CN104897931A - Telescopic wiring device for high-altitude test - Google Patents
Telescopic wiring device for high-altitude test Download PDFInfo
- Publication number
- CN104897931A CN104897931A CN201510308542.XA CN201510308542A CN104897931A CN 104897931 A CN104897931 A CN 104897931A CN 201510308542 A CN201510308542 A CN 201510308542A CN 104897931 A CN104897931 A CN 104897931A
- Authority
- CN
- China
- Prior art keywords
- clip
- altitude
- wiring
- magnetic
- operating rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Clamps And Clips (AREA)
Abstract
一种伸缩式高空试验接线器,高空接线钳包括接线夹,在螺杆下方装有磁式内套筒,磁式内套筒两侧设有卡销;连接线采用多股软铜线,多股软铜线的上端焊接在铜鼻下端,在铜鼻的背面贴装有条形固定夹,固定夹的下端夹片包裹在多股软铜线外用紧固螺丝固定,铜鼻和固定夹的上孔套在接线夹的上侧背面的紧固螺栓上,用螺母紧固,在接线夹的下侧背面用固定片固定贴装有条形固定夹的多股软铜线;绝缘操作杆包括上端的磁式外套筒和伸缩操作杆,磁式外套筒的上端两侧设有与磁式内套筒的卡销对应的卡槽。本发明可减少登高作业,提高工作效率,技术层面克服班组人员少、工作任务重的问题,从科学层面提高班组工作效率,解决工作中存在的安全隐患。
A telescopic high-altitude test connector, the high-altitude wiring pliers include a clamp, a magnetic inner sleeve is installed under the screw rod, and bayonet pins are arranged on both sides of the magnetic inner sleeve; the connecting wire adopts multi-strand soft copper wire, multi-strand The upper end of the annealed copper wire is welded to the lower end of the copper nose, and a strip-shaped fixing clip is mounted on the back of the copper nose. The hole is set on the fastening bolt on the back of the upper side of the wiring clip, fastened with a nut, and the multi-strand annealed copper wire with the bar-shaped fixing clip is fixed and pasted on the lower back of the wiring clip with a fixed piece; the insulating operating rod includes the upper end The magnetic outer sleeve and the telescopic operating rod are provided with slots corresponding to the bayonet pins of the magnetic inner sleeve on both sides of the upper end of the magnetic outer sleeve. The invention can reduce climbing operations, improve work efficiency, overcome the problems of fewer team members and heavy work tasks at the technical level, improve the work efficiency of the team at the scientific level, and solve potential safety hazards in the work.
Description
技术领域 technical field
本发明属于电力检修工具领域,是一种安全系数较高的接线装置。 The invention belongs to the field of electric power maintenance tools, and is a wiring device with a high safety factor.
背景技术 Background technique
目前,供电公司的班组存在工作任务重、班组人员少,担负着公司所辖所有变电站保护、远动、通讯、直流四个专业的安装、调试、检修、维护工作,几乎涵盖变电站所有的二次、三次、通讯等各种设备。因此,利用科技手段提高工作效率、节约人力物力已迫在眉睫。高空试验接线存在安全隐患:作为检修班组,自动化班每年都有大量的预试、年检、检修工作。在对不能直接接触的电器设备进行测试或检修时,需要班组人员攀高接线。特别对于110kV变电站的一次设备,距离地面高度高,试验接线时,必须采取人字梯登高接线。这种工作方式既占用人力,又存在安全隐患。必须采取有效的措施,减少登高作业,才能提高工作效率。 At present, the team of the power supply company has heavy work tasks and few team members. It is responsible for the installation, commissioning, overhaul and maintenance of all substation protection, telecontrol, communication, and direct current of all substations under the company's jurisdiction, covering almost all secondary substations. , Three times, communications and other equipment. Therefore, it is imminent to use scientific and technological means to improve work efficiency and save manpower and material resources. There are potential safety hazards in high-altitude test wiring: as a maintenance team, the automation team has a lot of pre-test, annual inspection, and maintenance work every year. When testing or overhauling electrical equipment that cannot be directly touched, team members are required to climb high for wiring. Especially for the primary equipment of 110kV substation, the height from the ground is high, when testing the wiring, it is necessary to use a ladder to climb the wiring. This way of working not only takes up manpower, but also has potential safety hazards. Effective measures must be taken to reduce climbing operations in order to improve work efficiency.
发明内容 Contents of the invention
本发明的目的在于克服现有不足,提供一种能与设备可靠连接的螺旋式接线钳,操作杆设计制作简单的伸缩式高空试验接线器;可适用于各种高空试验接线。 The object of the present invention is to overcome existing deficiencies, provide a kind of screw-type wiring pliers that can be reliably connected with the equipment, and the design and manufacture of the operating rod is simple and telescopic high-altitude test connector; it is applicable to various high-altitude test wiring.
为达到上述目的,本发明提供的技术方案为:一种伸缩式高空试验接线器,其特点是:它包括高空接线钳、绝缘操作杆、连接线;高空接线钳包括由螺杆旋转控制收紧夹爪的接线夹,在螺杆下方装有磁式内套筒,磁式内套筒两侧设有卡销;连接线采用多股软铜线,多股软铜线的上端焊接在铜鼻下端,在铜鼻的背面贴装有条形固定夹,固定夹的下端夹片包裹在多股软铜线外用紧固螺丝固定,铜鼻和固定夹的上孔套在接线夹的上侧背面的紧固螺栓上,用螺母紧固,在接线夹的下侧背面用固定片固定贴装有条形固定夹的多股软铜线;绝缘操作杆包括上端的磁式外套筒和伸缩操作杆,磁式外套筒的上端两侧设有与磁式内套筒的卡销对应的卡槽。 In order to achieve the above object, the technical solution provided by the present invention is: a telescopic high-altitude test connector, which is characterized in that it includes high-altitude wiring pliers, insulating operating rods, and connecting wires; high-altitude wiring pliers include tightening clamps controlled by screw rotation The claw clamp is equipped with a magnetic inner sleeve under the screw rod, and there are bayonet pins on both sides of the magnetic inner sleeve; the connecting wire is made of multi-strand annealed copper wire, and the upper end of the multi-strand annealed copper wire is welded to the lower end of the copper nose. On the back of the copper nose, there is a strip-shaped fixing clip. The lower clip of the fixing clip is wrapped around multiple soft copper wires and fixed with fastening screws. Fasten the bolts and fasten them with nuts, and fix the multi-strand annealed copper wires with strip-shaped fixing clips on the back of the lower side of the clamp with a fixed piece; the insulating operating rod includes a magnetic outer sleeve at the upper end and a telescopic operating rod. Both sides of the upper end of the magnetic outer sleeve are provided with slots corresponding to the bayonet pins of the magnetic inner sleeve.
本发明可减少登高作业,提高工作效率,技术层面克服班组人员少、工作任务重的问题,从科学层面提高班组工作效率,解决工作中存在的安全隐患。1、操作简单:通过旋转接线夹下端绝缘操作杆即可将其固定在高空设备线缆上,操作简单。2、安全可靠:接线夹安装后,在非操作情况下不会松动,夹持可靠。3、过载能力强:其满足短时通电电流大于200A。4、使用轻便 :重量轻,结构设计合理,经久耐用。5、采用旋转固定,操作杆可脱卸,顶端加装带磁性螺杆套筒,操作简单,夹持牢固可靠,适合室外高空线缆接线。 The invention can reduce climbing operations, improve work efficiency, overcome the problems of fewer team members and heavy work tasks at the technical level, improve the work efficiency of the team at the scientific level, and solve potential safety hazards in the work. 1. Simple operation: by rotating the insulating operating lever at the lower end of the terminal clamp, it can be fixed on the high-altitude equipment cable, and the operation is simple. 2. Safe and reliable: After the wiring clip is installed, it will not loosen under non-operating conditions, and the clamping is reliable. 3. Strong overload capacity: it meets the short-time energizing current greater than 200A. 4. Easy to use: light in weight, reasonable in structural design and durable in use. 5. It is fixed by rotation, the operating rod is detachable, and a magnetic screw sleeve is installed on the top, which is easy to operate, firm and reliable in clamping, and is suitable for outdoor high-altitude cable wiring.
附图说明 Description of drawings
图1是本发明的结构示意图。 Fig. 1 is a schematic structural view of the present invention.
图中:1——固定螺栓;2——铜鼻;3——紧固螺栓;4——固定片;5——固定夹;6——多股软铜线;7——卡销;8——磁式内套筒;9——螺杆;10——固定螺栓;11——接线夹;12——夹爪;13——紧固螺丝;14——卡槽;15——磁式外套筒;16——伸缩操作杆。 In the figure: 1—fixing bolt; 2—copper nose; 3—fastening bolt; 4—fixing piece; 5—fixing clip; 6—multi-strand annealed copper wire; ——magnetic inner sleeve; 9—screw; 10—fixing bolt; 11—wiring clip; 12—clamp claw; 13—fastening screw; 14—card slot; 15—magnetic outer Sleeve; 16——telescopic operating rod.
具体实施方式 Detailed ways
本发明它包括高空接线钳、绝缘操作杆、连接线;高空接线钳包括由螺杆9旋转控制收紧夹爪12的接线夹11,在螺杆9下方装有磁式内套筒8,磁式内套筒8两侧设有卡销7;连接线采用多股软铜线6,多股软铜线6的上端焊接在铜鼻2下端,在铜鼻2的背面贴装有条形固定夹5,固定夹5的下端夹片包裹在多股软铜线6外用紧固螺丝13固定,铜鼻2和固定夹5的上孔套在接线夹的上侧背面的紧固螺栓3上,用螺母紧固,在接线夹的下侧背面用固定片4固定贴装有条形固定夹5的多股软铜线6;绝缘操作杆包括上端的磁式外套筒15和伸缩操作杆16,磁式外套筒15的上端两侧设有与磁式内套筒的卡销7对应的卡槽14。 The present invention includes high-altitude wiring pliers, insulating operating rods, and connecting wires; high-altitude wiring pliers include a connecting clip 11 that is controlled by screw rod 9 to rotate and tighten clamp jaws 12, and a magnetic inner sleeve 8 is installed below the screw rod 9. Both sides of the sleeve 8 are provided with bayonet pins 7; the connecting wire is multi-strand annealed copper wire 6, the upper end of the multi-strand annealed copper wire 6 is welded to the lower end of the copper nose 2, and a strip-shaped fixing clip 5 is mounted on the back of the copper nose 2 , the lower clip of the fixing clip 5 is wrapped in the multi-strand annealed copper wire 6 and fixed with fastening screws 13, the upper hole of the copper nose 2 and the fixing clip 5 is set on the fastening bolt 3 on the upper back of the connecting clip, and the nuts Tighten, fix the multi-strand annealed copper wire 6 with the bar-shaped fixing clip 5 with the fixed piece 4 on the back side of the lower side of the clamp; Both sides of the upper end of the magnetic outer sleeve 15 are provided with locking grooves 14 corresponding to the bayonet pins 7 of the magnetic inner sleeve.
伸缩操作杆的选用主要考虑以下几个方面: The selection of the telescopic operating rod mainly considers the following aspects:
①与高空接线钳配套使用,在接线夹固定后可脱卸,且上举及旋转过程中要保证接线夹不脱落; ① It is used together with high-altitude wiring pliers. It can be detached after the clamp is fixed, and the clamp must not fall off during the lifting and rotation process;
②考虑到110kV、35kV设备高度不同,操作杆应具有伸缩性,使其满足各种不同的工作需求。 ②Considering the different heights of 110kV and 35kV equipment, the operating lever should be flexible so that it can meet various work requirements.
③伸缩操作杆16应具有良好的绝缘性。 ③The telescopic operating rod 16 should have good insulation.
操作杆顶端的磁式外套筒为不锈钢套筒,保证上举过程中接线钳的固定,同时旋转操作杆带动螺杆9完成高空接线钳的固定。为了保证高空接线钳底部磁式内套筒牢固连接于操作杆,磁式内套筒和磁式外套筒底部均安装有磁铁,保证接线钳上举过程中不脱落, The magnetic outer sleeve at the top of the operating rod is a stainless steel sleeve to ensure the fixing of the wiring clamp during the lifting process, and at the same time, the rotating operating rod drives the screw rod 9 to complete the fixing of the high-altitude wiring clamp. In order to ensure that the magnetic inner sleeve at the bottom of the high-altitude wiring pliers is firmly connected to the operating rod, magnets are installed at the bottom of the magnetic inner sleeve and the magnetic outer sleeve to ensure that the wiring pliers will not fall off during the lifting process.
伸缩操作杆由耐高压环氧玻纤制作而成,这样重量轻,强度高,220kV内安全使用。伸缩管1.2M/节,两节之间通过螺丝连接,保证其连接的可靠性。连接两节即可连接4米高度,满足110kV试验需求。 The telescopic operating rod is made of high-voltage epoxy glass fiber, which is light in weight and high in strength, and can be used safely within 220kV. The telescopic tube is 1.2M/section, and the two sections are connected by screws to ensure the reliability of the connection. The height of 4 meters can be connected by connecting two sections, which meets the test requirements of 110kV.
为了保证大电流试验室的可靠性,我们选择25㎜2的多股软铜线作为上下连接线。参考大电流试验设备试验线的接口方式,我们利用铜鼻子作为下端试验用接线连接处,使其可以直接和试验仪器连接,减少中间连接环节。 In order to ensure the reliability of the high-current laboratory, we choose 25㎜ 2 multi-strand annealed copper wires as the upper and lower connecting wires. Referring to the interface mode of the test line of the high-current test equipment, we use the copper nose as the connection point for the lower test wiring, so that it can be directly connected to the test instrument and reduce the intermediate connection links.
我们以110kV环峰变CT极性变比试验为准,未使用本接线器时,每相CT大概需要13.5 分钟,使用接线器后,每组试验时间为7.5分钟,平均时间节省了44%。 We take the 110kV ring peak transformer CT polarity ratio test as the standard. When the connector is not used, each phase CT takes about 13.5 minutes. After using the connector, the test time of each group is 7.5 minutes, and the average time is saved by 44%.
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510308542.XA CN104897931A (en) | 2015-06-08 | 2015-06-08 | Telescopic wiring device for high-altitude test |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510308542.XA CN104897931A (en) | 2015-06-08 | 2015-06-08 | Telescopic wiring device for high-altitude test |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104897931A true CN104897931A (en) | 2015-09-09 |
Family
ID=54030719
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510308542.XA Pending CN104897931A (en) | 2015-06-08 | 2015-06-08 | Telescopic wiring device for high-altitude test |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104897931A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107359435A (en) * | 2017-07-28 | 2017-11-17 | 国网安徽省电力公司合肥供电公司 | A kind of transmission line of electricity split multi-angle formula grounding wire device |
CN111610350A (en) * | 2020-06-04 | 2020-09-01 | 贵州电网有限责任公司 | High-altitude junction pole and device |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103176000A (en) * | 2013-04-01 | 2013-06-26 | 国家电网公司 | Telescopic high altitude test wire connector |
CN203217071U (en) * | 2013-04-22 | 2013-09-25 | 国家电网公司 | A current transformer experimental wiring device |
CN203350290U (en) * | 2013-06-28 | 2013-12-18 | 国家电网公司 | High-voltage test jointing clamp |
CN203574123U (en) * | 2013-11-27 | 2014-04-30 | 国家电网公司 | Transformer bushing junction device |
CN203672918U (en) * | 2014-01-09 | 2014-06-25 | 国家电网公司 | Portable substation equipment high voltage test wiring clamp |
CN203672922U (en) * | 2014-01-26 | 2014-06-25 | 国家电网公司 | Electrical test junction pole for substation equipment |
CN203705476U (en) * | 2014-02-18 | 2014-07-09 | 国家电网公司 | Electrical test multifunctional leading wire insulation operation rod |
CN204011790U (en) * | 2014-06-24 | 2014-12-10 | 国家电网公司 | Repair apparatus hangs the binding clip of eminence grounding wire device |
CN104459226A (en) * | 2014-12-22 | 2015-03-25 | 深圳市航天泰瑞捷电子有限公司 | High-voltage line monitor and shell of high-voltage line monitor |
CN204679527U (en) * | 2015-06-08 | 2015-09-30 | 国家电网公司 | Telescopic high altitude test wire connector |
-
2015
- 2015-06-08 CN CN201510308542.XA patent/CN104897931A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103176000A (en) * | 2013-04-01 | 2013-06-26 | 国家电网公司 | Telescopic high altitude test wire connector |
CN203217071U (en) * | 2013-04-22 | 2013-09-25 | 国家电网公司 | A current transformer experimental wiring device |
CN203350290U (en) * | 2013-06-28 | 2013-12-18 | 国家电网公司 | High-voltage test jointing clamp |
CN203574123U (en) * | 2013-11-27 | 2014-04-30 | 国家电网公司 | Transformer bushing junction device |
CN203672918U (en) * | 2014-01-09 | 2014-06-25 | 国家电网公司 | Portable substation equipment high voltage test wiring clamp |
CN203672922U (en) * | 2014-01-26 | 2014-06-25 | 国家电网公司 | Electrical test junction pole for substation equipment |
CN203705476U (en) * | 2014-02-18 | 2014-07-09 | 国家电网公司 | Electrical test multifunctional leading wire insulation operation rod |
CN204011790U (en) * | 2014-06-24 | 2014-12-10 | 国家电网公司 | Repair apparatus hangs the binding clip of eminence grounding wire device |
CN104459226A (en) * | 2014-12-22 | 2015-03-25 | 深圳市航天泰瑞捷电子有限公司 | High-voltage line monitor and shell of high-voltage line monitor |
CN204679527U (en) * | 2015-06-08 | 2015-09-30 | 国家电网公司 | Telescopic high altitude test wire connector |
Non-Patent Citations (1)
Title |
---|
李昌兵等: "伸缩式高空试验接线器", 《农村电气化》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107359435A (en) * | 2017-07-28 | 2017-11-17 | 国网安徽省电力公司合肥供电公司 | A kind of transmission line of electricity split multi-angle formula grounding wire device |
CN111610350A (en) * | 2020-06-04 | 2020-09-01 | 贵州电网有限责任公司 | High-altitude junction pole and device |
CN111610350B (en) * | 2020-06-04 | 2022-08-30 | 贵州电网有限责任公司 | High-altitude junction pole device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2012088987A1 (en) | Maintenance tool for insulator of direct current transmission line | |
CN104868403B (en) | A kind of portable 120~400mm2Steel-cored aluminium strand shunt line fixture and application method | |
CN102966301B (en) | Live working sliding board | |
CN206274554U (en) | A kind of dismountable portable high-pressure ground wire | |
CN105932599A (en) | Tool set capable of replacing insulator chain of ultra-high-voltage transmission line under electrified state and use method for tool set | |
CN205791227U (en) | Charged for replacement UHV transmission line insulator chain tool set | |
CN105337216A (en) | Tool and method for realizing charged replacement of tension insulator of extra-high voltage earth electrode line | |
CN201522505U (en) | A high-voltage test lead wire connection tool for electric equipment | |
CN104535804A (en) | Portable current transformer test clamp | |
CN204439667U (en) | A kind of portable type current transformer testing clamp | |
CN204679527U (en) | Telescopic high altitude test wire connector | |
CN203800477U (en) | Clamping tool used for electriferous replacement of first insulator of power transmission line tension single chain at wire side | |
CN201466574U (en) | A device for equipotential replacement of transmission line tower insulators and accessories | |
CN102623927B (en) | Charged for replacement 220kV circuit multiloop double bundle conductor insulator tool and method | |
CN104897931A (en) | Telescopic wiring device for high-altitude test | |
CN103346451A (en) | 220kV transformer test short-circuit wire connector | |
CN103500966B (en) | 66kv disconnecting switch is to pipe bus charged disconnecting lead-in wire method | |
CN202572183U (en) | Large-current telescopic high-altitude cable connecting clamp | |
CN202602171U (en) | A tool for power-on replacing multi-loop double split conductor insulator of 220kV line | |
CN203895633U (en) | Short circuit grounding wire suitable for box transformer substation and electricity distribution room | |
CN104113007A (en) | Operation method for replacing strain insulator of 35kV overhead distribution line in live state | |
CN203909080U (en) | Telescopic wiring post used for transformation ratio tests of current transformer in transformer station | |
CN203326326U (en) | 220kV transformer test short-circuit wire connector | |
CN108847617A (en) | The device and method of UHV transmission line live-line replacing strain wire jumper insulator chain | |
CN204230763U (en) | A kind of 10kV overhead distribution electrical verification operation insulating bar |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150909 |
|
RJ01 | Rejection of invention patent application after publication |