CN204224077U - A kind of steel construction piece mounting hanger - Google Patents
A kind of steel construction piece mounting hanger Download PDFInfo
- Publication number
- CN204224077U CN204224077U CN201420675391.2U CN201420675391U CN204224077U CN 204224077 U CN204224077 U CN 204224077U CN 201420675391 U CN201420675391 U CN 201420675391U CN 204224077 U CN204224077 U CN 204224077U
- Authority
- CN
- China
- Prior art keywords
- steel structure
- hanger
- installing
- lugs
- vertical
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 29
- 239000010959 steel Substances 0.000 title claims abstract description 29
- 238000010276 construction Methods 0.000 title description 4
- 238000009434 installation Methods 0.000 claims abstract description 18
- 239000000725 suspension Substances 0.000 claims description 5
- 238000004519 manufacturing process Methods 0.000 abstract description 6
- 239000000463 material Substances 0.000 abstract description 5
- 238000000034 method Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 1
- 230000008092 positive effect Effects 0.000 description 1
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
本实用新型提供一种钢结构件安装吊具,包括横梁以及横梁两端上侧设置的吊装孔;所述横梁两端下侧各设一立杆;每个所述立杆上都设有不同高度的数个立杆吊耳;每个所述立杆吊耳上均安装有卡环,在所述卡环上都设有吊绳。其中,每个所述立杆上端通过销轴铰接在横梁上。本实用新型能够实现较小的钢结构件安装高空吊装作业功能,操作安全可靠。同时能实现“一钩多件”,大大提高了安装效率、加快了安装速度,提高了工作效率。另外,制作工艺简单,取材广泛,生产成本较低。
The utility model provides a hanger for installing a steel structure, which includes a beam and hoisting holes provided on the upper sides of both ends of the beam; a vertical pole is respectively arranged on the lower side of the two ends of the beam; each of the vertical poles is provided with different A plurality of vertical pole lifting lugs with the same height; a snap ring is installed on each of the vertical pole lifting lugs, and a sling is arranged on the snap rings. Wherein, the upper end of each vertical rod is hinged on the beam through a pin shaft. The utility model can realize the high-altitude hoisting operation function of installing small steel structural parts, and the operation is safe and reliable. At the same time, "one hook with multiple pieces" can be realized, which greatly improves the installation efficiency, speeds up the installation speed, and improves the work efficiency. In addition, the manufacturing process is simple, the materials are widely used, and the production cost is low.
Description
技术领域technical field
本实用新型属于建筑钢结构安装施工技术领域,尤其是涉及一种钢结构件安装吊具。The utility model belongs to the technical field of installation and construction of building steel structures, in particular to a hoist for installing steel structure parts.
背景技术Background technique
目前在国内建筑钢结构安装施工领域,对于数量巨大的较小型的轻型结构件高空安装方法都是采用“一钩一件”,其效率低、成本高的问题明显,只有采用“一钩多件”的专用吊具,才可以大大提高吊装效率和降低机械台班成本。At present, in the field of domestic construction steel structure installation and construction, "one hook and one piece" is used for the high-altitude installation method of a large number of smaller light structural parts. The problems of low efficiency and high cost are obvious. "The special spreader can greatly improve the lifting efficiency and reduce the cost of mechanical shifts.
实用新型内容Utility model content
本实用新型要解决的问题是提供一种钢结构件安装吊具,结构简单,设计科学合理,生产成本较低,使用方便,能够有效保障快速、稳定、安全进行小型构件高空安装。The problem to be solved by the utility model is to provide a hoist for installing steel structural parts, which has simple structure, scientific and reasonable design, low production cost, convenient use, and can effectively ensure fast, stable and safe high-altitude installation of small components.
为解决上述技术问题,本实用新型采用的技术方案是:一种钢结构件安装吊具,包括横梁以及横梁两端上侧设置的吊装孔;所述横梁两端下侧各设一立杆;每个所述立杆上都设有不同高度的数个立杆吊耳;每个所述立杆吊耳上均安装有卡环,在所述卡环上都设有吊绳。In order to solve the above-mentioned technical problems, the technical solution adopted by the utility model is: a steel structure installation hanger, including a beam and hoisting holes provided on the upper sides of both ends of the beam; a vertical pole is provided on the lower side of the two ends of the beam; Each of the vertical poles is provided with several vertical pole lifting lugs of different heights; each of the vertical pole lifting lugs is equipped with a snap ring, and a sling is arranged on the snap ring.
进一步,每个所述立杆上端均通过销轴铰接在横梁上。Further, the upper end of each vertical rod is hinged to the beam through a pin.
进一步,所述横梁两端设置的立杆相对于横梁的中心对称设置。Further, the uprights arranged at both ends of the beam are arranged symmetrically with respect to the center of the beam.
进一步,所述横梁两端的下侧设置有横梁下吊耳,所述立杆均铰接在横梁下吊耳上。Further, the lower sides of the two ends of the crossbeam are provided with lower lugs of the crossbeam, and the vertical rods are hinged on the lower lugs of the crossbeam.
进一步,所述横梁下吊耳焊接在横梁上。Further, the lower lugs of the beam are welded to the beam.
进一步,所述横梁两端上侧分别设有横梁上吊耳,所述吊装孔设置在横梁上吊耳上。Further, the upper sides of the two ends of the beam are respectively provided with lifting lugs on the beam, and the hoisting holes are arranged on the lifting lugs on the beam.
进一步,所述横梁上吊耳焊接在横梁上。Further, the lifting lugs on the beam are welded on the beam.
进一步,所述横梁两端的吊装孔相对于横梁的中心对称设置。Further, the hoisting holes at both ends of the beam are arranged symmetrically with respect to the center of the beam.
进一步,每个所述吊绳上均设有绳扣。Further, each of the slings is provided with a rope buckle.
本实用新型具有的优点和积极效果是:The advantages and positive effects that the utility model has are:
1)实现较小的钢结构件安装高空吊装作业功能,操作安全可靠。1) Realize the function of small steel structure installation and high-altitude hoisting operation, and the operation is safe and reliable.
2)实现了“一钩多件”,大大提高了安装效率、加快了安装速度,提高了工作效率。2) "One hook with multiple pieces" is realized, which greatly improves the installation efficiency, speeds up the installation speed, and improves the work efficiency.
3)制作工艺简单,取材广泛,生产成本较低。3) The manufacturing process is simple, the materials are widely drawn, and the production cost is relatively low.
附图说明Description of drawings
图1是本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;
图2是本实用新型使用时的示意图。Fig. 2 is a schematic diagram when the utility model is in use.
图中:1-横梁;2-立杆;3-销轴;4-立杆吊耳;5-卡环;6-吊绳;7-横梁上吊耳;8-横梁下吊耳;9-绳扣;10-吊装孔。In the figure: 1-Beam; 2-Pole; 3-Pin shaft; 4-Pole lug; 5-Snap ring; buckle; 10-lifting hole.
具体实施方式Detailed ways
下面结合附图对本实用新型的具体实施例做详细说明。Specific embodiments of the present utility model are described in detail below in conjunction with accompanying drawings.
一种钢结构件安装吊具,如图1所示,包括横梁1以及横梁1两端上侧设置的吊装孔10;所述横梁1两端下侧各设一立杆2;每个所述立杆2上都设有不同高度的数个立杆吊耳4;每个所述立杆吊耳4上均安装有卡环5,在所述卡环5上都设有吊绳6。A hanger for installing a steel structure, as shown in Figure 1, includes a beam 1 and hoisting holes 10 provided on the upper sides of both ends of the beam 1; a vertical pole 2 is respectively set on the lower side of the two ends of the beam 1; each of the The pole 2 is provided with several pole lugs 4 of different heights; each of the pole lugs 4 is equipped with a snap ring 5 , and a suspension rope 6 is arranged on the snap ring 5 .
其中,每个所述立杆2上端均通过销轴3铰接在横梁1上,结构稳固,立杆2与横梁1能相对转动,这样,钢结构件安装时更方便灵活,不受结构的限制,易于安装。Wherein, the upper end of each vertical rod 2 is hinged on the beam 1 through the pin shaft 3, the structure is stable, and the vertical rod 2 and the beam 1 can rotate relatively. In this way, the installation of the steel structure is more convenient and flexible, and is not restricted by the structure. , easy to install.
其中,所述横梁1两端设置的立杆2相对于横梁1的中心对称设置,整体平衡性好,需要说明的是,在地面上绑扎结构件时,也尽量使两立杆2上的结构件重量对等,以免起吊之后发生倾斜,不利于安装。Wherein, the poles 2 provided at both ends of the beam 1 are arranged symmetrically with respect to the center of the beam 1, and the overall balance is good. The weight of the parts is equal to avoid tilting after lifting, which is not conducive to installation.
其中,所述横梁1两端的下侧设置有横梁下吊耳8,所述立杆2均铰接在横梁下吊耳8上,所述横梁下吊耳8焊接在横梁1两端上侧。Wherein, the lower sides of the two ends of the beam 1 are provided with the lower lugs 8 of the beam, the vertical rods 2 are hinged on the lower lugs 8 of the beam, and the lower lugs 8 of the beam are welded on the upper sides of the two ends of the beam 1 .
其中,所述横梁1两端上侧分别设有横梁上吊耳7,所述吊装孔10设置在横梁上吊耳7上,所述横梁上吊耳7焊接在横梁1两端下侧。Wherein, the upper sides of the two ends of the beam 1 are respectively provided with upper lugs 7 of the beam, the hoisting holes 10 are arranged on the upper lugs 7 of the beam, and the upper lugs 7 of the beam are welded on the lower sides of the two ends of the beam 1 .
其中,所述横梁1两端的吊装孔10相对于横梁1中心对称设置,结构稳固,整体平衡性好,易于起吊操作。Wherein, the hoisting holes 10 at both ends of the beam 1 are arranged symmetrically with respect to the center of the beam 1 , the structure is stable, the overall balance is good, and the hoisting operation is easy.
横梁1采用方钢管或圆钢管制成,横梁上吊耳7和横梁下吊耳8均焊接在横梁1上,更易于加工,结构强度完全得到保证的同时,还节约加工成本。The beam 1 is made of square steel pipe or round steel pipe, and the upper lug 7 of the beam and the lower lug 8 of the beam are welded on the beam 1, which is easier to process, the structural strength is fully guaranteed, and the processing cost is also saved.
其中,每个所述吊绳6上均设有绳扣9。需要说明的是,吊绳6一端连接卡环5,另一端设置绳扣9,这样更便于结构件的绑扎,效率高。卡环5钩挂钢结构件,吊绳6起到绑扎固定作用,钢结构件绑扎稳固,结实牢靠,起吊安全,各工件安装方便。Wherein, each of the hanging ropes 6 is provided with a rope buckle 9 . It should be noted that one end of the suspension rope 6 is connected to the snap ring 5, and the other end is provided with a rope buckle 9, which is more convenient for binding structural parts and has high efficiency. The snap ring 5 hooks the steel structure, and the sling 6 plays a role of binding and fixing. The steel structure is bound firmly, firm and reliable, safe for lifting, and each workpiece is easy to install.
需要说明的是,横梁1和立杆2均采用钢管料加工制成,销轴3采用45号钢加工制成,横梁上吊耳7、横梁下吊耳8以及立杆吊耳4都采用钢板料加工制成。取材广泛,生产成本较低。It should be noted that the beam 1 and the vertical rod 2 are both made of steel pipe material, the pin shaft 3 is made of No. 45 steel, and the upper lug 7 of the beam, the lower lug 8 of the beam and the lifting lug 4 of the vertical rod are all made of steel material Processed. Wide range of materials and low production cost.
另需说明的是,附图1和附图2中为结构表达的清楚,隐去了部分卡环5上的吊绳6。It should be further noted that, in order to clarify the structure in the accompanying drawings 1 and 2, part of the hanging rope 6 on the clasp 5 is hidden.
各个吊绳6的长短尺寸可以不同,其相差值为被吊装构件断面尺寸高度的n倍数,更易于吊起各个结构件,并且各个结构件之间不会发生干涉。The length and length of each suspension rope 6 can be different, and the difference value is n times of the section height of the member to be hoisted, which makes it easier to lift each structural member, and there will be no interference between each structural member.
使用时,如图2所示,先用绳索(如吊带、钢丝绳等)穿过横梁上吊耳7,用吊装设备(如天车、起重机等)吊起本吊具,使立杆2垂下。During use, as shown in Figure 2, earlier pass lug 7 on the crossbeam with rope (as sling, steel wire rope etc.), hang this spreader with hoisting equipment (as crane, crane etc.), make vertical bar 2 hang down.
然后,操作人员在地面上将多个小型构件分别钩挂在不同的卡环5上,并且用每个卡环5上设置的吊绳6绑扎住,确认各个钢结构件绑扎牢固后,用吊装设备将本吊具吊起,这样,就实现了“一钩多件”,大大提高了安装效率、加快了安装速度,提高了工作效率。Then, the operator hooks a plurality of small components on different clasps 5 on the ground, and binds them with the slings 6 provided on each clasp 5. After confirming that each steel structure is firmly bound, use a hoist The equipment lifts the spreader, so that "one hook with multiple pieces" is realized, which greatly improves the installation efficiency, speeds up the installation speed, and improves the work efficiency.
以上对本实用新型的一个实施例进行了详细说明,但所述内容仅为本实用新型的较佳实施例,不能被认为用于限定本实用新型的实施范围。凡依本实用新型申请范围所作的均等变化与改进等,均应仍归属于本实用新型的专利涵盖范围之内。An embodiment of the present utility model has been described in detail above, but the content described is only a preferred embodiment of the present utility model, and cannot be considered as limiting the implementation scope of the present utility model. All equal changes and improvements made according to the application scope of the utility model should still belong to the scope covered by the patent of the utility model.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420675391.2U CN204224077U (en) | 2014-11-13 | 2014-11-13 | A kind of steel construction piece mounting hanger |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420675391.2U CN204224077U (en) | 2014-11-13 | 2014-11-13 | A kind of steel construction piece mounting hanger |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204224077U true CN204224077U (en) | 2015-03-25 |
Family
ID=52922195
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420675391.2U Expired - Lifetime CN204224077U (en) | 2014-11-13 | 2014-11-13 | A kind of steel construction piece mounting hanger |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204224077U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109368485A (en) * | 2018-11-29 | 2019-02-22 | 岑加昌 | A kind of environmental project trees balance type lifting device |
-
2014
- 2014-11-13 CN CN201420675391.2U patent/CN204224077U/en not_active Expired - Lifetime
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109368485A (en) * | 2018-11-29 | 2019-02-22 | 岑加昌 | A kind of environmental project trees balance type lifting device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN109095343A (en) | Assembled hanger | |
| CN204342250U (en) | A kind of multi-state hoisting balance beam | |
| CN207566719U (en) | Prefabricated element slings | |
| CN203173684U (en) | Component for hoisting reinforcement cage | |
| CN206720558U (en) | A kind of adjustable steel-reinforcement cage hanger | |
| CN205114843U (en) | Prefabricated post hoist device with unhook function | |
| CN203820283U (en) | Lifting frame | |
| CN205916895U (en) | But chain hoist that multiple spot hung | |
| CN204342257U (en) | A kind of large-scale component turning device | |
| CN204224077U (en) | A kind of steel construction piece mounting hanger | |
| CN103395689A (en) | Horizontal hoisting clamp for wallboard | |
| CN204057659U (en) | The prefabricated superimposed panel lifting appliance of super large | |
| CN206665955U (en) | A kind of high-strength steel triangle suspender lifts framework constructing device | |
| CN205132903U (en) | Steel wire slings | |
| CN209242475U (en) | A kind of suspender | |
| CN208948679U (en) | Assembled hanger | |
| CN105329766A (en) | Automatic balance type lifting beam | |
| CN205973449U (en) | Jack -up handling rigging of buffering pulley | |
| CN202089683U (en) | Three-leg hoisting device | |
| CN206615927U (en) | Large-scale dry-type air-core reactor special hanger | |
| CN205637617U (en) | Hoist and mount of many roof beams of girder steel construction cluster are put | |
| CN108516454A (en) | A kind of hanging apparatus of prefabricated components | |
| CN208279171U (en) | A kind of device for prefabricated components hoisting and hanging | |
| CN207404687U (en) | A kind of heavy truck rivet line vehicle frame suspender | |
| CN207932896U (en) | Ring beam and ring rail integral hoisting tool |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20150325 |