CN203881738U - Three-dimensional model test system for treating water bursting, mud bursting and grouting of tunnel - Google Patents
Three-dimensional model test system for treating water bursting, mud bursting and grouting of tunnel Download PDFInfo
- Publication number
- CN203881738U CN203881738U CN201420222070.7U CN201420222070U CN203881738U CN 203881738 U CN203881738 U CN 203881738U CN 201420222070 U CN201420222070 U CN 201420222070U CN 203881738 U CN203881738 U CN 203881738U
- Authority
- CN
- China
- Prior art keywords
- grouting
- water
- slip casting
- test
- pressure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model discloses a three-dimensional model test system for treating water bursting, mud bursting and grouting of a tunnel. The three-dimensional model test system comprises a test bed, a ground stress loading system, a water supply system, a grouting system and a monitoring system, wherein a space for filling compactness medium, fault medium and surrounding rock medium is arranged in the test bed, the compactness medium is arranged on the periphery and the bottom of the space in the test bed, the fault medium and the surrounding rock medium are arranged in a concave space formed by the compactness medium, the fault medium is arranged in the middle part of the surrounding rock medium, the top of the fault medium is provided with a gravel filter layer, and the water supply system is arranged on the gravel filter layer; the ground stress loading system is arranged on the top of the surrounding rock medium, the grouting system stretches to a digging tunnel part in the surrounding rock medium from the bottom of the test bed, the monitoring system comprises a plurality of sensors which are arranged on the junction of the fault medium and the surrounding rock medium and in the fault medium, and the sensors are connected with a display device outside the test bed.
Description
Technical field
The utility model relates to a kind of Geotechnical Engineering model test system, is specifically related to the prominent mud of a kind of tunnel gushing water and Grouting three-dimensional model pilot system.
Background technology
In rich water study on weak faults band, when tunneling, often there is the prominent mud disaster of gushing water, cause huge personnel's property loss.Slip casting has obtained application more and more widely as a kind of a kind of effective means of reinforcing weak surrounding rock, the prominent mud disaster of improvement gushing water in the prominent mud hazard management engineering of tunnel gushing water.But due to the complicacy of rock mass hydrogeological condition, the reason such as disguise, the time variation of slurries character of Grouting engineering, grouting theory seriously lags behind Grouting engineering practice.
Model test is the important method of slurries Diffusion Law and reinforcement mechanism in catastrophe mechanism in the prominent mud formation of marine disasters process of research tunnel gushing water, slip casting governance process.At present, aspect slip casting model experiment, slip casting model experiment lays particular emphasis on the part of slip casting process more, only, for some specific stratum (as Single Fracture, simple porous medium), slip casting process is not carried out the research of total system; Aspect the prominent mud model test of gushing water, researcher only studies the calamity process that causes of the prominent mud of gushing water mostly, not to administering and study after calamity.Especially cause the prominent mud disaster of gushing water and after calamity, carry out aspect the model investigation of slip casting improvement domestic rare research at tunnel excavation.
Utility model content
The purpose of this utility model is for overcoming above-mentioned the deficiencies in the prior art, the prominent mud of a kind of tunnel gushing water and Grouting three-dimensional model pilot system are provided, digging process after the prominent mud formation of marine disasters process of gushing water, calamity grouting behind shaft or drift lining governance process, the slip casting that the utility model can system simulation tunnel excavation causes is administered, and can further pass judgment on slip casting effect and analyze Analyses of Tunnel Wall Rock Stability.Realize continuous, the complete simulation of three phases of administering, administering rear excavation after the prominent mud formation of marine disasters of tunnel gushing water, calamity, for correlative study lays the foundation.
For achieving the above object, the utility model adopts following technical proposals:
The prominent mud of a kind of tunnel gushing water and Grouting three-dimensional model pilot system, comprise test-bed, terrestrial stress loading system, water system, filling system and monitoring system, in test-bed, be provided with the space for filling density medium, tomography medium and surrounding rocks, density medium is positioned at periphery and the bottom of test-bed inner space, tomography medium and surrounding rocks are positioned at the concave shaped space that density medium forms, tomography medium is in surrounding rocks middle part, tomography top of media is provided with one deck gravel packer, and water system is arranged on gravel packer; Terrestrial stress loading system is positioned at surrounding rocks top, filling system extend into the tunneling position in surrounding rocks by test-bed bottom, monitoring system comprises the some sensors that are arranged at tomography medium and surrounding rocks intersection and tomography medium inside, some sensors are connected with test-bed exterior display device, and tomography medium below arranges piezometric tube;
Described test-bed comprises sidewall, for the top cover that loads terrestrial stress platform and the base plate of being located at reinforced concrete support top of the trellis are provided, described sidewall is vertically built in base plate and is connected with base plate, top cover is located at the top of sidewall and is connected with sidewall; The model loop unit that described sidewall is stacked together by multiple in the vertical directions is connected in sequence; And in Tunnel Design position, the diametric(al) of corresponding model loop unit, just to two cavities are set, is used before tunnel excavation with the arc of sidewall identical radian measure and is sealed steel plate shutoff hole, between arc sealing steel plate and sidewall, is connected.
Described model loop unit is formed by connecting by two semi arch unit; Model loop adjacent one another are unit connects and composes sidewall by semicircle ring type floor.
Semi arch unit comprises arc plate, semicircle ring type floor, vertical floor, and semicircular ring formula floor is welded in top, the bottom of described arc plate circumferencial direction along edge; The two ends along the circumferential direction of arc plate and middle part are equipped with coupled vertical floor; And the in the vertical direction of described vertical floor is connected with semicircle ring type floor, and is drilled with hole on semicircle ring type floor.
On described arc plate, be provided with two connecting pipes that use or use as the fairlead of monitoring system as the Grouting Pipe coupling arrangement inside and outside model.
Described top cover is circular, and its top is provided with the intersection floor for improving intensity of top cap and rigidity, which is provided with one and arrives test-bed connecting pipe inner and that use as the connecting hole of terrestrial stress loading system through it.
On described base plate, be provided with many pipelines, pipeline passes base plate and is connected with base plate; And the pipe end that is positioned at test-bed inside is connected with Grouting Pipe by screw thread, the pipe end outside test-bed connects grouting pipeline.
When tunnel excavation, replace arc sealing steel plate with guiding steel plate, guiding steel plate provides excavation benchmark for tunneling.
Described guiding steel plate is made up of with the web joint of sidewall identical radian measure plain plate and two, and plain plate is connected with web joint; In the position perforate at four angles of plain plate, position of opening is identical with the position of opening of arc sealing steel plate.
Described terrestrial stress loading system comprises a head tank communicating with model test top of the trellis, described head tank is provided with 3 interfaces and a pressure relief valve, first interface is connected for it provides the air compressor machine of pressure with one, the second interface is connected for it provides the water pump at water source with one, the 3rd interface is communicated with water pocket, for the medium in model test frame provides pressure.
Described first interface is connected with the pressure governor of air compressor machine, induction valve door is installed on the second interface, and induction valve door is connected by flow pipe with water pump, and the 3rd interface is connected with water-delivery valve, water-supply-pipe connects water-delivery valve and water pocket, and tensimeter monitoring hydraulic pressure is set on water-supply-pipe.
Air compressor machine is by pressure governor regulation output pressure, and output pressure scope is 0~5MPa.
Described water-supply-pipe is connected with the connecting pipe entering in water pocket by a movable joint, described welding chassis, connecting pipe bottom, and connecting pipe chassis and water pocket circular open position are bonding.
Described water pocket employing thin-walled, the elastomeric material that deformation performance is splendid, survivability is strong are made, and water pocket is shaped as cylindrical, and centre arranges circular open.
The surrounding of described water pocket is test-bed sidewall, and water pocket diameter equates with test-bed sidewall internal diameter, and water pocket height equates with the distance between filled out surrounding rocks and top cover, thereby ensures the laminating of water pocket and test-bed sidewall and the surrounding rocks of filling out.
Test-bed sidewall bears the counter-force effect producing in water pocket pressure process, and top cover arranges the strength and stiffness of the floor enhancing top cover of square crossing.
Described water system comprises air compressor machine, water pump, waterpower pressure-bearing cylinder and pressurised water tank, and after tunnel excavation to the prominent mud of gushing water, prominent mud grouting behind shaft or drift lining administered, administered, in tunnel excavation process, water system can whole process provide steady pressure water source.Waterpower pressure-bearing cylinder is steel circular cylindrical pressure-bearing cylinder, pressure-bearing cylinder top arranges two valves, bottom arranges a valve, one of them upper valve is connected by air hose with the pressure governor on air compressor machine, air compressor machine provides stable aerodynamic force for waterpower pressure-bearing cylinder, compressed-air actuated pressure is easy to control and is stable, and by regulating pressure governor control output pressure, output pressure scope is 0~1.5MPa.Another upper valve of waterpower pressure-bearing cylinder is connected by delivery hose with water pump, and bottom valve is connected by delivery hose with pressurised water tank, P-Q-t registering instrument is set on delivery hose and is connected with computer, and real time record pressure, flow are over time.In experimentation, waterpower pressure-bearing tube inner chamber top is pressurized air, and bottom is water, utilizes stable air pressure to promote water and enters pressurised water tank.
Pressurised water tank is the water tank of flat, and water tank upper is connected by delivery hose with waterpower pressure-bearing cylinder, and osculum equidistantly gathers in water tank bottom.In model test process, pressurised water tank is preset at the top of tomography medium, water tank floorage with tomography medium on surface level to block area identical, ensure that pressurised water tank and tomography have maximum contact area, thereby make in model test process hydraulic pressure more even.
Described filling system comprises the segmenting slip casting device arranging before and after two pairs, the wherein wall rock grouting reinforcing area of a pair of segmenting slip casting device after corresponding to tunnel excavation, and another is the leading curtain-grouting reinforcing area before corresponding to tunnel excavation to segmenting slip casting device; Each segmenting slip casting device all comprises a vertical Grouting Pipe, in Grouting Pipe, be parallel with three slip casting flexible pipes corresponding with leading curtain-grouting reinforcing area before wall rock grouting reinforcing area or tunnel excavation after tunnel excavation respectively, in Grouting Pipe between every two slip casting flexible pipes, be provided with a slip casting separation scraper, the import of Grouting Pipe is connected with grouting pump;
Described slip casting separation scraper is the thin rounded flakes of marginal belt sawtooth, the diameter of thin rounded flakes is identical with the external diameter of Grouting Pipe, to after the bending of thin slice sawtooth, be inserted in Grouting Pipe end, and utilize bonding agent that both are adhesively fixed, the Grouting Pipe of bonding slip casting separation scraper is connected by joint with the Grouting Pipe of non-caked slip casting separation scraper, thus fixing slip casting separation scraper.
Described Grouting Pipe is PVC material, and Grouting Pipe lower port is connected with steel fiber tube by PVC box cupling, and steel fiber tube passes base plate and is welded to connect with base plate.
Described steel fiber tube lower end is connected with grouting pipeline by movable joint, and grouting pipeline is connected with grouting pump, and grouting pipeline is provided with valve.
Described thin rounded flakes is that thickness is the aluminum sheet of 0.23mm, and this aluminum sheet can be born the grouting pressure of 1MPa, meets the requirement of model test to grouting pressure completely.
Described slip casting flexible pipe adopts the plastic tube of softwood matter to make, and on flexible pipe, interval arranges the slurry mouthful that overflows, and slip casting flexible pipe is connected by PVC reducing with Grouting Pipe.
Two relative slip casting flexible pipes are arranged on same straight line, and totally 12 slip casting flexible pipes of the segmenting slip casting device arranging before and after two pairs is positive six prisms and arranges centered by tunnel.
The prominent mud of tunnel gushing water and Grouting three-dimensional model pilot system test method, step is:
Step 1: installation test stand on reinforced concrete support frame; The base plate of fixation test stand, connects into model loop unit by two semi arch unit by high-strength bolt, is bolted model loop unit, base plate and supporting steel plate, and rubber blanket is placed to ensure sealing in all bolts junction.Along with the increase of filler side's amount, set up in real time next layer model ring element, can avoid so disposable the test-bed filler bringing and the problem of burying monitoring element operating space deficiency underground of setting up;
Step 2: inner pre-buried segmenting slip casting device is installed, set up the model loop unit that contains tunnel portal in Tunnel Design position, lay 4 pre-buried segmenting slip casting devices in inside according to the tunnel location of design, 12 slip casting flexible pipes are evenly arranged in around tunnel, pass through to adjust the adjusted size slip casting flexible pipe position of PVC Grouting Pipe according to tunnel size;
Step 3: adopt compacting to fill method in test-bed inner filling surrounding rocks, improve tamped strength and compacting number of times at test-bed internal edge near zone, make it to form density medium, object is improve its intensity and reduce its permeability, prevent that slurries or water are along test-bed internal side wall flow effect experimental result, the normal filler of surrounding rocks in other regions;
Step 4: according to tomography medium inclination angle, thickness and tomography medium and tunnel relative position preset parameter tomography medium, fill tomography medium according to above-mentioned tomography medium parameter, and below tomography medium, piezometric tube being set, the effect of piezometric tube is whether checking tomography medium inside reaches full water state;
Step 5: arrange monitoring element, the critical area that Fibre Optical Sensor is arranged in respective process is observed the variation of specific physical field.Before and after the prominent mud disaster of gushing water occurs, near having a common boundary, tomography medium and country rock there is the critical area of front and back for disaster, this area interstitial flow field, displacement field, stress field generation significant change, near having a common boundary, section emphasis is arranged osmotic pressure, displacement, soil pressure and strain transducer.In Grouting process, tomography medium inside is the critical area of grouting and reinforcing, and this regional temperature field, seepage field, stress field generation significant change are arranged temperature, osmotic pressure, soil pressure and displacement transducer at the inner emphasis of tomography medium;
Step 6: place pressurised water tank, prevent that at the preset one deck gravel packer of tomography top of media tomography medium analog material from entering water tank by tank drains hole and stopping up osculum, preset pressurised water tank above gravel packer, pressurised water tank floorage with tomography medium on surface level to block area identical, ensure that pressurised water tank and tomography medium have maximum contact area;
Step 7: if do not need to load terrestrial stress, top cover is not installed, filler is issued in deadweight the stress level that test design requires, if desired load terrestrial stress, terrestrial stress loading system is installed, above surrounding rocks, places water pocket, ensure that water pocket and surrounding rocks and test-bed sidewall fit tightly, afterwards top cover is connected by high-strength bolt with sidewall, connects water-supply-pipe and water pocket connecting pipe by movable joint;
Step 8: start monitoring system, complete after the work such as whole fillers, monitoring element are buried underground, installations of pre-buried segmenting slip casting device, the installation of terrestrial stress loading system, startup monitoring system, starts to monitor each physical field data until model test finishes;
Step 9: form pressure-bearing Lentic environment, connect the equipment such as air compressor machine, water pump, waterpower pressure-bearing cylinder, pressurised water tank, P-Q-t registering instrument, open water pump to make waterpower pressure-bearing cylinder be full of water, close water-delivery valve after being full of water; Set air compressor machine pressure by object of experiment requirement, open related valve and make press water enter model inside, until tomography medium inside reaches full water state, thereby form pressure-bearing Lentic environment;
Step 10: tunnel excavation, replace arc with guiding steel plate and seal steel plate, taking the tunneling mouth on guiding steel plate as tunnel excavation benchmark and by design step-length gradation tunneling, after each step has been excavated, wait for a period of time, after each physical field data stabilization, carry out next step long excavation.Water yield during real time record tunnel excavation, and the prominent mud amount of gushing water when recording the prominent mud of gushing water and occurring;
Near step 11: tunnel surrounding is implemented to slip casting, and the outstanding mud mixture in cleaning tunnel is placed cylindrical self-control wall for grouting prominent mud mouth, prevents that in slip casting process, slurries flow out from the tunnel space having excavated; Because there are two slip casting separation scrapers the pre-buried segmenting slip casting device in inside and the each pre-buried segmenting slip casting device inside that are provided with 4 diverse locations, whole slip casting process divides 4 orders, every order to divide 3 sections of slip castings, altogether slip casting 12 times; Priority requirement by experimental program to reinforcing area, implements grouting for water-blocking to tunnel surrounding and reinforces.In slip casting process, utilize P-Q-t registering instrument to record grouting pressure, slip casting speed over time;
Step 12: tunneling after slip casting continues tunneling after slip casting, until tunnel holing through after every Monitoring Data is stable.After tunnel holing through, constantly increase pressure of supply water, make tunnel that the prominent mud of gushing water occur again, the maximum water pressure that the tunnel surrounding after inspection grouting and reinforcing can bear, and then pass judgment on slip casting effect;
Step 13: model test system is removed, and closes water system and terrestrial stress loading system, removes sidewall, records slurries diffusion form in form removal process, and is used for follow-up study in critical positions sampling.Model test finishes.
In the utility model, test-bed, for model test provides a bearing structure, bears the stress loading and the hydraulic pressure load that in experimentation, produce.Test-bed each several part all adopts the Plate Welding that 10mm is thick to form, and has ensured the strength and stiffness of test-bed, and it comprises base plate, sidewall and top cover.Sidewall in test-bed is formed by connecting by high-strength bolt by the model loop unit of high 300mm.Model loop unit is by two semi arch cell formations, and semi arch unit is made up of arc plate, semicircle ring type floor, vertical floor.Arc thickness of slab 10mm, diameter 1500mm, the semicircle ring type floor of wide 100mm, thick 10mm is welded in arc plate top, bottom along edge, and the vertical floor of wide 100mm, high 300mm, thick 10mm is welded at two ends and middle part; Semicircle ring type floor and vertically floor are by being welded to connect, and evenly boring.Two semi arch unit connect and compose model loop unit by the vertical floor of end by high-strength bolt; Model loop adjacent one another are unit connects and composes sidewall by semicircle ring type floor by high-strength bolt.Semicircle ring type floor and vertically floor improve structural strength and rigidity and play connection function.Two connecting pipes are set on arc plate, and connecting pipe can be used as the inside and outside Grouting Pipe coupling arrangement of model and uses, and the fairlead that also can be used as monitoring system uses.Sidewall is assembled by model loop unit, and successively assembling from lower to upper in model experiment set-up procedure, for filler and laying monitoring element provide larger operating space; After model test finishes, successively form removal from top to bottom, ensures that stratal configuration and slip casting slurry arteries and veins intactly remain and can observe slurries diffusion form.Each structural unit of test-bed adopts modular mode to connect, and assembling and convenient disassembly can adopt according to different model height the model loop combination of respective numbers.The design of test-bed has met the requirement of model test repeatability better.
In Tunnel Design position, the diametric(al) of corresponding model loop unit is just to arranging two circular cavities, cavity diameter is greater than the maximum tunnel size of getting by the design of different tests guide, before tunnel excavation, use the arc sealing steel plate shutoff circular opening with sidewall identical radian measure, in the position perforate at arc sealing four angles of steel plate, between arc sealing steel plate and sidewall, be bolted the middle rubber blanket of placing.When tunnel excavation, replace arc sealing steel plate with guiding steel plate, guiding steel plate provides excavation benchmark for tunneling.Guiding steel plate is made up of with the web joint of sidewall identical radian measure plain plate and two, and plain plate and web joint are by being welded to connect.In the position perforate at four angles of plain plate, position of opening is identical with the position of opening of arc sealing steel plate.Between guiding steel plate and sidewall, be bolted.By actual tunnel shape, tunneling mouth is set according to different test guides from circular hole correspondence position at plain plate.
On top cover, weld the intersection floor that high 100mm, thick 10mm intersect vertically, the floor that intersects improves the strength and stiffness of top cover, and top cover and sidewall are bolted.A connecting pipe of top cover welding, connecting pipe uses as the connecting hole of terrestrial stress loading system.The effect of top cover is to provide the platform that loads terrestrial stress; In the situation that not loading terrestrial stress, test-bed does not comprise top cover, and country rock material directly contacts with extraneous.
Base plate arranges 4 band silk steel pipes according to tunnel location, band silk steel pipe passes base plate and is connected by welding manner with base plate, the steel tube end part of test-bed inside is connected with pre-buried segmenting slip casting device by screw thread, steel tube end part outside test-bed is connected with valve by screw thread, and valve connects grouting pipeline.Top cover, base plate and sidewall are bolted.The rubber blanket that 10mm is thick is all placed in the junction of junction, sidewall and the base plate of junction, sidewall and top cover between junction, model loop unit between semi arch unit, ensures the sealing of model.
Test-bed is placed on reinforced concrete support frame, and reinforced concrete support frame is made up of supporting steel plate, 4 reinforced columns and reinforced concrete platform.Integrated the building of reinforced column and reinforced concrete platform forms, pre-buried two lead screw on every reinforced column, and supporting steel plate is arranging bolt hole with lead screw opposite position, and supporting steel plate is connected by lead screw with reinforced column.Supporting steel plate is an annular steel plate, thick 10mm, external diameter 2000mm, internal diameter 1100mm.Test-bed is directly placed on supporting steel plate, and supporting steel plate arranges bolt hole at bed bolt correspondence position, and supporting steel plate, base plate and sidewall are bolted.Reinforced concrete support frame has ensured that enough operating spaces are arranged at base plate bottom.
Terrestrial stress loading system is mainly made up of high-power air compressor machine, head tank, water pocket three parts.High-power air compressor machine in terrestrial stress loading system is connected by gas piping with head tank, and the high-power air compressor machine output pressure of pressure governor control is set, and output pressure scope is 0~5MPa.Stent support head tank is made and arranged to head tank by the thick steel plate of 10mm, head tank top arranges three interfaces and a pressure relief valve, first interface is connected with high-power air compressor machine by gas piping, the second interface is that filler the connection valve family status three interfaces connect valve and are connected with water pocket by water-supply-pipe, and gauge measurement hydraulic pressure is set on water-supply-pipe.Water pocket employing thin-walled, the elastomeric material that deformation performance is splendid, survivability is strong are made.Water pocket is shaped as cylindrical, and centre arranges circular open, and water pocket radius equates with test-bed internal diameter, and water pocket height equates with the distance between filled out surrounding rocks and top cover, thereby ensures that water pocket and test-bed sidewall and the surrounding rocks of filling out fit tightly.Water-supply-pipe is connected with the water pocket connecting pipe entering in water pocket by a movable joint, described welding chassis, water pocket connecting pipe bottom, and connecting pipe chassis and water pocket circular open position are bonding.In terrestrial stress loading procedure, in head tank, bottom is water, and top is air, relies on high-power air compressor machine that air pressure is provided, and air pressure is converted into effect of water pressure in water pocket, and institute adds hydraulic pressure and is delivered on surrounding rocks, loads thereby realize terrestrial stress.Hydraulic pressure will inevitably produce pressure loss by water pocket transmission of pressure, and by adopting deformation performance, good material making water pocket reduces pressure loss to greatest extent, allows added hydraulic pressure equate as far as possible with the terrestrial stress that will apply.
Water system is made up of air compressor machine, water pump, waterpower pressure-bearing cylinder and pressurised water tank etc., and after tunnel excavation to the prominent mud of gushing water, prominent mud grouting behind shaft or drift lining administered, administered, in tunnel excavation process, water system can whole process provide steady pressure water source.Waterpower pressure-bearing cylinder is steel circular cylindrical pressure-bearing cylinder, pressure-bearing cylinder top arranges two valves, bottom arranges a valve, one of them upper valve is connected by air hose with the pressure governor on air compressor machine, air compressor machine provides stable aerodynamic force for waterpower pressure-bearing cylinder, compressed-air actuated pressure is easy to control and is stable, and by regulating pressure governor control output pressure, output pressure scope is 0~1.5MPa.Waterpower pressure-bearing cylinder upper valve is connected by delivery hose with water pump, and bottom valve is connected by delivery hose with pressurised water tank, P-Q-t registering instrument is set on delivery hose and is connected with computer, and real time record pressure, flow are over time.In experimentation, waterpower pressure-bearing tube inner chamber top is pressurized air, and bottom is water, utilizes stable air pressure to promote water and enters pressurised water tank.
Pressurised water tank is the water tank of flat, and water tank upper is connected by delivery hose with waterpower pressure-bearing cylinder, and osculum equidistantly gathers in water tank bottom.In model test process, pressurised water tank is preset at the top of tomography medium, water tank floorage with tomography medium on surface level to block area identical, ensure that pressurised water tank and tomography medium have maximum contact area, thereby make in model test process hydraulic pressure more even
Filling system is made up of outside grouting device and inner pre-buried segmenting slip casting device two parts.Outside grouting device is made up of grouting pump, P-Q-t registering instrument and corresponding grouting pipeline.The band silk steel tube end part of test-bed inside is connected with 4 pre-buried segmenting slip casting devices in inside by screw thread, and inner pre-buried segmenting slip casting device is made up of PVC Grouting Pipe, slip casting separation scraper and slip casting flexible pipe.Each pre-buried segmenting slip casting device inside is provided with 2 slip casting separation scrapers and 3 slip casting flexible pipes, and inner pre-buried segmenting slip casting device can be realized a point order segmenting slip casting, and detailed process is referring to concrete test method.PVC Grouting Pipe adopts PVC material to be made, easy to process, with low cost.The material of slip casting separation scraper is common aluminum sheet, be shaped as the thin rounded flakes with sawtooth, the diameter of thin rounded flakes is identical with the external diameter of PVC Grouting Pipe, utilize AB glue bond PVC Grouting Pipe and slip casting separation scraper, the PVC Grouting Pipe of bonding slip casting separation scraper and the PVC Grouting Pipe of non-caked slip casting separation scraper are connected by PVC joint, thus fixing slip casting separation scraper.Slip casting separation scraper can bear the grouting pressure of 1MPa, meets the requirement of model test to grouting pressure completely.After the last period, slip casting completed, utilize drill bit to destroy aluminum sheet and can carry out slip casting next time.Slip casting flexible pipe adopts the plastic tube of softwood matter to make, and on flexible pipe, interval arranges the slurry mouthful that overflows, and slip casting flexible pipe is connected by PVC reducing with PVC Grouting Pipe.Slip casting flexible pipe does not have supporting capacity, and the prominent mud of tomography medium gushing water is not impacted.12 slip casting flexible pipes are evenly arranged in around tunnel, pass through to adjust the adjusted size slip casting flexible pipe position of PVC Grouting Pipe according to tunnel size.
Data monitoring system adopts Fibre Optical Sensor, comprises soil pressure, osmotic pressure, displacement, strain, optical fiber temperature sensor.That Fibre Optical Sensor has is highly sensitive, fast response time, wide dynamic range, lightweight, compact conformation, use are flexible, anticorrosive, high temperature resistant, be not subject to the advantages such as electromagnetic interference (EMI).The critical area that Fibre Optical Sensor is arranged in respective process is observed the variation of specific physical field.Before and after the prominent mud disaster of gushing water occurs, near having a common boundary, tomography medium and country rock there is the critical area of front and back for disaster, this area interstitial flow field, displacement field, stress field generation significant change, near having a common boundary, section emphasis is arranged osmotic pressure, displacement, soil pressure and strain transducer.In Grouting process, tomography medium inside is the critical area of grouting and reinforcing, and this regional temperature field, seepage field, stress field generation significant change are arranged temperature, osmotic pressure, soil pressure and displacement transducer at the inner emphasis of tomography medium.
The beneficial effects of the utility model are, digging process after the prominent mud formation of marine disasters process of gushing water, calamity grouting behind shaft or drift lining governance process, the slip casting that the utility model can system simulation tunnel excavation causes is administered, and can further pass judgment on slip casting effect and analyze Analyses of Tunnel Wall Rock Stability.Realize continuous, the complete simulation of three phases of administering, administering rear excavation after the prominent mud formation of marine disasters of tunnel gushing water, calamity, for correlative study lays the foundation.
Brief description of the drawings
Fig. 1 is the prominent mud of tunnel gushing water and Grouting three-dimensional model pilot system experiment process figure;
Fig. 2 is test-bed sectional view;
Fig. 3-1,3-2 are respectively test-bed sidewall semi arch unit front view and vertical view;
Fig. 4-1,4-2 are respectively guiding steel plate front view and vertical view;
Fig. 5 is test-bed base arrangement figure;
Fig. 6 is test-bed cap structure figure;
Fig. 7-1,7-2 are respectively reinforced concrete support frame vertical view and front view;
Fig. 8 is terrestrial stress loading system schematic diagram;
Fig. 9 is water system schematic diagram;
Figure 10 is pressurised water tank base arrangement figure;
Figure 11-1,11-2,11-3 are respectively inner pre-buried segmenting slip casting device structure and arrange front view, side view and vertical view;
Figure 12-1,12-2 are respectively inner pre-buried segmenting slip casting device detail structure chart;
Figure 12-3 are slip casting hose construction figure;
Figure 13 is model test filler, filling system, monitoring system work schematic diagram;
Figure 14 is test-bed three-dimension integrally figure;
1---sidewall; 2---top cover; 3---base plate; 4---high-strength bolt; 5---model loop unit; 6---semi arch unit; 7---arc plate; 8---semicircle ring type floor; 9---vertically floor; 10---arc plate connecting pipe; 11---circular cavity; 12---arc sealing steel plate; 13---rubber blanket; 14---intersection floor; 15---top cover connecting pipe; 16---pressure relief valve; 17---band silk steel pipe; 18---base plate valve; 19---reinforced concrete support frame; 20---supporting steel plate; 21---reinforced column; 22---reinforced concrete platform; 23---lead screw; 24---high-power air compressor machine; 25---head tank; 26---water pocket; 27---gas piping; 28---pressure governor; 29---support; 30---first interface; 31---the second interface; 32---water-supply-pipe; 33---tensimeter; 34---the 3rd interface; 35---water pocket connecting pipe; 36---air compressor machine; 37---water pump; 38---waterpower pressure-bearing cylinder; 39---pressurised water tank; 40---P-Q-t registering instrument; 41---pressure governor; 42---valve; 43---air hose; 44---delivery hose; 45---osculum; 46---PVC Grouting Pipe; 47---slip casting separation scraper; 48---slip casting flexible pipe; 49---sawtooth; 50---PVC joint; 51---PVC reducing; 52---inner pre-buried segmenting slip casting device; 53---tunnel; 54---surrounding rocks; 55---density medium; 56---tomography medium; 57---piezometric tube; 58---gravel packer; 59---monitoring section; 60---grouting pump; 61---P-Q-t registering instrument; 62---grouting pipeline; 63---guiding steel plate; 64---plain plate; 65---web joint; 66---tunneling mouth; 67---bolt hole; 68---slurry mouthful overflows.
Embodiment
Below in conjunction with drawings and Examples, the utility model is further illustrated.
As shown in Fig. 1-Figure 14, empirical model design height need to connect four layer model ring elements, and tunnel location is in second layer model loop element diameter position.Do not load terrestrial stress, surrounding rocks directly contacts with extraneous.Surrounding rocks is severely-weathered clay, and tomography medium is original state tomography medium mud, the stone potpourri of rich water weakness, 70 °, tomography medium inclination angle, and tomography dielectric thickness 60cm, this kind of geological condition very easily causes the prominent mud disaster of gushing water in tunnel excavation process to occur.
Model test system can the complete geologic condition of Simulation of Complex continuously under tunnel excavation process after the prominent mud Law of Disastor Evolution of tunnel gushing water, the punishment of calamity grouting behind shaft or drift lining and grouting and reinforcing, and can further pass judgment on slip casting effect and analyze Analyses of Tunnel Wall Rock Stability.It comprises test-bed, terrestrial stress loading system, water system, filling system, monitoring system five parts.
As shown in figure 13, test-bed is made up of base plate 3, sidewall 1 and top cover 2 three parts; Terrestrial stress loading system is mainly made up of high-power air compressor machine 24, head tank 25, water pocket 26 3 parts; Water system is made up of air compressor machine 36, water pump 37, waterpower pressure-bearing cylinder 38 and pressurised water tank 39 etc.; Filling system is made up of outside grouting device and inner pre-buried segmenting slip casting device 52 two parts; Monitoring system is made up of Fibre Optical Sensor and data sampling and processing device thereof.
In test-bed, be provided with the space for filling density medium 55, tomography medium 56 and surrounding rocks 54, density medium 55 is positioned at periphery and the bottom of test-bed inner space, tomography medium 56 and surrounding rocks 54 are positioned at the concave shaped space that density medium 55 forms, tomography medium 56 is in surrounding rocks 54 middle parts, tomography medium 56 tops are provided with one deck gravel packer 58, and water system is arranged on gravel packer 58; Terrestrial stress loading system is positioned at surrounding rocks 54 tops, filling system extend into tunneling 53 positions in surrounding rocks 54 by test-bed bottom, monitoring system comprises the some sensors that are arranged at tomography medium 56 and surrounding rocks 54 intersections and tomography medium 56 inside, some sensors are connected with test-bed exterior display device, and tomography medium 56 belows arrange piezometric tube 57.
As shown in Fig. 2-7, the sidewall 1 in test-bed is formed by connecting by high-strength bolt by the model loop unit 5 of high 300mm.Described model loop unit 5 is made up of two semi arch unit 6, and described semi arch unit 6 is made up of arc plate 7, semicircle ring type floor 8, vertical floor 9.The thick 10mm of arc plate 7, diameter 1500mm, the semicircle ring type floor 8 of wide 100mm, thick 10mm is welded in arc plate 7 tops, bottom along edge, and the vertical floor 9 of wide 100mm, high 300mm, thick 10mm is welded at two ends and middle part; Semicircle ring type floor 8 and vertically floor are by being welded to connect, and evenly boring.Two semi arch unit 6 connect and compose model loop unit 5 by the vertical floor 9 of end by high-strength bolt; Model loop adjacent one another are unit 5 connects and composes sidewall by semicircle ring type floor 8 by high-strength bolt.Semicircle ring type floor 8 and vertically floor 9 improve structural strength and rigidity and play connection function.Each structural unit of test-bed adopts modular mode to connect, and assembling and convenient disassembly can adopt the model loop 5 of respective numbers to combine according to different model height.
Two connecting pipes 10 are set on arc plate 7, and connecting pipe 10 can be used as the inside and outside Grouting Pipe coupling arrangement of model and uses, and the fairlead that also can be used as monitoring system uses.In Tunnel Design position, the diametric(al) of corresponding model loop unit 5 is just to arranging two circular cavities 11, cavity diameter is greater than maximum tunnel 53 sizes of getting by experimental design, before tunnel excavation, use the arc sealing steel plate 12 shutoff circular openings with sidewall identical radian measure, in the position perforate at arc sealing 12 4 angles of steel plate, between arc sealing steel plate 12 and sidewall, be connected the middle rubber blanket 13 of placing by bolt 4.
When tunnel excavation, replace arc sealing steel plate 12 with guiding steel plate 63, guiding steel plate 63 provides excavation benchmark for tunneling.Described guiding steel plate 63 is made up of with the web joint 65 of sidewall identical radian measure plain plate 64 and two, plain plate 64 with web joint 65 by being welded to connect.In the position perforate at 64 4 angles of plain plate, position of opening is identical with the position of opening of arc sealing steel plate 12.When tunnel excavation, lead and be connected by high-strength bolt 4 between steel plate 63 and sidewall 1.By actual tunnel shape, tunneling mouth 66 is set according to different test guides from circular hole 11 correspondence positions at plain plate 64.
On top cover 2, weld the intersection floor 14 that high 100mm, thick 10mm intersect vertically, the floor 14 that intersects improves the strength and stiffness of top cover 2, and top cover 2 is connected by high-strength bolt 4 with sidewall 1.Top cover 2 welds a connecting pipe 15, and connecting pipe 15 uses as the connecting hole of terrestrial stress loading system.The effect of top cover is to provide the platform that loads terrestrial stress; In the situation that not loading terrestrial stress, test-bed does not comprise top cover, and country rock material directly contacts with extraneous.
The base plate 3 of test-bed arranges 4 band silk steel pipes 17 according to tunnel location, band silk steel pipe 17 passes base plate 3 and is connected by welding manner with base plate 3, the steel tube end part of test-bed inside is connected with pre-buried segmenting slip casting device 52 by screw thread, steel tube end part outside test-bed is connected with base plate valve 18 by screw thread, and base plate valve 18 connects grouting pipeline.Base plate 3 is connected by high-strength bolt 4 with sidewall.
On top cover 2, base plate 3 and web joint 65, be equipped with bolt hole 67.
Junction, sidewall 1 between junction, model loop unit 5 between semi arch unit 6 all place with the junction of base plate 3 rubber blanket that 10mm is thick with junction, the sidewall 1 of top cover 2, ensure the sealing of model.
Test-bed is placed on reinforced concrete support frame 19, and reinforced concrete support frame 19 is made up of 20,4 reinforced columns 21 of supporting steel plate and reinforced concrete platform 22.Reinforced column 21 forms with integrated the building of reinforced concrete platform 22, pre-buried two lead screw 23 on every reinforced column 21, supporting steel plate 20 is arranging bolt hole with lead screw opposite position, and supporting steel plate 20 is connected by lead screw 23 with reinforced column 21.Supporting steel plate 20 is an annular steel plate, thick 10mm, external diameter 2000mm, internal diameter 1100mm.Test-bed is directly placed on supporting steel plate 20, and supporting steel plate 20 arranges bolt hole at base plate 3 bolt hole correspondence positions, and supporting steel plate 20, base plate 3 and sidewall 1 are connected by high-strength bolt 4.Reinforced concrete support frame 19 has ensured that enough operating spaces are arranged at base plate 3 bottoms.
As shown in Figure 8, the high-power air compressor machine 24 in terrestrial stress loading system is connected by gas piping 27 with head tank 25, and pressure governor 28 is set controls high-power air compressor machine 24 output pressures, and output pressure scope is 0~5MPa.Support 29 abutment pressure tanks 25 are made and arranged to head tank 25 by the thick steel plate of 10mm, head tank is provided with 3 interfaces and a pressure relief valve 16, first interface 30 is connected with high-power air compressor machine 24, and the second interface 31 is connected with water pump by water-supply-pipe 32, and the 3rd interface 34 is communicated with water pocket 26.
The tensimeter 33 of measuring hydraulic pressure is set on the pipeline that the water pocket 26 in terrestrial stress loading system is connected with head tank 25.Water pocket 26 adopts thin-walled, deformation performance is splendid, survivability is strong elastomeric material to make.Water pocket 26 is shaped as cylindrical, centre arranges circular open, water pocket 26 radiuses equate with test-bed internal diameter, and water pocket 26 height equate with the distance between filled out surrounding rocks 54 and top cover 2, thereby ensure that water pocket 26 and test-bed sidewall and the surrounding rocks of filling out 54 fit tightly.Water-supply-pipe is connected with the connecting pipe 35 entering in water pocket by movable joint, connecting pipe 35 welding chassis, bottom, and connecting pipe 35 chassis and water pocket 26 circular open positions are bonding.
As shown in Figure 9, Figure 10, waterpower pressure-bearing cylinder 38 in water system is steel circular cylindrical pressure-bearing cylinder, pressure-bearing cylinder top arranges two valves 42, bottom arranges a valve 42, one of them upper valve 42 is connected by air hose 43 with the pressure governor 41 on air compressor machine 36, by regulating pressure governor 41 to control output pressure, output pressure scope is 0~1.5MPa.
Another upper valve of waterpower pressure-bearing cylinder 33 in water system is connected by delivery hose 44 with water pump 37, bottom valve is connected by water-supply-pipe with pressurised water tank 39, P-Q-t registering instrument 40 is set on water-supply-pipe and is connected with computer, real time record pressure, flow are over time.
The water tank that pressurised water tank 39 in water system is flat, water tank upper is connected by delivery hose 44 with waterpower pressure-bearing cylinder 38, and osculum 45 equidistantly gathers in water tank bottom.Pressurised water tank 39 floorages with tomography medium on surface level to block area identical, ensured that in model test process, hydraulic pressure is more even.
As shown in Figure 11, Figure 12, outside grouting device is made up of grouting pump 60, P-Q-t registering instrument 61 and corresponding grouting pipeline 62.The band silk steel tube end part of test-bed inside is connected with 4 pre-buried segmenting slip casting devices 52 in inside by screw thread, and inner pre-buried segmenting slip casting device 52 is made up of PVC Grouting Pipe 46, slip casting separation scraper 47 and slip casting flexible pipe 48.Each pre-buried segmenting slip casting device 52 inside are provided with 47 and 3 slip casting flexible pipes 48 of 2 slip casting separation scrapers, and pre-buried segmenting slip casting device can be realized a point order segmenting slip casting.
The material of slip casting separation scraper 47 is common aluminum sheet, be shaped as the thin rounded flakes with sawtooth 49, the diameter of thin rounded flakes is identical with the external diameter of PVC Grouting Pipe 46, utilize AB glue bond PVC Grouting Pipe 46 and slip casting separation scraper 47, the PVC Grouting Pipe 46 of bonding slip casting separation scraper 47 and the PVC Grouting Pipe 46 of non-caked slip casting separation scraper 47 are connected by PVC joint 50, thus fixing slip casting separation scraper 47.
Slip casting flexible pipe 48 adopts the plastic tube of softwood matter to make, and on flexible pipe, interval arranges the slurry mouth 68 that overflows, and slip casting flexible pipe 48 is connected by PVC reducing 51 with PVC Grouting Pipe 46.Slip casting flexible pipe 48 does not have supporting capacity, and the prominent mud of tomography medium gushing water is not impacted.12 slip casting flexible pipes 48 are evenly arranged in around tunnel 53, adjust flexibly slip casting flexible pipe 48 positions according to tunnel size by the size of adjusting PVC Grouting Pipe 46.
Data monitoring system adopts Fibre Optical Sensor, comprises soil pressure, osmotic pressure, displacement, strain, optical fiber temperature sensor.That Fibre Optical Sensor has is highly sensitive, fast response time, wide dynamic range, lightweight, compact conformation, use are flexible, anticorrosive, high temperature resistant, be not subject to the advantages such as electromagnetic interference (EMI).
The critical area that Fibre Optical Sensor is arranged in respective process is observed the variation of specific physical field.Before and after the prominent mud disaster of gushing water occurs, near having a common boundary, tomography medium and country rock there is the critical area of front and back for disaster, this area interstitial flow field, displacement field, stress field generation significant change, near having a common boundary, section emphasis is arranged osmotic pressure, displacement, soil pressure and strain transducer.In Grouting process, tomography medium inside is the critical area of grouting and reinforcing, and this regional temperature field, seepage field, stress field generation significant change are arranged temperature, osmotic pressure, soil pressure and displacement transducer at the inner emphasis of tomography medium.
The prominent mud of tunnel gushing water and Grouting three-dimensional model pilot system test method, step is:
Step 1: installation test stand on reinforced concrete support frame 19.The base plate 3 of fixation test stand, connects into model loop unit 5 by two semi arch unit by high-strength bolt 4, is bolted model loop unit 5, base plate 3 and supporting steel plate 20, and rubber blanket 13 is placed to ensure sealing in all bolts junction.Along with the increase of filler side's amount, set up in real time next layer model ring element, can avoid so disposable the test-bed filler bringing and the problem of burying monitoring element operating space deficiency underground of setting up.
Step 2: inner pre-buried segmenting slip casting device 52 is installed.Set up the model loop unit that contains tunnel portal in Tunnel Design position, lay 4 pre-buried segmenting slip casting devices 52 in inside according to the tunnel location of design, 12 slip casting flexible pipes 48 are evenly arranged in around tunnel 53, pass through to adjust adjusted size slip casting flexible pipe 48 positions of PVC Grouting Pipe 46 according to tunnel size.The layout of pre-buried segmenting slip casting device as shown in figure 11.
Step 3: adopt compacting to fill method in test-bed inner filling surrounding rocks 54.Improve tamped strength and compacting number of times at test-bed internal edge near zone, make it to form density medium 55, object is improve its intensity and reduce its permeability, prevents that slurries or water from flowing along test-bed internal side wall, affects experimental result.The normal filler of surrounding rocks 54 in other regions.
Step 4: according to preset parameter tomography media 56 such as tomography medium inclination angle, thickness and tomography medium and tunnel relative positions.Fill tomography medium according to above-mentioned tomography medium parameter, and below tomography medium 56, piezometric tube 57 is set, the effect of piezometric tube 57 is whether checking tomography medium inside reaches full water state.
Step 5: arrange monitoring element.The critical area that Fibre Optical Sensor is arranged in respective process is observed the variation of specific physical field.Before and after the prominent mud disaster of gushing water occurs, near having a common boundary with country rock 54, tomography medium 56 there is the critical area of front and back for disaster, this area interstitial flow field, displacement field, stress field generation significant change, arrange osmotic pressure, displacement, soil pressure and strain transducer at I, II, the III section emphasis of monitoring section 59.In Grouting process, tomography medium inside is the critical area of grouting and reinforcing, this regional temperature field, seepage field, stress field generation significant change, arrange temperature, osmotic pressure, soil pressure and displacement transducer in the tomography medium inside of monitoring section 59 at III, IV, V, VI emphasis.Monitoring element is arranged as shown in figure 13.
Step 6: place pressurised water tank 39.Prevent that at the tomography medium 56 preset one deck gravel packers 58 in top tomography medium analog material from entering water tank by tank drains hole and stopping up osculum 45, preset pressurised water tank 39 above gravel packer 58, pressurised water tank 39 floorages with tomography medium 56 on surface level to block area identical, ensure that pressurised water tank 39 and tomography medium 56 have maximum contact area.
Step 7: if do not need to load terrestrial stress, top cover 2 is not installed, filler is issued in deadweight the stress level that test design requires.If desired load terrestrial stress, terrestrial stress loading system is installed, above surrounding rocks, places water pocket 26, ensure that water pocket 26 and surrounding rocks and test-bed sidewall fit tightly, afterwards top cover 2 is connected by high-strength bolt with sidewall 1, connects water-supply-pipe and water pocket connecting pipe 35 by movable joint.
Step 8: start monitoring system.Completing after the work such as whole fillers, monitoring element are buried underground, pre-buried segmenting slip casting device 52 is installed, the installation of terrestrial stress loading system, start monitoring system, start to monitor each physical field data until model test finishes.
Step 9: form pressure-bearing Lentic environment.Connect air compressor machine 36, water pump 37, waterpower pressure-bearing cylinder 38, pressurised water tank 39, P-Q-t registering instrument 40 equipment, open water pump and make waterpower pressure-bearing cylinder 38 be full of water, close water-delivery valve 42 after being full of water.Set air compressor machine pressure by object of experiment requirement, open related valve and make press water enter model inside, until tomography medium inside reaches full water state, thereby form pressure-bearing Lentic environment.
Step 10: tunnel excavation.Replace arc with guiding steel plate 63 and seal steel plate 12, taking the tunneling mouth 66 on guiding steel plate 63 as tunnel excavation benchmark and by design step-length gradation tunneling, after each step has been excavated, wait for a period of time, after each physical field data stabilization, carry out next step long excavation.Water yield during real time record tunnel excavation, and the prominent mud amount of gushing water when recording the prominent mud of gushing water and occurring.
Step 11: tunnel surrounding is implemented to slip casting.The outstanding mud mixture in cleaning tunnel is placed cylindrical self-control wall for grouting near prominent mud mouth, prevents that in slip casting process, slurries flow out from the tunnel space having excavated.Because there are two slip casting separation scrapers the pre-buried segmenting slip casting device 52 in inside and each pre-buried segmenting slip casting device 52 inside that are provided with 4 diverse locations, whole slip casting process divides 4 orders, every order to divide 3 sections of slip castings, altogether slip casting 12 times.Priority requirement by experimental program to reinforcing area, implements grouting for water-blocking to tunnel surrounding and reinforces.In slip casting process, utilize P-Q-t registering instrument to record grouting pressure, slip casting speed over time.
Step 12: tunneling after slip casting.After slip casting, after every Monitoring Data is stable, continue tunneling, until tunnel holing through.After tunnel holing through, constantly increase pressure of supply water, make tunnel that the prominent mud of gushing water occur again, the maximum water pressure that the tunnel surrounding after inspection grouting and reinforcing can bear, and then pass judgment on slip casting effect.
Step 13: model test system is removed.Close water system and terrestrial stress loading system, remove sidewall 1, in form removal process, record slurries diffusion form, and be used for follow-up study in critical positions sampling.Model test finishes.
Test-bed can consist of adjustment the model loop unit 5 quantity change model height of sidewall 1.Sidewall 1 is assembled by model loop unit 5, and assembly and disassembly are convenient, and model test is repeatable strong.Successively assembling from lower to upper in model experiment set-up procedure, for filler and laying monitoring element provide larger operating space; After model test finishes, successively form removal from top to bottom, ensures that stratal configuration and slip casting slurry arteries and veins intactly remain and can observe slurries diffusion form.
The band silk steel tube end part of test-bed inside is connected with 4 pre-buried segmenting slip casting devices 52 by screw thread, and inner pre-buried segmenting slip casting device 52 is made up of PVC Grouting Pipe 46, slip casting separation scraper 47 and slip casting flexible pipe 48.The material of slip casting separation scraper 47 is common aluminum sheet, after the last period, slip casting completed, utilizes drill bit to destroy aluminum sheet and can carry out slip casting next time.Each pre-buried segmenting slip casting device 52 inside are provided with 47 and 3 slip casting flexible pipes 48 of 2 slip casting separation scrapers, and pre-buried segmenting slip casting device can be realized a point order segmenting slip casting.
Slip casting flexible pipe 48 adopts the plastic tube of softwood matter to make, and on flexible pipe, interval arranges the slurry mouth 68 that overflows, and slip casting flexible pipe 48 is connected by PVC reducing with PVC Grouting Pipe 46.Slip casting flexible pipe 48 does not have supporting capacity, and the prominent mud of tomography medium gushing water is not impacted.12 slip casting flexible pipes 48 are evenly arranged in around tunnel 53, pass through to adjust adjusted size slip casting flexible pipe 48 positions of PVC Grouting Pipe 46 according to tunnel size.
The water tank that pressurised water tank 39 is flat, water tank upper is connected with waterpower pressure-bearing cylinder 38, and osculum 45 equidistantly gathers in water tank bottom.Pressurised water tank 39 floorages with tomography medium on surface level to block area identical, ensured that in model test process, hydraulic pressure is more even.The pressurised water tank 39 preset one deck gravel packers 58 in bottom, prevent that country rock analog material from entering water tank by tank drains hole and stopping up osculum 45.
Tomography medium, density medium, common surrounding rocks are analog material, and the mechanics parameter of analog material is according to similarity theory and actual tests Location of requirement.
By reference to the accompanying drawings embodiment of the present utility model is described although above-mentioned; but the not restriction to the utility model protection domain; one of ordinary skill in the art should be understood that; on the basis of the technical solution of the utility model, those skilled in the art do not need to pay various amendments that creative work can make or distortion still in protection domain of the present utility model.
Claims (10)
1. the prominent mud of a tunnel gushing water and Grouting three-dimensional model pilot system, it is characterized in that, comprise test-bed, terrestrial stress loading system, water system, filling system and monitoring system, in test-bed, be provided with for filling density medium, the space of tomography medium and surrounding rocks, density medium is positioned at periphery and the bottom of test-bed inner space, tomography medium and surrounding rocks are positioned at the concave shaped space that density medium forms, tomography medium is in surrounding rocks middle part, tomography top of media is provided with one deck gravel packer, water system is arranged on gravel packer, terrestrial stress loading system is positioned at surrounding rocks top, filling system extend into the tunneling position in surrounding rocks by test-bed bottom, monitoring system comprises the some sensors that are arranged at tomography medium and surrounding rocks intersection and tomography medium inside, some sensors are connected with test-bed exterior display device, and tomography medium below arranges piezometric tube,
Described test-bed comprises sidewall, for the top cover that loads terrestrial stress platform and the base plate of being located at reinforced concrete support top of the trellis are provided, described sidewall is vertically built in base plate and is connected with base plate, top cover is located at the top of sidewall and is connected with sidewall; The model loop unit that described sidewall is stacked together by multiple in the vertical directions is connected in sequence; And in Tunnel Design position, the diametric(al) of corresponding model loop unit, just to two cavities are set, is used before tunnel excavation with the arc of sidewall identical radian measure and is sealed steel plate shutoff hole, between arc sealing steel plate and sidewall, is connected;
Described terrestrial stress loading system comprises a head tank communicating with model test top of the trellis, described head tank is provided with 3 interfaces and a pressure relief valve, first interface is connected for it provides the air compressor machine of pressure with one, the second interface is connected for it provides the water pump at water source with one, the 3rd interface is communicated with water pocket, for the medium in model test frame provides pressure.
2. the prominent mud of tunnel as claimed in claim 1 gushing water and Grouting three-dimensional model pilot system, is characterized in that, described model loop unit is formed by connecting by two semi arch unit; Model loop adjacent one another are unit connects and composes sidewall by semicircle ring type floor;
Semi arch unit comprises arc plate, semicircle ring type floor, vertical floor, and semicircular ring formula floor is welded in top, the bottom of described arc plate circumferencial direction along edge; The two ends along the circumferential direction of arc plate and middle part are equipped with coupled vertical floor; And described vertical floor in the vertical direction is connected with semicircle ring type floor, and is drilled with hole on semicircle ring type floor;
On described arc plate, be provided with two connecting pipes that use or use as the fairlead of monitoring system as the Grouting Pipe coupling arrangement inside and outside model.
3. the prominent mud of tunnel as claimed in claim 1 gushing water and Grouting three-dimensional model pilot system, it is characterized in that, described top cover is circular, its top is provided with the intersection floor for improving intensity of top cap and rigidity, which is provided with one and arrives test-bed connecting pipe inner and that use as the connecting hole of terrestrial stress loading system through it;
On described base plate, be provided with many pipelines, pipeline passes base plate and is connected with base plate; And the pipe end that is positioned at test-bed inside is connected with Grouting Pipe by screw thread, the pipe end outside test-bed connects grouting pipeline.
4. the prominent mud of tunnel as claimed in claim 1 gushing water and Grouting three-dimensional model pilot system, is characterized in that, when tunnel excavation, replaces arc sealing steel plate with guiding steel plate, and the steel plate that leads provides excavation benchmark for tunneling;
Described guiding steel plate is made up of with the web joint of sidewall identical radian measure plain plate and two, and plain plate is connected with web joint; In the position perforate at four angles of plain plate, position of opening is identical with the position of opening of arc sealing steel plate.
5. the prominent mud of tunnel as claimed in claim 1 gushing water and Grouting three-dimensional model pilot system, it is characterized in that, described first interface is connected with the pressure governor of air compressor machine, induction valve door is installed on the second interface, induction valve door is connected by flow pipe with water pump, the 3rd interface is connected with water-delivery valve, and water-supply-pipe connects water-delivery valve and water pocket, and tensimeter monitoring hydraulic pressure is set on water-supply-pipe;
Air compressor machine is by pressure governor regulation output pressure, and output pressure scope is 0~5MPa;
Described water-supply-pipe is connected with the connecting pipe entering in water pocket by a movable joint, described welding chassis, connecting pipe bottom, and connecting pipe chassis and water pocket circular open position are bonding.
6. the prominent mud of tunnel as claimed in claim 1 gushing water and Grouting three-dimensional model pilot system, is characterized in that, described water pocket adopts the elastomeric material of thin-walled to make, and water pocket is shaped as cylindrical, and centre arranges circular open;
The surrounding of described water pocket is test-bed sidewall, and water pocket diameter equates with test-bed sidewall internal diameter, and water pocket height equates with the distance between filled out surrounding rocks and top cover, thereby ensures the laminating of water pocket and test-bed sidewall and the surrounding rocks of filling out;
Test-bed sidewall bears the counter-force effect producing in water pocket pressure process, and the top cover of test-bed arranges the floor of square crossing.
7. the prominent mud of tunnel as claimed in claim 1 gushing water and Grouting three-dimensional model pilot system, it is characterized in that, described water system comprises air compressor machine, water pump, waterpower pressure-bearing cylinder and pressurised water tank, waterpower pressure-bearing cylinder is steel circular cylindrical pressure-bearing cylinder, pressure-bearing cylinder top arranges two valves, bottom arranges a valve, one of them upper valve is connected by air hose with the pressure governor on air compressor machine, air compressor machine provides stable aerodynamic force for waterpower pressure-bearing cylinder, by regulating pressure governor control output pressure, output pressure scope is 0~1.5MPa; Another upper valve of waterpower pressure-bearing cylinder is connected by delivery hose with water pump, and bottom valve is connected by delivery hose with pressurised water tank, P-Q-t registering instrument is set on delivery hose and is connected with computer, and real time record pressure, flow are over time;
Pressurised water tank is the water tank of flat, and water tank upper is connected by delivery hose with waterpower pressure-bearing cylinder, and osculum equidistantly gathers in water tank bottom; In model test process, pressurised water tank is preset at the top of tomography medium, water tank floorage with tomography medium on surface level to block area identical, ensure that pressurised water tank and tomography medium have maximum contact area, thereby make in model test process hydraulic pressure more even.
8. the prominent mud of tunnel as claimed in claim 1 gushing water and Grouting three-dimensional model pilot system, it is characterized in that, the segmenting slip casting device that described filling system arranges before and after comprising two pairs, the wherein wall rock grouting reinforcing area of a pair of segmenting slip casting device after corresponding to tunnel excavation, another is the leading curtain-grouting reinforcing area before corresponding to tunnel excavation to segmenting slip casting device; Each segmenting slip casting device all comprises a vertical Grouting Pipe, in Grouting Pipe, be parallel with three slip casting flexible pipes corresponding with leading curtain-grouting reinforcing area before wall rock grouting reinforcing area or tunnel excavation after tunnel excavation respectively, in Grouting Pipe between every two slip casting flexible pipes, be provided with a slip casting separation scraper, the import of Grouting Pipe is connected with grouting pump;
Described slip casting separation scraper is the thin rounded flakes of marginal belt sawtooth, the diameter of thin rounded flakes is identical with the external diameter of Grouting Pipe, to after the bending of thin slice sawtooth, be inserted in Grouting Pipe end, and utilize bonding agent that both are adhesively fixed, the Grouting Pipe of bonding slip casting separation scraper is connected by joint with the Grouting Pipe of non-caked slip casting separation scraper, thus fixing slip casting separation scraper.
9. the prominent mud of tunnel as claimed in claim 8 gushing water and Grouting three-dimensional model pilot system, is characterized in that, described Grouting Pipe is PVC material, and Grouting Pipe lower port is connected with steel fiber tube by PVC box cupling, and steel fiber tube passes base plate and is welded to connect with base plate;
Described steel fiber tube lower end is connected with grouting pipeline by movable joint, and grouting pipeline is connected with grouting pump;
Described thin rounded flakes is that thickness is the aluminum sheet of 0.23mm, and this aluminum sheet can be born the grouting pressure of 1MPa, meets the requirement of model test to grouting pressure completely;
Described slip casting flexible pipe adopts the plastic tube of softwood matter to make, and on flexible pipe, interval arranges the slurry mouthful that overflows, and slip casting flexible pipe is connected by PVC reducing with Grouting Pipe.
10. the prominent mud of tunnel as claimed in claim 8 gushing water and Grouting three-dimensional model pilot system, it is characterized in that, two relative slip casting flexible pipes are arranged on same straight line, and totally 12 slip casting flexible pipes of the segmenting slip casting device arranging before and after two pairs is positive six prisms and arranges centered by tunnel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420222070.7U CN203881738U (en) | 2014-04-30 | 2014-04-30 | Three-dimensional model test system for treating water bursting, mud bursting and grouting of tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420222070.7U CN203881738U (en) | 2014-04-30 | 2014-04-30 | Three-dimensional model test system for treating water bursting, mud bursting and grouting of tunnel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203881738U true CN203881738U (en) | 2014-10-15 |
Family
ID=51682224
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420222070.7U Withdrawn - After Issue CN203881738U (en) | 2014-04-30 | 2014-04-30 | Three-dimensional model test system for treating water bursting, mud bursting and grouting of tunnel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203881738U (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104374680A (en) * | 2014-11-07 | 2015-02-25 | 山东大学 | Slip casting diffusion testing device and testing method using same |
CN103926383B (en) * | 2014-04-30 | 2015-08-05 | 山东大学 | Tunnel gushing water is dashed forward mud and Grouting three-dimensional model pilot system and test method thereof |
CN104833775A (en) * | 2015-05-07 | 2015-08-12 | 中国人民解放军理工大学 | Three-dimensional model testing apparatus capable of simulating water outburst and mud outburst geological disasters |
CN105510534A (en) * | 2015-12-14 | 2016-04-20 | 辽宁建筑职业学院 | Testing device and method capable of simulating filling and grouting of water-containing coal seams with different inclination angles |
CN105785468A (en) * | 2016-01-05 | 2016-07-20 | 西南交通大学 | Destructive testing apparatus and method for simulating tunnel going through oblique displaced active fault |
CN105807012A (en) * | 2016-05-19 | 2016-07-27 | 湖南科技大学 | Testing device and method for simulating water outburst and mud outburst of fault |
CN107144470A (en) * | 2017-05-05 | 2017-09-08 | 山东大学 | The prominent mud disaster real-time monitoring device of gushing water and operating method in tunnels and underground engineering |
CN107290501A (en) * | 2017-05-27 | 2017-10-24 | 莫纳什大学 | Filling medium seepage failure gushing water experimental provision and method inside the tomography type geological structure of crack |
CN115019618A (en) * | 2022-04-19 | 2022-09-06 | 中国海洋大学 | High-temperature water-rich weak stratum tunnel curtain grouting excavation model test device and method |
-
2014
- 2014-04-30 CN CN201420222070.7U patent/CN203881738U/en not_active Withdrawn - After Issue
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103926383B (en) * | 2014-04-30 | 2015-08-05 | 山东大学 | Tunnel gushing water is dashed forward mud and Grouting three-dimensional model pilot system and test method thereof |
CN104374680A (en) * | 2014-11-07 | 2015-02-25 | 山东大学 | Slip casting diffusion testing device and testing method using same |
CN104833775A (en) * | 2015-05-07 | 2015-08-12 | 中国人民解放军理工大学 | Three-dimensional model testing apparatus capable of simulating water outburst and mud outburst geological disasters |
CN105510534A (en) * | 2015-12-14 | 2016-04-20 | 辽宁建筑职业学院 | Testing device and method capable of simulating filling and grouting of water-containing coal seams with different inclination angles |
CN105785468A (en) * | 2016-01-05 | 2016-07-20 | 西南交通大学 | Destructive testing apparatus and method for simulating tunnel going through oblique displaced active fault |
CN105807012A (en) * | 2016-05-19 | 2016-07-27 | 湖南科技大学 | Testing device and method for simulating water outburst and mud outburst of fault |
CN107144470A (en) * | 2017-05-05 | 2017-09-08 | 山东大学 | The prominent mud disaster real-time monitoring device of gushing water and operating method in tunnels and underground engineering |
CN107290501A (en) * | 2017-05-27 | 2017-10-24 | 莫纳什大学 | Filling medium seepage failure gushing water experimental provision and method inside the tomography type geological structure of crack |
CN107290501B (en) * | 2017-05-27 | 2020-05-26 | 莫纳什大学 | Crack fault type geological structure internal filling medium seepage instability water inrush experiment device and method |
CN115019618A (en) * | 2022-04-19 | 2022-09-06 | 中国海洋大学 | High-temperature water-rich weak stratum tunnel curtain grouting excavation model test device and method |
CN115019618B (en) * | 2022-04-19 | 2023-02-28 | 中国海洋大学 | High-temperature water-rich weak stratum tunnel curtain grouting excavation model test device and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103926383B (en) | Tunnel gushing water is dashed forward mud and Grouting three-dimensional model pilot system and test method thereof | |
CN203881738U (en) | Three-dimensional model test system for treating water bursting, mud bursting and grouting of tunnel | |
CN104614497B (en) | True triaxial stream pressure fracturing, slot, seepage flow, gas drive integrated experimental system | |
CN100390357C (en) | Analogue experiment stand for interreaction of tunnel structure, surrounding rock and underground water | |
CN100535267C (en) | Simulation test system for underground construction in city | |
CN103940968B (en) | Test bed device for tunnel excavating and grouting model and application method of device | |
CN103995097B (en) | A kind of test method and device of simulating jacking construction initiation stratum deformation | |
CN101798933B (en) | Simulation test system for soil pressure balance shielding screw conveyer | |
CN108196034A (en) | Simulate high-pressure slip-casting device and test method under buried stratum river channels | |
CN104568595A (en) | Coal bed mining floor grouting infiltration-reducing simulation testing system | |
CN203881760U (en) | Test device for simulating stratum loss caused by pipe-jacking construction | |
CN110108838A (en) | A kind of simulation experiment method of directional drilling grouting serous fluid diffusion | |
CN113586069A (en) | Indoor test device for simulating shield water-rich stratum synchronous grouting construction technology and using method thereof | |
CN109709307B (en) | Simulation test device and method for similar materials under irregular boundary conditions | |
CN104849428A (en) | Experimental device for simulating overlaying strata migration and water and sand bursting of underground coal mining | |
CN112229981A (en) | Device for simulating comprehensive influence of foundation pit excavation and multi-gradient precipitation on tunnel | |
CN202916109U (en) | Multifunctional experimental device for simulating pipe-clay effect | |
CN116047024A (en) | Grouting lifting three-dimensional model test device and test method | |
CN108195739B (en) | Pressure-controlled seepage test mechanism and seepage time measuring device | |
CN203881737U (en) | Rack device for tunnel excavating and grouting model test | |
CN212506453U (en) | Indoor model test system for simulating foundation pit dewatering plane seepage and retaining wall deformation | |
CN203881759U (en) | Circular jacking pipe for simulating pipe-jacking construction | |
CN113030400A (en) | Water inrush evolution simulation test device and method for tunnel face of water-rich fault tunnel | |
CN112067477A (en) | Boundary loading device for tunnel underground structure vibrating table geomechanical model test | |
CN115902151A (en) | Test device and method for simulating shield stratum loss and monitoring soil body displacement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20141015 Effective date of abandoning: 20150805 |
|
RGAV | Abandon patent right to avoid regrant |