12 | 2014-06-12 | A kind of slow-recovery sponge pillow delivery system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203921852U true CN203921852U (en) | 2014-11-05 |
Family
ID=51817710
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420311742.1U Expired - Lifetime CN203921852U (en) | 2014-06-12 | 2014-06-12 | A kind of slow-recovery sponge pillow delivery system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203921852U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104016069A (en) * | 2014-06-12 | 2014-09-03 | 江苏恒康家居科技股份有限公司 | Slow-springback sponge pillow conveying system |
CN107840102A (en) * | 2017-09-26 | 2018-03-27 | 马二峰 | A kind of vegetables and fruits conveying arrangement |
-
2014
- 2014-06-12 CN CN201420311742.1U patent/CN203921852U/en not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104016069A (en) * | 2014-06-12 | 2014-09-03 | 江苏恒康家居科技股份有限公司 | Slow-springback sponge pillow conveying system |
CN107840102A (en) * | 2017-09-26 | 2018-03-27 | 马二峰 | A kind of vegetables and fruits conveying arrangement |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104016069A (en) | Slow-springback sponge pillow conveying system | |
CN203921852U (en) | A kind of slow-recovery sponge pillow delivery system | |
CN103818851A (en) | Transmission lifting system for planting crops | |
CN205500140U (en) | Long -pending formula of putting of optional route hangs conveying system | |
CN203238507U (en) | Polishing device of high-speed steel rail polishing train | |
CN110039398A (en) | A kind of bag cage deburring equipment | |
CN205998561U (en) | Kiln car automatic traction device | |
CN113601383B (en) | Polishing machine | |
CN205132357U (en) | Multiple operation follows circular track way device | |
CN110406545A (en) | A kind of train enters the station not parking transfer device | |
CN107187659A (en) | Recrater is positioned and guider | |
CN102320079A (en) | Demoulding hook push ferrying vehicle | |
CN209244572U (en) | A kind of shield machine cutter transfer device | |
CN109177321A (en) | A kind of infolding bottom reason bag machine | |
CN209177375U (en) | Vertical library transfer robot | |
JP2008222406A (en) | Conveying equipment | |
CN204921022U (en) | Remove tunnel survival capsule | |
CN204912052U (en) | Remove to hang formula of shaking reciprocal wind riddle that circles round | |
CN104255891B (en) | A kind of sheep skin tearing machine | |
CN103155806B (en) | Suspension type track planting system of edible mushrooms | |
CN205915698U (en) | 3D (three -dimensional) printer | |
CN203319252U (en) | Feed mechanism | |
CN205616234U (en) | Trade a set device | |
CN205873108U (en) | Slide rail mechanism of material frame transition exchange | |
CN202358343U (en) | Cylindrical cartridge feeding device with distributing and shaping functions |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |