CN203699729U - Quickly-mounting type pull rod structure for flat-top crane - Google Patents

Quickly-mounting type pull rod structure for flat-top crane Download PDF

Info

Publication number
CN203699729U
CN203699729U CN201420064389.1U CN201420064389U CN203699729U CN 203699729 U CN203699729 U CN 203699729U CN 201420064389 U CN201420064389 U CN 201420064389U CN 203699729 U CN203699729 U CN 203699729U
Authority
CN
China
Prior art keywords
pull bar
pull rod
bearing pin
arm
tie
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420064389.1U
Other languages
Chinese (zh)
Inventor
王建军
米成宏
周瑜
李海峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Construction Machinery Group Co Ltd XCMG
Original Assignee
Xuzhou Construction Machinery Group Co Ltd XCMG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou Construction Machinery Group Co Ltd XCMG filed Critical Xuzhou Construction Machinery Group Co Ltd XCMG
Priority to CN201420064389.1U priority Critical patent/CN203699729U/en
Application granted granted Critical
Publication of CN203699729U publication Critical patent/CN203699729U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a quickly-mounting type pull rod structure for a flat-top crane. The quickly-mounting type pull rod structure comprises a tower top structure (1), a lock pin (3), a pull rod I (4), a pull rod II (8), a pull rod support bracket (9) and a balance arm structure (10), as well as a pulling plate (6), wherein the pull rod I (4) is connected to the tower top structure (1) through a pin shaft I (2) and is locked by the lock pin (3); the pull rod II (8) is connected onto the balance arm structure (10) through a pin shaft IV (11), and is placed on the pull rod support bracket (9); one end of the pulling plate (6) is connected onto the pull rod I (4), and the other end of the pulling plate (6) is connected with the pull rod II (8) through a pin shaft III (7). According to the utility model, the pull rods comprise a longer pull rod, a shorter pulling plate and a short pull rod with medium length; during the mounting process, the manner that the pulling plate with lighter weight is manually lifted and connected with the longer pull rod is adopted, so that the mounting and connection of the pull rods are more convenient, faster, more efficient, and safer.

Description

Flat-top tower crane fast-assembling type Tiebar structure
Technical field
The utility model relates to a kind of flat-top tower crane, specifically a kind of flat-top tower crane fast-assembling type Tiebar structure.
Background technology
In existing design, equilibrium arm pull bar is generally divided into two sectional type or syllogic, and syllogic is made up of three different pull bars of length, and every pull bar is all round steel and be connected otic placode and be welded; As shown in Figure 1: comprise tower top structure 1, bearing pin I 2, lock pin 3, pull bar I 4, bearing pin II 5, pull bar II 61, bearing pin III 7, pull bar support I 81, pull bar III 91, equilibrium arm structure 10 and bearing pin IV 11.In installation process, need first pull bar I 4 to be installed in tower top structure 1; Again pull bar II 61 and pull bar III 91 are linked into an integrated entity with equilibrium arm structure 10; The last entirety equilibrium arm structure 10 of slinging is connected with tower top structure 1, and pull bar I 4 and pull bar II 61 are connected, and there will be following technological deficiency in connection procedure:
1, install, dismantle inconvenience.In installation process, the last entirety equilibrium arm structure 10 of slinging is connected with tower top structure 1, when pull bar I 4 is connected with pull bar II 61, because the weight ratio of pull bar II 61 is heavier, needs auxiliary hanging device, wastes resource.Because pull bar is to be welded by round steel and otic placode, if Large Towers machine, round steel can be thicker, weight can be larger, individual cannot be lifted at all, many times, in the time there is no auxiliary hanging device, need two, three installation personnels to be lifted, have again in addition installation personnel that it is connected with bearing pin.In connection procedure, because framing member is longer, if the equilibrium arm angle of slinging is improper, will be difficult in placely, installation difficulty is too large.
2, in installation process, there is potential safety hazard.In installation connection procedure, due to needs, many people lift pull bar II 61, limited space on equilibrium arm; And while slinging equilibrium arm, there is certain angle, when installation personnel stands in above, steadily do not have potential safety hazard.
3, production and processing is loaded down with trivial details.This is designed to the pull bar composition that three same form and length differ.Tiebar structure by round steel be connected otic placode and be welded, pull bar one end is monaural plate, one end is ears plate in addition, there are 4 important weld seams monaural plate one end, there are 8 important weld seams ears plate one end, and every pull bar adds up to 12 important weld seams, and three pull bars have 36 important weld seams, welding capacity is large especially, and comparision of production is loaded down with trivial details.
Summary of the invention
The problem existing for above-mentioned prior art, the utility model provides a kind of flat-top tower crane fast-assembling type Tiebar structure, and while making installation, dismounting tower machine equilibrium arm, the connection of pull bar is more convenient, efficient, safety.
To achieve these goals, the technical solution adopted in the utility model is: a kind of flat-top tower crane fast-assembling type Tiebar structure, comprises tower top structure, bearing pin I, lock pin, pull bar I, bearing pin II, bearing pin III, pull bar II, pull bar support, equilibrium arm structure and bearing pin IV; Pull bar I is connected in tower top structure and with lock pin and is locked by bearing pin I, and pull bar II is connected in equilibrium arm structure by bearing pin IV, and is positioned on pull bar support; Also comprise arm-tie, arm-tie one end is connected in pull bar I by bearing pin II, and the other end is connected with pull bar II by bearing pin III; Pull bar II, pull bar I, arm-tie are respectively long draw, short rod, short arm-tie, and shorten successively.
The relative ground of equilibrium arm structure forms the angle that upwarps of 1-2 degree.
Pull bar II, pull bar I are monaural plate structure, and arm-tie is ears plate structure.
Compared with existing device: in the utility model, pull bar is divided into a longer pull bar, the short rod of a shorter arm-tie and a moderate length, in installation process, utilize artificial the hold up arm-tie that weight is lighter the form being connected with long draw, there is following advantage: 1, equilibrium arm entirety is sling and after tower top connects, equilibrium arm is tilted slightly, an installation personnel can easily hold up arm-tie, another installation personnel connects arm-tie and pull bar II by bearing pin III, very convenient, efficient; 2, in installation process, the angle of equilibrium arm and horizontal surface is very little, above installation personnel can pulsation-free stands in.Because the utility model adopts the version of short arm-tie, junction framing member lightweight, installation personnel can easily hold up arm-tie, and packs smoothly connection bearing pin into, and whole process is convenient, efficient, safety; 3, long draw is for to be monaural plate structure with short rod, totally 16 important weld seams; On short arm-tie, only have 4 general little weld seams; So welding capacity reduces greatly, production and processing gets up to be more prone to, simple.
Brief description of the drawings
Fig. 1 is existing apparatus structural representation;
Fig. 2 is the utility model structural representation.
In figure: 1, tower top structure, 2, bearing pin I, 3, lock pin, 4, pull bar I, 5, bearing pin II, 6, arm-tie, 61, pull bar II, 7, bearing pin III, 8, pull bar II, 81, pull bar support I, 9, pull bar support, 91, pull bar III, 10, equilibrium arm structure, 11, bearing pin IV.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail.
As shown in Figure 2, a kind of flat-top tower crane fast-assembling type Tiebar structure, comprises tower top structure 1, bearing pin I 2, lock pin 3, pull bar I 4, bearing pin II 5, bearing pin III 7, pull bar II 8, pull bar support 9, equilibrium arm structure 10 and bearing pin IV 11; Pull bar I 4 is connected in tower top structure 1 and is locked with lock pin 3 by bearing pin I 2, and pull bar II 8 use bearing pin IV 11 are connected in equilibrium arm structure 10, and are positioned on pull bar support 9; Also comprise arm-tie 6, arm-tie 6 one end are connected in pull bar I 4 by bearing pin II 5, and the other end is connected with pull bar II 8 by bearing pin III 7; Pull bar II 8, pull bar I 4, arm-tie 6 are respectively long draw, short rod, short arm-tie, and shorten successively.
In installation process, pull bar I 4 use bearing pin I 2 are connected in tower top structure 1 and are also locked with lock pin 3, make pull bar I 4 can not hang down, arm-tie 6 use bearing pin II 5 are connected in pull bar I 4; Again pull bar II 8 use bearing pin IV 11 are connected in equilibrium arm structure 10, and are positioned on pull bar support 9; Finally equilibrium arm structure 10 entirety are sling and after tower top structure 1 connects, equilibrium arm structure 10 is tilted slightly, an installation personnel can easily hold up arm-tie 6, and another installation personnel connects arm-tie 6 and pull bar II 8 use bearing pin III 7, very convenient, efficient.
As improvement of the present utility model, the relative ground of equilibrium arm structure 10 forms the angle that upwarps of 1-2 degree, above installation personnel can pulsation-free stands in.Due to arm-tie in the utility model 6 version that is short arm-tie, junction framing member lightweight, installation personnel can easily hold up arm-tie, installs, and whole process is convenient, efficient, safety.
Further, pull bar II 8 and pull bar I 4 are monaural plate structure, totally 16 weld seams, and 6 of arm-ties only have 4 general little weld seams, and welding capacity reduces greatly, and production and processing gets up to be more prone to, simple.
Principle of work of the present utility model is as follows: by pull bar length classifying rationally, pull bar is divided into the version of three sections of connections: the pull bar II 8 being connected with equilibrium arm structure 10 is made to the structure that length is grown, be placed on pull bar support 9 when installation; The pull bar I 4 being connected with tower top structure 1 is made to moderate length and shorter structure, and lock with lock pin 3, make pull bar I can not hang down; One section of centre arm-tie 6 is made to length short, lightweight structure, very convenient, efficient, safety when installation.

Claims (3)

1. a flat-top tower crane fast-assembling type Tiebar structure, comprises tower top structure (1), bearing pin I (2), lock pin (3), pull bar I (4), bearing pin II (5), bearing pin III (7), pull bar II (8), pull bar support (9), equilibrium arm structure (10) and bearing pin IV (11); Pull bar I (4) is connected to tower top structure (1) by bearing pin I (2) and goes up and use lock pin (3) locking, and it is upper that pull bar II (8) is connected to equilibrium arm structure (10) by bearing pin IV (11), and be positioned on pull bar support (9); It is characterized in that, also comprise arm-tie (6), arm-tie (6) for one end bearing pin II (5) to be connected to pull bar I (4) upper, the other end is connected with pull bar II (8) by bearing pin III (7); Pull bar II (8), pull bar I (4), arm-tie (6) are respectively long draw, short rod, short arm-tie, and shorten successively.
2. a kind of flat-top tower crane fast-assembling type Tiebar structure according to claim 1, is characterized in that, the relative ground of described equilibrium arm structure (10) forms the angle that upwarps of 1-2 degree.
3. a kind of flat-top tower crane fast-assembling type Tiebar structure according to claim 1, is characterized in that, described pull bar II (8), pull bar I (4) are monaural plate structure, and arm-tie (6) is ears plate structure.
CN201420064389.1U 2014-02-13 2014-02-13 Quickly-mounting type pull rod structure for flat-top crane Withdrawn - After Issue CN203699729U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420064389.1U CN203699729U (en) 2014-02-13 2014-02-13 Quickly-mounting type pull rod structure for flat-top crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420064389.1U CN203699729U (en) 2014-02-13 2014-02-13 Quickly-mounting type pull rod structure for flat-top crane

Publications (1)

Publication Number Publication Date
CN203699729U true CN203699729U (en) 2014-07-09

Family

ID=51050197

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420064389.1U Withdrawn - After Issue CN203699729U (en) 2014-02-13 2014-02-13 Quickly-mounting type pull rod structure for flat-top crane

Country Status (1)

Country Link
CN (1) CN203699729U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103863953A (en) * 2014-02-13 2014-06-18 徐州建机工程机械有限公司 Rapidly mounted pull rod structure of flat-top crane

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103863953A (en) * 2014-02-13 2014-06-18 徐州建机工程机械有限公司 Rapidly mounted pull rod structure of flat-top crane
CN103863953B (en) * 2014-02-13 2015-11-18 徐州建机工程机械有限公司 A kind of flat-top tower crane fast-assembling type Tiebar structure

Similar Documents

Publication Publication Date Title
CN201381166Y (en) Hanging-point adjustable transverse hanging beam
CN202518926U (en) Multi-direction rotary type lifting appliance
CN204150929U (en) A kind of suspender
CN204265299U (en) The structure that a kind of foreign material hang
CN203699729U (en) Quickly-mounting type pull rod structure for flat-top crane
CN104016220B (en) The adjustable handling suspension bracket of waste heat boiler module
CN203699679U (en) Lifting appliance for lifting wire coil
CN103863953B (en) A kind of flat-top tower crane fast-assembling type Tiebar structure
CN205989837U (en) A kind of flour feeding device dedicated
CN204938733U (en) The general reversal hanger of sprocket hub
CN207375669U (en) The electronic lifting bracket of cable tunnel inner column formula cable
CN105712183B (en) A kind of high angle belt conveyer special hanger
CN102730577A (en) Detachable propeller strut for crane
CN203903768U (en) Adjustable loading and unloading lifting bracket for waste heat boiler module
CN203624932U (en) Portable indoor material lifter
CN207932896U (en) Ring beam and ring rail integral hoisting tool
CN207330112U (en) A kind of device for improving large rotor bearing shell overhaul efficiency
CN206203742U (en) Isolated pillar crane revolving bed
CN201980883U (en) Hoisting tool
CN204643670U (en) Split type arm tower crane Shears structure
CN204224077U (en) A kind of steel construction piece mounting hanger
CN205901172U (en) Nearly pole of transmission line overhauls corridor hanger device
CN202687818U (en) Dismountable propeller strut for crane
CN203639105U (en) Suspension type temporary hoisting operation platform
CN204057677U (en) A kind of quick-release suspension hook

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20140709

Effective date of abandoning: 20151118

C25 Abandonment of patent right or utility model to avoid double patenting