CN203705476U - Electrical test multifunctional leading wire insulation operation rod - Google Patents
Electrical test multifunctional leading wire insulation operation rod Download PDFInfo
- Publication number
- CN203705476U CN203705476U CN201420079890.5U CN201420079890U CN203705476U CN 203705476 U CN203705476 U CN 203705476U CN 201420079890 U CN201420079890 U CN 201420079890U CN 203705476 U CN203705476 U CN 203705476U
- Authority
- CN
- China
- Prior art keywords
- insulating
- test
- rod
- vibration
- support rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Testing Relating To Insulation (AREA)
Abstract
一种电气试验多功能引接线绝缘操作杆,其中包括:万向活动绝缘橡胶底座,所述的万向活动绝缘橡胶底座上安装绝缘支架杆,所述绝缘支架杆上安装振出并继式和插入式组合绝缘支架杆,所述振出并继式和插入式组合绝缘支架杆上安装振出并继式绝缘操作杆,所述振出并继式绝缘操作杆上安装跟随式自动收放线轮和导体螺母,所述自动收放线轮上安装发条储能弹簧、试验线插孔、导线管和内藏式试验线,所述导体螺母上安装导线杆螺丝,所述导线杆螺丝上安装高空夹线钳和接线螺栓,高空夹线钳和接线螺栓之间连接有试验联接线,本实用新型的优点是:不需登高作业,避免试验线在外力作用下摇摆晃动,避免试验线携带不便易缠绕,进而提高工作效率,杜绝安全隐患和降低作业费用。
An insulating operating rod for electrical test multifunctional lead wires, which includes: a universal movable insulating rubber base, an insulating support rod is installed on the universal movable insulating rubber base, and a vibration-out parallel and insertion type is installed on the insulating support rod. The combined insulating support rod of the vibration-out and continuous type and the plug-in type are installed on the combined insulating support rod of the vibration-out and continuous type, and the following type automatic retractable reel and conductor nut are installed on the insulating operation rod of the vibration-out and continuous type , a spring energy storage spring, a test line jack, a conduit and a built-in test line are installed on the automatic retractable wire wheel, a guide rod screw is installed on the conductor nut, and a high-altitude clamp is installed on the guide rod screw There is a test connection line connected between the pliers and the connection bolts, and the high-altitude clamps and the connection bolts. The utility model has the advantages of: no need for climbing work, avoiding the test line from swinging and shaking under the action of external force, and avoiding the inconvenience of carrying the test line and easy winding. Then improve work efficiency, eliminate potential safety hazards and reduce operating costs.
Description
技术领域technical field
本实用新型涉及电力系统中发、输、变、配电及厂矿企业的高、低压电气设备的试验仪器与被试设备之间的试验联接线专用工具,具体涉及一种电气试验多功能引接试验线绝缘操作杆。The utility model relates to a special tool for test connecting wires between high and low voltage electrical equipment test instruments and tested equipment in power systems for power generation, transmission, transformation, power distribution, and factories and mines, in particular to a multifunctional lead-in test for electrical tests Wire insulated operating lever.
背景技术Background technique
《电力安全工作规程》、《电气试验规程》以及《状态检修规程》中均有规定,必须定期对电气设备进行电气试验,这是检测设备各项性能好坏、诊断设备是否能正常运行的重要手段。敞开式高压电气设备,例如电流互感器、电压互感器、避雷器、变压器套管、断路器、隔离开关等设备安装位置高,进行电气试验时通常需要高空作业。传统方式,一是需要人员登高接拆试验线,高空作业难度大,存在高空坠落的安全隐患,即使使用高空作业车解决了登高问题,但费用高,工作效率和安全性仍不乐观;二是需要使用多节绝缘杆与外接试验线组合的操作方式,工作中试验线较多,长而且零乱,易磨损,使用起来互相缠绕,工作效率低,而且外接试验线在风力或其他外力下会出现摇摆、晃动,已出现此类事故案例。"Electrical Safety Work Regulations", "Electrical Test Regulations" and "Condition Maintenance Regulations" all stipulate that electrical tests must be carried out on electrical equipment on a regular basis. means. Open-type high-voltage electrical equipment, such as current transformers, voltage transformers, lightning arresters, transformer bushings, circuit breakers, and disconnectors, are installed at high locations, and high-altitude operations are usually required for electrical tests. The traditional method, first, requires personnel to ascend to connect and disassemble the test line, which is difficult to work at heights, and there is a safety hazard of falling from heights. Even if the problem of ascending heights is solved by using aerial work vehicles, the cost is high, and the work efficiency and safety are still not optimistic; the second is It is necessary to use a combination of multi-section insulating rods and external test lines. There are many test lines during work, which are long and messy, easy to wear, and entangled with each other when used. The work efficiency is low, and the external test lines will appear under wind or other external forces. Swaying, shaking, such accidents have occurred.
实用新型内容Utility model content
本实用新型的目的是提供一种不需登高作业,避免试验线在外力作用下摇摆、晃动,以及避免试验线携带不便易缠绕,进而提高工作效率,杜绝安全隐患,降低作业费用的电气试验多功能绝引接线缘操作杆。The purpose of the utility model is to provide a kind of electric test machine that does not need to climb a height, avoids the test line from swaying and shaking under the action of external force, and avoids the inconvenience and easy winding of the test line, thereby improving work efficiency, eliminating potential safety hazards, and reducing operating costs. FUNCTIONAL INSULATED TERMINAL OPERATION Lever.
为实现上述目的,本实用新型所采用的技术方案为:In order to achieve the above object, the technical solution adopted in the utility model is:
一种电气试验多功能引接线绝缘操作杆,其特点在于:其中包括:万向活动绝缘橡胶底座,所述的万向活动绝缘橡胶底座上安装绝缘支架杆,所述绝缘支架杆上安装振出并继式和插入式组合绝缘支架杆,所述振出并继式和插入式组合绝缘支架杆上安装振出并继式绝缘操作杆,所述振出并继式绝缘操作杆上安装自动收放试验线轮和导体螺母,所述自动收放试验线轮上安装发条储能弹簧、试验线插孔、导线管和内藏式试验线,所述导体螺母上安装导线杆螺丝,所述导线杆螺丝上安装高空夹线钳和接线螺栓,所述高空夹线钳和接线螺栓之间连接有试验联接线。An electrical test multifunctional lead wire insulating operating rod, which is characterized in that it includes: a universal movable insulating rubber base, an insulating support rod is installed on the universal movable insulating rubber base, and a vibrating and The combined insulating support rod of the continuous and plug-in type, the combined insulating support rod of the vibration-out and continuous-type and plug-in type is installed with the insulating operation rod of the vibration-out and continuous type, and the automatic retractable test wire wheel is installed on the insulating operation rod of the vibration-out and continuous type and a conductor nut, a clockwork energy storage spring, a test line jack, a conduit and a built-in test line are installed on the automatic retractable test line wheel, a guide rod screw is installed on the described conductor nut, and a guide rod screw is installed on the guide rod screw Install high-altitude wire clamps and wiring bolts, and a test connection line is connected between the high-altitude wire clamps and the wiring bolts.
根据上述的电气试验多功能引接线绝缘操作杆,其特点在于:所述振出并继式绝缘操作杆上安装动锁定位器。According to the above-mentioned electrical test multi-function lead wire insulating operating rod, the characteristic is that a dynamic locking positioner is installed on the vibrating-and-continuing insulating operating rod.
根据上述的电气试验多功能引接线绝缘操作杆,其特点在于:所述导线管两端呈喇叭口状。According to the above-mentioned electrical test multi-function lead wire insulating operating rod, its characteristic is that: the two ends of the wire tube are in the shape of a bell mouth.
根据上述的电气试验多功能引接线绝缘操作杆,其特点在于:所述自动收放线轮采用铜或不锈钢材质,所述试验线插孔为铜或不锈钢材质中空轮轴。According to the above-mentioned insulating operating rod with multi-functional lead wires for electrical testing, the feature is that: the automatic take-up and release reel is made of copper or stainless steel, and the test line jack is a hollow wheel shaft made of copper or stainless steel.
本实用新型的优点是:本实用新型在工作过程中,不需登高作业,所述高空夹线钳拉紧时可以夹紧被测电气设备导体部分,松开时可与被测电气设备分离,所述的万向活动绝缘橡胶底座上安装所述的绝缘支架杆,起到固定绝缘作用,防止操作杆因外力而自动移位,所述绝缘支架杆上安装振出并继式和插入式组合绝缘支架杆,在电气试验时可提供足够的安全距离,所述振出并继式绝缘操作杆上安装所述动锁定位器,可实现振出并继式绝缘操作杆长度的灵活调节,同时所述振出并继式绝缘操作杆内的内藏式试验线,避免试验线在外力作用下摇摆、晃动的问题,所述振出并继式绝缘操作杆上安装自动收放线轮,以及所述自动收放线轮上安装发条跟随式储能弹簧、试验线插孔、导线管,在手动将振出并继式绝缘操作杆伸展时,内藏试验线随即自动跟出拉长,发条储能弹簧转动伸展存储能量,当手动将振出并继式绝缘操作杆缩回时,发条储能弹簧回缩释放能量,将试验线顺势自动收回,实现内藏式试验线自动收放,解决了试验线易缠绕,携带不便,本实用新型提高了工作效率,降低了安全隐患和作业费用,所述导线管两端呈喇叭口状,可提高自动收放内藏式试验线顺滑的效果。The utility model has the advantages that: in the working process of the utility model, no climbing operation is required, the high-altitude wire clamp can clamp the conductor part of the electrical equipment under test when tightened, and can be separated from the electrical equipment under test when loosened. The insulating support rod is installed on the universal movable insulating rubber base, which plays a role of fixed insulation and prevents the automatic displacement of the operating rod due to external force. The support rod can provide a sufficient safety distance during the electrical test. The dynamic locking positioner is installed on the vibration-out and continuous-type insulation operating rod, which can realize the flexible adjustment of the length of the vibration-out and continuous-type insulation operation rod. The built-in test line in the parallel insulated operating rod avoids the problem of the test line swaying and shaking under the action of external force. The mainspring follow-up energy storage spring, the test line jack, and the conduit are installed on the wire wheel. When the vibrating and continuous insulating operating rod is manually extended, the built-in test line will automatically follow and stretch, and the mainspring energy storage spring will rotate. Stretching and storing energy, when manually retracting the vibrating and continuous insulating operating rod, the mainspring energy storage spring retracts to release energy, and the test line is automatically retracted, realizing the automatic retraction of the built-in test line, which solves the problem of easy access to the test line. Winding and inconvenient to carry, the utility model improves work efficiency, reduces potential safety hazards and operating costs, and the two ends of the wire tube are bell-shaped, which can improve the smooth effect of automatically retracting the built-in test line.
附图说明Description of drawings
图1本实用新型结构示意图。Fig. 1 is a structural schematic diagram of the utility model.
图2本实用新型半剖结构示意图。Fig. 2 is a schematic diagram of a half-section structure of the utility model.
附图中In the attached picture
1、绝缘支架杆;2、自动收放线轮;3、试验线插孔;4、振出并继式绝缘操作杆;5、导体螺母;6、导线杆螺丝;7、高空夹线钳;8、万向活动绝缘橡胶底座;9、振出并继式和插入式组合绝缘支架杆;10、发条跟随式储能弹簧;11、导线管;12、内藏式试验线;13、接线螺栓;14、试验联接线。1. Insulation support rod; 2. Automatic take-up and release reel; 3. Test line jack; 4. Vibration and continuous insulation operation rod; 5. Conductor nut; 6. Lead rod screw; 7. High-altitude wire clamp; 8 1. Universal movable insulating rubber base; 9. Vibrating out parallel and plug-in combined insulating support rod; 10. Spring following energy storage spring; 11. Conduit; 12. Built-in test line; 13. Wiring bolts; 14. Test connection line.
具体实施方式Detailed ways
下面结合附图1、图2与具体实施例对本实用新型作进一步描述:Below in conjunction with accompanying drawing 1, Fig. 2 and specific embodiment the utility model is further described:
一种电气试验多功能引接线绝缘操作杆,其中包括:万向活动绝缘橡胶底座8,所述的万向活动绝缘橡胶底座8上安装绝缘支架杆1,所述绝缘支架杆1上安装振出并继式和插入式组合绝缘支架杆9,所述振出并继式和插入式组合绝缘支架杆9上安装振出并继式绝缘操作杆4,所述振出并继式绝缘操作杆4上安装自动收放线轮2和导体螺母5,所述自动收放线轮2上安装发条跟随式储能弹簧10、试验线插孔3、导线管11和内藏式试验线12,所述导体螺母5上安装导线杆螺丝6,所述导线杆螺丝上安装高空夹线钳7和接线螺栓13,所述高空夹线钳7和接线螺栓13之间连接有试验联接线14。An insulating operating rod for electrical test multifunctional leads, which includes: a universal movable insulating rubber base 8, an insulating support rod 1 is installed on the universal movable insulating rubber base 8, and a vibrating and The continuous and plug-in combined insulation support rod 9, the vibration and continuous insulation operating rod 4 is installed on the combined insulation support rod 9 of the vibration output and the insertion type, and the automatic retraction operation rod 4 is installed on the vibration and continuous insulation operation rod 4. Pay-off wheel 2 and conductor nut 5, spring follow-up energy storage spring 10, test line jack 3, wire conduit 11 and built-in test line 12 are installed on the described automatic retractable line wheel 2, and described conductor nut 5 The lead rod screw 6 is installed on the lead rod screw, and the high-altitude wire clamp 7 and the connection bolt 13 are installed on the described lead rod screw, and the test connection line 14 is connected between the high-altitude wire clamp 7 and the connection bolt 13.
在本实施例中:所述振出并继式绝缘操作杆4上安装动锁定位器。In this embodiment: a dynamic locking positioner is installed on the vibrating and continuous insulating operating rod 4 .
在本实施例中:所述导线管11两端呈喇叭口状。In this embodiment: both ends of the wire conduit 11 are bell-shaped.
在本实施例中:所述自动收放线轮2采用铜或不锈钢材质,所述试验线插孔3为铜或不锈钢材质中空轮轴。In this embodiment: the automatic retractable reel 2 is made of copper or stainless steel, and the test line insertion hole 3 is a hollow wheel shaft made of copper or stainless steel.
本实用新型有益效果:本实用新型在工作过程中,不需登高作业,所述高空夹线钳7拉紧时可以夹紧被测电气设备导体部分,松开时可与被测电气设备分离,所述的万向活动绝缘橡胶底座8上安装所述的绝缘支架杆1,起到固定绝缘作用防止操作杆因外力而自动移位,所述绝缘支架杆上1安装振出并继式和插入式组合绝缘支架杆9,在电气试验时可提供足够的安全距离,所述振出并继式绝缘操作杆4上安装所述动锁定位器,可实现振出并继式绝缘操作杆4长度的灵活调节,同时所述振出并继式绝缘操作杆4内的内藏式试验线12,避免试验线在外力作用下摇摆、晃动的问题,所述振出并继式绝缘操作杆4上安装自动收放线轮2,以及所述自动收放线轮2上安装发条储能弹簧10、试验线插孔3、导线管11,在手动将振出并继式绝缘操作杆4伸展时,内藏试验线12随即自动跟出拉长,发条跟随式储能弹簧10转动伸展存储能量,当手动将振出并继式绝缘操作杆4缩回时,发条储能弹簧10回缩释放能量,将试验线顺势自动收回,实现内藏式试验线12自动收放,解决了试验线易缠绕,携带不便,本实用新型提高了工作效率,降低了安全隐患和作业费用,所述导线管11两端呈喇叭口状,可提高自动收放内藏式试验线顺滑的效果。Beneficial effects of the utility model: the utility model does not need to climb a height during the working process, and the high-altitude wire clamp 7 can clamp the conductor part of the electrical equipment under test when tightened, and can be separated from the electrical equipment under test when loosened. The insulating support rod 1 is installed on the universal movable insulating rubber base 8, which plays a role of fixed insulation and prevents the operating rod from automatically shifting due to external force. The combined insulating support rod 9 can provide a sufficient safety distance during the electrical test, and the dynamic locking positioner is installed on the vibration-out and continuous-type insulation operating rod 4, which can realize the flexible adjustment of the length of the vibration-out and continuous-type insulation operation rod 4 At the same time, the built-in test line 12 in the vibration-out and continuous type insulating operating rod 4 can avoid the problem of the test line swinging and shaking under the action of external force, and the automatic retracting and releasing line is installed on the vibration-out and continuous type insulating operating rod 4 The spring 10, the test line jack 3, and the wire conduit 11 are installed on the wheel 2 and the automatic retractable line wheel 2, and the test line 12 is built in when the vibration-out and follow-up insulating operating rod 4 is manually extended. Immediately, it automatically follows and elongates, and the mainspring follows the type energy storage spring 10 to rotate and stretch to store energy. When the vibration-out and continuous type insulation operating rod 4 is retracted manually, the mainspring energy storage spring 10 retracts to release energy, and the test line is moved along the trend. Automatic retraction realizes automatic retraction of the built-in test line 12, which solves the problem that the test line is easily entangled and inconvenient to carry. The utility model improves work efficiency and reduces safety hazards and operating costs. The two ends of the conduit 11 are bell-mouthed shape, which can improve the smooth effect of the automatic retractable built-in test line.
上面所述的实施例仅仅是对本实用新型的优选实施方式进行描述,并非对本实用新型的构思和保护范围进行限定,在不脱离本实用新型设计构思的前提下,本领域中普通工程技术人员对本实用新型的技术方案作出的各种变型和改进,均应落入本实用新型的保护范围。The above-mentioned embodiment is only to describe the preferred implementation of the present utility model, not to limit the design and protection scope of the present utility model. Various modifications and improvements made in the technical solution of the utility model shall fall within the scope of protection of the utility model.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420079890.5U CN203705476U (en) | 2014-02-18 | 2014-02-18 | Electrical test multifunctional leading wire insulation operation rod |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420079890.5U CN203705476U (en) | 2014-02-18 | 2014-02-18 | Electrical test multifunctional leading wire insulation operation rod |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN203705476U true CN203705476U (en) | 2014-07-09 |
Family
ID=51055896
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420079890.5U Expired - Fee Related CN203705476U (en) | 2014-02-18 | 2014-02-18 | Electrical test multifunctional leading wire insulation operation rod |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN203705476U (en) |
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104550073A (en) * | 2015-01-10 | 2015-04-29 | 国家电网公司 | Portable electric cleaning tool |
| CN104597291A (en) * | 2015-01-27 | 2015-05-06 | 广西大学 | High-altitude wiring and clamping device |
| CN104897931A (en) * | 2015-06-08 | 2015-09-09 | 国家电网公司 | Telescopic wiring device for high-altitude test |
| CN105610052A (en) * | 2016-03-04 | 2016-05-25 | 南京擎雷科技发展有限公司 | Lightning early-warning lifting linkage system |
| CN105929205A (en) * | 2016-05-24 | 2016-09-07 | 国网宁夏电力公司中卫供电公司 | Insulation resistance test auxiliary device for high-altitude equipment |
| CN106199088A (en) * | 2016-09-14 | 2016-12-07 | 国家电网公司 | A kind of telescopic termination of power test |
| CN106526247A (en) * | 2016-11-18 | 2017-03-22 | 中国南方电网有限责任公司超高压输电公司昆明局 | Secure and stable wire hanging head for insulated test wire hanging pole |
| CN107942104A (en) * | 2017-11-22 | 2018-04-20 | 广西电网有限责任公司南宁供电局 | Portable lead wire device |
| CN115494272A (en) * | 2022-10-09 | 2022-12-20 | 广西电网有限责任公司北海供电局 | A special integrated automatic take-up high-altitude wiring device for high-voltage testing |
-
2014
- 2014-02-18 CN CN201420079890.5U patent/CN203705476U/en not_active Expired - Fee Related
Cited By (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104550073A (en) * | 2015-01-10 | 2015-04-29 | 国家电网公司 | Portable electric cleaning tool |
| CN104597291A (en) * | 2015-01-27 | 2015-05-06 | 广西大学 | High-altitude wiring and clamping device |
| CN104597291B (en) * | 2015-01-27 | 2017-09-29 | 广西大学 | Overhead wiring clamp device |
| CN104897931A (en) * | 2015-06-08 | 2015-09-09 | 国家电网公司 | Telescopic wiring device for high-altitude test |
| CN105610052A (en) * | 2016-03-04 | 2016-05-25 | 南京擎雷科技发展有限公司 | Lightning early-warning lifting linkage system |
| CN105929205A (en) * | 2016-05-24 | 2016-09-07 | 国网宁夏电力公司中卫供电公司 | Insulation resistance test auxiliary device for high-altitude equipment |
| CN106199088A (en) * | 2016-09-14 | 2016-12-07 | 国家电网公司 | A kind of telescopic termination of power test |
| CN106526247A (en) * | 2016-11-18 | 2017-03-22 | 中国南方电网有限责任公司超高压输电公司昆明局 | Secure and stable wire hanging head for insulated test wire hanging pole |
| CN107942104A (en) * | 2017-11-22 | 2018-04-20 | 广西电网有限责任公司南宁供电局 | Portable lead wire device |
| CN115494272A (en) * | 2022-10-09 | 2022-12-20 | 广西电网有限责任公司北海供电局 | A special integrated automatic take-up high-altitude wiring device for high-voltage testing |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203705476U (en) | Electrical test multifunctional leading wire insulation operation rod | |
| CN204680772U (en) | A kind of portable stretchable high-voltage earthing line apparatus | |
| CN205790462U (en) | A kind of power secure grounding cable line | |
| CN201548642U (en) | High voltage test wiring rod | |
| CN201673736U (en) | Pin type insulator | |
| CN202929093U (en) | A multi-functional high-voltage electrical testing device | |
| CN108574219A (en) | A kind of self-locking high-altitude application pincers | |
| CN202523948U (en) | Movable grounding protection device for electric welding equipment | |
| CN204008704U (en) | The universal lead wire insulating bar in a kind of high-altitude | |
| CN203643482U (en) | High-altitude wiring pliers | |
| CN206387819U (en) | A kind of high-altitude automatic deploying and retracting test wire action bars | |
| CN203014232U (en) | Transformer station tube type bus single-clamp grounding device | |
| CN202720248U (en) | Insulating bracket for high voltage test | |
| CN204065171U (en) | A kind of telescopic electric test wire | |
| CN204101601U (en) | A kind of test clip | |
| CN203929815U (en) | High voltage power cable clips | |
| CN201742027U (en) | Special tool for replacing insulators in electriferous state for 110kV single tower double circuit | |
| CN207730923U (en) | Transformer test rod | |
| CN205104688U (en) | High -voltage line wire support | |
| CN204028209U (en) | Fast high-altitude high-voltage electroscope | |
| CN103808984A (en) | Insulating support for high-voltage test | |
| CN203981710U (en) | A kind of Assisted Combinatorial device that is applicable to megger method test power distribution network stake resistance | |
| CN105703270A (en) | Conductor insulating supporting rod for high-voltage live-line operation | |
| CN104020323B (en) | High-voltage power cable tension clamp | |
| CN205407116U (en) | Insulating vaulting pole of wire that high voltage live operation was used |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140709 Termination date: 20160218 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |