CN203705266U - 工程桩检测静载试验装置 - Google Patents
工程桩检测静载试验装置 Download PDFInfo
- Publication number
- CN203705266U CN203705266U CN201420036059.1U CN201420036059U CN203705266U CN 203705266 U CN203705266 U CN 203705266U CN 201420036059 U CN201420036059 U CN 201420036059U CN 203705266 U CN203705266 U CN 203705266U
- Authority
- CN
- China
- Prior art keywords
- pile
- testing device
- load testing
- testing
- engineering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
Abstract
本实用新型公开了一种工程桩检测静载试验装置,包括竖直埋设于地基中的检测基桩,通过支墩设置于地基上且位于所述检测基桩的上方的主梁,设置于所述主梁上方的加载重块,设置于所述检测基桩的桩头与所述主梁的底面之间的千斤顶;所述桩头上设置有硬质材料制成的桩帽,所述桩帽包括两个截面为半圆形的夹块、和一个圆饼形的压块,两个所述夹块包裹所述桩头的侧壁,所述压块设置于桩头的顶部上方,所述压块的直径大于或等于两个所述夹块构成的圆管的外径。本实用新型所述的工程桩检测静载试验装置,具有操作便捷安全,试验结果准确的优点;且能够满足竖向静载试验对桩头的处理要求,此外免去现浇程序,进而可以缩短试验工期。
Description
技术领域
本实用新型涉及一种工程桩检测静载试验装置,属于建筑工程行业中的基桩检测技术领域。
背景技术
检测工程桩的合格与否主要是承载力与完整性。承载力就是抵抗荷载的能力,完整性就是基桩本身有没有缺陷。承载力对大部分基桩通常指的都是竖向承载力,即基桩受到上部荷载时沉降要在一定的范围内,对各种建筑构筑物最不利的就是超出范围的沉降、特别是不均匀沉降。对于各种基桩竖向抗压承载力检测的最主要的方法是进行基桩单桩竖向抗压静载荷试验。每一种规格的基桩都有一个设计极限承载力,检测基桩合格与否的方式就是对该基桩施以极限承载力,然后观测沉降,只要沉降在相关规范规定的范围内,即承载力合格。现有的工程桩检测静载试验通常采用直接加载重力载荷的方式进行,即在检测基桩的桩头上方堆放配重块,该方法对于桩头顶面的平整度要求较高,且堆码配重块较耗时,试验效率较低,此外,堆码配重块还存在一定的试验安全风险。
此外,在单桩竖向抗压静载荷试验中,桩头需要承受很大荷载,由于现有的桩头承受较大载荷容易碎裂,特别是一些复合地基桩其承受荷载碎裂的几率极大,为了克服上述问题,通常都需要对桩头应该处理。由此可知,试验中对于受检桩头的处理直接决定了整个试验的检测效果。目前常用的桩头处理方法为桩顶整平架模板现浇混凝土桩帽,即凿去桩头软弱混凝土层,加钢筋网片,再用高标号的混凝土浇筑出完整的桩头,再进行试验。此种方法费时费力,且通常需要等待至少14天以上以确保新浇的混凝土上强度方可试验,易延误工期;且现有处理方法在试验时仍旧不能完全避免桩头承受荷载发生破碎的情况。
实用新型内容
为了克服现有基桩检测静载试验装置试验效率较低、存在安全风险的问题,以及现浇桩头处理方法出现的工期紧张及桩头易碎的不足,本实用新型提供一种工程桩检测静载试验装置,具有操作便捷安全,试验结果准确的优点;且能够满足竖向静载试验对桩头的处理要求,此外免去现浇程序,进而可以缩短试验工期。
为解决上述问题,本实用新型所采取的技术方案如下:
一种工程桩检测静载试验装置,包括:
竖直埋设于地基中的检测基桩,
通过支墩设置于地基上且位于所述检测基桩的上方的主梁,
设置于所述主梁上方的加载重块,
设置于所述检测基桩的桩头与所述主梁的底面之间的千斤顶;
所述桩头上设置有硬质材料制成的桩帽,所述桩帽包括两个截面为半圆形的夹块、和一个圆饼形的压块,两个所述夹块包裹所述桩头的侧壁,所述压块设置于桩头的顶部上方,所述压块的直径大于或等于两个所述夹块构成的圆管的外径。
试验时检测基桩的上部荷载是由千斤顶产生的,千斤顶上方依靠加载重块施加反作用力。上部荷载通常为几千千牛,由于千斤顶面积小、直接作用于桩头,桩头承受很大荷载,因此桩头不仅承受住荷载还需要桩头的顶部平整。通过设置夹块提高桩头在受压时的机械强度,降低桩头发生破裂的几率,同时设置压块能够降低桩头不平整对试验的不利影响,从而提高试验的成功率。
作为上述技术方案的改进,还包括用于测定所述检测基桩沉降位移的位移计,所述位移计的下端固设于所述千斤顶,所述位移计的上端连接所述主梁的底面。所述结构能够直观便捷地实时显示观测沉降幅度,一旦沉降超出相关规范规定的范围,就无需再继续试验,从而提高试验的效率。
作为上述技术方案的改进,所述位移计为多个且分布于所述千斤顶的侧壁上。所述结构能够直观地观察检测基桩沉降时是否发生了偏斜,以及偏斜的幅度。
作为上述技术方案的改进,所述主梁上还设置有支撑杆,所述支撑杆为多根且垂直设置于所述主梁上,所述加载重块设置于所述支撑杆上。所述结构能够提高加载重块的平稳性,且节省支撑性材料。
作为上述技术方案的改进,所述支撑杆为工字钢。工字钢具有较好的机械强度和刚性,且采用工字钢作为支撑杆成本低。
作为上述技术方案的改进,所述加载重块为一块整体结构。所述结构能够提高加载重块的平稳性,提高试验安全性。
作为上述技术方案的改进,所述桩帽为金属钢质地。
作为上述技术方案的改进,所述夹块顶部设置有“工”字形卡销,所述压块设置有配合所述卡销的卡槽。所述结构能够保证压块在试验过程中不发生偏移。
本实用新型与现有技术相比较,本实用新型的实施效果如下:
本实用新型所述的工程桩检测静载试验装置,该桩帽分为两瓣,为约厚5毫米的钢板压铸而成,具有加工便捷,结构简单的优点。经长时间试验及实践得知,桩帽辅以一定的握裹力,可以很好的保护检测基桩桩头不会出现破碎。检测基桩桩径为多少,就使用同桩径规格的桩帽,方便快捷,尤其适用于桩径固定的复合地基单桩及管桩试验。实际使用时可在桩顶辅以高强度水泥砂浆及细砂后再安装压块,确保单桩竖向抗压静载荷试验顺利进行。本实用新型的有益效果是,对在基桩单桩竖向抗压静载荷试验的桩头处理时,采用本试验装置结构简单,省时省力,效果较好,操作安全。
附图说明
图1为本实用新型所述的工程桩检测静载试验装置整体结构示意图;
图2为本实用新型所述的主梁和支撑杆俯视结构示意图;
图3为本实用新型所述的夹块俯视结构示意图;
图4为本实用新型所述的压块俯视结构示意图;
图5为本实用新型所述的夹块侧面局部结构示意图。
具体实施方式
下面将结合具体的实施例来说明本实用新型的内容。
如图1至图5所示,为本实用新型所述的工程桩检测静载试验装置结构示意图。本实用新型所述工程桩检测静载试验装置,包括:竖直埋设于地基1中的检测基桩2,通过支墩3设置于地基1上且位于所述检测基桩2的上方的主梁4,设置于所述主梁4上方的加载重块5,设置于所述检测基桩2的桩头21与所述主梁4的底面之间的千斤顶6;所述桩头21上设置有硬质材料制成的桩帽7,所述桩帽7包括两个截面为半圆形的夹块71、和一个圆饼形的压块72,两个所述夹块71包裹所述桩头21的侧壁,所述压块72设置于桩头21的顶部上方,所述压块72的直径大于或等于两个所述夹块71构成的圆管的外径。所述加载重块5为一块整体结构。所述桩帽7具体地可以为金属钢质地。所述夹块71顶部设置有“工”字形卡销73,所述压块72设置有配合所述卡销73的卡槽74。
进一步改进地,还包括用于测定所述检测基桩2沉降位移的位移计8,所述位移计8的下端固设于所述千斤顶6,所述位移计8的上端连接所述主梁4的底面。所述位移计8为多个且分布于所述千斤顶6的侧壁上。
进一步改进地,所述主梁4上还设置有支撑杆9,所述支撑杆9为多根且垂直设置于所述主梁4上,所述加载重块5设置于所述支撑杆9上。所述支撑杆9具体地可以为工字钢。
试验时,首先凿去桩头21软弱层,将压块72与两个夹块71配合后,直接将桩帽7套上去,或者可以用磨光机磨平桩头21后再将桩帽7套上去,通过螺栓10将两个夹块71固定连接,即可开始试验。通过实际使用可知,本实用新型所述的工程桩检测静载试验装置结可以保证桩头21在试验中不会被压缩,且结构简单易用,节省试验时间。尤其适用于复合地基及管桩,因为复合地基及管桩桩径基本固定,一个工地通常只有一种桩径,且复合地基桩体混凝土强度低,桩头极易被压碎。
以上内容是结合具体的实施例对本实用新型所作的详细说明,不能认定本实用新型具体实施仅限于这些说明。对于本实用新型所属技术领域的技术人员来说,在不脱离本实用新型构思的前提下,还可以做出若干简单推演或替换,都应当视为属于本实用新型保护的范围。
Claims (8)
1.一种工程桩检测静载试验装置,其特征是,包括:
竖直埋设于地基(1)中的检测基桩(2),
通过支墩(3)设置于地基(1)上且位于所述检测基桩(2)的上方的主梁(4),
设置于所述主梁(4)上方的加载重块(5),
设置于所述检测基桩(2)的桩头(21)与所述主梁(4)的底面之间的千斤顶(6);
所述桩头(21)上设置有硬质材料制成的桩帽(7),所述桩帽(7)包括两个截面为半圆形的夹块(71)、和一个圆饼形的压块(72),两个所述夹块(71)包裹所述桩头(21)的侧壁,所述压块(72)设置于桩头(21)的顶部上方,所述压块(72)的直径大于或等于两个所述夹块(71)构成的圆管的外径。
2.如权利要求1所述的工程桩检测静载试验装置,其特征是,还包括用于测定所述检测基桩(2)沉降位移的位移计(8),所述位移计(8)的下端固设于所述千斤顶(6),所述位移计(8)的上端连接所述主梁(4)的底面。
3.如权利要求2所述的工程桩检测静载试验装置,其特征是,所述位移计(8)为多个且分布于所述千斤顶(6)的侧壁上。
4.如权利要求1所述的工程桩检测静载试验装置,其特征是,所述主梁(4)上还设置有支撑杆(9),所述支撑杆(9)为多根且垂直设置于所述主梁(4)上,所述加载重块(5)设置于所述支撑杆(9)上。
5.如权利要求4所述的工程桩检测静载试验装置,其特征是,所述支撑杆(9)为工字钢。
6.如权利要求1所述的工程桩检测静载试验装置,其特征是,所述加载重块(5)为一块整体结构。
7.如权利要求1所述的工程桩检测静载试验装置,其特征是,所述桩帽(7)为金属钢质地。
8.如权利要求1所述的工程桩检测静载试验装置,其特征是,所述夹块(71)顶部设置有“工”字形卡销(73),所述压块(72)设置有配合所述卡销(73)的卡槽(74)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420036059.1U CN203705266U (zh) | 2014-01-21 | 2014-01-21 | 工程桩检测静载试验装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420036059.1U CN203705266U (zh) | 2014-01-21 | 2014-01-21 | 工程桩检测静载试验装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203705266U true CN203705266U (zh) | 2014-07-09 |
Family
ID=51055687
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420036059.1U Expired - Fee Related CN203705266U (zh) | 2014-01-21 | 2014-01-21 | 工程桩检测静载试验装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203705266U (zh) |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104975619A (zh) * | 2015-07-03 | 2015-10-14 | 朱洋 | 一种桩基静载测试装置及其测试方法 |
CN105155595A (zh) * | 2015-08-11 | 2015-12-16 | 周兆弟 | 预制桩的抗压检测装置及抗压检测方法 |
CN105241754A (zh) * | 2015-09-08 | 2016-01-13 | 吉林建筑大学 | 半面桩小比例模型竖向抗压试验装置 |
CN107034929A (zh) * | 2017-04-08 | 2017-08-11 | 温州信达交通工程试验检测有限公司 | 一种桩基静载试验系统 |
CN107130649A (zh) * | 2017-06-21 | 2017-09-05 | 浙江求是工程检测有限公司 | 一种大吨位砼块堆载桩基静载装置 |
CN107130647A (zh) * | 2017-06-14 | 2017-09-05 | 核工业井巷建设集团公司 | 一种混凝土灌注桩试验桩头保护装置 |
CN108487339A (zh) * | 2018-05-31 | 2018-09-04 | 苏州市吴江东南建筑检测有限公司 | 一种单桩竖向抗压静载试验方法 |
CN108612136A (zh) * | 2018-05-25 | 2018-10-02 | 深圳市岩土工程有限公司 | 一种工程桩接桩的试桩结构及施工方法 |
CN109113110A (zh) * | 2018-09-25 | 2019-01-01 | 福建省永正工程质量检测有限公司 | 一种单桩竖向抗压静载试验检测装置 |
CN109537646A (zh) * | 2018-12-11 | 2019-03-29 | 佛山科学技术学院 | 一种钢桁梁桥悬臂拼装水中临时墩承载力试验加载装置 |
CN111733899A (zh) * | 2020-06-18 | 2020-10-02 | 湖北震泰建设工程质量检测有限责任公司 | 一种混凝土灌注桩静载荷试验过程中桩顶的实时安全监测方法 |
CN117030487A (zh) * | 2023-10-09 | 2023-11-10 | 武汉中岩科技股份有限公司 | 适用于静载荷试验的压重反力平台安全预警方法及装置 |
-
2014
- 2014-01-21 CN CN201420036059.1U patent/CN203705266U/zh not_active Expired - Fee Related
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104975619A (zh) * | 2015-07-03 | 2015-10-14 | 朱洋 | 一种桩基静载测试装置及其测试方法 |
CN105155595A (zh) * | 2015-08-11 | 2015-12-16 | 周兆弟 | 预制桩的抗压检测装置及抗压检测方法 |
CN105241754A (zh) * | 2015-09-08 | 2016-01-13 | 吉林建筑大学 | 半面桩小比例模型竖向抗压试验装置 |
CN107034929A (zh) * | 2017-04-08 | 2017-08-11 | 温州信达交通工程试验检测有限公司 | 一种桩基静载试验系统 |
CN107130647A (zh) * | 2017-06-14 | 2017-09-05 | 核工业井巷建设集团公司 | 一种混凝土灌注桩试验桩头保护装置 |
CN107130649B (zh) * | 2017-06-21 | 2019-11-22 | 浙江求是工程检测有限公司 | 一种大吨位砼块堆载桩基静载装置 |
CN107130649A (zh) * | 2017-06-21 | 2017-09-05 | 浙江求是工程检测有限公司 | 一种大吨位砼块堆载桩基静载装置 |
CN108612136A (zh) * | 2018-05-25 | 2018-10-02 | 深圳市岩土工程有限公司 | 一种工程桩接桩的试桩结构及施工方法 |
CN108487339A (zh) * | 2018-05-31 | 2018-09-04 | 苏州市吴江东南建筑检测有限公司 | 一种单桩竖向抗压静载试验方法 |
CN109113110A (zh) * | 2018-09-25 | 2019-01-01 | 福建省永正工程质量检测有限公司 | 一种单桩竖向抗压静载试验检测装置 |
CN109537646A (zh) * | 2018-12-11 | 2019-03-29 | 佛山科学技术学院 | 一种钢桁梁桥悬臂拼装水中临时墩承载力试验加载装置 |
CN111733899A (zh) * | 2020-06-18 | 2020-10-02 | 湖北震泰建设工程质量检测有限责任公司 | 一种混凝土灌注桩静载荷试验过程中桩顶的实时安全监测方法 |
CN111733899B (zh) * | 2020-06-18 | 2022-02-18 | 湖北震泰建设工程质量检测有限责任公司 | 一种混凝土灌注桩静载荷试验过程中桩顶的实时安全监测方法 |
CN117030487A (zh) * | 2023-10-09 | 2023-11-10 | 武汉中岩科技股份有限公司 | 适用于静载荷试验的压重反力平台安全预警方法及装置 |
CN117030487B (zh) * | 2023-10-09 | 2023-12-29 | 武汉中岩科技股份有限公司 | 适用于静载荷试验的压重反力平台安全预警方法及装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203705266U (zh) | 工程桩检测静载试验装置 | |
US11453992B2 (en) | Pile foundation bearing platform settlement, reinforcement, lift-up and leveling structure, and construction method thereof | |
CN103485374B (zh) | 静载试验锚桩连接结构 | |
CN101220593A (zh) | 一种预应力管桩施工后处理该管桩断裂的加固方法 | |
CN105220654B (zh) | 一种土石坝的加固结构及其施工方法 | |
CN207672637U (zh) | 超大吨位静载试验用锚桩反力装置 | |
CN104374650A (zh) | 一种测试管桩与注浆土体之间静力剪切特性的试验装置及方法 | |
CN102605785A (zh) | 锚杆静压桩预加压力封桩装置 | |
CN203498758U (zh) | 一种杠杆式预压托架装置 | |
CN106442108A (zh) | 废旧轮胎片体抗剪强度测试装置和方法 | |
CN102134859A (zh) | 预应力管桩抗拔试验装置 | |
CN103469732A (zh) | 一种桥梁支座地脚螺栓预留孔的施工方法 | |
CN205934713U (zh) | 预制拼装式防撞墙 | |
CN203441376U (zh) | 一种溜井降段封堵结构 | |
CN102182179A (zh) | 一种浮桩补强的方法 | |
CN204461905U (zh) | 一种测试管桩与注浆土体之间静力剪切特性的试验装置 | |
CN202644531U (zh) | 锚杆静压桩预加压力封桩装置 | |
CN204325931U (zh) | 桥梁高墩台顶端支架分级加载装置 | |
CN111519623A (zh) | 一种用于桩体承载力检测的预制桩帽及施工方法 | |
CN105784506A (zh) | 预加剪应力试件、试件制备装置和方法及劈裂试验方法 | |
CN103628498B (zh) | T型地脚螺栓孔洞封堵方法 | |
CN103257082B (zh) | 一种减小直剪试验试样扰动的方法及环刀 | |
CN205749157U (zh) | 可预加剪应力碾压混凝土高压水劈裂试验试件及制备装置 | |
CN201704710U (zh) | 预应力管桩抗拔试验装置 | |
CN204098088U (zh) | 一种可移动的静载试验桩帽 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140709 Termination date: 20150121 |
|
EXPY | Termination of patent right or utility model |