CN105929205A - Insulation resistance test auxiliary device for high-altitude equipment - Google Patents

Insulation resistance test auxiliary device for high-altitude equipment Download PDF

Info

Publication number
CN105929205A
CN105929205A CN201610349512.8A CN201610349512A CN105929205A CN 105929205 A CN105929205 A CN 105929205A CN 201610349512 A CN201610349512 A CN 201610349512A CN 105929205 A CN105929205 A CN 105929205A
Authority
CN
China
Prior art keywords
resistance test
auxiliary device
insulating bar
eminence
fixing support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610349512.8A
Other languages
Chinese (zh)
Inventor
王玺
李文涛
陶莉
何玉宝
李春阳
何娇
刘军福
周秀
李秀广
何锐
李永增
韩涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHONGWEI POWER SUPPLY Co OF STATE GRID NINGXIA ELECTRIC POWER Co
Original Assignee
ZHONGWEI POWER SUPPLY Co OF STATE GRID NINGXIA ELECTRIC POWER Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHONGWEI POWER SUPPLY Co OF STATE GRID NINGXIA ELECTRIC POWER Co filed Critical ZHONGWEI POWER SUPPLY Co OF STATE GRID NINGXIA ELECTRIC POWER Co
Priority to CN201610349512.8A priority Critical patent/CN105929205A/en
Publication of CN105929205A publication Critical patent/CN105929205A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R1/00Details of instruments or arrangements of the types included in groups G01R5/00 - G01R13/00 and G01R31/00
    • G01R1/02General constructional details
    • G01R1/04Housings; Supporting members; Arrangements of terminals
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R27/00Arrangements for measuring resistance, reactance, impedance, or electric characteristics derived therefrom
    • G01R27/02Measuring real or complex resistance, reactance, impedance, or other two-pole characteristics derived therefrom, e.g. time constant
    • G01R27/025Measuring very high resistances, e.g. isolation resistances, i.e. megohm-meters

Abstract

The invention discloses an insulation resistance test auxiliary device for high-altitude equipment. The insulation resistance test auxiliary device for the high-altitude equipment includes an insulating rod, a fixed supporting base and a connecting wire; the top of the insulating rod is provided with a top rod hanging hook; the top rod hanging hook is used for enabling the connecting wire to be reliably connected with the equipment; the fixed supporting base is installed at the bottom of the insulating rod; the fixed supporting base is provided with a grounding binding post, an insulation resistance test hole and an air switch; the connecting wire is arranged in the insulating rod; one end of the connecting wire is connected with the top rod hanging hook; and the other end of the connecting wire is connected with the fixed supporting base. The insulation resistance test auxiliary device for the high-altitude equipment of the invention is of a detachable structure and has the advantages of compact structure, fast disassembly, small size, portable convenience and the like. With the insulation resistance test auxiliary device for the high-altitude equipment of the invention adopted, the workload of work staff can be decreased, and hazards of working at height can be eliminated, and the safety factor and work efficiency of insulation resistance test work can be effectively improved.

Description

Eminence apparatus insulated resistance test auxiliary device
Technical field:
The present invention relates to electric testing device technical field, be specifically related to a kind of apparatus insulated resistance test of eminence Auxiliary device.
Background technology:
A following two is mainly had: (1) ascends a height method currently for the method for the apparatus insulated resistance test of eminence, I.e. staff utilizes the instrument of climbing such as insulating ladder, stool to climb on tested device framework to test.Step on After supreme people's court completes test, needing to discharge with special discharging rod, not only operation is time-consuming long, and there is height Empty pendant thing is dangerous.Part 110kV and above equipment are due to excessive height, even if climbing up framework also It is difficult to test.The method does not only exist falling from high altitude danger and work efficiency is low.(2) insulating bar P-wire termination is fixed on insulating bar top by take-up method, i.e. staff, p-wire is provoked contact tested Position is to complete test.Operating process mesohigh p-wire exists and comes off danger, personnel can be caused to be injured by a crashing object or Shock by electricity, and long-time operation can cause loose contact or touch other charging equipments by mistake because personnel are tired.Use Insulating bar take-up method completes owing to p-wire is soft after test, and discharging rod is difficult to contact well with p-wire, Guiding discharge can not exclusively or by mistake touch the danger such as operator, the method operating process is the longest, work effect Rate is low.To this end, improve for above key factor, design a kind of apparatus insulated resistance of eminence and survey Examination auxiliary device, can be effectively improved safety coefficient and the work efficiency of megger test work.
Summary of the invention:
For the problem overcoming prior art to exist, the present invention provides the apparatus insulated resistance test of a kind of eminence Auxiliary device, the workload that can reduce a staff, eliminate the risk factor of operation of ascending a height, be effectively improved absolutely The safety coefficient of edge resistance test work and work efficiency.
For solving above-mentioned technical problem, the present invention takes techniques below scheme:
The auxiliary device of the apparatus insulated resistance test of a kind of eminence, including insulating bar, fixing support base and company Connecing wire, the top of described insulating bar is provided with masthead hook, and described masthead hook is used for making described connection wire It is reliably connected with equipment;The bottom of described insulating bar is provided with fixing support base;Described fixing support base It is provided with ground connection binding post, megger test hole and air switch;Described connection wire is arranged at insulating bar Inside, its one end be connected to described masthead hook on, the other end is fixedly connected on described fixing support base On.
Above-mentioned insulating bar is the hollow pipe of extension type, may be elongated to the height arbitrarily needed, and is surveyed by high pressure Examination line is increased to test height, wide adaptability.
Above-mentioned masthead hook is used for making connection wire be reliably connected with equipment, and eliminate that hand-held insulating bar causes connects Touch bad defect.
Above-mentioned connection wire is the scalable shape of spiral, and it is placed in the inside of telescopic insulating bar, can avoid connecting The danger of wire dropping.
Above-mentioned fixing support chassis interior is provided with electric discharge device, electric discharge device by air switch by earth potential with The tail end connecting wire connects.During test, air switch disconnects, and can complete megger test;Test After, it is only necessary to press air switch can carrying out safely and fast test after discharge work, shorten and put The used time of electricity work, improve work efficiency.
The bottom of above-mentioned insulating bar is additionally provided with a high-strength Magnet.
Above-mentioned fixing support base is provided with a magnet attraction, fixing support base and insulating bar by magnet attraction and Captivation between high-strength Magnet is fixed, and can improve insulating bar stability, and connection wire is caused ground, Avoid operation of ascending a height cleverly, improve safety and the efficiency of work.
The beneficial effects of the present invention is:
(1) the apparatus insulated resistance test of this eminence auxiliary device use demountable structure, be divided into telescopic absolutely Edge bar, fixing support base, connect wire three part, have compact conformation, fast assembling-disassembling, compact, The advantage such as be easy to carry.
(2) present invention utilizes insulating bar support that high pressure is connected wire support to fix, decrease staff's Workload, and eliminate the risk factor of operation of ascending a height, the fixing chassis interior that supports has installed quick electric discharge additional Device, can be effectively improved safety coefficient and the work efficiency of megger test work.
Accompanying drawing illustrates:
Fig. 1 is the structural representation of the auxiliary device of the apparatus insulated resistance test of eminence of the present invention;
Fig. 2 is the circuit theory schematic diagram of the auxiliary device of the apparatus insulated resistance test of eminence of the present invention;
In figure: 1-insulating bar, 2-is fixing supports base, and 3-connects wire, and 4-masthead is linked up with, 5-ground connection wiring Post, 6-megger test hole, 7-air switch, the high-strength Magnet of 8-, 9-magnet attraction.
Detailed description of the invention:
The present invention is further detailed explanation with detailed description of the invention below in conjunction with the accompanying drawings.
As shown in Figure 1 and Figure 2, the auxiliary device of the apparatus insulated resistance test of a kind of eminence, including insulating bar 1, The fixing base 2 that supports is provided with masthead links up with 4 with connection wire 3, the top of described insulating bar 1, described masthead Hook 4 is used for making described connection wire 3 be reliably connected with equipment;The bottom of described insulating bar 1 is provided with solid Surely base 2 is supported;Described fixing support base 2 is provided with ground connection binding post 5, megger test hole 6 and Air switch 7;Described connection wire 3 is arranged at the inside of insulating bar 1, and its one end is connected to described masthead and hangs On hook 4, the other end is fixedly connected on described fixing support base 2;Described insulating bar 1 is extension type Hollow pipe, may be elongated to the height arbitrarily needed, high pressure connected wire 3 and is increased to test height; Described masthead hook 4 is used for making connection wire 3 be reliably connected with equipment;Described connection wire 3 can for spiral Retractable, it is placed in the inside of telescopic insulating bar 1.
The bottom of described insulating bar 1 is additionally provided with a high-strength Magnet 8;Described fixing support base 2 is provided with a magnetic Adhesive 9, fixing support base 2 and insulating bar 1 are entered by the captivation between magnet attraction 9 and high-strength Magnet 8 Row is fixing.
Described fixing support base 2 is internal is provided with electric discharge device, and electric discharge device is electric by ground by air switch 7 Position connects with the tail end being connected wire 3.During test, air switch 7 disconnects, and can complete insulation resistance and survey Examination;After being completed, it is only necessary to press air switch 7 can carrying out safely and fast test after discharge work, Shorten the used time of electric discharge work, improve work efficiency.
Scene carries out the test of the apparatus insulated resistance of eminence:
(1) preparatory stage: by telescopic insulating bar 1, fixing support base 2, connect wire 3 three part Assemble, be the auxiliary device of the apparatus insulated resistance test of this eminence;
(2) the wiring stage: use the auxiliary device of the apparatus insulated resistance test of this eminence, linked up with by masthead Connection wire 3 is reliably connected by 4 with eminence equipment to be measured, and by ground connection binding post 5 by fixing support base Electric discharge device 5 within 2 carries out grounding connection, completes wiring;
(3) test phase: be connected on megger test hole 6 by megger test equipment, disconnects sky Air cock 7, opens megger test equipment and carries out the test of the apparatus insulated resistance of this eminence, record data, It is completed;
(4) discharge regime: press air switch 6, can carrying out safely and fast test after discharge work.
When scene carries out eminence apparatus insulated resistance test, before not using this device, this work average used time For 23.85min, after using this device, the work used time shortens to 9.81min, and therefore the working time saves 58.57%, greatly improve work efficiency.

Claims (6)

1. the auxiliary device of the apparatus insulated resistance test of eminence, it is characterised in that: include insulating bar (1), Fixing support base (2) and connection wire (3), the top of described insulating bar (1) is provided with masthead hook (4), Described masthead hook (4) is used for making described connection wire (3) be reliably connected with equipment;Described insulating bar (1) Bottom be provided with and fixing support base (2);Described fixing support base (2) be provided with ground connection binding post (5), Megger test hole (6) and air switch (7);Described connection wire (3) is arranged at insulating bar (1) Inside, its one end be connected to described masthead hook (4) on, the other end is fixedly connected on described fixing support On base (2).
The auxiliary device of the apparatus insulated resistance test of eminence the most according to claim 1, it is characterised in that: Described insulating bar (1) is the hollow pipe of extension type, may be elongated to the height arbitrarily needed, by high pressure even Connect wire (3) and be increased to test height.
The auxiliary device of the apparatus insulated resistance test of eminence the most according to claim 1, it is characterised in that: Described connection wire (3) is the scalable shape of spiral.
The auxiliary device of the apparatus insulated resistance test of eminence the most according to claim 1, it is characterised in that: Described fixing support base (2) is internal is provided with electric discharge device, and electric discharge device passes through air switch (7) by ground Current potential connects with the tail end being connected wire (3).
The auxiliary device of the apparatus insulated resistance test of eminence the most according to claim 1, it is characterised in that: The bottom of described insulating bar (1) is additionally provided with a high-strength Magnet (8).
The auxiliary device of the apparatus insulated resistance test of eminence, its feature the most according to claim 1 or 5 It is: described fixing support base (2) is provided with a magnet attraction (9), fixing support base (2) and institute State insulating bar (1) to be fixed by the captivation between magnet attraction (9) and high-strength Magnet (8).
CN201610349512.8A 2016-05-24 2016-05-24 Insulation resistance test auxiliary device for high-altitude equipment Pending CN105929205A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610349512.8A CN105929205A (en) 2016-05-24 2016-05-24 Insulation resistance test auxiliary device for high-altitude equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610349512.8A CN105929205A (en) 2016-05-24 2016-05-24 Insulation resistance test auxiliary device for high-altitude equipment

Publications (1)

Publication Number Publication Date
CN105929205A true CN105929205A (en) 2016-09-07

Family

ID=56840948

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610349512.8A Pending CN105929205A (en) 2016-05-24 2016-05-24 Insulation resistance test auxiliary device for high-altitude equipment

Country Status (1)

Country Link
CN (1) CN105929205A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107505484A (en) * 2017-08-28 2017-12-22 广西电网有限责任公司贵港供电局 A kind of Intelligent high-pressure transformer test short jumper device
CN113189474A (en) * 2021-04-26 2021-07-30 厦门理工学院 Flexible circuit board reel-to-reel board testing device and method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2193555Y (en) * 1994-07-25 1995-03-29 陈邦达 Rod-type megger
JP2005043196A (en) * 2003-07-28 2005-02-17 Kyushu Electric Power Co Inc Insulation resistance measuring device for insulating material for power distribution
CN102128958A (en) * 2010-12-02 2011-07-20 河南省电力公司商丘供电公司 Insulating support for supporting high-pressure testing leads and use method thereof
CN103176000A (en) * 2013-04-01 2013-06-26 国家电网公司 Telescopic high altitude test wire connector
CN103245838A (en) * 2013-04-27 2013-08-14 国家电网公司 Cable insulation test system
CN103336153A (en) * 2013-06-28 2013-10-02 国家电网公司 High-voltage test junction pole
CN203705476U (en) * 2014-02-18 2014-07-09 国家电网公司 Electrical test multifunctional leading wire insulation operation rod
CN205679638U (en) * 2016-05-24 2016-11-09 国网宁夏电力公司中卫供电公司 Eminence apparatus insulated resistance test auxiliary device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2193555Y (en) * 1994-07-25 1995-03-29 陈邦达 Rod-type megger
JP2005043196A (en) * 2003-07-28 2005-02-17 Kyushu Electric Power Co Inc Insulation resistance measuring device for insulating material for power distribution
CN102128958A (en) * 2010-12-02 2011-07-20 河南省电力公司商丘供电公司 Insulating support for supporting high-pressure testing leads and use method thereof
CN103176000A (en) * 2013-04-01 2013-06-26 国家电网公司 Telescopic high altitude test wire connector
CN103245838A (en) * 2013-04-27 2013-08-14 国家电网公司 Cable insulation test system
CN103336153A (en) * 2013-06-28 2013-10-02 国家电网公司 High-voltage test junction pole
CN203705476U (en) * 2014-02-18 2014-07-09 国家电网公司 Electrical test multifunctional leading wire insulation operation rod
CN205679638U (en) * 2016-05-24 2016-11-09 国网宁夏电力公司中卫供电公司 Eminence apparatus insulated resistance test auxiliary device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107505484A (en) * 2017-08-28 2017-12-22 广西电网有限责任公司贵港供电局 A kind of Intelligent high-pressure transformer test short jumper device
CN107505484B (en) * 2017-08-28 2023-09-19 广西电网有限责任公司贵港供电局 Intelligent high-voltage transformer test shorting device
CN113189474A (en) * 2021-04-26 2021-07-30 厦门理工学院 Flexible circuit board reel-to-reel board testing device and method
CN113189474B (en) * 2021-04-26 2023-06-16 厦门理工学院 Flexible circuit board roll-to-roll light board testing device and method

Similar Documents

Publication Publication Date Title
CN104133104B (en) Novel telescopic type low-voltage tong-type ammeter
CN204314342U (en) Transformer online monitoring end shield of high-voltage bushing adapter
CN108789492B (en) Device and method for testing insulation distance of amphibious live working robot
CN206349691U (en) A kind of power construction insulation support device
CN105929205A (en) Insulation resistance test auxiliary device for high-altitude equipment
CN109254243A (en) A kind of high-voltage circuitbreaker test short jumper device
CN101825649A (en) Superpower remote control electric discharge device
CN206362918U (en) Remote control termination for altitude test wiring unmanned aerial vehicle platform
CN205679638U (en) Eminence apparatus insulated resistance test auxiliary device
CN204758730U (en) Composite insulator electric field detects analogue means
CN105699813A (en) Ultra and extra high tension power transformer test apparatus using oil-SF6 sheathed tube
CN209607932U (en) A kind of ground line electroscopic device
CN209728103U (en) A kind of corona accelerates the experimental rig of composite insulator aging
CN106534770A (en) Electric power electricity inspection device
CN206147013U (en) Capacitance of electric condenser volume measuring device is mended to cluster
CN204882795U (en) Insulating measuring device of multi -functional integration
CN104991140A (en) Simulation apparatus of electric field detection of composite insulator
CN106353661A (en) Lifting device for checking and detecting inventory power equipment
CN209148844U (en) A kind of high-voltage circuitbreaker test short jumper device
CN207096377U (en) A kind of high voltage electrical test concertina type anchor leg device
CN108760497A (en) A kind of insulator tension experimental machine
CN203909088U (en) Portable insulating operation rod
CN211554114U (en) Charging port high-voltage power-down time test equipment
CN208860333U (en) One kind is fixed for coating thickness detector and measuring device
CN208705433U (en) A kind of test tool for insulating of electric measurement of high pressure part lightning impulse test

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160907