CN203705476U - Electrical test multifunctional leading wire insulation operation rod - Google Patents

Electrical test multifunctional leading wire insulation operation rod Download PDF

Info

Publication number
CN203705476U
CN203705476U CN201420079890.5U CN201420079890U CN203705476U CN 203705476 U CN203705476 U CN 203705476U CN 201420079890 U CN201420079890 U CN 201420079890U CN 203705476 U CN203705476 U CN 203705476U
Authority
CN
China
Prior art keywords
wire
test
insulation
insulating bar
insulating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420079890.5U
Other languages
Chinese (zh)
Inventor
李铁夫
方保垒
贾寅飞
李业锋
孟凡波
胡孝欣
刘建
王鑫
张旭
张琪
王龙
徐勤超
王任
袁震
倪丽
来庆红
王淦
田家铭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Zaozhuang Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Zaozhuang Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Zaozhuang Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201420079890.5U priority Critical patent/CN203705476U/en
Application granted granted Critical
Publication of CN203705476U publication Critical patent/CN203705476U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Testing Relating To Insulation (AREA)

Abstract

The utility model relates to an electrical test multifunctional leading wire insulation operation rod. The electrical test multifunctional leading wire insulation operation rod comprises a universal movable insulation rubber base, wherein the universal movable insulation rubber base is equipped with an insulation support rod, the insulation support rod is equipped with a vibration-out plugging type and insertion type combined insulation support rod, the vibration-out plugging type and insertion type combined insulation support rod is equipped with a vibration-out plugging type insulation operation rod, the vibration-out plugging type operation rod is equipped with a following type automatic wire coiling/uncoiling wheel and a conductor nut, the automatic wire coiling/uncoiling wheel is equipped with a clockwork energy storage spring, a test wire jack, a lead tube and a built-in test wire, the conductor nut is equipped with a lead rod screw, the lead rod screw is equipped with a high-altitude wire clamp and a wiring bolt, and a test connection wire is connected between the high-altitude wire clamp and the wiring bolt. The electrical test multifunctional leading wire insulation operation rod is advantaged in that: high-altitude operation is not needed, the test wire under the action of external force is prevented from shaking, problems that the test wire is not convenient to carry and is liable to wind are settled, and thereby work efficiency is improved, hidden safety trouble is avoided, and work cost reduction is realized.

Description

The multi-functional lead wire insulating bar of electrical test
Technical field
The utility model relate in electric system send out, test tie specific purpose tool between test apparatus and the tested device of the high and low pressure electrical equipment of defeated, change, distribution and industrial enterprise, be specifically related to multi-functional drawing of a kind of electrical test to connect test wire insulating bar.
Background technology
In " electric power safety working regulation ", " electrical test rules " and " repair based on condition of component rules ", all there is regulation, must regularly carry out electrical test to electrical equipment, this is the important means whether checkout equipment properties quality, diagnostic device can normally move.Open type high-voltage electrical equipment, the equipment installation positions such as such as current transformer, voltage transformer (VT), lightning arrester, bushing shell for transformer, isolating switch, disconnector set high, and conventionally need work high above the ground while carrying out electrical test.Traditional approach, the one, need personnel to ascend a height to connect to tear test wire open, work high above the ground difficulty is large, has the potential safety hazard of falling from high altitude, even if use high-altitude operation vehicle to solve the problem of ascending a height, but expense is high, work efficiency and security are still pessimistic; The 2nd, the mode of operation that need to use more piece insulating bar and external test wire to combine, in work, test wire is more, long and messy, easy to wear, use mutual winding, inefficiency, and external test wire there will be and wave, rock under wind-force or other external force, occurred this type of accident case.
Utility model content
The purpose of this utility model is to provide one and does not need ascend operation, avoid test wire to wave under external force, rock, and avoid test wire to carry not easy winding, and then increase work efficiency, stop potential safety hazard, reduce the multi-functional exhausted lead wire edge control lever of electrical test of opex.
For achieving the above object, the technical scheme that the utility model adopts is:
The multi-functional lead wire insulating bar of a kind of electrical test, its feature is: comprising: Universal active electro-insulating rubber base, installing insulating cradling piece on described Universal active electro-insulating rubber base, on described insulating support bar, install and shake and continue formula and plug-in type combined insulation cradling piece, described shake and continue formula and plug-in type combined insulation cradling piece on install shake and continue formula insulating bar, described shake and the formula insulating bar that continues on automatic deploying and retracting test wire wheel and conductor nut are installed, the upper spiral power spring storaging energy spring of installing of described automatic deploying and retracting test wire wheel, test wire jack, conduit and built-in test wire, conducting wire bar screw on described conductor nut, on described conductor rod screw, high-altitude clamping pliers and connection bolt are installed, between described high-altitude clamping pliers and connection bolt, be connected with test tie.
According to the multi-functional lead wire insulating bar of above-mentioned electrical test, its feature is: described in shake and the formula insulating bar that continues on moving locking bit device is installed.
According to the multi-functional lead wire insulating bar of above-mentioned electrical test, its feature is: described conduit two ends are bell mouth shape.
According to the multi-functional lead wire insulating bar of above-mentioned electrical test, its feature is: described automatic deploying and retracting line wheel adopts copper or stainless steel, and described test wire jack is copper or stainless steel hollow wheel shaft.
The utility model has the advantages that: the utility model in the course of the work, do not need ascend operation, described high-altitude clamping pliers can clamp tested electrical equipment conductor part while tension, while unclamping, can separate with tested electrical equipment, described insulating support bar is installed on described Universal active electro-insulating rubber base, play fixed insulation effect, prevent that control lever is because of external force automatic shift, on described insulating support bar, install and shake and continue formula and plug-in type combined insulation cradling piece, in the time of electrical test, can provide enough safe distances, described shake and the formula insulating bar that continues on described moving locking bit device is installed, can realize the flexible of shaking and continuing formula insulating bar length, the built-in test wire that shakes and continue in formula insulating bar simultaneously, avoid test wire to wave under external force, the problem of rocking, described shake and the formula insulating bar that continues on automatic deploying and retracting line wheel is installed, and the upper clockwork spring trailing type energy-stored spring of installing of described automatic deploying and retracting line wheel, test wire jack, conduit, in the time manually will shaking and the formula insulating bar that continues stretches, built-in test wire is followed out elongation immediately automatically, spiral power spring storaging energy spring rotates and stretches stored energy, when manual will shake and continue formula insulating bar retract time, spiral power spring storaging energy spring retraction releases energy, by the test wire automatic drawing back of taking advantage of a situation, realize built-in test wire automatic deploying and retracting, having solved test wire is easily wound around, carry inconvenience, the utility model has improved work efficiency, potential safety hazard and opex are reduced, described conduit two ends are bell mouth shape, can improve the smooth effect of the built-in test wire of automatic deploying and retracting.
Accompanying drawing explanation
Fig. 1 the utility model structural representation.
Fig. 2 the utility model partly cuts open structural representation.
In accompanying drawing
1, insulating support bar; 2, automatic deploying and retracting line wheel; 3, test wire jack; 4, shake and continue formula insulating bar; 5, conductor nut; 6, conductor rod screw; 7, high-altitude clamping pliers; 8, Universal active electro-insulating rubber base; 9, shake and continue formula and plug-in type combined insulation cradling piece; 10, clockwork spring trailing type energy-stored spring; 11, conduit; 12, built-in test wire; 13, connection bolt; 14, test tie.
Embodiment
Below in conjunction with accompanying drawing 1, Fig. 2 and specific embodiment, the utility model is further described:
The multi-functional lead wire insulating bar of a kind of electrical test, comprising: Universal active electro-insulating rubber base 8, installing insulating cradling piece 1 on described Universal active electro-insulating rubber base 8, on described insulating support bar 1, install and shake and continue formula and plug-in type combined insulation cradling piece 9, described shake and continue formula and plug-in type combined insulation cradling piece 9 on install shake and continue formula insulating bar 4, described shake and the formula insulating bar 4 that continues on automatic deploying and retracting line wheel 2 and conductor nut 5 are installed, on described automatic deploying and retracting line wheel 2, clockwork spring trailing type energy-stored spring 10 is installed, test wire jack 3, conduit 11 and built-in test wire 12, conducting wire bar screw 6 on described conductor nut 5, high-altitude clamping pliers 7 and connection bolt 13 are installed on described conductor rod screw, between described high-altitude clamping pliers 7 and connection bolt 13, be connected with test tie 14.
In the present embodiment: described in shake and the formula insulating bar 4 that continues on moving locking bit device is installed.
In the present embodiment: described conduit 11 two ends are bell mouth shape.
In the present embodiment: described automatic deploying and retracting line wheel 2 adopts copper or stainless steel, and described test wire jack 3 is copper or stainless steel hollow wheel shaft.
The utility model beneficial effect: the utility model in the course of the work, do not need ascend operation, described high-altitude clamping pliers 7 can clamp tested electrical equipment conductor part while tension, while unclamping, can separate with tested electrical equipment, described insulating support bar 1 is installed on described Universal active electro-insulating rubber base 8, play fixed insulation effect and prevent that control lever is because of external force automatic shift, on described insulating support bar, 1 installation is shaken and continues formula and plug-in type combined insulation cradling piece 9, in the time of electrical test, can provide enough safe distances, described shake and the formula insulating bar 4 that continues on described moving locking bit device is installed, can realize the flexible of shaking and continuing formula insulating bar 4 length, the built-in test wire 12 that shakes and continue in formula insulating bar 4 simultaneously, avoid test wire to wave under external force, the problem of rocking, described shake and the formula insulating bar 4 that continues on automatic deploying and retracting line wheel 2 is installed, and on described automatic deploying and retracting line wheel 2, spiral power spring storaging energy spring 10 is installed, test wire jack 3, conduit 11, in the time manually will shaking and the formula insulating bar 4 that continues stretches, built-in test wire 12 is followed out elongation immediately automatically, clockwork spring trailing type energy-stored spring 10 rotates and stretches stored energy, to shake and when the formula insulating bar 4 that continues is retracted when manual, spiral power spring storaging energy spring 10 retractions release energy, by the test wire automatic drawing back of taking advantage of a situation, realize built-in test wire 12 automatic deploying and retractings, having solved test wire is easily wound around, carry inconvenience, the utility model has improved work efficiency, potential safety hazard and opex are reduced, described conduit 11 two ends are bell mouth shape, can improve the smooth effect of the built-in test wire of automatic deploying and retracting.
Embodiment recited above is described preferred implementation of the present utility model; not design of the present utility model and protection domain are limited; do not departing under the prerequisite of the utility model design concept; various modification and improvement that in this area, common engineering technical personnel make the technical solution of the utility model, all should fall into protection domain of the present utility model.

Claims (4)

1. the multi-functional lead wire insulating bar of electrical test, it is characterized in that: comprising: Universal active electro-insulating rubber base (8), the upper installing insulating cradling piece (1) of described Universal active electro-insulating rubber base (8), the upper installation of described insulating support bar (1) shaken and continues formula and plug-in type combined insulation cradling piece (9), describedly shake and upper installation of continue formula and plug-in type combined insulation cradling piece (9) shaken and continue formula insulating bar (4), describedly shake and upper automatic deploying and retracting line wheel (2) and the conductor nut (5) installed of the formula insulating bar (4) that continues, the upper clockwork spring trailing type energy-stored spring (10) of installing of described automatic deploying and retracting line wheel (2), test wire jack (3), conduit (11) and built-in test wire (12), the upper conducting wire bar screw (6) of described conductor nut (5), high-altitude clamping pliers (7) and connection bolt (13) are installed on described conductor rod screw, between described high-altitude clamping pliers (7) and connection bolt (13), be connected with test tie (14).
2. the multi-functional lead wire insulating bar of electrical test according to claim 1, is characterized in that: described in shake and the formula insulating bar (4) that continues is upper that moving locking bit device is installed.
3. the multi-functional lead wire insulating bar of electrical test according to claim 1, is characterized in that: described conduit (11) two ends are bell mouth shape.
4. the multi-functional lead wire insulating bar of electrical test according to claim 1, it is characterized in that: described trailing type automatic deploying and retracting line wheel (2) adopts copper or stainless steel, and described test wire jack (3) is copper or stainless steel hollow wheel shaft.
CN201420079890.5U 2014-02-18 2014-02-18 Electrical test multifunctional leading wire insulation operation rod Expired - Fee Related CN203705476U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420079890.5U CN203705476U (en) 2014-02-18 2014-02-18 Electrical test multifunctional leading wire insulation operation rod

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420079890.5U CN203705476U (en) 2014-02-18 2014-02-18 Electrical test multifunctional leading wire insulation operation rod

Publications (1)

Publication Number Publication Date
CN203705476U true CN203705476U (en) 2014-07-09

Family

ID=51055896

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420079890.5U Expired - Fee Related CN203705476U (en) 2014-02-18 2014-02-18 Electrical test multifunctional leading wire insulation operation rod

Country Status (1)

Country Link
CN (1) CN203705476U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104550073A (en) * 2015-01-10 2015-04-29 国家电网公司 Portable electric cleaning tool
CN104597291A (en) * 2015-01-27 2015-05-06 广西大学 High-altitude wiring and clamping device
CN104897931A (en) * 2015-06-08 2015-09-09 国家电网公司 Telescopic wiring device for high-altitude test
CN105610052A (en) * 2016-03-04 2016-05-25 南京擎雷科技发展有限公司 Lightning early-warning lifting linkage system
CN105929205A (en) * 2016-05-24 2016-09-07 国网宁夏电力公司中卫供电公司 Insulation resistance test auxiliary device for high-altitude equipment
CN106199088A (en) * 2016-09-14 2016-12-07 国家电网公司 A kind of telescopic termination of power test
CN106526247A (en) * 2016-11-18 2017-03-22 中国南方电网有限责任公司超高压输电公司昆明局 Secure and stable wire hanging head for insulated test wire hanging pole
CN107942104A (en) * 2017-11-22 2018-04-20 广西电网有限责任公司南宁供电局 Portable lead wire device

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104550073A (en) * 2015-01-10 2015-04-29 国家电网公司 Portable electric cleaning tool
CN104597291A (en) * 2015-01-27 2015-05-06 广西大学 High-altitude wiring and clamping device
CN104597291B (en) * 2015-01-27 2017-09-29 广西大学 Overhead wiring clamp device
CN104897931A (en) * 2015-06-08 2015-09-09 国家电网公司 Telescopic wiring device for high-altitude test
CN105610052A (en) * 2016-03-04 2016-05-25 南京擎雷科技发展有限公司 Lightning early-warning lifting linkage system
CN105929205A (en) * 2016-05-24 2016-09-07 国网宁夏电力公司中卫供电公司 Insulation resistance test auxiliary device for high-altitude equipment
CN106199088A (en) * 2016-09-14 2016-12-07 国家电网公司 A kind of telescopic termination of power test
CN106526247A (en) * 2016-11-18 2017-03-22 中国南方电网有限责任公司超高压输电公司昆明局 Secure and stable wire hanging head for insulated test wire hanging pole
CN107942104A (en) * 2017-11-22 2018-04-20 广西电网有限责任公司南宁供电局 Portable lead wire device

Similar Documents

Publication Publication Date Title
CN203705476U (en) Electrical test multifunctional leading wire insulation operation rod
CN202454746U (en) High-altitude wiring pliers with built-in wire
CN203481707U (en) Upper pile head drainage wire fixing rod
CN201450135U (en) Multifunctional grounding wire
CN101726632B (en) Electrical equipment test wire clamp
CN103151730A (en) Dedicated tool for quickly processing live conductor foreign matter
CN206387819U (en) A kind of high-altitude automatic deploying and retracting test wire action bars
CN203398349U (en) Auxiliary device of ground wire installation
CN204101590U (en) Transformer neutral point test of lightning arrester insulating shielding device
CN204905469U (en) Distribution lines overhauls protective earthing device
CN207165335U (en) Energy-conservation becomes platform pillar arrester
CN202599986U (en) Lightning arrester live test jointing clamp
CN204858367U (en) Substation grounding fastener utensil
CN204538355U (en) A kind of movable type cable axle with length alarm and defencive function
CN204205512U (en) A kind of high voltage transmission line vibration damping conductor spacer
CN204089022U (en) Bird's Nest removes insulating tool
CN208548696U (en) The seal of secondary cable
CN202308922U (en) Anti-dropping hook of electric insulation protection umbrella
CN203277934U (en) Grounding wire
CN202651045U (en) Spiral fuse protective device
CN103474906A (en) Upper pile head drainage wire containing device
CN203690871U (en) Thunder air termination rapid mounting structure
CN204156481U (en) A kind of roll-on/roll-off vessel for vehicle mobile deck cable connecting arrangement
CN205282852U (en) Multifunctional grounding wire
CN211940664U (en) Quick ratchet box spanner action bars

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140709

Termination date: 20160218