CN203730041U CN201420047516.7U CN201420047516U CN203730041U CN 203730041 U CN203730041 U CN 203730041U CN 201420047516 U CN201420047516 U CN 201420047516U CN 203730041 U CN203730041 U CN 203730041U
Authority
CN
China
Prior art keywords
air channel
air flue
air
bearing wall
top board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420047516.7U
Other languages
Chinese (zh)
Inventor
涂兴子
郭春生
王和平
宋合聚
丁永民
尚长海
高吾斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pingdingshan Tianan Coal Mining Co Ltd
Original Assignee
Pingdingshan Tianan Coal Mining Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pingdingshan Tianan Coal Mining Co Ltd filed Critical Pingdingshan Tianan Coal Mining Co Ltd
Priority to CN201420047516.7U priority Critical patent/CN203730041U/en
Application granted granted Critical
Publication of CN203730041U publication Critical patent/CN203730041U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The utility model discloses a suspended air bridge. The suspended air bridge comprises a first air flue and a second air flue, wherein the second air flue is arranged above the first air flue and is vertically crossed with the first air flue. The left side and the right side of the first air flue are respectively provided with a bearing wall making tight contact with a bottom plate of the second air flue. The left side and the right side of the second air flue are respectively provided with a wind break wall. The two ends of each wind break wall are arranged on the upper side of the corresponding bearing wall in a crossing mode. A top plate of the first air flue is the bottom plate of the second air flue. Reinforcement beams are arranged in the top plate of the first air flue. The two ends of each reinforcement beam are arranged on the upper sides of the corresponding bearing walls in a crossing mode. The bearing walls can reinforce the connecting structure of the crossing position of the first air flue and the second air flue and prevent the position where the first air flue and the second air flue are vertically crossed from deforming, cracking and even collapsing. The wing break walls can avoid air leakage, caused by shaking, of the position where the first air flue and the second air flue are vertically crossed. Through the reinforcement beams, prestress can be generated in the top plate of the first air flue, and the connecting strength of the position where the first air flue and the second air flue are vertically crossed is enhanced. The suspended air bridge is simple in structure and convenient to construct, and has the advantages of being high in firmness, free of deformation, low in maintenance cost and high in safety coefficient.

Description

A kind of suspension air crossing
Technical field
The utility model belongs to ground ore deposit technical field, has been specifically related to the solution that uses in a kind of coal mine roadway existing the air crossing fastness of existence is poor, yielding in the time that air channel occurs handing over trouble, maintenance cost is high, easily caused the suspension air crossing of security incident.
Background technology
At present, existing coal mining is mostly underground mining, in order to ensure the ventilation that down-hole is good and in time pernicious gas and toxic emission to be gone out, down-hole all arranges multiple air channels, traditional air channel, down-hole mostly is the forms such as concrete, work stone or brick (stone revolves), its main deficiency is: being subject to unsupported back span, rock crusher and adopting traverse degree affects greatlyr, and yielding cracking causes and leaks out.In addition, along with the progressively popularization that down-hole coal road is arranged, increasing every layer of requirement has independently air return system, so just occurred the three-dimensional phenomenon of handing over trouble in coal road air channel, and the frequency occurring is more and more higher; And existing air crossing structure is difficult to meet the three-dimensional needs of handing over trouble in air channel, exists that fastness is poor, yielding, maintenance cost is high, easily cause the shortcoming of security incident.
Summary of the invention
The purpose of this utility model is to solve the deficiencies in the prior art and the suspension that a kind of fastness is strong, indeformable, maintenance cost is low, safety factor is high air crossing is provided.
The technical solution of the utility model is:
A kind of suspension air crossing, comprise air channel one and be arranged on one top, air channel and air channel one is three-dimensional air channel two of handing over trouble, the left and right sides in described air channel one is provided with the load bearing wall of top and air channel two base plate close contacts, and the left and right sides in described air channel two is provided with the windbreak of two ends across load bearing wall upside; The base plate that is air channel two at the top board in the friendship Cha Chu air channel one in air channel one and air channel two, is provided with the reinforcement beam of two ends across load bearing wall upside in the top board in air channel one.
The cross section of described windbreak is trapezoidal shape structure.
In described windbreak, be provided with the short anchor cable that one end is connected the other end with reinforcement beam and is anchored at air channel two top boards.
The contact position of the base plate in described load bearing wall and air channel two is filled with encapsulant, and the contact position of the top board in described windbreak and air channel two is also filled with encapsulant.
In the top board in described air channel two, be provided with the long anchor cable distributing as net shape.
The beneficial effects of the utility model:
The utility model comprises air channel one and the air channel two with the three-dimensional friendship trouble in air channel one, be provided with the load bearing wall of top and air channel two base plate close contacts in the left and right sides in air channel one, the left and right sides in air channel two is provided with the windbreak of two ends across load bearing wall upside, load bearing wall can reinforce air channel one and air channel two solids are handed over the syndeton of Cha Chu, and then the problem of avoiding the three-dimensional Cha Chu of the friendship distortion in air channel one and air channel two, rupturing, even cave in; The air leakage phenomena that windbreak can avoid air channel one and the three-dimensional Cha Chu of friendship in air channel two to occur because of vibrations; The top board in air channel one is the base plate in air channel two, and in the top board in air channel one, be provided with the reinforcement beam of two ends across load bearing wall upside, can make so the interior prestressing force that produces of top board in air channel one, and then the three-dimensional bonding strength of handing over Cha Chu in reinforcing air channel one and air channel two, avoid the top board in air channel one to occur caving in or being out of shape; The short anchor cable that one end is connected the other end with reinforcement beam and is anchored at air channel two top boards is set in windbreak, can well fixes like this reinforcement beam, and make to form prestressing force in windbreak, increased the intensity of windbreak; In the top board in air channel two, be provided with and be latticed long anchor cable, these long anchor cables can make the top board in air channel two produce prestressing force, and then have strengthened the intensity of the top board in air channel two, prevent that the wall rock loosening ring in air channel two is by air channel two crimps; Further, structure of the present utility model is comparatively simple, easy construction, has advantages of that fastness is strong, indeformable, maintenance cost is low, safety factor is high.
Brief description of the drawings
Fig. 1 is the frame construction schematic diagram of a kind of suspension air crossing of the present utility model.
Fig. 2 is the A-A view of Fig. 1.
Fig. 3 is the B-B view of Fig. 1.
In figure: 1, air channel 1, air channel 23, load bearing wall 4, windbreak 5, reinforcement beam 6, long anchor cable 7, short anchor cable.
Detailed description of the invention
Below in conjunction with accompanying drawing, embodiment of the present utility model is described in further detail:
Embodiment 1
As shown in Figure 1, Figure 2 and Figure 3, a kind of suspension air crossing, it comprises air channel 1 and is arranged on one 1 tops, air channel and air channel 1 is three-dimensional air channel 22 of handing over trouble, the left and right sides in described air channel 1 is provided with the load bearing wall 3 of top and air channel 22 base plate close contacts, and the left and right sides in described air channel 22 is provided with the windbreak 4 of two ends across load bearing wall 3 upsides; The base plate that is air channel 22 at the top board in the friendship Cha Chu air channel 1 in air channel 1 and air channel 22, is provided with the reinforcement beam 5 of two ends across load bearing wall 3 upsides in the top board in air channel 1.
The utility model comprises air channel one and the air channel two with the three-dimensional friendship trouble in air channel one, be provided with the load bearing wall of top and air channel two base plate close contacts in the left and right sides in air channel one, the left and right sides in air channel two is provided with the windbreak of two ends across load bearing wall upside, load bearing wall can reinforce air channel one and air channel two solids are handed over the syndeton of Cha Chu, and then the problem of avoiding the three-dimensional Cha Chu of the friendship distortion in air channel one and air channel two, rupturing, even cave in; The air leakage phenomena that windbreak can avoid air channel one and the three-dimensional Cha Chu of friendship in air channel two to occur because of vibrations; The top board in air channel one is the base plate in air channel two, and in the top board in air channel one, be provided with the reinforcement beam of two ends across load bearing wall upside, can make so the interior prestressing force that produces of top board in air channel one, and then the three-dimensional bonding strength of handing over Cha Chu in reinforcing air channel one and air channel two, avoid the top board in air channel one to occur caving in or being out of shape; Structure of the present utility model is comparatively simple, easy construction, has advantages of that fastness is strong, indeformable, maintenance cost is low, safety factor is high.
Implement 2
As shown in Figure 1, Figure 2 and Figure 3, a kind of suspension air crossing, it comprises air channel 1 and is arranged on one 1 tops, air channel and air channel 1 is three-dimensional air channel 22 of handing over trouble, the left and right sides in described air channel 1 is provided with the load bearing wall 3 of top and air channel 22 base plate close contacts, and the left and right sides in described air channel 22 is provided with the windbreak 4 of two ends across load bearing wall 3 upsides; The base plate that is air channel 22 at the top board in the friendship Cha Chu air channel 1 in air channel 1 and air channel 22, is provided with the reinforcement beam 5 of two ends across load bearing wall 3 upsides in the top board in air channel 1.
The cross section of described windbreak 4 is trapezoidal shape structure.
In described windbreak 4, be provided with the short anchor cable 7 that one end is connected the other end with reinforcement beam 5 and is anchored at air channel 22 top boards.
Described load bearing wall 3 is filled with encapsulant with the contact position of the base plate in air channel 22, and described windbreak 4 is also filled with encapsulant with the contact position of the top board in air channel 22.
In the top board in described air channel 22, be provided with the long anchor cable 6 distributing as net shape.
The utility model comprises air channel one and the air channel two with the three-dimensional friendship trouble in air channel one, be provided with the load bearing wall of top and air channel two base plate close contacts in the left and right sides in air channel one, the left and right sides in air channel two is provided with the windbreak of two ends across load bearing wall upside, load bearing wall can reinforce air channel one and air channel two solids are handed over the syndeton of Cha Chu, and then the problem of avoiding the three-dimensional Cha Chu of the friendship distortion in air channel one and air channel two, rupturing, even cave in; The air leakage phenomena that windbreak can avoid air channel one and the three-dimensional Cha Chu of friendship in air channel two to occur because of vibrations; The top board in air channel one is the base plate in air channel two, and in the top board in air channel one, be provided with the reinforcement beam of two ends across load bearing wall upside, can make so the interior prestressing force that produces of top board in air channel one, and then the three-dimensional bonding strength of handing over Cha Chu in reinforcing air channel one and air channel two, avoid the top board in air channel one to occur caving in or being out of shape; The short anchor cable that one end is connected the other end with reinforcement beam and is anchored at air channel two top boards is set in windbreak, can well fixes like this reinforcement beam, and make to form prestressing force in windbreak, increased the intensity of windbreak; In the top board in air channel two, be provided with and be latticed long anchor cable, these long anchor cables can make the top board in air channel two produce prestressing force, and then have strengthened the intensity of the top board in air channel two, prevent that the wall rock loosening ring in air channel two is by air channel two crimps; Further, structure of the present utility model is comparatively simple, easy construction, has advantages of that fastness is strong, indeformable, maintenance cost is low, safety factor is high.

Claims (5)

1. a suspension air crossing, comprise air channel one and be arranged on one top, air channel and air channel one is three-dimensional air channel two of handing over trouble, it is characterized in that: the left and right sides in described air channel one is provided with the load bearing wall of top and air channel two base plate close contacts, the left and right sides in described air channel two is provided with the windbreak of two ends across load bearing wall upside; The base plate that is air channel two at the top board in the friendship Cha Chu air channel one in air channel one and air channel two, is provided with the reinforcement beam of two ends across load bearing wall upside in the top board in air channel one.
2. a kind of suspension air crossing according to claim 1, is characterized in that: the cross section of described windbreak is trapezoidal shape structure.
3. a kind of suspension air crossing according to claim 1, is characterized in that: in described windbreak, be provided with the short anchor cable that one end is connected the other end with reinforcement beam and is anchored at air channel two top boards.
4. a kind of suspension air crossing according to claim 1, is characterized in that: the contact position of the base plate in described load bearing wall and air channel two is filled with encapsulant, the contact position of the top board in described windbreak and air channel two is also filled with encapsulant.
5. a kind of suspension air crossing according to claim 2, is characterized in that: in the top board in described air channel two, be provided with the long anchor cable distributing as net shape.
CN201420047516.7U 2014-01-26 2014-01-26 Suspended air bridge Expired - Fee Related CN203730041U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420047516.7U CN203730041U (en) 2014-01-26 2014-01-26 Suspended air bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420047516.7U CN203730041U (en) 2014-01-26 2014-01-26 Suspended air bridge

Publications (1)

Publication Number Publication Date
CN203730041U true CN203730041U (en) 2014-07-23

Family

ID=51200121

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420047516.7U Expired - Fee Related CN203730041U (en) 2014-01-26 2014-01-26 Suspended air bridge

Country Status (1)

Country Link
CN (1) CN203730041U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111764910A (en) * 2020-06-24 2020-10-13 临沂矿业集团菏泽煤电有限公司 Coal mine overpass air bridge roadway tunneling construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111764910A (en) * 2020-06-24 2020-10-13 临沂矿业集团菏泽煤电有限公司 Coal mine overpass air bridge roadway tunneling construction method

Similar Documents

Publication Publication Date Title
CN104963705B (en) A kind of underground space tunneling construction method
CN207988212U (en) A kind of precast shear wall horizontal connection structure with W-shaped seam
CN103410550B (en) A kind of coal mine underground airbridge construction method
CN105064391A (en) Assembly type device foundation
CN207813629U (en) A kind of strong dynamic load anti-impact supporting new structure in tunnel
CN203730041U (en) Suspended air bridge
CN202559382U (en) Concrete prefabricated combined duct with stepped conical spigot and socket
CN205171804U (en) Building block of combatting earthquake by force of T form height
CN202611082U (en) Z-shaped porous stone face wall brick and lapping structure thereof
CN104164839A (en) Construction method for broadening box culvert
CN105370307B (en) Coal working face crosses freeboard section support process
CN203022777U (en) Shed erection support at underground fork or tunnel opening
CN204282391U (en) A kind of heel foundation formwork erecting structure
CN203296778U (en) Rigid-flexible combination gob-side entry retaining roadway-side shoring device
CN206693266U (en) concrete pipe gallery module
CN106939586B (en) A kind of panel construction of concrete face rockfill dam
CN106480906B (en) Feed intake storehouse and the connection structure of standard block tube coupling and the pipe gallery of changes of section
CN109208786A (en) A kind of ring muscle that is easily installed fastens shear wall structure and its installation method
CN104405404B (en) A kind of gas in mine stay roadway method
CN205329918U (en) Step board light partition wall system
CN204940328U (en) A kind of mounted equipment basis
CN204000581U (en) There is the large span composite bridge steel bridge pier structure of anti-seismic performance
CN208201614U (en) A kind of steel corrugated plating assembling combination bridge
CN203097062U (en) Anti-seismic anti-cracking interlocking building block
CN207143996U (en) A kind of underground structure spare interface temporary plugging structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140723