CN201704710U - 预应力管桩抗拔试验装置 - Google Patents

预应力管桩抗拔试验装置 Download PDF

Info

Publication number
CN201704710U
CN201704710U CN2010201010385U CN201020101038U CN201704710U CN 201704710 U CN201704710 U CN 201704710U CN 2010201010385 U CN2010201010385 U CN 2010201010385U CN 201020101038 U CN201020101038 U CN 201020101038U CN 201704710 U CN201704710 U CN 201704710U
Authority
CN
China
Prior art keywords
straining beam
pile
prestressed pipe
utility
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010201010385U
Other languages
English (en)
Inventor
徐汉东
卢刚
吴忠新
徐进
王叶平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhou Institute of building science group Limited by Share Ltd
Original Assignee
CHANGZHOU CONSTRUCTION SCIENCE INST Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGZHOU CONSTRUCTION SCIENCE INST Co Ltd filed Critical CHANGZHOU CONSTRUCTION SCIENCE INST Co Ltd
Priority to CN2010201010385U priority Critical patent/CN201704710U/zh
Application granted granted Critical
Publication of CN201704710U publication Critical patent/CN201704710U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本实用新型涉及一种预应力管桩抗拔试验装置,包括桩筒、上拉梁、下拉梁、主梁以及千斤顶,所述的上拉梁与下拉梁通过拉杆固定连接,下拉梁与桩筒固定连接,上拉梁与下拉梁位于主梁的两侧,上拉梁与主梁之间设置有千斤顶,主梁通过支墩与地面连接。本实用新型解决了背景技术中存在的缺陷,桩筒与端头板通过法兰连接,使得预应力管桩受力稳定,无偏心现象产生,结构简单,连接牢固,工期缩短,适用范围广。

Description

预应力管桩抗拔试验装置 
技术领域
本实用新型涉及一种建筑用测试装置,尤其涉及一种预应力管桩抗拔试验装置。 
背景技术
现有技术中,预应力管桩的抗拔试验一般通过几种形式进行试验,1、焊接形式,将桩头端板与拉环焊接,然后通过千斤顶将顶压拉环的方式来测试管桩的抗拔力,需要对桩端头板进行焊接,而且焊接不牢靠,受力不均匀,容易偏心;另外,通过在桩体内灌浇混凝土的形式,这种缺点在于养护时间较长,费工费力,且桩体内部容易占有灰尘,浇注混凝土后,混凝土与桩体连接不稳定,容易将浇注体拔出。 
实用新型内容
本实用新型要解决的技术问题是:提供一种连接可靠的预应力管桩抗拔试验装置。 
为了克服背景技术中存在的缺陷,本实用新型解决其技术问题所采用的技术方案是:一种预应力管桩抗拔试验装置,包括桩筒、上拉梁、下拉梁、主梁以及千斤顶,所述的上拉梁与下拉梁通过拉杆固定连接,下拉梁与桩筒固定连接,上拉梁与下拉梁位于主梁的两侧,上拉梁与主梁之间设置有千斤顶,主梁通过支墩与地面连接。 
根据本实用新型的另一个实施例,预应力管桩抗拔试验装置进一步包括所述的桩筒上设置有法兰盘,通过法兰盘与预应力管桩端头板固定连接。 
根据本实用新型的另一个实施例,预应力管桩抗拔试验装置进一步包括所述的桩筒与预应力管桩通过螺纹连接。 
根据本实用新型的另一个实施例,预应力管桩抗拔试验装置进一步包括所述的桩筒与法兰盘之间焊接有加强筋。 
根据本实用新型的另一个实施例,预应力管桩抗拔试验装置进一步包括所述的桩筒为实心圆柱体或空心圆柱体。 
本实用新型解决了背景技术中存在的缺陷,桩筒与端头板通过法兰连接,使得预应力管桩受力稳定,无偏心现象产生,结构简单,连接牢固,工期缩短,适用范围广。 
附图说明
下面结合附图和实施例对本实用新型进一步说明。 
图1是本实用新型的优选实施例的结构示意图; 
其中:1、桩筒,2、上拉梁,3、下拉梁,4、主梁,5、千斤顶,6、支墩,7、法兰盘,8、管桩,9、拉杆,10、百分表。 
具体实施方式
现在结合附图和优选实施例对本实用新型作进一步详细的说明。这些附图均为简化的示意图,仅以示意方式说明本实用新型的基本结构,因此其仅显示与本实用新型有关的构成。 
如图1所示,一种预应力管桩8抗拔试验装置,包括桩筒1、上拉梁2、下拉梁3、主梁4以及千斤顶5,所述的上拉梁2与下拉梁3通过拉杆9固定连接,下拉梁3与桩筒1固定连接,上拉梁2与下拉梁3位于主梁4的两侧,上拉梁2与主梁4之间设置有千斤顶5,主梁4通过支墩6与地面连接。所述的桩筒1上优选设置有法兰盘7,通过法兰盘7与预应力管桩8端头板固定连接,使得预应力管桩8受力稳定。其中,桩筒1与预应力管桩8通过螺纹连接,便于调节,防止偏心。其中,桩筒1的法兰盘7上连接有百分表10。
另外,桩筒1与法兰盘7之间焊接有加强筋,由于管桩8的抗拔力相对较大,一般管桩8的抗拔力有140吨左右,采用上述设置保证法兰盘7不被拉坏。 
本实用新型中桩筒1为实心圆柱体或空心圆柱体。 
本实用新型实施过程如下: 
首先启动液压千斤顶5,通过主梁4发作用于上拉梁2,接着,上拉梁2拉动下拉梁3,下拉梁3推动桩筒1上拔,从而推动预应力管桩8上拔,调整液压千斤顶5压力,控制在140吨左右,测试时间一般为40小时~50小时,最后,通过百分表10查看预应力管桩8的上拔距离是否在合理程度范围内,及实施本实验完成。 
以上述依据本实用新型的理想实施例为启示,通过上述的说明内容,相关工作人员完全可以在不偏离本项实用新型技术思想的范围内,进行多样的变更以及修改。本项实用新型的技术性范围并不局限于说明书上的内容,必须要根据权利要求范围来确定其技术性范围。 

Claims (5)

1.一种预应力管桩抗拔试验装置,其特征在于:包括桩筒、上拉梁、下拉梁、主梁以及千斤顶,所述的上拉梁与下拉梁通过拉杆固定连接,下拉梁与桩筒固定连接,上拉梁与下拉梁位于主梁的两侧,上拉梁与主梁之间设置有千斤顶,主梁通过支墩与地面连接。
2.如权利要求1所述的预应力管桩抗拔试验装置,其特征在于:所述的桩筒上设置有法兰盘,通过法兰盘与预应力管桩端头板固定连接。
3.如权利要求2所述的预应力管桩抗拔试验装置,其特征在于:所述的桩筒与预应力管桩通过螺纹连接。
4.如权利要求2所述的预应力管桩抗拔试验装置,其特征在于:所述的桩筒与法兰盘之间焊接有加强筋。
5.如权利要求1所述的预应力管桩抗拔试验装置,其特征在于:所述的桩筒为实心圆柱体或空心圆柱体。
CN2010201010385U 2010-01-25 2010-01-25 预应力管桩抗拔试验装置 Expired - Fee Related CN201704710U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201010385U CN201704710U (zh) 2010-01-25 2010-01-25 预应力管桩抗拔试验装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201010385U CN201704710U (zh) 2010-01-25 2010-01-25 预应力管桩抗拔试验装置

Publications (1)

Publication Number Publication Date
CN201704710U true CN201704710U (zh) 2011-01-12

Family

ID=43441864

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201010385U Expired - Fee Related CN201704710U (zh) 2010-01-25 2010-01-25 预应力管桩抗拔试验装置

Country Status (1)

Country Link
CN (1) CN201704710U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102134859A (zh) * 2010-01-25 2011-07-27 常州市建筑科学研究院有限公司 预应力管桩抗拔试验装置
CN104099955A (zh) * 2014-07-16 2014-10-15 中铁西北科学研究院有限公司 基桩竖向抗拔检测连接器

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102134859A (zh) * 2010-01-25 2011-07-27 常州市建筑科学研究院有限公司 预应力管桩抗拔试验装置
CN104099955A (zh) * 2014-07-16 2014-10-15 中铁西北科学研究院有限公司 基桩竖向抗拔检测连接器

Similar Documents

Publication Publication Date Title
CN102134859A (zh) 预应力管桩抗拔试验装置
CN203705266U (zh) 工程桩检测静载试验装置
CN203569582U (zh) 一种混凝土管桩与承台的连接结构
CN103590414B (zh) 一种混凝土管桩与承台的连接结构
CN204255832U (zh) 锚栓抗拔试验加载装置
CN103485374B (zh) 静载试验锚桩连接结构
CN104452597A (zh) 水中墩超长预应力盖梁施工支撑体系
CN202194162U (zh) 钻孔桩声测管通管器
CN201704710U (zh) 预应力管桩抗拔试验装置
CN109403366A (zh) 一种装配式钢管混凝土桩基及其施工方法
CN209669688U (zh) 一种半装配式薄壁桥墩
CN108442386A (zh) 一种可拆芯扩体锚固结构装置及其组装施工方法
CN102828533A (zh) 灌注桩竖向抗压静载试验桩头超前处理节点及施工方法
CN202644531U (zh) 锚杆静压桩预加压力封桩装置
CN201347590Y (zh) 一种钢柱接头快速连接校正夹具
CN108678767B (zh) 挤压大变形围岩隧道开挖与让压-刚性联合支护施工方法
CN206607613U (zh) 一种灌注桩位移采集装置
CN108505449B (zh) 一种钢管混凝土拱桥水中支架吊装体系的施工方法
CN216040750U (zh) 一种适用于圆形独柱墩桥梁抗倾覆加固装置
CN102493431B (zh) 防止桩基沉降的实时监测加固方法
CN211318047U (zh) 一种现场进行锚栓剪切力的实测装置
CN114718313A (zh) 球体钢结构倾斜钢管混凝土柱高抛自密实免振捣施工方法
CN209011153U (zh) 既有结构基础底板上增补抗拔圆形钢管桩结构
CN208618468U (zh) 既有结构基础底板上增补抗拔矩形钢管桩结构
CN215253061U (zh) 一种试验桩消除侧阻力用双筒装置

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHANGZHOU ARCHITECTURAL RESEARCH INSTITUTE CO., LT

Free format text: FORMER OWNER: CHANGZHOU CONSTRUCTION SCIENCE INST. CO., LTD.

Effective date: 20111122

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20111122

Address after: 213015 Jiangsu province Changzhou City Zhonglou District Mushu Road No. 10

Patentee after: Changzhou Architectural Research Institute Co., Ltd.

Address before: 213015 Jiangsu province Changzhou City Zhonglou District Mushu Road No. 10

Patentee before: Changzhou Construction Science Inst. Co., Ltd.

C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 213015 Jiangsu province Changzhou City Zhonglou District Mushu Road No. 10

Patentee after: Changzhou Institute of building science group Limited by Share Ltd

Address before: 213015 Jiangsu province Changzhou City Zhonglou District Mushu Road No. 10

Patentee before: Changzhou Architectural Research Institute Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110112

Termination date: 20180125