CN203687791U - Novel blasting embedded pipe - Google Patents
Novel blasting embedded pipe Download PDFInfo
- Publication number
- CN203687791U CN203687791U CN201420003738.9U CN201420003738U CN203687791U CN 203687791 U CN203687791 U CN 203687791U CN 201420003738 U CN201420003738 U CN 201420003738U CN 203687791 U CN203687791 U CN 203687791U
- Authority
- CN
- China
- Prior art keywords
- pipe
- concrete
- head portion
- embedded pipe
- head
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model relates to a novel blasting embedded pipe which is structurally composed of a pipe body and a head portion. The tail end of the head portion is inserted to the pipe body, the taper of the front part of the head portion is 60 degrees, the pipe body is formed by rolling textile spool paper, and the head portion is formed in a die-casting mode through plastics. The novel blasting embedded pipe solves the problems that in the prior art, a PVC pipe is high in cost, difficult to block and low in efficiency, a paper tube is usually pinched to be flat by fingers, labor intensity is large, and when the PVC pipe needs to be inserted into concrete, the PVC pipe can not be inserted into the concrete due to blocking of transverse reinforcement in the concrete and needs to be pulled out and then inserted into other positions, and labor efficiency is low. The novel blasting embedded pipe is low in cost and convenient to use, and can be easily inserted into concrete, the position of the embedded pipe can be automatically adjusted when the embedded pipe encounters reinforcement, labor intensity of workers is lowered, and work efficiency is improved.
Description
Technical field
The utility model relates to blasting technique field, particularly a kind of Novel explosion built-in pipe.
Background technology
For the explosion of armored concrete that needs demolition blasting, conventionally adopt hole firing method, the blasthole diameter of this blasting procedure is no more than 50mm, and the degree of depth is no more than 5m.The formation in big gun hole, a kind of method is to use hand-held or pusher leg drill and drill jumbo boring, and this method mechanization degree is low, and labor strength is large, and labor productivity is low.Another kind method is in cast concrete, the built-in pipe that is used to form big gun hole of burying underground, and this method labor strength is low, and labor productivity is high, is generally adopted.
Before the present utility model, there is not the built-in pipe of the explosion of being specifically designed to now, in construction, conventionally select pvc pipe or the paper tube of same outer diameter.Burying built-in pipe underground, is in 1~2 hour, built-in pipe to be inserted in unhardened armored concrete after pouring concrete, and this just need to block one end of built-in pipe in advance, prevents that concrete from entering in pipe.Pvc pipe adopts heating means conventionally, after pvc pipe deliquescing, flattens; Paper tube is firmly pinched flat with finger conventionally.But these two kinds of built-in pipes have obvious shortcoming: 1, pvc pipe cost is high, when shutoff pvc pipe, bothers, and efficiency is low.2, paper tube is pinched flatly with finger conventionally, and labour intensity is large.3, no matter be pvc pipe or paper tube, inserting when concrete, easily run into the transverse steel of inside concrete and insert not enter, need to again pull out and change position, efficiency is declined.
Summary of the invention
The purpose of this utility model is just to overcome above-mentioned defect, develops a kind of Novel explosion built-in pipe.
The technical solution of the utility model is:
A kind of Novel explosion built-in pipe, its technical characteristics is to be made up of pipe shaft, head, and head tail end inserts in pipe shaft.
The anterior tapering of described head is 60 °.
Described pipe shaft adopts cop tube paper to roll and forms.
Described head plastics die cast.
Advantage of the present utility model and effect are to provide a kind of cheap, easy to use explosion built-in pipe, built-in pipe is inserted in concrete process and easily insert, and automatic adjusting position in the time running into reinforcing bar, reduces labor strength, raises labour efficiency.
Accompanying drawing explanation
Fig. 1---the utility model pipe shaft generalized section.
Fig. 2---the utility model head generalized section.
The generalized section of Fig. 3---the utility model pipe shaft and head combination.
In figure, each label represents that corresponding component names is as follows:
1-pipe shaft, 2-head.
The specific embodiment
As shown in Figure 1:
Built-in pipe is divided into pipe shaft 1 and head 2 two parts, and the tail end of head 2 inserts in pipe shaft 1, and with glue, the two is bonding.Described pipe shaft 1 adopts cop tube paper to roll and forms; Said head 2, generally uses plastics die cast.
The anterior tapering of head 2 is 60 °, hollow, and wall thickness is that 2mm is good, and pipe shaft 1 wall thickness is that 2mm is good, and length and external diameter are according to needing making, and the tail end external diameter of head 2 and the internal diameter of pipe shaft 1 are take interference fits as good.
The explanation of the utility model application process:
Explosion built-in pipe of the present utility model, application result shows, the explosion built-in pipe that the present invention makes, at beforehand burying phase, can be raised the efficiency 3~4 times, has obtained good effect.
Claims (4)
1. a Novel explosion built-in pipe, is characterized in that being made up of pipe shaft, head, and head tail end inserts in pipe shaft.
2. a kind of Novel explosion built-in pipe according to claim 1, is characterized in that the anterior tapering of head is 60 °.
3. a kind of Novel explosion built-in pipe according to claim 1, is characterized in that pipe shaft adopts cop tube paper to roll and forms.
4. a kind of Novel explosion built-in pipe according to claim 1, is characterized in that head plastics die cast.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420003738.9U CN203687791U (en) | 2014-01-03 | 2014-01-03 | Novel blasting embedded pipe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420003738.9U CN203687791U (en) | 2014-01-03 | 2014-01-03 | Novel blasting embedded pipe |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203687791U true CN203687791U (en) | 2014-07-02 |
Family
ID=51009678
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420003738.9U Expired - Fee Related CN203687791U (en) | 2014-01-03 | 2014-01-03 | Novel blasting embedded pipe |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203687791U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105823386A (en) * | 2016-06-03 | 2016-08-03 | 武汉科技大学 | Method for blasting demolition of reinforced concrete supporting beam in foundation pit |
-
2014
- 2014-01-03 CN CN201420003738.9U patent/CN203687791U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105823386A (en) * | 2016-06-03 | 2016-08-03 | 武汉科技大学 | Method for blasting demolition of reinforced concrete supporting beam in foundation pit |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204112604U (en) | The slip casting rebar connector of band cone tail | |
CN204343285U (en) | A kind of pile foundation pile crown entirety abolishes structure | |
CN205225271U (en) | Shield constructs portal collar tie beam structure suitable for shield constructs end not to be had with solid | |
CN204326248U (en) | A kind of steel reinforcement abutting joints with the concavo-convex rib of spirality connects grout sleeve | |
CN204001720U (en) | Service sleeve in a kind of constructional column | |
CN104895585A (en) | Construction method of reserved grouting pipe of tunnel vault | |
CN206088161U (en) | Spiral drill rod | |
CN204002832U (en) | A kind of shield tunnel portal structure | |
CN203687791U (en) | Novel blasting embedded pipe | |
CN103382843B (en) | The construction equipment preventing push-bench and tube coupling from rotating with pull bar and construction method | |
CN206591821U (en) | A kind of plastic lined piping joint, which is installed, exempts to wear template | |
CN204186396U (en) | A kind of shield tunnel surrounding formation reinforces channels configuration | |
CN204327112U (en) | Tunnel outlet advance support system | |
CN205778969U (en) | A kind of self-advancing type pipe canopy anchor pole for tunnel weakness geology band country rock pretreatment | |
CN205314534U (en) | Frame post can't harm drawknot steel form structure | |
CN207583398U (en) | A kind of weak surrounding rock combination supporting device | |
CN204344048U (en) | Foreign matter fisher in hole | |
CN107060776A (en) | The unit development machine combination of underground interface channel draws in construction method | |
KR100716858B1 (en) | A under ground-process of rein force tube | |
CN210086498U (en) | Fill wall lacing bar built-in fitting in shear force wall | |
CN204385748U (en) | A kind of novel tunnel structure | |
CN106640129A (en) | Tunnel face surrounding rock construction method and face grouting guide pipe | |
CN204212158U (en) | A kind of Grouting Pipe with well | |
JP6389681B2 (en) | Ground improvement method in front of face in tunnel excavation work. | |
CN203412596U (en) | Grouting device and grouting pipe for deep rock tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140702 Termination date: 20170103 |
|
CF01 | Termination of patent right due to non-payment of annual fee |