CN203795839U - Elevator shaft assembled telescopic form erecting system - Google Patents

Elevator shaft assembled telescopic form erecting system Download PDF

Info

Publication number
CN203795839U
CN203795839U CN201420140585.2U CN201420140585U CN203795839U CN 203795839 U CN203795839 U CN 203795839U CN 201420140585 U CN201420140585 U CN 201420140585U CN 203795839 U CN203795839 U CN 203795839U
Authority
CN
China
Prior art keywords
mobile jib
diagonal brace
elevator shaft
brace mobile
rods
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420140585.2U
Other languages
Chinese (zh)
Inventor
徐立峰
王院生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG JIELI CONSTRUCTION GROUP Ltd Co
Original Assignee
ZHEJIANG JIELI CONSTRUCTION GROUP Ltd Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG JIELI CONSTRUCTION GROUP Ltd Co filed Critical ZHEJIANG JIELI CONSTRUCTION GROUP Ltd Co
Priority to CN201420140585.2U priority Critical patent/CN203795839U/en
Application granted granted Critical
Publication of CN203795839U publication Critical patent/CN203795839U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The utility model relates to an elevator shaft assembled telescopic form erecting system comprising a base and a platform. The base comprises at least two oblique brace main rods which are 45 degrees angled; the lower end of each oblique brace main rod is provided with a clamp which is in a 90-degree L-shaped structure; the upper end of each oblique brace main rod is provided with anchor bolt connected with a length regulation mechanism; the oblique brace main rods are parallel; horizontal rods are connected between the oblique brace main rods through fasteners; vertical rods are vertically and fixedly connected to the oblique brace main rods; the vertical rods and the horizontal rods are combined through the fasteners; the platform is formed. The elevator shaft assembled telescopic form erecting system with the structure has the advantages that the oblique brace main rods made into the main support base, the oblique brace main rods can be clamped at any floor and the stable state is achieved.

Description

The scalable formwork system of elevator shaft assembling
Technical field
The utility model relates to a kind of formwork system, particularly the scalable formwork system of a kind of elevator shaft assembling and construction method thereof.
Background technology
Traditional electrical stair shaft support for shuttering adopts steel pipe directly set up to operation layer or use i iron (channel-section steel) to be shelved on certain one deck as base from bottom, from i iron, up set up again, these class methods are along with the steel tube poles that increases of floor is easily out of shape, and built on the sand, bring huge potential safety hazard to formwork system
Utility model content
The purpose of this utility model is the deficiency in order to solve above-mentioned technology and provide a kind of for Stability Analysis of Structures, easy for installation, and in all scalable formwork system of spendable elevator shaft assembling and construction methods thereof of floor arbitrarily
In order to achieve the above object, the scalable formwork system of many elevator shafts assembling that the utility model is designed, comprises base and platform, and base comprises diagonal brace mobile jib, and diagonal brace mobile jib is 45 ° of settings, and its lower end is provided with card base, and card base is 90 ° of L-type structures; The upper end of diagonal brace mobile jib is provided with crab-bolt and is connected with length adjustment mechanism, described diagonal brace mobile jib is at least two and be arranged in parallel, between diagonal brace mobile jib, be connected with horizon bar by fastener, on diagonal brace mobile jib, be vertically fixedly connected with vertical rod, the combination by fastener and horizon bar in vertical rod forms platform.The feature of this structure is to utilize diagonal brace mobile jib for main support base, can be at any floor sandwiched diagonal brace mobile jib, and reach steady status.
In order further to improve the applicability of formwork system, described diagonal brace mobile jib has 10# channel-section steel to form, its upper end is by crab-bolt and multiple screwed hole and 8# channel-section steel composition length adjustment mechanism, and its lower end is fixed by welded construction and card base, on diagonal brace mobile jib, fixes vertical rod by welded construction.Be slidably matched by two channel-section steels, extend the length of diagonal brace mobile jib, only deeply coordinate robust structure with elevator shaft.
In order conveniently to move up and down formwork system, vertical rod upper end is welded with round steel as suspension ring hook.
The construction method of the scalable formwork system of above-mentioned elevator shaft assembling, be arranged in hoistway oblique diagonal brace mobile jib, its lower end is fixed by card base and elevator shaft lower floor door opening beam, upper end leans on elevator shaft the concrete wall or structural beams relative with door opening, and can regulate length by the length adjustment device of diagonal brace mobile jib upper end, diagonal brace mobile jib is coordinated deeply with the clean of elevator shaft, then build upper brace by horizon bar; After floor concrete waters and has smash, remove elevator hoistways inner formword, use tower machine to be connected with suspension ring hook, whole formwork system is promoted to last layer.
The scalable formwork system of elevator shaft assembling and construction method thereof that the utility model is designed, by design diagonal brace mobile jib, make whole formwork system can be firm, balance be arranged on every one deck, thereby abandon the structure in the past in layer up superposeing, greatly reduce the deadweight of whole formwork system, thereby ensured its safety.In addition, due to the oblique setting of diagonal brace mobile jib, also make gravity distribute more even, improve stability and safety through a step.Meanwhile, due to without being layering, also reduced material cost.
Brief description of the drawings
The front view of the scalable formwork system of elevator shaft assembling in Fig. 1 the utility model;
The sectional view of the scalable formwork system of elevator shaft assembling in Fig. 2 the utility model.
Detailed description of the invention
Below by embodiment, the utility model will be further described by reference to the accompanying drawings.
Embodiment 1:
The scalable formwork system of many elevator shafts assembling that the present embodiment is described, comprises base and platform, and base comprises diagonal brace mobile jib 1, and diagonal brace mobile jib 1 is 45 ° of settings, and its lower end is provided with card base 2, and card base 2 is 90 ° of L-type structures; The upper end of diagonal brace mobile jib 1 is provided with crab-bolt and is connected with length adjustment mechanism, 1 to two described of diagonal brace mobile jib be arranged in parallel, between diagonal brace mobile jib 1, be connected with horizon bar 5 by fastener 4, on diagonal brace mobile jib 1, be vertically fixedly connected with vertical rod 6, in vertical rod 6, form platform by fastener 4 and the combination of horizon bar 5.Wherein said diagonal brace mobile jib 1 has 10# channel-section steel to form, and its upper end is by crab-bolt and multiple screwed hole and 8# channel-section steel composition length adjustment mechanism, and its lower end is fixing by welded construction and card base 2, on diagonal brace mobile jib 1, fixes vertical rod 6 by welded construction.Vertical rod 6 upper ends are welded with round steel as suspension ring hook 7.
The construction method of the scalable formwork system of above-mentioned elevator shaft assembling, be arranged in hoistway 8 oblique diagonal brace mobile jib 1, its lower end is fixing with elevator shaft lower floor door opening beam 9 by card base 2, upper end leans on the elevator shaft concrete wall 10 relative with door opening, and can regulate length by the length adjustment device of diagonal brace mobile jib 1 upper end, diagonal brace mobile jib 1 is coordinated deeply with the clean of elevator shaft, then build upper brace by horizon bar; After floor concrete waters and smash, then remove after elevator hoistways inner formword, use tower machine 3 to be connected with suspension ring hook 7, whole formwork system is promoted to last layer.

Claims (3)

1. the scalable formwork system of elevator shaft assembling, comprises base and platform, it is characterized in that base comprises diagonal brace mobile jib, and diagonal brace mobile jib is 45 ° of settings, and its lower end is provided with card base, and card base is 90 ° of L-type structures; The upper end of diagonal brace mobile jib is provided with crab-bolt and is connected with length adjustment mechanism, described diagonal brace mobile jib is at least two and be arranged in parallel, between diagonal brace mobile jib, be connected with horizon bar by fastener, on diagonal brace mobile jib, be vertically fixedly connected with vertical rod, the combination by fastener and horizon bar in vertical rod forms platform.
2. the scalable formwork system of elevator shaft assembling according to claim 1, it is characterized in that described diagonal brace mobile jib has 10# channel-section steel to form, its upper end is by crab-bolt and multiple screwed hole and 8# channel-section steel composition length adjustment mechanism, its lower end is fixed by welded construction and card base, on diagonal brace mobile jib, fixes vertical rod by welded construction.
3. the scalable formwork system of elevator shaft assembling according to claim 2, is characterized in that being welded with round steel as suspension ring hook in vertical rod upper end.
CN201420140585.2U 2014-03-26 2014-03-26 Elevator shaft assembled telescopic form erecting system Expired - Lifetime CN203795839U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420140585.2U CN203795839U (en) 2014-03-26 2014-03-26 Elevator shaft assembled telescopic form erecting system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420140585.2U CN203795839U (en) 2014-03-26 2014-03-26 Elevator shaft assembled telescopic form erecting system

Publications (1)

Publication Number Publication Date
CN203795839U true CN203795839U (en) 2014-08-27

Family

ID=51378064

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420140585.2U Expired - Lifetime CN203795839U (en) 2014-03-26 2014-03-26 Elevator shaft assembled telescopic form erecting system

Country Status (1)

Country Link
CN (1) CN203795839U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112554568A (en) * 2020-12-08 2021-03-26 中建七局第一建筑有限公司 Movable concrete spreader steel base device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112554568A (en) * 2020-12-08 2021-03-26 中建七局第一建筑有限公司 Movable concrete spreader steel base device

Similar Documents

Publication Publication Date Title
AU2015100669A4 (en) Hollow Wall
CN103306208A (en) Formwork creeping method for novel 1.6 parabola-shaped four-column type hollow variable section high pier
CN103206074A (en) Elevator shaft template construction method, platform and support
CN103122691A (en) Tower crane standard knot bearing upper air supporting formwork steel platform structure and construction method
CN203834926U (en) Formwork erecting structure for bare concrete basement exterior wall
CN105317205A (en) Elevator shaft construction method and used device
CN108729640B (en) Mounting method of cantilever plate of assembled building
CN202451040U (en) Perpendicular high-altitude crawling ladder
CN104499706B (en) Hoistway formwork platform and construction method thereof
CN106351245A (en) Tower crane foundation base and construction method thereof
CN204040515U (en) Cat ladder
CN203795839U (en) Elevator shaft assembled telescopic form erecting system
CN203034799U (en) Tower hoist standard knot bearing overhead support formwork steel platform structure
CN202658867U (en) Overhanging construction platform
CN103015693A (en) Three-dimensional construction device for super high-rise core tube beam-slab structure
CN203891442U (en) High-rise elevator shaft template supporting platform
CN205777531U (en) Floor slab construction beam string shuttering supporting equipment
CN205444451U (en) An H-shaped steel combined base for light house
CN205134921U (en) Building outer wall concrete constructional column hangs construction platform
CN203430006U (en) Quick disassembly and assembly cantilever bracket for building outer wall construction
CN204212385U (en) Scaffold strengthened by truss
CN203257080U (en) Adjustable overhang supporting device for building construction
CN205242988U (en) Bottom has diagonal bracing's shaped steel of encorbelmenting
CN106869515A (en) The dismountable top plate supporting device of regularization
CN103993729A (en) High rise elevator shaft formwork erecting platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Xu Lifeng

Inventor after: Wang Yuansheng

Inventor before: Xu Lifeng

Inventor before: Wang Yuansheng

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140827