CN205257771U - Torch integral hoisting support - Google Patents
Torch integral hoisting support Download PDFInfo
- Publication number
- CN205257771U CN205257771U CN201521004558.3U CN201521004558U CN205257771U CN 205257771 U CN205257771 U CN 205257771U CN 201521004558 U CN201521004558 U CN 201521004558U CN 205257771 U CN205257771 U CN 205257771U
- Authority
- CN
- China
- Prior art keywords
- entablature
- torch
- utility
- model
- integral hoisting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Jib Cranes (AREA)
Abstract
The utility model relates to a torch pylon, in particular to torch integral hoisting support. The three summit that the device's three stand is triangle -shaped sets up, and every stand top all is connected with the lug, goes up the lower extreme between two adjacent stands and is connected through entablature and bottom end rail respectively, is connected through the connecting rod between entablature and the bottom end rail, and the entablature is connected through the junction of two enhancement steel pipes with bottom end rail and two stands respectively, and all weld on torch pylon top three stand bottom. The utility model discloses a flare tower shelf energy is enough droped to the ground and is assembled on assembly platform, the equipment accomplish the back through connect the hoisting support on top by large -scale crane integral hoisting, can greatly reduce the risk of high altitude installation component, the simple and convenient safety of assembly process reduces the manpower and materials among the assembly process widely, saving construction cost shortens the construction and installation cycle.
Description
Technical field:
The utility model relates to a kind of installing flare tower frame, particularly a kind of torch integral hoisting support.
Background technology:
The general height of installing flare tower frame is more than 60m, and in installation process in the past, installing flare tower frame is by large-scale craneCoordinate lifting group one by one right. Very easily be subject to the unfavorable meteorological effects such as strong wind, mist, rain, and high-altitude group to doWhen industry, crane utilization rate is low and security risk is large, and equipment leasing expense is higher, and flow chart trouble is inconvenient,Lifting group is to needing to expend a large amount of time and manpower and materials in process.
Utility model content:
The technical problems to be solved in the utility model is to provide a kind of torch integral hoisting support, and this device is realizedInstalling flare tower frame can drop to the ground and assemble on assembly platform, after having assembled, prop up by the lifting that is connected to topFrame, by large-scale crane integral hoisting, can greatly reduce the risk of high-altitude installation component, and assembling process is simpleConvenient and safe, reduce widely the manpower and materials in assembling process, save construction cost, shorten installationCycle. Having overcome existing installing flare tower frame assembling process wastes time and energy, and security risk is high, and construction cost is largeFoot.
Technical solution adopted in the utility model is: a kind of torch integral hoisting support, comprises three columns;Three column three summits triangular in shape arrange, and each column top is all connected with hanger, and adjacent two are stoodBetween post, upper and lower side is connected with sill by entablature respectively, passes through to connect between entablature and sillBar is connected, and entablature is strengthened steel pipe by two respectively and is connected with the junction of two columns with sill,Three column bottoms are all welded on installing flare tower frame top.
The beneficial effects of the utility model are: the utility model has been realized installing flare tower frame and can have been droped to the ground flat in assemblingOn platform, assemble, the hoisting bracket by being connected to top after having assembled, can by large-scale crane integral hoistingGreatly reduce the risk of high-altitude installation component, the simple and convenient safety of assembling process, reduces and assembled widelyManpower and materials in journey, save construction cost, shorten the installation cycle.
Brief description of the drawings:
Below in conjunction with the drawings and specific embodiments, the utility model is described in more detail.
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the top view of Fig. 1.
Detailed description of the invention:
As shown in Figure 1 and Figure 2, a kind of torch integral hoisting support, comprises three columns 1; Three columns 1Three summits triangular in shape arrange, and each column 1 top is all connected with hanger 4, adjacent two columns 1 itBetween upper and lower side be connected with sill 3 by entablature 2 respectively, between entablature 2 and sill 3, pass throughConnecting rod 5 is connected, and entablature 2 is strengthened steel pipe 6 and sill 3 and two columns 1 by two respectivelyJunction be connected, three column 1 bottoms are all welded on installing flare tower frame top. Installing flare tower frame was being assembledCheng Zhongxian horizontal pylon assembling, by large-scale crane passes through the utility model one after having assembled by small craneInferior hoisted in position.
Be understandable that, above about specific descriptions of the present utility model, only for the utility model is describedAnd being not limited to the described technical scheme of the utility model embodiment, those of ordinary skill in the art shouldWork as understanding, still can modify or be equal to replacement the utility model, to reach identical technique effect;Use needs as long as meet, all within protection domain of the present utility model.
Claims (1)
1. a torch integral hoisting support, comprises three columns (1); It is characterized in that: three columns (1)Three summits triangular in shape arrange, and each column (1) top is all connected with hanger (4), and adjacent two are stoodBetween post (1), upper and lower side is connected with sill (3) by entablature (2) respectively, entablature (2) andBetween sill (3), be connected by connecting rod (5), entablature (2) is strengthened steel pipe by two respectively(6) be connected with the junction of two columns (1) with sill (3), all weld three columns (1) bottomBe connected on installing flare tower frame top.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521004558.3U CN205257771U (en) | 2015-12-07 | 2015-12-07 | Torch integral hoisting support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521004558.3U CN205257771U (en) | 2015-12-07 | 2015-12-07 | Torch integral hoisting support |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205257771U true CN205257771U (en) | 2016-05-25 |
Family
ID=55999312
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201521004558.3U Expired - Fee Related CN205257771U (en) | 2015-12-07 | 2015-12-07 | Torch integral hoisting support |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205257771U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107201846A (en) * | 2017-05-23 | 2017-09-26 | 中建安装工程有限公司 | A kind of installing flare tower frame and its modularization installation method |
CN116216482A (en) * | 2023-01-11 | 2023-06-06 | 中建五洲工程装备有限公司 | Truss type fan tower standard section integral hoisting system and hoisting method |
-
2015
- 2015-12-07 CN CN201521004558.3U patent/CN205257771U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107201846A (en) * | 2017-05-23 | 2017-09-26 | 中建安装工程有限公司 | A kind of installing flare tower frame and its modularization installation method |
CN116216482A (en) * | 2023-01-11 | 2023-06-06 | 中建五洲工程装备有限公司 | Truss type fan tower standard section integral hoisting system and hoisting method |
CN116216482B (en) * | 2023-01-11 | 2023-11-14 | 中建五洲工程装备有限公司 | Truss type fan tower standard section integral hoisting system and hoisting method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204251239U (en) | A kind of tower crane inclined ladder and hoisting crane | |
CN205257771U (en) | Torch integral hoisting support | |
CN201665992U (en) | Whole lifting platform of large steel net frame | |
CN203247868U (en) | Large-span steel structure construction temporary supporting frame | |
CN201793330U (en) | Gantry hanger frame device | |
CN205132955U (en) | Hoist and mount operation of electric power industry low latitude is with hoist and mount frame | |
CN203788804U (en) | Design of wind-resistant and snow-resistant sunlight greenhouse framework | |
CN202000268U (en) | Foldable front outrigger for bridge girder erection machine | |
CN203938973U (en) | Column | |
CN208718346U (en) | Building engineering outer scaffold wall connector | |
CN201883728U (en) | DC filter structural frame for converter station | |
CN201458090U (en) | Spherical water box with round support square steel foot stand | |
CN206940369U (en) | A kind of dock wall hydraulic pressure maintenance platform | |
CN201485204U (en) | Gas tank hanging device | |
CN201458089U (en) | Spherical water box with round support round steel foot stand | |
CN105594513A (en) | Steel structure greenhouse | |
CN204282614U (en) | A kind of rope plated construction of large span sunshine rooftop | |
CN203639105U (en) | Suspension type temporary hoisting operation platform | |
CN201434476Y (en) | Mounting bracket of out-door air-conditioner | |
CN104389369A (en) | Cable-slab structure of large-span solar roof and mounting method | |
CN203475882U (en) | Novel aluminum alloy stage | |
CN204728541U (en) | Frame type lifting curtain wall | |
CN203938975U (en) | A kind of connecting rod | |
CN204299451U (en) | The aerial ladder that can increase fast | |
CN204190677U (en) | The detachable solar bracket of a kind of wind and light complementary road lamp |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160525 Termination date: 20181207 |