CN203639105U - Suspension type temporary hoisting operation platform - Google Patents

Suspension type temporary hoisting operation platform Download PDF

Info

Publication number
CN203639105U
CN203639105U CN201320888907.7U CN201320888907U CN203639105U CN 203639105 U CN203639105 U CN 203639105U CN 201320888907 U CN201320888907 U CN 201320888907U CN 203639105 U CN203639105 U CN 203639105U
Authority
CN
China
Prior art keywords
platform
operation platform
suspension type
equipment
horizontal peg
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320888907.7U
Other languages
Chinese (zh)
Inventor
赵洪敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG QILU PETROCHEMICAL CONSTRUCTION CO Ltd
Original Assignee
SHANDONG QILU PETROCHEMICAL CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG QILU PETROCHEMICAL CONSTRUCTION CO Ltd filed Critical SHANDONG QILU PETROCHEMICAL CONSTRUCTION CO Ltd
Priority to CN201320888907.7U priority Critical patent/CN203639105U/en
Application granted granted Critical
Publication of CN203639105U publication Critical patent/CN203639105U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model belongs to the building field, and particularly relates to a suspension type temporary hoisting operation platform. The suspension type temporary hoisting operation platform comprises a platform body, a guardrail and hanging legs. The guardrail is mounted on the periphery of the platform body, an equipment mounting circuit hole is formed in the center of the platform body, and the hanging legs are evenly distributed on the periphery of the equipment mounting circuit hole. The hanging legs are formed by combining vertical supporting rods and horizontal hanging rods, the lower portion of each vertical supporting rod is fixedly arranged on the platform body, the horizontal hanging rods are fixedly arranged on the tops of the vertical supporting rods, and the horizontal hanging rods are provided with bolt holes used for being connected with an equipment connecting flange. The suspension type temporary hoisting operation platform is flexible and convenient to operate and use, the temporary hoisting operation platform can be hung down together along with a lifting cover, operating personnel can fall off to the ground together along with the temporary hoisting operation platform, so that hoisting time of an auxiliary hoist is shortened, and hoisting efficiency is improved. The hanging legs are reasonable in structure, the height of the hanging legs and the distance from the platform to the edge of the equipment top connecting flange can be adjusted according to practical conditions, hence, the utilization rate of the temporary hoisting operation platform is improved, and resource waste is reduced.

Description

The interim lifting operation platform of suspension type
Technical field
The utility model relates to the interim lifting operation platform of a kind of suspension type, is applied to building field.
Background technology
In installation work; often can run into some special equipments; such as reactor, high pressure hot separator, cold low disconnector etc.; be characterized in that volume is little, quality is large; and all pass through POST WELD HEAT TREATMENT OF ENTIRE; generally do not allow to weld hanger on housing, but make the lifting main hoisting point of a blind flange formula lift cap matching with equipment top butt flange as this kind equipment.Lift cap is applicable to be provided with as top center the main hoisting ear of large pipe connecting flange kind equipment lifting.Before lifting, lift cap is connected by high strength bolt with apparatus body, after lifting finishes, hangs down by disassembling bolts and by lift cap again, lifting end-of-job.The installation of lift cap can complete on ground, but the dismounting of lift cap need to complete in high-altitude, due to now smooth in appearance of equipment, therefore makes an one-shot job platform just necessary.Traditional way is set up the form such as scaffold, support type platform.
The shortcoming that traditional interim lifting operation platform exists is to need by hanging basket, operating personnel to be hung oneself from job platform after lift cap dismounting finishes, main hoisting car will hang lid hang lower after, operating personnel must be got on one-shot job platform is hung down by hanging basket, and this will take the lifting time of crane greatly.
In addition, traditional one-shot job platform is only applicable to the equipment hoisting of a certain given configuration size conventionally, has just likely shelved for a long time once lifting operation finishes one-shot job platform, causes the waste of resource.
Utility model content
According to above deficiency of the prior art, the technical problems to be solved in the utility model is: provide a kind of rational in infrastructure, easy to operate, can improve lifting efficiency and the high interim lifting operation platform of suspension type of degree of utilization.
The interim lifting operation platform of suspension type described in the utility model, comprise platform body, guardrail and extension leg, guardrail is arranged on the periphery of platform body, the center of platform body has an equipment circular hole is installed, the periphery that equipment is installed circular hole is evenly equipped with extension leg, hangs leg and is combined by vertical support bar and horizontal peg, and vertical support bar bottom is fixed on platform body, top fixing horizontal peg, arranges the bolt hole that is connected use with equipment connection flange on horizontal peg.
Use procedure is as follows:
Before equipment lifting, interim suspension type lifting operation platform is installed on the butt flange of equipment top, the horizontal peg of hanging leg in platform is connected by tie bolt with equipment top butt flange; Equipment rear operating personal in place arrives on interim lifting operation platform by hanging basket, and nut under bolt is all opened, and now main hoisting car hooks up, and lift cap is hung down.Because interim lifting operation platform adopts suspended structure, interim lifting operation platform can follow lift cap to be hung down together, and operating personnel can drop down onto on ground with interim lifting operation platform, thereby greatly reduces the lifting time of whipline.
Described vertical support bar top has regulating sleeve, one pin-and-hole is set on regulating sleeve, regulating sleeve is enclosed within horizontal peg outside, multiple Level tune pin-and-holes are set on horizontal peg, regulating sleeve is fixedly connected with by set pin with horizontal peg, be connected the spiro keyhole position of use in the end of horizontal peg with equipment connection flange, can regulate according to platform the position (hanging the horizontal length of leg) of horizontal peg apart from the distance at butt flange edge, equipment top and bolt situation, to adapt to the installation requirements of different size equipment.
Except aforesaid way, multiple bolts hole that are connected use with equipment connection flange can also be directly set on horizontal peg, directly directly choose the bolt hole of correct position according to platform apart from distance and the bolt situation at butt flange edge, equipment top, and by tie bolt, horizontal peg and butt flange are connected and fixed.
Described vertical support bar is made up of upper and lower two pole bodies, on the upper and lower body of rod, all arrange and highly regulate pin-and-hole, upper and lower two pole bodies are set in together and are fixedly connected with by set pin, can regulate according to the thickness of equipment top butt flange and lift cap, bolt length the height (hanging the height of leg) of vertical support bar.
Can regulate and hang leg height and the platform distance apart from butt flange edge, equipment top according to actual conditions by such scheme, thereby improve the degree of utilization of interim lifting operation platform, reduce the waste of resource.
The beneficial effect that the utility model compared with prior art had is:
The interim lifting operation platform operations of this suspension type is flexible and convenient to use, because interim lifting operation platform adopts suspended structure, interim lifting operation platform can follow lift cap to be hung down together, operating personnel can drop down onto on ground with interim lifting operation platform, thereby greatly reduce the lifting time of whipline, improved lifting efficiency; Extension leg is rational in infrastructure, can regulate and hang leg height and the platform distance apart from butt flange edge, equipment top according to actual conditions, thereby improve the degree of utilization of interim lifting operation platform, has reduced the waste of resource.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
In figure: 1, guardrail; 2, platform body; 3, horizontal peg; 4, regulating sleeve; 5, set pin; 6, Level tune pin-and-hole; 7, the body of rod; 8, highly regulate pin-and-hole; 9, tie bolt; 10, butt flange; 11, equipment.
The specific embodiment
Below in conjunction with accompanying drawing, embodiment of the present utility model is described further:
As shown in Figure 1, the interim lifting operation platform of this suspension type, comprise platform body 2, guardrail and extension leg, guardrail is arranged on the periphery of platform body 2, and the center of platform body 2 has an equipment circular hole is installed, and the periphery that equipment is installed circular hole is evenly equipped with extension leg, hanging leg is combined by vertical support bar and horizontal peg 3, vertical support bar bottom is fixed on platform body 2, and top fixing horizontal peg 3 arranges the bolt hole that is connected use with equipment connection flange on horizontal peg 3.
Wherein: vertical support bar top has regulating sleeve 4, one pin-and-hole is set on regulating sleeve 4, regulating sleeve 4 is enclosed within horizontal peg 3 outsides, multiple Level tune pin-and-holes 6 are set on horizontal peg 3, regulating sleeve 4 is fixedly connected with by set pin 5 with horizontal peg 3, be connected the spiro keyhole position of use with equipment connection flange in the end of horizontal peg 3, can regulate according to platform the position (hanging the horizontal length of leg) of horizontal peg 3 apart from the distance at butt flange 10 edges, equipment top and bolt situation, to adapt to the installation requirements of different size equipment 11.Except aforesaid way, multiple bolts hole that are connected use with equipment connection flange can also be directly set on horizontal peg 3, directly directly choose the bolt hole of correct position according to platform apart from distance and the bolt situation at butt flange 10 edges, equipment top, and by tie bolt 9, horizontal peg 3 is connected and fixed with butt flange 10.
Vertical support bar is made up of upper and lower two pole bodies 7, on the upper and lower body of rod 7, all arrange and highly regulate pin-and-hole 8, upper and lower two pole bodies 7 are set in together and are fixedly connected with by set pin 5, can regulate according to the thickness of equipment top butt flange 10 and lift cap, bolt length the height (hanging the height of leg) of vertical support bar.
Can regulate and hang leg height and the platform distance apart from butt flange 10 edges, equipment top according to actual conditions by such scheme, thereby improve the degree of utilization of interim lifting operation platform, reduce the waste of resource.
Except above-mentioned points, the diameter that in the interim lifting operation platform of this suspension type, the equipment at platform body 2 centers is installed circular hole is when definite, will be take the commonality that improves interim lifting operation platform as object, with equipment, the diameter of circular hole and the gap of equipment top butt flange external diameter being installed does not affect operating personnel's the principle that is operating as; When platform is made, selected material is the materials such as the common channel-section steel of building-site, angle steel, steel pipe, diamond plate, draws materials conveniently.
Introduce the interim lifting operation platform application of suspension type as an example of the construction of 2,600,000 tons/year of Wax Oil Hydrogenation Unit example.Use procedure is as follows:
Before equipment 11 liftings, interim suspension type lifting operation platform is installed on the butt flange 10 at equipment 11 tops, the horizontal peg 3 of hanging leg in platform is connected by tie bolt 9 with equipment top butt flange 10; Equipment 11 rear operating personal in place arrives on interim lifting operation platform by hanging basket, and nut under bolt is all opened, and now main hoisting car hooks up, and lift cap is hung down.Because interim lifting operation platform adopts suspended structure, interim lifting operation platform can follow lift cap to be hung down together, and operating personnel can drop down onto on ground with interim lifting operation platform, thereby greatly reduces the lifting time of whipline.
In the middle of this construction, there is hydrotreating reactor (022-R-101), thermal low-pressure separators (022-D-104), high pressure hot separator (022-D-103), cold high pressure separator (022-D-105), five equipment 11 of desulphurization of recycle hydrogen tower (022-C-101) need to use lift cap to carry out lifting operation, as adopt orthodox method to need the interim lifting operation platform (cold high pressure separator of four of fabrication and installation, desulphurization of recycle hydrogen tower top flange profile is consistent), but adopt the interim lifting operation platform of suspension type only to need one just can meet operating needs, greatly save lifting operation cost.
Hydrotreating reactor top flange external diameter maximum (φ 1520mm), thermal low-pressure separators top flange external diameter minimum (φ 775mm).In design suspension type interim lifting operation platform, circular diameter is φ 1720mm, installs rear platform apart from flange periphery closest range 100mm, and maximum distance 473mm can meet operating personnel's operation requirements.

Claims (4)

1. the interim lifting operation platform of suspension type, it is characterized in that: comprise platform body (2), guardrail (1) and hang leg, guardrail (1) is arranged on the periphery of platform body (2), the center of platform body (2) has an equipment circular hole is installed, the periphery that equipment is installed circular hole is evenly equipped with extension leg, hanging leg is combined by vertical support bar and horizontal peg (3), vertical support bar bottom is fixed on platform body (2), top fixing horizontal peg (3), the upper bolt hole that is connected use with equipment connection flange that arranges of horizontal peg (3).
2. the interim lifting operation platform of suspension type according to claim 1, it is characterized in that: described vertical support bar top has regulating sleeve (4), regulating sleeve arranges a pin-and-hole on (4), regulating sleeve (4) is enclosed within horizontal peg (3) outside, multiple Level tune pin-and-holes (6) are set on horizontal peg (3), regulating sleeve (4) is fixedly connected with by set pin (5) with horizontal peg (3), is connected the spiro keyhole position of use in the end of horizontal peg (3) with equipment connection flange.
3. the interim lifting operation platform of suspension type according to claim 1, is characterized in that: multiple bolts hole that are connected use with equipment connection flange are set on described horizontal peg (3).
4. according to the interim lifting operation platform of suspension type described in claim 1,2 or 3, it is characterized in that: described vertical support bar is made up of upper and lower two pole bodies (7), on the upper and lower body of rod (7), all arrange and highly regulate pin-and-hole (8), upper and lower two pole bodies (7) are set in together and pass through set pin (5) and are fixedly connected with.
CN201320888907.7U 2013-12-31 2013-12-31 Suspension type temporary hoisting operation platform Expired - Fee Related CN203639105U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320888907.7U CN203639105U (en) 2013-12-31 2013-12-31 Suspension type temporary hoisting operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320888907.7U CN203639105U (en) 2013-12-31 2013-12-31 Suspension type temporary hoisting operation platform

Publications (1)

Publication Number Publication Date
CN203639105U true CN203639105U (en) 2014-06-11

Family

ID=50870368

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320888907.7U Expired - Fee Related CN203639105U (en) 2013-12-31 2013-12-31 Suspension type temporary hoisting operation platform

Country Status (1)

Country Link
CN (1) CN203639105U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108715431A (en) * 2018-07-10 2018-10-30 中铁大桥局武汉桥梁特种技术有限公司 A kind of hanger platform of T beams maintenance and reinforcement

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108715431A (en) * 2018-07-10 2018-10-30 中铁大桥局武汉桥梁特种技术有限公司 A kind of hanger platform of T beams maintenance and reinforcement

Similar Documents

Publication Publication Date Title
CN101845912A (en) Segmental-body assembly type emergency communication tower
CN206156567U (en) Thin cylinder body hoist
CN201793330U (en) Gantry hanger frame device
CN204752138U (en) High altitude construction safety hanging flower basket that suitability is strong
CN201826581U (en) Segmental-body assembly type emergency communication tower
CN203639105U (en) Suspension type temporary hoisting operation platform
CN103318745B (en) A kind of lightweight special hanger and installation method thereof
CN204751902U (en) Hoist device of steel pipe stiffening ring crown plate
CN205132955U (en) Hoist and mount operation of electric power industry low latitude is with hoist and mount frame
CN202072386U (en) Lifting appliance for lifting raft foundation reinforcement cage of containment vessel of nuclear power station
CN204111235U (en) A kind of voltage transformer and JP cabinet dismounting special purpose device
CN202754704U (en) Hoisting device for heating surface module of heat recovery boiler
CN205132926U (en) Special well word hoist of hydroelectric set tail water ell
CN203345912U (en) Portable special suspension tool
CN205034948U (en) Rack formula hanging beam device
CN205257771U (en) Torch integral hoisting support
CN203257075U (en) Core tube inner lifting type multifunctional operating platform for high-rise building construction
CN206940369U (en) A kind of dock wall hydraulic pressure maintenance platform
CN201238159Y (en) GW4-110 type isolation switch examination stand
CN206872351U (en) A kind of I-beam wheel dismounting Pneumatic power elevator apparatus
CN205730031U (en) A kind of hanging rack for safety belt
CN201261681Y (en) Sling for mounting RH furnace circulating pipe
CN204825952U (en) Tower machine steel platform basis fixed leg
CN205901172U (en) Nearly pole of transmission line overhauls corridor hanger device
CN205476444U (en) Light -duty support post based on low level jacking die carrier system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140611

Termination date: 20161231