CN203866849U - Seamless junction underground diaphragm wall guide wall structure on complex stratum - Google Patents

Seamless junction underground diaphragm wall guide wall structure on complex stratum Download PDF

Info

Publication number
CN203866849U
CN203866849U CN201420300880.XU CN201420300880U CN203866849U CN 203866849 U CN203866849 U CN 203866849U CN 201420300880 U CN201420300880 U CN 201420300880U CN 203866849 U CN203866849 U CN 203866849U
Authority
CN
China
Prior art keywords
hole
holes
underground diaphragm
guide wall
wall structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420300880.XU
Other languages
Chinese (zh)
Inventor
张炳吉
汪智慧
曾庆辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Northeast Architectural Design and Research Institute Co Ltd
Original Assignee
China Northeast Architectural Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Northeast Architectural Design and Research Institute Co Ltd filed Critical China Northeast Architectural Design and Research Institute Co Ltd
Priority to CN201420300880.XU priority Critical patent/CN203866849U/en
Application granted granted Critical
Publication of CN203866849U publication Critical patent/CN203866849U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a seamless junction underground diaphragm wall guide wall structure on a complex stratum. The seamless junction underground diaphragm wall guide wall structure on the complex stratum comprises holes I formed through a percussion drill and holes II formed through a rotary drilling multi-head drill or a guide plate grab machine, wherein the holes I and the holes II are arranged alternatively, the diameter of each hole I is larger than that of each hole II, the holes I are tangent with the holes II, and the thickness of a guide wall is smaller than the diameter of each hole II. The seamless junction underground diaphragm wall guide wall structure on the complex stratum has the advantages that the seamless junction underground diaphragm wall guide wall structure is good in permeability resistance, small in vibration and small in noise in construction process and quite suitable for city construction; a wall body is high in rigidity and capable of bearing large soil pressure used for excavation of a foundation pit, so that the accidents of foundation settlement or collapse hardly occur; construction can be carried out close to an original building; the seamless junction underground diaphragm wall guide wall structure can be applied to multiple stratum conditions, and is high in work efficiency, short in work period, reliable in quality and high in economic benefit.

Description

Bad ground seamless link underground impervious wall is led wall construction
Technical field
The utility model relates to the fields such as building, water conservancy, municipal administration, petroleum refining and nuclear industry, is that a kind of seamless link underground impervious wall that is applicable to bad ground is led wall construction specifically.
Background technology
TRD engineering method is the cutting box in insertion ground to be connected with main frame and transverse shifting, by the cutter digging ground on chain, inject simultaneously consolidation liquid in the vertical direction with original position soil mix and blend, in the engineering method of the firming body of underground formation wall shape.Underground impervious wall construction vibrations are little, noise is low, and wall stiffness is large, and barrier performance is good, to ground undisturbed around, can form and have the very arbitrary polygon diaphragm wall of large bearing capacity and replace pile foundation, open caisson foundation or laying foundation.In when construction, but in the time of bad ground construction, when TRD equipment cannot cut and need to set in advance and lead wall construction, otherwise, cannot cut into wall for the TRD equipment of constructing.Therefore, how to arrange and lead wall construction and become the necessary condition that affects TRD equipment construction.
Utility model content
For solving the problems of the technologies described above, the object of this invention is to provide a kind of bad ground seamless link underground impervious wall and lead wall construction, comprise and adopt the hole one of Churn drill formation and the hole two of rotary cutting Multi-drill bit or the formation of guide plate grab claw, the setting alternate with hole two of described hole one, the diameter in hole one is greater than the diameter in hole two; Hole one and hole two are tangent, lead the diameter that wall thickness is less than hole two.
Hole one diameter is 1000mm; Hole two diameters are 800mm; Leading wall thickness is 600mm.
The utility model has the advantages that: 1. impervious good; 2. when construction in, is shaken littlely, and noise is low, is highly suitable for municipal construction; 3. wall stiffness is large, during for excavation of foundation pit, can bear very large soil pressure, and foundation settlement or cave in accident seldom occur; 4. can press close to inhering architecture construction; 5. be applicable to multiple formation condition; 6. work efficiency is high, the duration is short, reliable in quality, economic benefit are high.
Brief description of the drawings
Fig. 1 is the utility model structural representation.
Detailed description of the invention
Illustrate the utility model below in conjunction with accompanying drawing, as shown in Figure 1, the utility model comprises the hole 1 of employing Churn drill formation and the hole 22 of rotary cutting Multi-drill bit or the formation of guide plate grab claw, the setting alternate with hole 22 of described hole 1, and the diameter in hole 1 is greater than the diameter in hole 22; Hole 1 and hole 22 are tangent, lead the diameter that wall 3 thickness are less than hole 22.
Hole one 1 diameters are 1000mm; Hole 22 diameters are 800mm; Leading wall 3 thickness is 600mm.
Principle of the present utility model is: first adopt Churn drill to hole to bad ground, and because the boring procedure of Churn drill must carry out sharp pounding to harder lithosphere, therefore, very favourable to adopting rotary cutting Multi-drill bit or guide plate grab claw to form hole; Through after two kinds of pore-formings above, TRD construction equipment can cut into wall easily, finally forms impervious wall.

Claims (2)

1. a bad ground seamless link underground impervious wall is led wall construction, it is characterized in that: comprise and adopt the hole one of Churn drill formation and the hole two of rotary cutting Multi-drill bit or the formation of guide plate grab claw, the setting alternate with hole two of described hole one, the diameter in hole one is greater than the diameter in hole two; Hole one and hole two are tangent, lead the diameter that wall thickness is less than hole two.
2. bad ground seamless link underground impervious wall according to claim 1 is led wall construction, it is characterized in that: hole one diameter is 1000mm; Hole two diameters are 800mm; Leading wall thickness is 600mm.
CN201420300880.XU 2014-06-06 2014-06-06 Seamless junction underground diaphragm wall guide wall structure on complex stratum Expired - Fee Related CN203866849U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420300880.XU CN203866849U (en) 2014-06-06 2014-06-06 Seamless junction underground diaphragm wall guide wall structure on complex stratum

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420300880.XU CN203866849U (en) 2014-06-06 2014-06-06 Seamless junction underground diaphragm wall guide wall structure on complex stratum

Publications (1)

Publication Number Publication Date
CN203866849U true CN203866849U (en) 2014-10-08

Family

ID=51647819

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420300880.XU Expired - Fee Related CN203866849U (en) 2014-06-06 2014-06-06 Seamless junction underground diaphragm wall guide wall structure on complex stratum

Country Status (1)

Country Link
CN (1) CN203866849U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105862872A (en) * 2016-04-05 2016-08-17 中铁十局集团第四工程有限公司 Deep foundation pit support structure joint water stop construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105862872A (en) * 2016-04-05 2016-08-17 中铁十局集团第四工程有限公司 Deep foundation pit support structure joint water stop construction method

Similar Documents

Publication Publication Date Title
CN103603342B (en) Major diameter assembled casing super-long filling pile construction method
CN104164873B (en) Prestressed pipe pile and construction method thereof
CN104074458A (en) Drilled pile graded casing drilling perforating method
CN105178861A (en) Drilling hole enlarging mechanism
CN101922149B (en) Construction method and construction equipment for one-step molded hole digging pile protecting wall
CN103485716B (en) Karst-geology rotary-drill guide-hole construction method
CN104074183A (en) Drilling and concrete injected root composite pile implanting pile structure and construction method
CN203924168U (en) Electronic milling fluting wall forming machine
CN203866849U (en) Seamless junction underground diaphragm wall guide wall structure on complex stratum
CN102425388A (en) Slag salvaging cylindrical drill for drilled pile
CN104141455A (en) Drilling machine device and drilling method of drilling machine
CN105804079A (en) Tool and method for smashing hard rock in large-diameter pile hole
CN104264679B (en) A kind of electric power pylon basis heavy caliber Underwater pile construction method
CN204139188U (en) Bad ground seamless link underground impervious wall leads wall construction
CN204492659U (en) The embedding rock cylinder that can shake disconnected core bores
CN202187735U (en) Bored pile tubular drill for fishing residue
CN201474618U (en) Multistage alloy leading roller bit
CN105586978A (en) Construction method of soil replacement stir waterproof curtain based on gravels
CN108005065A (en) The constructing structure and construction method of PHC static pressure pipe piles
CN104612164A (en) Reinforced composite envelope structure construction method
CN204344048U (en) Foreign matter fisher in hole
CN202659153U (en) Push plate type cylindrical drill
CN207004430U (en) A kind of interior rig
CN203334953U (en) Long rod type hole leading pile machine
CN102383429B (en) Digging pile-sinking device in the middle of a kind of heavy caliber pile tube

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141008

Termination date: 20150606

EXPY Termination of patent right or utility model