CN102182179A - 一种浮桩补强的方法 - Google Patents

一种浮桩补强的方法 Download PDF

Info

Publication number
CN102182179A
CN102182179A CN 201110053632 CN201110053632A CN102182179A CN 102182179 A CN102182179 A CN 102182179A CN 201110053632 CN201110053632 CN 201110053632 CN 201110053632 A CN201110053632 A CN 201110053632A CN 102182179 A CN102182179 A CN 102182179A
Authority
CN
China
Prior art keywords
pile
reinforcing
stake
reinforcement
pile crown
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201110053632
Other languages
English (en)
Other versions
CN102182179B (zh
Inventor
梁曦
施峰
张雄水
张添文
陈亮
李嫣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Academy Of Building Research Co ltd
Original Assignee
Fujian Academy of Building Research
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Academy of Building Research filed Critical Fujian Academy of Building Research
Priority to CN 201110053632 priority Critical patent/CN102182179B/zh
Publication of CN102182179A publication Critical patent/CN102182179A/zh
Application granted granted Critical
Publication of CN102182179B publication Critical patent/CN102182179B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

一种浮桩补强的方法,包括如下步骤:对需要补强的桩头做好防护措施:在桩头顶部制作一桩头保护系统;在现场安装自由落锺设备:将人字拔杆安放于桩头两侧,采用缆风绳固定;将重锺挂到滑轮组下方的吊钩上,利用卷扬机和滑轮组将重锤吊至一定的高度;采用自由落锺方式对桩头进行复打;同时在现场设置高应变动力监控仪器设备进行监控。本发明采用自由落锤复打加固法结合高应变动力手段监控的方法,这种方法即作为加固方法处理了工程中出现的浮桩问题,同时又包含检测手段保证了加固质量的可控性和加固效果的有效性,此外,这种方法在狭窄空间内的加固,基坑底的加固,以及加固时对邻桩及周边环境的影响最小化方面比其他方法具有显而易见的优势。

Description

一种浮桩补强的方法
【技术领域】
本发明属于土木建筑工程桩基技术领域,具体是指一种浮桩补强的方法。
【背景技术】
软土在我国的分布地区非常广泛,由于软土的工程特性,在软土地区广泛应用的挤土桩施工而引起的挤土效应是难以避免的。因挤土效应等原因造成的浮桩问题一直是岩土工程领域所面对的棘手问题,尤其是对于在深基坑中或狭小空间内的桩基工程。
对于基坑中或狭小空间内的浮桩补强,目前常用的对浮桩的补强加固方法往往是极其困难或者费用高昂的。补桩、基础处理、复合地基处理需要增加新的材料体,浪费社会资源,不仅在经济上大幅提高了成本而且技术上会带来新的问题。实践表明,注浆法由于桩底脱空问题没有得到根本解决,很难有较好的效果。传统上的桩机复压(复打)处理存在以下问题:一、打桩顺序不易安排,很容易发生桩机沉陷或桩机移动挤压基桩发生水平位移,甚至产生桩身上部破坏;二、柴油打桩机复打存在着收锤标准的控制问题,缺乏监控措施会导致桩在复打过程中产生桩身裂缝等缺陷;三、尤其是设有地下室的工程,桩已被送至不可见的地面以下深处,因此采用静压桩机复压或锤击桩机复打极其困难。而一旦基坑开挖后往往大型机械设备再进场已不可能或在基坑底的操作难度极大,无法实施该方法。
【发明内容】
本发明所要解决的技术问题在于提供一种有效的采用自由落锤复打方式进行浮桩补强的方法。
本发明采用以下技术方案解决上述技术问题:
一种浮桩补强的方法,包括如下步骤:
步骤一:对需要补强的桩做好桩头防护措施:制作一桩头保护系统安置于桩顶,该桩头保护系统从上到下依次包括锤垫、替打桩帽和桩垫;
步骤二:在现场安装自由落锺设备:将人字拔杆安放于桩头两侧,采用缆风绳固定;将重锺挂到滑轮组下方的吊钩上,利用卷扬机和滑轮组将重锤吊至一定的高度;
步骤三:采用自由落锺方式对桩头进行复打:使用脱钩装置,将重锺从吊钩上脱钩,使重锤自由落下,均匀地落在已做好防护措施的桩头上,使桩土之间产生永久的相对位移-贯入度,从而逐渐打动基桩,通过重复不断的锤击,就像模拟锤击打桩的过程,逐步使脱空的桩底回位。
还包括,步骤四:在现场同时设置高应变动力监控仪器设备进行监控:在桩头顶部附近的桩身安装力传感器和加速度传感器各一对,通过电缆连接至高应变试验主机,在每一锤击中时实测高应变的力和速度时程曲线,通过应力波理论分析桩土体系的有关性状,利用凯司法得到现场实时的实测极限承载力值以及桩身完整性、拉压应力值参数,必要时调整自由落锤的重量、落距、桩垫材料,保证加固安全高效地进行,并通过高应变实时承载力值结合实测贯入度确定复打加固的收锤标准。
较佳地,所述步骤一中所述锤垫材料为毛毡,所述替打桩帽采用钢材制作,桩垫为20mm~40mm厚的胶木板。
本发明的优点在于:采用自由落锤复打加固法结合高应变动力手段监控的方法,这种方法即作为加固方法处理了工程中出现的浮桩问题,同时又包含检测手段保证了加固质量的可控性和加固效果的有效性,此外这种方法在狭窄空间内的加固,基坑底的加固,以及加固时对邻桩及周边环境的影响最小化方面比其他方法具有显而易见的优势。
【附图说明】
下面参照附图结合实施例对本发明作进一步的描述。
图1是本发明中本发明桩头保护系统结构示意图。
图2是本发明自由落锺法现场吊装方式示意图。
图3是本发明中高应变动力监控仪器设备装置示意图。
【具体实施方式】
一种浮桩补强的方法,包括如下步骤:
步骤一:对需要补强的桩头做好防护措施:如图1所示,在桩头100顶部制作一桩头保护系统200,该桩头保护系统200从上到下依次包括锤垫201、替打桩帽202和桩垫203;其中锤垫201材料为毛毡,替打桩帽202采用钢材制作,桩垫203为20mm~40mm厚的胶木板。这套桩头保护系统200对自由落锤300锤击起到了缓冲、调节对准以及防止横向劈裂的作用,从而可以有效地防止桩头100被击碎,提高桩的贯入能力,并能有效预防落锤300的二次跌落。
步骤二:在现场安装自由落锺设备:如图2所示,将人字拔杆1安放于桩头(图未示)两侧,采用缆风绳2固定;将重锺(图未示)挂到滑轮组3下方的吊钩上,利用卷扬机(图未示)和滑轮组将重锤吊至一定的高度。
步骤三:采用自由落锺方式对桩头进行复打:使用脱钩装置,将重锺从吊钩上脱钩,使重锤自由落下,均匀地落在已做好防护措施的桩头上,使桩土之间产生永久的相对位移-贯入度,从而逐渐打动基桩,通过重复不断的锤击,就像模拟锤击打桩的过程,逐步使脱空的桩底回位,从而大幅提高桩的端阻力和承载力。
步骤四:设置高应变动力监控仪器设备进行监控:在桩头100顶部附近的桩身安装力传感器410和加速度传感器420各一对,通过电缆430连接至高应变试验主机440,在每一锤击中时实测高应变的力和速度时程曲线,通过应力波理论分析桩土体系的有关性状,利用凯司法得到现场实时的实测极限承载力值以及桩身完整性、拉压应力值参数,必要时调整自由落锤的重量、落距、桩垫材料,保证加固安全高效地进行,并通过高应变实时承载力值结合实测贯入度确定复打加固的收锤标准。
本发明在总结软土地区地质情况和国内外关于挤土效应的研究基础上, 针对挤土效应给浮桩所带来的承载力方面的影响因素,开创性地提出了建筑工程中一种全新的浮桩加固技术,即自由落锤复打加固法结合高应变动力手段监控的方法。这种方法既作为加固方法处理了工程中出现的浮桩问题,同时又包含检测手段保证了加固质量的可控性和加固效果的有效性,此外这种方法在狭窄空间内的加固,基坑底的加固,以及加固时对邻桩及周边环境的影响最小化方面比其他方法具有显而易见的优势。

Claims (3)

1.一种浮桩补强的方法,其特征在于:包括如下步骤:
步骤一:对需要补强的桩做好桩头防护措施:制作一桩头保护系统安置于桩顶,该桩头保护系统从上到下依次包括锤垫、替打桩帽和桩垫;
步骤二:在现场安装自由落锺设备:将人字拔杆安放于桩头两侧,采用缆风绳固定;将重锺挂到滑轮组下方的吊钩上,利用卷扬机和滑轮组将重锤吊至一定的高度;
步骤三:采用自由落锺方式对桩头进行复打:使用脱钩装置,将重锺从吊钩上脱钩,使重锤自由落下,均匀地落在已做好防护措施的桩头上,使桩土之间产生永久的相对位移-贯入度,从而逐渐打动基桩,通过重复不断的锤击,就像模拟锤击打桩的过程,逐步使脱空的桩底回位。
2.如权利要求1所述的一种浮桩补强的方法,其特征在于:还包括,
步骤四:同时在现场设置高应变动力监控仪器设备进行监控:在桩头顶部附近的桩身安装力传感器和加速度传感器各一对,通过电缆连接至高应变试验主机,在每一锤击中时实测高应变的力和速度时程曲线,通过应力波理论分析桩土体系的有关性状,利用凯司法得到现场实时的实测极限承载力值以及桩身完整性、拉压应力值参数,必要时调整自由落锤的重量、落距、桩垫材料,保证加固安全高效地进行,并通过高应变实时承载力值结合实测贯入度确定复打加固的收锤标准。
3.如权利要求1所述的一种浮桩补强的方法,其特征在于:所述步骤一中所述锤垫材料为毛毡,所述替打桩帽采用钢材制作,桩垫为20mm~40mm厚的胶木板。
CN 201110053632 2011-03-07 2011-03-07 一种浮桩补强的方法 Expired - Fee Related CN102182179B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110053632 CN102182179B (zh) 2011-03-07 2011-03-07 一种浮桩补强的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110053632 CN102182179B (zh) 2011-03-07 2011-03-07 一种浮桩补强的方法

Publications (2)

Publication Number Publication Date
CN102182179A true CN102182179A (zh) 2011-09-14
CN102182179B CN102182179B (zh) 2013-02-13

Family

ID=44568456

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110053632 Expired - Fee Related CN102182179B (zh) 2011-03-07 2011-03-07 一种浮桩补强的方法

Country Status (1)

Country Link
CN (1) CN102182179B (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103276728A (zh) * 2013-05-20 2013-09-04 福建建华管桩有限公司 一种桩头修补及加固的方法
CN103422503A (zh) * 2012-05-24 2013-12-04 Naruems株式会 一种利用桩帽和隔离坝降低噪音的方法
CN103898928A (zh) * 2014-03-12 2014-07-02 广东省建筑科学研究院 一种改进型高应变法
CN106939620A (zh) * 2016-01-05 2017-07-11 五冶集团上海有限公司 打入式预制桩整体上浮处理方法
CN111347819A (zh) * 2020-04-26 2020-06-30 岩土科技股份有限公司 一种大型景观假山施工方法
CN117871293A (zh) * 2024-03-11 2024-04-12 四川嘉乐地质勘察有限公司 基于自纠正的高应变力检测方法及检测装置
CN117871293B (zh) * 2024-03-11 2024-05-28 四川嘉乐地质勘察有限公司 基于自纠正的高应变力检测方法及检测装置

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1346000A (zh) * 2000-09-27 2002-04-24 曾昭礼 基桩缺陷高压侧喷补强方法
CN201354458Y (zh) * 2009-01-20 2009-12-02 杨敏 一种小型打桩设备
WO2010130009A1 (en) * 2009-05-15 2010-11-18 Norman Ross Watt Pile assembly and method of forming same

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1346000A (zh) * 2000-09-27 2002-04-24 曾昭礼 基桩缺陷高压侧喷补强方法
CN201354458Y (zh) * 2009-01-20 2009-12-02 杨敏 一种小型打桩设备
WO2010130009A1 (en) * 2009-05-15 2010-11-18 Norman Ross Watt Pile assembly and method of forming same

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《广东土木与建筑》 20040531 陈舜展 自由落锤上安装加速度传感器的高应变动力检测法及其应用 51-52 1-3 , 第5期 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103422503A (zh) * 2012-05-24 2013-12-04 Naruems株式会 一种利用桩帽和隔离坝降低噪音的方法
CN103422503B (zh) * 2012-05-24 2016-06-01 Naruems株式会 一种利用桩帽和隔离坝降低噪音的方法
CN103276728A (zh) * 2013-05-20 2013-09-04 福建建华管桩有限公司 一种桩头修补及加固的方法
CN103276728B (zh) * 2013-05-20 2015-08-05 福建建华管桩有限公司 一种桩头修补及加固的方法
CN103898928A (zh) * 2014-03-12 2014-07-02 广东省建筑科学研究院 一种改进型高应变法
CN106939620A (zh) * 2016-01-05 2017-07-11 五冶集团上海有限公司 打入式预制桩整体上浮处理方法
CN111347819A (zh) * 2020-04-26 2020-06-30 岩土科技股份有限公司 一种大型景观假山施工方法
CN117871293A (zh) * 2024-03-11 2024-04-12 四川嘉乐地质勘察有限公司 基于自纠正的高应变力检测方法及检测装置
CN117871293B (zh) * 2024-03-11 2024-05-28 四川嘉乐地质勘察有限公司 基于自纠正的高应变力检测方法及检测装置

Also Published As

Publication number Publication date
CN102182179B (zh) 2013-02-13

Similar Documents

Publication Publication Date Title
CN102182179B (zh) 一种浮桩补强的方法
CN101413265B (zh) 钻孔灌注桩缺陷加固处理施工方法
CN103510531A (zh) 一种分体式沉井加桩复合锚碇基础及其施工方法
CN105571759B (zh) 一种用于岩土工程的界面摩阻力测试装置与测试方法
CN105040715A (zh) 使用钢板桩做桥梁施工围堰方法
CN105220719B (zh) 深厚软土地区桥梁灌注桩纠偏方法
CN108343050A (zh) 一种强夯机施工监测系统及监测方法
CN109610342A (zh) 一种高速铁路桥梁大直径预制管桩长螺旋引孔施工方法
CN105970958A (zh) 一种预制桩施工的监测保护方法
CN109113049B (zh) 工后应力变形可调节预制桩及其施工方法
Huang et al. Numerical analysis and field monitoring on deformation of the semi-Top-Down excavation in Shanghai
CN203639929U (zh) 一种分体式沉井加桩复合锚碇基础
CN105887926B (zh) 软土震陷地层防止地基不均匀变形的明挖隧道结构
CN214842823U (zh) 一种用于拦截爆破飞石与减缓振动的协同装置
Wang Field test investigation of the pile jacking performance for prefabricated square rigid-drainage piles in saturated silt sandy soils
CN102235017B (zh) 软土地基建筑物抵抗侧向力的方法
Cui et al. Evaluation of bearing capacity of fly-ash highway subgrade based on model test
CN210141128U (zh) 模拟管幕暗挖的试验装置
Santos et al. Construction of a full-scale wrapped face geogrid reinforced wall using recycled construction and demolition waste as backfill material
Niroumand et al. Uplift response of irregular-shaped anchor in cohesionless soil
Izawa et al. Development of rational seismic design method for geogrid-reinforced soil wall combined with fibre-mixed soil-cement and its applications
Hameed et al. Lateral load behavior of jetted piles
CN205049357U (zh) 强夯机模拟试验装置
Wang et al. Mechanical Testing and Application of Steel-plastic Geogrid Instead of Metal Mesh in Supporting Engineering
Huang et al. The Influences of soil characteristics on the Negative Skin Friction on a single pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190130

Address after: 350100, 3rd floor 304-A47, Pioneer Building, Haixi High-tech Industrial Park, Fuzhou High-tech Zone, Fujian Province

Patentee after: FUJIAN ACADEMY OF BUILDING RESEARCH Co.,Ltd.

Address before: 350000 162 Yang Bridge Middle Road, Fuzhou, Fujian

Patentee before: Fujian Academy of Building Research

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130213

CF01 Termination of patent right due to non-payment of annual fee